Vous êtes sur la page 1sur 8
26 TACTILE PAVING [264 TACTILE PAVING 261.1 GENERAL ‘The Contractor shall conform tothe following: 261.4.1 CROSS REFERENCES General ‘Conform to the General Requirements worksection. ‘Take into account the recommendations of Conquas 21 “Good industry practices- Ceramic Ting & Marble and Granite Firishes* Conform to the requirements of the current edition of the Singapore “Code on Barrier Free Accessibilty in Bullings' unless directed otherwise by the Engineer. Conform to the detalis of tactile paving shown on the Authortys stendard drawing, Associated worksoctions Conform to associated worksections as follows: Achesives, Sealants and Fastenings Metals and Prefinishes Cementitious toppings ‘Stone Flooring Tiling Concrete finishes 281.4.2 261.1.2 INTERPRETATION General lnaison: An imeglar and sun change Inthe colour, texture, or geological constuents granit ‘Substrate: The actual surface to which flooring is bedded or attached, ‘DivLax: The layout of flooring as defined on the drawiins prior to placing for the purposes of verifying the colour, tone and texture of individual stone units. ‘Stone Finishes: Cross refer, “Stone Flooring’. ‘Authors Sample: A sample held by the Authorly and available for viewing during the tender and construction periods 261.1.3 EQUIPOTENTIAL BONDING REQUIREMENTS (EPB) General Cross Refer: section 20.2.7 *Design’ of the General Requirements. 26.1.4 DESIGN Drawings Contract érawings show generic design principles and design intont only. Follow the general tactile paving layout provided by the Engineer ensuring that the tactile Paving is integrated into any existing floor patiems. Ensure the integrity of the pattern is maintained without detriment tothe tactie layout. 2et=Rav 00. ‘TIO WES Staton 261 TACTILE PAVING 264.2 QUALITY “The Contractor chal conform totheTolowhG: SSS 281.21 INSPECTION Gonoral ‘Tactile paving shall be Inspected from a minimum distance of 1400 mm under the specified permanent artficial uminance or 600 lux, whichever is greater. Granite containing an Inclusion which cannot be covered in its entirety by a disk 20mm in diameter shall be rejected. Witness Points Give sufficient notice 20 that inspection may be made of the folowing: = Proposed mason's yard. = Materials stored at the yard or on site. = Setting out. Hold points = Completion of prototype Corrosion Cross refer: General Requirements clause 20.4.4 251.22 SAMPLES Genoral ‘Submit samples of the following in accordance with section 20.3.4 “Samples, of the General Requirements. ‘Tactile Paving Samples For each type and grade of ceramic and granite tactile paving submit: Bot decision anc sirection paving. = 300x300 mm, square showing the expected range of vatiation of colour, pattam, texture, and surtace finish in stone to be supplied. Motal Studs Decision and direction studs Ceramic andior stone paving incorporating decision and directional studs. = 300x300mm square Associated Materials and Products = Adhesive used to fx studs in position: No of samples: 1 261.2.3 TESTS General Carry out al tests in accordance with section 20.3.2, “Tests' of the General Requirements Pull cut test fo show studs adherence to the base material. Stone Tests Schedule Gross refer: “Stone floor ‘Aetitctral MEW ‘Contact 1228 et Rav 0 ‘T20 MRE Staton =D 261 TACTILE PAVING 261.24 PROTOTYPES Construct all protctypes in accordance with the requiremenis of Section 20.3.4, “Prototypes! of the General Requirements. Confirmation Prototype Provide confirmation prototype comprising: - _ Minimum 1.8m length of ‘directiona’ tile + ‘Decision’ aquate, minim 6tmm sere = Atleast one change of direction. Locaten: As agreed wit the Engineer. Retain all prototypes until the completion of the Works or as directed by the Enginger Incorporate accepted prototype ito the work asset by the Enginger. 261.25 SUBMISSIONS. General Make all submissions in accordance with the requirements of section 20.3.5, “Submissions! of the General Requirements, ‘Subcontractor ‘Submit names and contact datals of proposed specialst suppliers and installers, ‘Shop Drawings General: Submit shop drawings in accordance with section 20.3.8, Submissions’ of the General Requirements ‘Submit shop drawings of the tactile paving work showing relevant details, including the following, if applicable: + Layout ofall areas of tactile paving, including tile dimensions and setting out pois. - Method of bedding or attachmont to the base. = Thickness of beds, underbeds and toppings. + Touch voltage insulation, = Reinforcement of underbed. = Divider stips, type and location, + Movement joints and jointing material. + Interfaces with access hatches, gratings, signs et No of copies to be submitted: 7. Enginoaring Endorsement. ‘Submit a report from a Singapore registered Electrical Engineer certiying that the design and, nstalolon of tacile paving meets al of the Autorty’s equbpotental bonding requitemen Manufacturers" Information Technical Literature: Submit the manufacturer's technical literature for all proptetary ‘materials used together with certification that materials comply with the required standards in accordance with section 20.3.5, ‘Submissions! of the General Requirements. Instructions: Submit copies of relevant manufacturers’ instructions including standard ‘drawings and detals. ‘Materia safety data sheets (MSDS): Submit MSDS. No of copies to be submitted: 3 Tests ‘Submit reports of all tests in accordance with section 20.3.2, “Tests' of the, General Requirements No of copies to be submitted: 3 a ‘Arctigcural MAW Contract 7228 Bet-Rev ‘T2OMRS Stston

Vous aimerez peut-être aussi