This document outlines terms and conditions for a construction project, including that all road crossings and sleeves will be supplied by the party. The work is to be completed within 10 days of order confirmation and advance payment. Materials can vary by 10% and the sprinkler system will connect to an underground tank. Payment terms include a 60% advance, 25% on delivery, and a 15% balance after testing.
This document outlines terms and conditions for a construction project, including that all road crossings and sleeves will be supplied by the party. The work is to be completed within 10 days of order confirmation and advance payment. Materials can vary by 10% and the sprinkler system will connect to an underground tank. Payment terms include a 60% advance, 25% on delivery, and a 15% balance after testing.
This document outlines terms and conditions for a construction project, including that all road crossings and sleeves will be supplied by the party. The work is to be completed within 10 days of order confirmation and advance payment. Materials can vary by 10% and the sprinkler system will connect to an underground tank. Payment terms include a 60% advance, 25% on delivery, and a 15% balance after testing.
1) All road crossing/ sleeve will be supplied by party.
2) Work completion period 10 days from date of conformation of work order and advance. 3) Material variation 10%. 4) Connection for sprinkler system will be taken from underground tank. 5) This estimate is only valid for 1 month. 6) Payment will be done on actual measurements. 7) One year system warranty against any manufacturing defect. 8) System operating system – 2.5 kg/cm². 9) If quantity or the area increases, then it will be charged extra. 10) This estimate is inclusive of all the taxes. 11) Payment terms :- i) 60% advance along with work order. ii) 25% against delivery of material at site. iii) Balance 15% after testing and commissing of system.