1 Surface Preparation
1.1 The surface preparation and application requirements in the manufacturer's technical data sheet are followed. √
2 Paint Preparation
2.1 Paints are thoroughly mixed until it is homogeneous with Mixing ratio according to manufacturer's technical data sheet. √
2.2 Power stirrer is used for mixing quantities over 5 liters. √
2.3 Thinner type and quantity to be added shall be as given in the manufacturer's technical data sheet. √
2.4 Thinner is added only when the paint is fully homogeneous mixed. √
3 Paint Application
Paint shall not be applied if one or more of the following conditions exist (unless the paint is specifically formulated for the
averted condition):
a) The substrate temperature is less than 10°C of the temperature
limit given in the manufacturer's technical data sheet
3.1
b) The substrate temperature is more than the temperature limit √
given in themanufacturer's technical data sheet
c) The substrate temperature is less than 3°C above the dew
point.
Paint shall not be applied during adverse weather conditions such as, but not restricted to following:
1) Wind is strong enough to blow sand, salt spray or other foreign matter onto the surface being painted.
3.2 2) Wind is strong enough to cause dry spay or otherwise seriously distrub the spray pattern when application is by spray
gun.
√
3) Rain
3.3 Inspection of primer for surface defects and DFT prior to application of 2nd Coat is performed √
3.4 Primer coat have reached minimum recoating interval specified in manufacturer's technical data sheet √
3.5 Inspection of 2nd coat for surface defects and DFT prior to application of Top coat is performed √
3.6 2nd coat have reached minimum recoating interval specified in manufacturer's technical data sheet √
3.7 Total DFT of repair coating is conform with the specific requirement. Refer to 3rd party test report. √
3.8 Finished coating have a uniform appearance. √
COMMENTS:
SIGNATURE
DATE 12-Jun-18
LEGEND :
B.O.S BOTTOM OF STEEL
T.O.G TOP OF GRATING
T.O.S TOP OF STEEL
F.G.L FINISHED GROUND LEVEL
EL ELEVATION
LG LENGTH
T.O.CG TOP OF CRANE GIRDER
T.O.CB TOP OF CRANE BRACKET
T.O.C TOP OF CONCRETE
C.O.B CENTER OF BEAM
B.O.B BOTTOM OF BASE PLATE
BU BUILT UP
------ INDICATION OF BRACING MEMBERS
.... REFER TO DETAIL NO.
DET .../... REFER TO DRAWING SHEET NO.
NOTES :
1- FOR GENERAL NOTE , SEE DRAWING NO. M-ANM- 3G1ES0-CBST-SDR-200001
2- FOR STEEL STRUCTURE PLAN VIEW , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 1:3/11
3- FOR STEEL STRUCTURE SECTIONS , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 4:9/11
4- FOR STEEL STRUCTURE GENERAL DETAILS , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 10:11/11
5- FOR STEEL STRUCTURE SPECIFIC DETAILS , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS
6- The calculations for bolted connections, M-ANM-3B1ES0-CBST-RPT-000004-A and
M-ANM-3B1ES0-CBST-RPT-000005-A have been submitted and approved by RMTC
vide M-ANM-P2-RSB-005965-A1
REFERENCE DRAWING :-
M-ANM- 3G1ES0-CBST-EDR-200010
M-ANM- 3G1ES0-CBST-EDR-200011
M-ANM- 3G1ES0-CCFO-EDR-200001
M-ANM- 3G1ES0-CMEP-EDR-200013
M-ANM- 3G1ES0-CB00-EDR-200012
M-ANM- 3G1ES0-CBST-EDR-200006
M-ANM- 3G1ES0-CBST-EDR-200008
M-ANM- 3G1ES0-CBST-EDR-200007
M-ANM- 3G1ES0-CBST-EDR-200009
S49'
11
S48'
10 S47'
SA' S46'
S44'
S40' S45'
0 1:25 1:50
SUBJECT TITLE
ELEVATED STATION
3G1 STATION STRUCTURAL STEEL SHOP DRAWING
Grid S1' - S49' & SA' - SD'
3D VIEW
2860 5500 500 6000 300 5700 5500 500 6000 500
2012
2003 2005 2011 2006 HEB180
HEB180 HEB180 HEB180 HEB180
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
1001
1001
1001
1001
1001
1001
EL.+634.840(T.O.C.)
LINE OVERLAP
ELEVATION ON GRID LINE SA'
CUT LINE
NOTES :
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
1- FOR GENERAL NOTE , SEE DRAWING NO. M-ANM- 3G1ES0-CBST-SDR-200001
2- FOR STEEL STRUCTURE PLAN VIEW , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 1:3/11
1001
1001
1001
1001
1001
1001
1001
3- FOR STEEL STRUCTURE SECTIONS , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 4:9/11
4- FOR STEEL STRUCTURE GENERAL DETAILS , SEE DRAWING NO
EL.+634.840(T.O.C.) M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 10:11/11
LINE OVERLAP
CUT LINE
M-ANM- 3G1ES0-CBST-EDR-200010
S3' 4 5 S7' M-ANM- 3G1ES0-CBST-EDR-200011
S11' 6 S15' S19' S23'
M-ANM- 3G1ES0-CCFO-EDR-200001
2500 7500 20000 M-ANM- 3G1ES0-CMEP-EDR-200013
M-ANM- 3G1ES0-CB00-EDR-200012
2860 6000 6000 6000 6000 6000 M-ANM- 3G1ES0-CBST-EDR-200006
M-ANM- 3G1ES0-CBST-EDR-200008
2860 5500 500 6000 300 5700 5500 500 6000 500
M-ANM- 3G1ES0-CBST-EDR-200007
M-ANM- 3G1ES0-CBST-EDR-200009
8360 6800 11200 7000
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
FOR LUVER SUPPORT DRAWING REFER TO
M-ANM- 3G1ES0-CBST-SDR-200012
1001
1001
1001
1001
1001
1001
P1 23.03.2017 ISSUED FOR APPROVAL M.F
EL.+634.840(T.O.C.) REV DATE DESCRIPTION APPD.
