EFFECTIVE F'ROM
1ST APBIL 2OI5
GONTENTS
1. Report 1-3
(i)
Corrigendum
g@&
¼ghjkyky çlkn½
lnL;
jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lfefr
lg
vfHk;ark çeq[k
is;ty ,oa LoPNrk foHkkx] >kj[k.M] jk¡ph
izfrosnu
>kj[k.M yksd fuekZ.k lafgrk 2012 dh dafMdk 103 esa izko/kku ds vkyksd esa >kj[k.M ljdkj] iFk fuekZ.k foHkkx }kjk
fuxZr i=kad iÛfuÛfoÛ&fofo/k&6&14@09&6096¼S½ jk¡ph] fnukad 28-08-2012 esa mYysf[kr gS fd >kj[k.M yksd fuekZ.k
foHkkx lafgrk] 2012 ds dafMdk 103 esa jkT;Lrjh; vuqlwfpr nj fu/kkZj.k lfefr }kjk vuqlwfpr nj ds fu/kkZj.k dk izko/kku gSA
mDr lfefr ds la;kstd] iFk fuekZ.k foHkkx ds vfHk;ark izeq[k@eq[; vfHk;ark gksaxsA vU; lnL; lHkh dk;Z foHkkx ds vfHk;Urk
izeq[k@eq[; vfHk;Urk ,oa rduhdh ijh{kd dks’kkax] eaf=eaMy ¼fuxjkuh½ foHkkx ds vfHk;ark izeq[k@eq[; vfHk;ark gksaxsA
mi;qZDr izko/kku ds vkyksd esa jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lfefr dk xBu fuEu izdkj fd;k x;k gS %&
is;ty ,oa LoPNrk foHkkx >kj[k.M ds i=kad 64 ¼CDO½ fnukad 30-01-2013 }kjk vuqlwfpr nj fu/kkZj.k gsrq
is;ty ,oa LoPNrk foHkkx vUrxZr Dedicated SOR Cell dk xBu fd;k x;k gS] ftldk la'kksf/kr Lo:i fuEuor
gS %&
1- eq[; vfHk;ark lhÛMhÛvksÛ v/;{k
2- v/kh{k.k vfHk;ark ¼:ikad.k½] lhÛMhÛvksÛ la;kstd
3- v/kh{k.k vfHk;ark ¼;kaf=d½] lhÛMhÛvksÛ lnL;
4- dk;Zikyd vfHk;ark ¼xq.k fu;a=.k½] lhÛMhÛvksÛ lnL;
5- dk;Zikyd vfHk;ark ¼;kaf=d½] lhÛMhÛvksÛ lnL;
6- Jh vuqt dqekj flUgk] lgk;d vfHk;ark ¼:ikad.k½] lhÛMhÛvksÛ lnL;
7- Jh ';ke fcgkjh flag] :ikad.k leUo;d] lhÛMhÛvksÛ lnL;
fnukad 28-09-13 dks lEiUu jkT;Lrjh; vuqlwfpr nj fu/kkZj.k lfefr dh cSBd esa nj fo”ys’k.k ds laca/k esa
mu foHkkxksa ds fy, ftuds ikl Standard Data Book ykxw ugha gS] 5% overhead charge m)`r djus dk fu.kZ;
fy;k x;kA blds vfrfjDr lkefxz;ksa ij >kj[k.M jkT; esa ykxw VAT dk nj vuqekU; gksxkA
fnukad 16-04-2015 dks lEiUu jkT;Lrjh; vuqlwfpr nj fu/kkZj.k lfefr dh cSBd esa is;ty ,oa LoPNrk
foHkkx }kjk lefiZr vlSfud ,oa fo|qr ;kaf=d vo;oksa ls lacaf/kr en la[;k 1 ls 132 ij foLr`r ppkZ gqbZ ,oa
fopkjksijkUr loZlEefr ls vuqeksnu gsrq fu.kZ; fy;k x;kA
fnukad 16-04-2015 dks lEiUu jkT;Lrjh; vuqlwfpr nj fu/kkZj.k lfefr dh cSBd esa is;ty ,oa LoPNrk
foHkkx] >kj[k.M ljdkj ds vuqlwfpr nj iqfLrdk ds nj fo”ys’k.k esa iz;qDr gksus okys fuekZ.k lkefxz;ksa dh ekSfyd nj
,oa fnukad 01-04-2015 ls izHkkoh Jfedksa ds nj dk vuqeksnu lfefr }kjk fd;k x;k gSA
1
>kj[k.M jkT; esa izpfyr o’kZ& 2012 ds vuqlwfpr nj iqfLrdk ds nj fo”ys’k.k esa fuEufyf[kr izko/kku djrs gq,
bl nj iqfLrdk esa nj fu/kkZj.k fd;k x;k gS %&
i nj fo”ys’k.k esa izko/kkfur Lumpsum enksa ,oa Sundries enksa dks foyksfir djrs gq, 5% overhead charge
dk izko/kku fd;k x;k gSA vkiwfrZ }kjk fy, tkus okys lkefxz;ksa rFkk Pipe, Fittings/ Specials/ Valve, Pump &
Motor, etc. bR;kfn ij Over Head Charge ykxw ugha gksxkA
