26 TACTILE PAVING
[264 TACTILE PAVING
261.1 GENERAL
‘The Contractor shall conform tothe following:
261.4.1 CROSS REFERENCES
General
‘Conform to the General Requirements worksection.
‘Take into account the recommendations of Conquas 21 “Good industry practices- Ceramic
Ting & Marble and Granite Firishes*
Conform to the requirements of the current edition of the Singapore “Code on Barrier Free
Accessibilty in Bullings' unless directed otherwise by the Engineer.
Conform to the detalis of tactile paving shown on the Authortys stendard drawing,
Associated worksoctions
Conform to associated worksections as follows: Achesives, Sealants and Fastenings
Metals and Prefinishes
Cementitious toppings
‘Stone Flooring
Tiling
Concrete finishes
281.4.2 261.1.2 INTERPRETATION
General
lnaison: An imeglar and sun change Inthe colour, texture, or geological constuents
granit
‘Substrate: The actual surface to which flooring is bedded or attached,
‘DivLax: The layout of flooring as defined on the drawiins prior to placing for the purposes of
verifying the colour, tone and texture of individual stone units.
‘Stone Finishes: Cross refer, “Stone Flooring’.
‘Authors Sample: A sample held by the Authorly and available for viewing during the
tender and construction periods
261.1.3 EQUIPOTENTIAL BONDING REQUIREMENTS (EPB)
General
Cross Refer: section 20.2.7 *Design’ of the General Requirements.
26.1.4 DESIGN
Drawings
Contract érawings show generic design principles and design intont only.
Follow the general tactile paving layout provided by the Engineer ensuring that the tactile
Paving is integrated into any existing floor patiems. Ensure the integrity of the pattern is
maintained without detriment tothe tactie layout.
2et=Rav 00. ‘TIO WES Staton261 TACTILE PAVING
264.2 QUALITY
“The Contractor chal conform totheTolowhG: SSS
281.21 INSPECTION
Gonoral
‘Tactile paving shall be Inspected from a minimum distance of 1400 mm under the specified
permanent artficial uminance or 600 lux, whichever is greater.
Granite containing an Inclusion which cannot be covered in its entirety by a disk 20mm in
diameter shall be rejected.
Witness Points
Give sufficient notice 20 that inspection may be made of the folowing:
= Proposed mason's yard.
= Materials stored at the yard or on site.
= Setting out.
Hold points
= Completion of prototype
Corrosion
Cross refer: General Requirements clause 20.4.4
251.22 SAMPLES
Genoral
‘Submit samples of the following in accordance with section 20.3.4 “Samples, of the General
Requirements.
‘Tactile Paving Samples
For each type and grade of ceramic and granite tactile paving submit: Bot decision anc
sirection paving.
= 300x300 mm, square
showing the expected range of vatiation of colour, pattam, texture, and surtace finish in
stone to be supplied.
Motal Studs
Decision and direction studs
Ceramic andior stone paving incorporating decision and directional studs.
= 300x300mm square
Associated Materials and Products
= Adhesive used to fx studs in position: No of samples: 1
261.2.3 TESTS
General
Carry out al tests in accordance with section 20.3.2, “Tests' of the General Requirements
Pull cut test fo show studs adherence to the base material.
Stone Tests Schedule
Gross refer: “Stone floor
‘Aetitctral MEW ‘Contact 1228
et Rav 0 ‘T20 MRE Staton
=D261 TACTILE PAVING
261.24 PROTOTYPES
Construct all protctypes in accordance with the requiremenis of Section 20.3.4, “Prototypes!
of the General Requirements.
Confirmation Prototype
Provide confirmation prototype comprising:
- _ Minimum 1.8m length of ‘directiona’ tile
+ ‘Decision’ aquate, minim 6tmm sere
= Atleast one change of direction.
Locaten: As agreed wit the Engineer.
Retain all prototypes until the completion of the Works or as directed by the Enginger
Incorporate accepted prototype ito the work asset by the Enginger.
261.25 SUBMISSIONS.
General
Make all submissions in accordance with the requirements of section 20.3.5, “Submissions!
of the General Requirements,
‘Subcontractor
‘Submit names and contact datals of proposed specialst suppliers and installers,
‘Shop Drawings
General: Submit shop drawings in accordance with section 20.3.8, Submissions’ of the
General Requirements
‘Submit shop drawings of the tactile paving work showing relevant details, including the
following, if applicable:
+ Layout ofall areas of tactile paving, including tile dimensions and setting out pois.
- Method of bedding or attachmont to the base.
= Thickness of beds, underbeds and toppings.
+ Touch voltage insulation,
= Reinforcement of underbed.
= Divider stips, type and location,
+ Movement joints and jointing material.
+ Interfaces with access hatches, gratings, signs et
No of copies to be submitted: 7.
Enginoaring Endorsement.
‘Submit a report from a Singapore registered Electrical Engineer certiying that the design
and, nstalolon of tacile paving meets al of the Autorty’s equbpotental bonding
requitemen
Manufacturers" Information
Technical Literature: Submit the manufacturer's technical literature for all proptetary
‘materials used together with certification that materials comply with the required standards in
accordance with section 20.3.5, ‘Submissions! of the General Requirements.
Instructions: Submit copies of relevant manufacturers’ instructions including standard
‘drawings and detals.
‘Materia safety data sheets (MSDS): Submit MSDS. No of copies to be submitted: 3
Tests
‘Submit reports of all tests in accordance with section 20.3.2, “Tests' of the, General
Requirements No of copies to be submitted: 3
a
‘Arctigcural MAW Contract 7228
Bet-Rev ‘T2OMRS Stston