Note: the distance between indoor unit top and roof should be more than 5 mm; the bottom of drain pan should
be at least 5mm away from the ceiling.
2
YORK VRF Air-Conditioner IOM
4 PREPARATION BEFORE INSTALLATION connection nuts, temperature sensors, EXV coil,
drain pump (if it has), etc. The inspection
4.1 Confirm the position of suspension bolts opening size should be no smaller than 450h450
z Refer to Fig. 2 to see the diameter of suspension mm2.
hole and confirm the bolt location. z Also inspection opening for repairing should be
z Install an inspection opening on the control box installed in the ceiling right below the unit. The
side for convenient maintenance and inspection size should be no smaller than the unit diameter
of the parts such as electrical parts, refrigerant BhE shown in the Fig. 2.
Models A B C D E
YDCC018/020/ Models A B C D E
605 630 830 609 681
025 YDCC066/078 1205 1235 1450 1213 222
YDCC034 805 830 1030 809 881 YDCC095/115 1505 1535 1780 1513 237
YDCC045/053 910 935 1150 914 986
*Note: indoor unit series type of A, B, C and D is determined by the specific letter in the bar code on the unit. For
example, indoor unit YDCC*****-*C* means C type series unit and YDCC*****-*B* means B type.
ㅵሎᇌ㸼
ㅵᕘሎᇌPP
ᴎ㒘ൟো
⎆ㅵ ⇨ㅵ
3
YORK VRF Air-Conditioner IOM
4.2 Install the suspension bolts
z Use a hole-in-anchor for existing ceilings, and a
sunken insert, sunken anchor or other part to be
procured in the field to reinforce the ceiling to
bearing the weight of the unit for new ceiling.
(Refer to Fig. 3)
z Note˖
If the internal insulation material is PE, in
installation process, please take some preventive
measure to avoid brazing sparkle contacting the Fig. 5 Check Unit Level
insulation material, which may result in fire.
5.4 Tighten the upper nuts
z Be sure the below washer and nut are installed
within the hanger bracket for fear of bolt rolling
out, this may result in danger.
4
YORK VRF Air-Conditioner IOM
z Do not use flux when brazing refrigerant piping. 6.2 AIR TIGHT TEST
Therefore, use the phosphor copper brazing filler
metal (BCuP) which does not require flux. z Air tight test should be done after the piping
If chlorine based flux is used, it will cause pipe connection completed.
corrosion and contamination of refrigerant oil z Operation method:
(a) Fill in dry nitrogen into the refrigerant piping
6.1 Connect the piping and let the pressure slowly rise to 4.15MPa.
(b) The specified pressure should be maintained
z Be sure to use both a spanner and torque wrench
for 10 minutes, and then soapy water or other
together, as shown in Fig. 6, when connecting or
foaming agent are applied to the connection
disconnecting pipes to/from the unit.
positions, such as brazing seams, screwed
joints ,etc. for leakage detection.
(c) If it has leakage, then tighten or braze the
leakage point.
(d) After it has been confirmed that the piping
does not leak, the dwelling test should be
performed. Fill in the dry nitrogen again and
let the pressure slowly rise to 4.15MPa.
(e) The pressure needs to be maintained for 6
Fig. 6 Piping Connection hours and then record the pressure value
through the manometer. 24 hours later, record
z Refer to Table 1 for the tightening torque. the pressure again.
(f) No pressure drop after 24 hours means it has
Table 1 no leakage. Otherwise, the leaking point must
Pipe Diameter Tightening Torque be found and mended. Then repeat the above
mm (inch) (Ngm) (d) and (e) steps.
Ħ6.35(1/4") 14̚17
Ħ9.53(3/8") 32.5̚40
Ħ12.7(1/2") 49.5̚60 NO
CAUTION
Ħ15.88(5/8") 62̚75 TE
Ħ19.05(3/4") 80̚95 z Gas pressure is relevant to ambient temperature.
Ħ22.23(7/8") 100̚115 So temperature should be considered when judging
the pressure variation. The relationship of pressure
z If no torque wrench is available, please follow the and temperature is shown below.
below method to do the installation.
§ t 273 ·
Using a wrench to tighten flare nuts causes the 'P P1 u ¨ 2 1¸
tightening torque to suddenly grow much tighter © t1 273 ¹
after a certain point. From that point, tighten the
nut further by the appropriate angle listed in Table Pcorrection P2 'P
2.
Table 2 'P — Pressure correction value (bar)
Pipe Diameter Further tightening Recommended arm length Pcorrection — the correced pressure value (bar)
mm (inch) angle of toll
5
YORK VRF Air-Conditioner IOM
polythylene materials. thoroughly insulated to avoid accumulating of
z Be sure to insulate the field piping all the way to condensate water.
the piping connection inside the unit. Any exposed
piping may casue condensate water or being
burned if touched.
