Re : Installation of Capiz Lights along Makati Ave. – Sta. Potenciana – Apartment Ridge (Zuellig
Building Perimeter).
Dear Sir/Madam,
The Zuellig Building would like to seek for your approval for our planned installation of capiz lights hanging in the
acacia trees along Makati Avenue, Sta. Potenciana and Apartment Ridge (Zuellig Building Perimeter). Below are
photos of the actual location and a sample photo of the capiz light.
VISUAL PEGS:
CAPIZ LIGHTS
10 lights per tree for
16 trees – 160 total
SCOPE OF WORK and PROCEDURE:
A. Installation of Capiz Lights – Using a hydraulic man lift, engineering personnel wearing personal
protective equipment (safety harness, safety glasses and gloves) will install ten (10) pieces of capiz
lights at six (6) capiz trees – 60 pieces total. Electrician’s tools such as cutters, pliers and electrical tape
will be utilized during the installation.
DURATION:
A. Installation of Capiz Lights - Nov. 15 until Dec. 9, Monday to Friday (9PM to 5AM)
LIST OF MANPOWER:
TOOLS/EQUIPMENT: Hydraulic lifter, personal protective equipment (safety harness, safety glasses and
gloves), and electrician’s tools (cutters, pliers and electrical tape).
ZUELLIG BUILDING - JOB HAZARD ANALYSIS
Jobs/Tasks Supervisors Date
Installation of Capiz Lights Mr. Ronald Sendiong/Mr. Rod Robles Nov. 15 to Dec. 9, 2018
Thank you in advance for your assistance. For any questions or clarifications, please contact Zuellig Building
Management at 818-7020 or via e-mail address mgalvez@zuelligbuilding.com