Re : Installation of Capiz Lights along Makati Ave. – Sta. Potenciana – Apartment Ridge (Zuellig
Building Perimeter).

Dear Sir/Madam,

The Zuellig Building would like to seek for your approval for our planned installation of capiz lights hanging in the
acacia trees along Makati Avenue, Sta. Potenciana and Apartment Ridge (Zuellig Building Perimeter). Below are
photos of the actual location and a sample photo of the capiz light.

VISUAL PEGS:

LOCATION OF CAPIZ LIGHTS:

CAPIZ LIGHTS
10 lights per tree for
16 trees – 160 total
SCOPE OF WORK and PROCEDURE:

A. Installation of Capiz Lights – Using a hydraulic man lift, engineering personnel wearing personal
protective equipment (safety harness, safety glasses and gloves) will install ten (10) pieces of capiz
lights at six (6) capiz trees – 60 pieces total. Electrician’s tools such as cutters, pliers and electrical tape
will be utilized during the installation.

DURATION:

A. Installation of Capiz Lights - Nov. 15 until Dec. 9, Monday to Friday (9PM to 5AM)

LIST OF MANPOWER:

A. Engineering Staff for Capiz Lights Installation


➢ Ronald Sendiong
➢ Mark Zenarosa
➢ Jeremy Armada
➢ Edward Versoza
➢ Albert Jhun Yana

TOOLS/EQUIPMENT: Hydraulic lifter, personal protective equipment (safety harness, safety glasses and
gloves), and electrician’s tools (cutters, pliers and electrical tape).
ZUELLIG BUILDING - JOB HAZARD ANALYSIS
Jobs/Tasks Supervisors Date
Installation of Capiz Lights Mr. Ronald Sendiong/Mr. Rod Robles Nov. 15 to Dec. 9, 2018

ITEM JOB STEP POTENTIAL HAZARD STEP TO PREVENT


Review Job Hazard Clarify job and associated hazard and
1 Misunderstanding
Analysis safety concern.

Meeting with engineering


Everyone must pay attention to ensure
personnel who will conduct
2 Misunderstanding they understand their role and
installation of capiz
responsibility.
ligthings

Use of safety harness connected on the


basket of the hydraulic lifter.
Falling Hazard
Only authorized housekeeping and
4 Use of hydraulic lifter engineering personnel of Zuellig
Building can operate the machine.
Use caution tape around the perimeter
Pedestrian collision during
and near the hydraulic lifter during
glass cleaning and lights
lights installation operations.
installation.

Perform lock-out/ tag-out procedure.


Electrical Hazard
Use of electrical gloves, safety glass,
and appropriate tools during the
activity.
5 Installation of capiz lights.
Installation of stanchion post and
caution marking on the work area.
During installation, capiz light
might fall Hold firmly the capiz star during
installation from the branches of the
tree.

Thank you in advance for your assistance. For any questions or clarifications, please contact Zuellig Building
Management at 818-7020 or via e-mail address mgalvez@zuelligbuilding.com

Thank you.

Sincerely,

Engr. JP Lozano
Zuellig Building Management (Building Admin)