Académique Documents
Professionnel Documents
Culture Documents
Item
DESCRIPTION AMOUNT (RM)
No.
PRELIMINARY PARTICULARS
1.0 Generally
1.3
The term " Superintending Officer" or "S.O" wherever used
in these Bills of Quantities shall mean the Architect
2.1
The is a firm price Contract and the Contract shall allow
for any fluctuation in the price of labour, materials,
constructional plant, fuel, contributions, duties, levles,
taxes, temporary works, transport or otherwise howsoever
which may occur during the period of the Contract.
2.2 All rates and sums contained in the the Bills of Quantities
shall be deemed to include for such provisions.
To Collection RM -
P/A/1
PREIMINARIES
General Conditions And Preliminaries Applying To The Whole Of The Works
Item
DESCRIPTION AMOUNT (RM)
No.
5.2
Where any Items in these Bills of Quantities are either
unpriced or have dashes or other suitable marks placed
against them, it shall be deemed that the price has been
#REF!
included in the rates of accompanying work and shall be
deemed to be included in the Total Tender Price indicated
in the Form of Tender.
5.5
THE QUANTITIES SHAAL BE TAKEN ABSOLUTELY NETT unless
otherwise stated, The rates shall be the full inclusive
value of the finished work shown on the drawings and/or
described or implied in these Bills and shall be deemed to
include for the supply of materials, including cutting and
waste, unloading, storage, packing, carriage, hoisting; all
labour for fabricating, setting, fitting in position, use
of plant, fuel, supervision, establishment charges, duty,
profit and any other expense and everything else necessary
for the due and proper completion of the works.
5.6
To Collection RM #REF!
P/A/2
PREIMINARIES
General Conditions And Preliminaries Applying To The Whole Of The Works
Item
DESCRIPTION AMOUNT (RM)
No.
6.1
Text of the Bills of Quantities shall not be altered in any
way by the tendere. Any alteration, addition or more made
by him will not be recognised and the text of the Bills of
Quantities as originally prepared by the Quantity Surveyor
will be strictly adhered to.
6.2
The amount appearing as the total of the General Summary of
Tender at the front of these Bills and marked "Carried to
Form of Tender" shall be transferred to the Tender Form,
Ringgit and Sen, without any alteration or rounding off.
Abbreviations
Abbreviations where used in the context of the Bills of
8.1
Quantities shall have their full meanings assigned against
them in brackets :-
M3 - (Cubic Metre)
M2 - (Squaree Metre)
M - (Lineal Metre)
mm - (Millimetre)
No. - (Number)
T. - (Metric Ton)
g. - (Gramme)
Kg. - (Kilogramme)
M.S. - The lates Malaysian Standard Specification issued by
the Standard and Industrial Regulation Institu Malaysia.
To Collection RM #REF!
P/A/3
PREIMINARIES
General Conditions And Preliminaries Applying To The Whole Of The Works
Item
DESCRIPTION AMOUNT (RM)
No.
9.0 Warranty
9.1
The main Contractor with his specialist and/or Nominated
Sub-Contractors / Suppliers shall Inter alia, jointly and
severally warrant materials and workmanship of the
following works and any other works required throught the
Bills of Quantities. Period of commencement of the warranty
shall be from the date of Practical Completion of the
Works. Unless Otherwise provided in the specification
section, the specimen warranty shall be as per Appendix 'M'
Section 3.
b)
Proprietary timber or steel roof trusses whichever
applicable (aginst defects in fabrication distortion,
deflection, joint degradation, workmanship and material
and against attacks by termites and other wood boring
insects) (Ten (10) years warranty)
#REF!
c)
Waterproofing works (against leaks and defects in
workmanship and materials) (Ten (10) years warranty)
e)
Fabricated aluminium works and members including anodic
finishes (against failure of materials or workmanship
which shall included but not limited to failure in
operation of doors and windows and hardware penetration
of water or infiltration of air, excessive deflection
of members, non- conformity of colour, discoloration,
peeling, corrosion of the finished surface, fault or
defects causedor aggregated by mortar stain, cracking
of glass arising from incorrect glazing tolerance or
technique, defects in accessories, weather stripping
and other components of the work (Five (5) years
warranty)
9.3 In the event the warranty shall expire after the Defect
Liability Period, the Contractor shall rectify or replace
any faulty good or material within any such time the
warranty is still valid
To Collection RM #REF!
P/A/4
PREIMINARIES
General Conditions And Preliminaries Applying To The Whole Of The Works
Item
DESCRIPTION AMOUNT (RM)
No.
10.1
To Collection RM #REF!
P/A/5