ii ftu enksa ds nj fo”ys’k.k esa etnwjksa dh nj] Scaffolding, Tools ,oa Plants, Carriage vkfn dks Lumpsum esa
j[kk x;k gS mls lekuqikfrd :Ik ls izfr”kr ;k la[;k esa j[krs gq, mDr en dk nj fo”ys’k.k fd;k x;k gSA
iii ftu lkefxz;ksa ds njksa dk iqujh{k.k ugha gks ldk gS mudk nj o’kZ 2012 ds >kj[k.M jkT; esa izpfyr vuqlwfpr
nj fo”ys’k.k ds vk/kkj ij gh j[kk x;k gSA
iv fo”ysf’kr njksa esa lHkh rjg ds Taxes, Royalty “kkfey gSA Royalty dk izko/ku [kuu foHkkx dh vf/klwpuk
la[;k&[kÛHkwÛ ¼fofo/k½&29@4&2332@,eÛ jk¡ph] fnukad 27-12-2010 ,oa >kj[k.M xtV ¼vlk/kkj.k½ cq/kokj 29
fnlEcj 2010 esa izdkf”kr ds vuqlkj fd;k x;k gA jkW;YVh dh dVkSrh foi=ksa ls Loose volume of material ij
dh tkuh gS u fd Finished Volume of material (compacted volume) ij ftudk vuqikyu lqfuf”pr djus dh
ftEesokjh {ks=h; inkf/kdkfj;ksa dh gksxhA
v Jfed dY;k.k dks’k gsrq 1% ¼,d izfr”kr½ labour Cess dh dVkSrh ls lacaf/kr Je fu;kstu ,oa izf”k{k.k
foHkkx] >kj[k.M ljdkj ,oa la;kstd lg vfHk;ark izeq[k] iFk fuekZ.k foHkkx ds i=kad 373¼S½ WE fnukad
12-01-2013 ds }kjk djus dh ftEesojh {ks=h; inkf/kdkjh dh gksxhA bl vuqlwfpr nj iqfLrdk ds nj fo”ys’k.k esa
1% ¼,d izfr”kr½ Labour Cess dh jkf”k dks lfEefyr ugha fd;k x;k gSA Labour Cess ds fy, 1% jkf”k
izkDdyu esa izko/kku dj tksM+k tk;A
;|fi bl vuqlwfpr nj iqfLrdk dks lHkh lnL;ksa dh ns[k js[k esa dkQh lko/kkuhiwoZd rS;kkj fd;k x;k gS fQj
Hkh ;fn mDr vuqlwfpr nj esa dgha =qfV;k¡ n`f’Vxkspj gksrh gS rks ,slh ifjfLFkfr esa fuosnu gS fd mu =qfV;ksa dks
¼v/kksgLrk{kjh½ lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lfefr lg vfHk;ark izeq[k] is;ty ,oa LoPNrk foHkkx] dks
vfoyEc nh tk; rkfd lle; fopkjksijkUr mu =qfV;ksa dk leqfpr fujkdj.k fd;k tk ldsA
oÙkZeku vuqlwfpr nj dks rS;kj djus esa is;ty ,oa LoPNrk foHkkx] >kj[k.M ds Dedicated SOR Cell ds
v/;{k Jh fouksn dqekj oekZ] eq[; vfHk;ark] lhÛMhÛvksÛ lfgr fuEu inkf/kdkfj;ksa }kjk vuqlwfpr nj fooj.k rS;kj djus
esa lfØ;rk] rRijrk ,oa lg;ksx vR;ar gh ljkguh; jgk gS] ftuds esgur ds QyLo:i JSOR-DWSD-15 tks fd
01-04-2015 ls izHkkoh gS& QyhHkwr gks ldkA
bl vuqlwfpr nj iqfLrdk ds mi;ksx djus okyksa dh lqfo/kk ds fy, bldh Soft Copy foHkkxh; Website ij Hkh
miyC/k djk;h tk jgh gSA bl vuqlwfpr nj dks fnukad 01-04-2015 ls izHkkoh fd;k tkrk gSA
¼ghjkyky izlkn½
lnL;
a jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lfefr a
lg
vfHk;ark izeq[k
is;ty ,oa LoPNrk foHkkx] >kj[k.M] jk¡ph
3
>kj[k.M ljdkj
jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lfefr
dsUnzh; fu:i.k laxBu] iFk fuekZ.k foHkkx] jk¡ph
4
CHAPTER 1
GOVERNMENT OF JHARKHAND
DRINKING WATER & SANITATION DEPARTMENT
BASIC RATES OF MATERIALS FOR PERPARATION OF SCHEDULE OF RATES
ONLY,(MATERIAL SHOULD CONFORM TO RELEVANT B.I.S. SPECIFICATION).THE RATES
ARE INCLUSIVES OF ALL TAXES,ROYALTY, CARRIAGE etc. BUT EXCLUSIVE OF
CONTRACTOR'S PROFIT AND OVERHEAD CHARGES FOR THE YEAR 2015-16.