LINE OVERLAP
PROJECT
500 5500 5500 500 6000 500 5500 500 5500 500 5500 2860
ORIGINATOR CHECK REVIEW APPROVAL
AIC/ AIC/ AIC/ M.F
11000 7000 6000 6000 8360
SUBJECT TITLE
ELEVATED STATION
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
RHS180X140X12
3G1 STATION STRUCTURAL STEEL SHOP DRAWING
Grid S1' - S49' & SA' - SD'
1001
1001
1001
1001
1001
1001
1001
GRID LINE SA'&SD'
M-ANM-3G1ES0-CBST-SDR-200006 P1 2 OF 7
Tekla Structures
CUT LINE
4
S1' S2' S4' S5' S6' S8' S9' S10' S12' S13' S14' S16' S17'
24193
2500 7500
1138 2090 2623 1401 2090 2623 1401 2090 2623 1401 2090 2623
2908 2908 2908
2915 RHS120*80*5.0 2908
RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0
RHS120*80*5.0 2902 2905 2902 2905 2902 2905 2902 2905
121
RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0
EL.+639.215(T.O.S.)
1058 2010 2543 1321 2010 2543 1321 2010 2543 1321 2010 2543
1333
2913 2906 2906 2906
RHS120*80*5.0 RHS120*80*5.0 2906 RHS120*80*5.0 RHS120*80*5.0
2900 2903 2900 2903 RHS120*80*5.0 2900 2903 2900 2903
RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0
4375
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
3002
2897
2025
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
2020
EL.+634.840(T.O.C.)
200
9001
LINE OVERLAP
9001 9001 9001 9001 9001
PL30X280 PL30X280 9001
9001 PL30X280 9001 9001 PL30X280 9001 PL30X280 PL30X280 9001
PL30X280 9001 PL30X280 PL30X280
PL30X280 PL30X280 PL30X280 PL30X280
CUT LINE
T.O.CG TOP OF CRANE GIRDER
T.O.CB TOP OF CRANE BRACKET
24456 T.O.C TOP OF CONCRETE
C.O.B CENTER OF BEAM
B.O.B BOTTOM OF BASE PLATE
20000 20000 BU BUILT UP
------ INDICATION OF BRACING MEMBERS
.... REFER TO DETAIL NO.
DET .../...
1401 2090 2623 1401 2090 2623 1401 2090 2623 1401 2090 2623 REFER TO DRAWING SHEET NO.
2905
RHS120*80*5.0 1992 631 2908 2908
2908 2908 2908 RHS120*80*5.0 RHS120*80*5.0
RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 NOTES :
2902 2905 2902 2905 2902 2905 2902 2905
RHS120*80*5.0
121
RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0 1- FOR GENERAL NOTE , SEE DRAWING NO. M-ANM- 3G1ES0-CBST-SDR-200001
EL.+639.215(T.O.S.)
2- FOR STEEL STRUCTURE PLAN VIEW , SEE DRAWING NO
M-ANM-3G1ES0-CBST-SDR-200006 SHEETS 1:3/11
1321 2010 2543 1321 2010 2543 1321 2010 2543 1321 2010 2543
3- FOR STEEL STRUCTURE SECTIONS , SEE DRAWING NO
1333
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
REFERENCE DRAWING :-
3002
2897
M-ANM- 3G1ES0-CBST-EDR-200010
2020
2020
2020
2020
2020
2020
2020
2021
2020
2020
2021
2020
2020
M-ANM- 3G1ES0-CBST-EDR-200011
M-ANM- 3G1ES0-CCFO-EDR-200001
M-ANM- 3G1ES0-CMEP-EDR-200013
M-ANM- 3G1ES0-CB00-EDR-200012
M-ANM- 3G1ES0-CBST-EDR-200006
M-ANM- 3G1ES0-CBST-EDR-200008
EL.+634.840(T.O.C.) M-ANM- 3G1ES0-CBST-EDR-200007
200
M-ANM- 3G1ES0-CBST-EDR-200009
LINE OVERLAP
9001
LINE OVERLAP
2905 1401 2090 2623 1401 2090 2623 1401 2090 2623 1401 2090 1098
RHS120*80*5.0 P1 23.03.2017 ISSUED FOR APPROVAL M.F
2908 2908 2912
RHS120*80*5.0 2908 2908
RHS120*80*5.0 RHS120*80*5.0 RHS120*80*5.0
2902 2905 RHS120*80*5.0 2902 2905 2902 2905 2902 REV DATE DESCRIPTION APPD.
RHS120*80*5.0
121
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
HB270X80X12
3002
2897
2020
2021
2020
2020
2021
2020
2020
2021
2020
2020
2021
2020
2024
ORIGINATOR CHECK REVIEW APPROVAL
AIC/ AIC/ AIC/ M.F
EL.+634.840(T.O.C.) 23.03.2017
200
9001 9001
9001 9001 9001 PL30X280 9001 0 1:25 1:50
LINE OVERLAP
SUBJECT TITLE
ELEVATED STATION
ELEVATION ON GRID LINE SC' 3G1 STATION STRUCTURAL STEEL SHOP DRAWING
Grid S1' - S49' & SA' - SD'