0+000 0+100 0+200 0+252.9 0+300
LOT
START OF SECTION
BEG. OF ASPHALT (50MM) START OF DRAINAGE 5 pcs. 5 pcs. 5 pcs. 5 pcs. 5 pcs. 5 pcs. 5 pcs. 5 pcs. 5 pcs. 5 pcs. 14 pcs.
KM POST
484+747.1 484+891.5 485+000
METROBANK
PETRON
SURPLUS
BASSIG SHELL
SEA OIL
0+300 0+400 0+500 0+600
BDO
14 pcs. 25 pcs. 25 pcs. 12 pcs. 8 pcs. 8 pcs.
CROSS DRAIN
12 PCS
485+297.45
WAREHOUSE
0+900 CALTEX 1+000 1+100 1+200
CROSS DRAIN
12 PCS
485+881.1 485+900
CAGAYAN THIRD
System/ Highway Development and Management-4 (HDM-4) - Primary -
Cagayan-Apayao Rd (Tuguegarao Sect) - K0482 + (-466) - K0482 + (-377), K0482 + CHECKED:
RAYNALDO T. ARUGAY MARIANO B. MALUPENG DANILO U. TABILAS 5
DISTRICT ENGINEERING OFFICE
REGION II
(-1360) - K0482 + (-705), K0482 + (-1512) - K0482 + (-1412), K0482 + (-691) - K0482
+ (-481), K0484 + 717 - K0486 + 105 , K0486 + 1383 - K0487 + 227, K0483 + 693 -
STRAIGHT LINE DIAGRAM
OIC, CONSTRUTION SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 6
K0483 + 718 VALERICO E. BADUA JR.
TUGUEGARAO CITY, CAGAYAN TUGUEGARAO CITY, CAGAY AN PROJECT ENGINEER / ENGINEER II DATE DATE DATE