6
YORK VRF Air-Conditioner IOM
YDCC25-45/YDCC066-115 indoor unit models’ ESP
(External Static Pressure) can be divided as 3 types
– 15 Pa, 40 Pa and 100 Pa;
YDCC50~60/YDCC140~175 indoor unit models’ ESP
(External Static Pressure) can be divided as 3 types
– 15 Pa, 50 Pa and 100 Pa;
Out factory state, YDCC indoor unit ESP is 15 Pa
(default value). User can adjust the ESP according
to the actual pressure drop of the air duct.
z Indoor unit ESP can be adjusted by changing the
Fig. 10 Duct Connection connection site of fan wiring in the control board.
For detail setting method of different indoor ESP,
NO please refer to the wiring diagram attached to the
CAUTION control box lid.
TE
z Wrap both the inlet-side and outlet-side flange and 10 ELECTRIC WIRING WORK
the duct connection area with aluminium tape for 10.1 General introduction
something similar to prevent air escaping.
z Please attach an air filter inside the air passage on z Shut off the power before doing any work.
the inlet-side. (Use an air filter which duct z All field supplied parts and materials and electric
collection efficiency (in a gravimetric technique) is works must conform to local laws.
higher than 50%) z All wiring works should be performed by specially
z Be sure to insulate the duct to prevent condensate qualified electricians.
water from forming. (Material: glass wool or z Install a wiring interrupter or ground-fault circuit
polyethylene foam, above 25mm thickness) interrupter for the power supply wiring.
z Be
z Be sure the air-conditioner is well grounded. Never
z Duct pressure drop of YDCC06~18/YDCC018~053 connect the ground line with gas pipe, water pipe,
indoor unit models cannot be higher than 30 Pa; lightning conductor or telephone lines.
YDCC25~45/YDCC066~115 indoor unit models z Do not turn on the power sully unless all the work
cannot be higher than 80 Pa; has been done.
YDCC50~60/YDCC140~175 indoor unit models z Wiring of different thickness or diameter cannot be
cannot be higher than 100 Pa. connected to one power supply wiring terminal.
z The air outlet cannot be too high and be positioned z For wiring, please use the designated power supply
at the place where it directly blows the people for a wiring and connect firmly, then secure to prevent
long period. external pressure being exerted on the terminal
z To reduce vibration and noise, it is better to use board.
flexible connection to connect the air inlet and z The terminal screw should not be tightened too
outlet duct with indoor unit. hard or too loose. Too hard may damage the
terminal board and too loose may result in bad
SET THE ESP
9 connection and danger due to terminal board
z YDCC06~18/YDCC018~053 indoor unit models’ ESP overheating.
(External Static Pressure) can be divided as 3 types
– 0 Pa, 15 Pa and 30 Pa;
10.2 Electrical parameters
Indoor unit power supply and Max operation current
Indoor Unit Model Max Operation Current(A)
Power Supply H0 type
BTU type kW type H2 type H4 type
(or Cooling Only)
YDCC06̚09 YDCC018̚025 0.26 4.76 -
YDCC12̚25 YDCC034̚066 0.85 8.15 9.85
YDCC30̚45 YDCC078̚115 220V̚ 50Hz 1.31 10.31 15.81
YDCC50 YDCC140 2.8 - -
YDCC60 YDCC175 3.18 - -
7
YORK VRF Air-Conditioner IOM
10.3 Power distribution
z Refer to Fig. 11 for power distribution of the system.
z An independent refrigeration system is controlled by a single switch and several systems cannot be controlled
with a switch. Especially forbid some indoors unit in a system sharing a control switch with other system,
while the other indoor units are controlled by another switch.
10.4 Indoor unit field wiring
z For detail indoor unit wiring, see the “Wring Diagram” attached to the control box lid when laying the indoor
unit electrical wiring.
10.5 Setting indoor unit model
z Refer to the “Wring Diagram” attached to the control box lid for indoor unit model setting.
10.5 Communication network
Note: indoor unit communication lines TB2, TB3 (TB2 in, TB3out) cannot be conversely connected, otherwise it will
have communication failure and the unit cannot startup.
Fig. 12 Connection Line Connection
8
YORK VRF Air-Conditioner IOM
10.7 Install the controller determined by the specific letter in the bar code
attached on the unit. For example, indoor unit
z Install the wire controller on the pre-reserved site YDCC*****-*C* means C type series unit and
on the wall. YDCC*****-*B* means B type.
z Carcassing for communication wiring should be z The indoor units in one group should be
ready before installation the controller. The
connected in a same power supply to guarantee
recommended communication line is RVSP2h normal initialization of wire controller when
0.75. Be sure to pull the wires through the PVC power on.
conduit. z Connection of indoor unit and wire controller:
Note: the communication wire and PVC conduit (a) One wire controller connecting only one
are the field supplied parts. indoor unit: (refer to the wiring diagram)
10.8 Connect the wire controller and indoor unit (b) One wire controller connecting multi indoor
units:
z Group control can be realized through the wire For YDCC-B (C, D) series indoor unit, wiring
controller. For YDCC-B (C, D) series indoor unit, diagram of wire controller and the indoor
one wire controller can connect to max 4 indoor units is shown in Fig. 14.
units.
Note: indoor unit series type of A, B, C and D is
Fig. 13 One wire controller connects to multi indoor units (B, C or D type)