13) For ESR upto 500 cum capacity C.I.D. double flanged pipes upto 300
mm dia shall be provided and C.I. specials shall be used. For ESR
above 500 cum capacity C.I. / M.S. pipes assembly with minimum 8
mm thickness upto 500 mm dia. And minimum 10 mm thickness
above 500 mm dia can be used with proper anti-corrosive epoxy
treatment from in side and out side.
14) Below mentioned rates are for foundation with individual footing
with bearing capacity of 30 tonnes per square metre. For raft
foundations, these rates shall be increased by 7.5% where safe
bearing capacity (SBC) is 5 MT per sq.m and by 5 % where SBC is
more than 5MT / sqm and upto 10 MT / sqm. This % of 5 % or 7. 5 %
is applicable for estimation of amount of lumpsum item of ESR. For
extra item due to change from individual footing foundation to raft,
actual increase in concrete and steel quantities be paid as per
relevant DSR item.
15) The rate shall be increased by 30 % for bearing piles upto depth of
10 M and for further increased in depth by 5 M each, it shall be
increased by another 10%. These rates are applicable where raft is
not reasible. For pile foundations sulphate resistant cement shall
only be used. Single pile for the column is not permitted group of
piles shall be designed with pile cap for each column of ESR.
16) These rates are applicable for staging height of 12 M. These rates
shall be increased or decreased for per metre variation in this staging
height as below :
12 to 16 M --- 4 x 2 = 8%
Sr. Description Unit Approved Remarks
No. Rate (In Rs.)
16 & 17 M --- 1 x 3% = 3% Total = 11%
12 to 16 M --- 4 x 2 = 8%
16 to 20 M --- 4 x 3% = 12%
20& 21 M --- 1 x 4% = 4% Total = 24%
16) Following rates are for seismic zone III. For zone IV, these rates shall
be increased by 5% and for zone II, these rates shall be decreased by
5%. Concerned Executive Engineer shall confirm the seismic zone for
the scheme from seismic zone splan before estimation and adopt
appropriate rates as per actual seismic zones. (Seismic maps
attached in this CSR).
Notes
1) Conditions from Sr.No.1 to 10 shall form a part and parcel of the
tender papers and must be included in the draft tender papers for
works of R.C.C. E.S.R.
2) Conditions from Sr.No.11 to 16 are for estimation purpose only and
shall not appear in the tender.
Rates for RCC ESRs
1) Upto 25,000 litres P/Lit 28.24
2) Cost of 25,000 litres capacity P/Job 706000.00
3) Add for capacity above 25,000 upto 50,000 litres P/Lit 14.10
4) Cost of 50,000 litres capacity P/Job 1058500.00
5) Add for capacity above 50,000 upto 75,000 litres P/Lit 10.26
6) Cost of 75,000 litres capacity P/Job 1315000.00
7) Add for capacity above 75,000 upto 1,00,000 litres P/Lit 8.96
8) Cost of 1,00,000 litres capacity P/Job 1539000.00
9) Add for capacity above 1,00,000 upto 1,50,000 litres P/Lit 7.71
10) Cost of 1,50,000 litres capacity P/Job 1924500.00
11) Add for capacity above 1,50,000 upto 2,00,000 litres P/Lit 6.42
12) Cost of 2,00,000 litres capacity P/Job 2245500.00
13) Add for capacity above 2,00,000 upto 2,50,000 litres P/Lit 6.10
14) Cost of 2,50,000 litres capacity P/Job 2550500.00
15) Add for capacity above 2,50,000 upto 3,00,000 litres P/Lit 5.77
16) Cost of 3,00,000 litres capacity P/Job 2839000.00
17) Add for capacity above 3,00,000 upto 4,00,000 litres P/Lit 5.45
18) Cost of 4,00,000 litres capacity P/Job 3384000.00
19) Add for capacity above 4,00,000 upto 5,00,000 litres P/Lit 5.13
20) Cost of 5,00,000 litres capacity P/Job 3897000.00
21) Add for capacity above 5,00,000 upto 7,50,000 litres P/Lit 4.80
22) Cost of 7,50,000 litres capacity P/Job 5097000.00
23) Add for capacity above 7,50,000 upto 10,00,000 litres P/Lit 4.50
24) Cost of 10,00,000 litres capacity P/Job 6222000.00
Sr. Description Unit Approved Remarks
No. Rate (In Rs.)
25) Add for capacity above 10,00,000 upto 15,00,000 litres P/Lit 4.17
26) Cost of 15,00,000 litres capacity P/Job 8307000.00
27) Add for capacity above 15,00,000 upto 20,00,000 litres P/Lit 3.85
28) Cost of 20,00,000 litres capacity P/Job 10232000.00
111 RCC GSR AND SUMP
Designing (aesthetically), and constructing RCC ground service
reservoirs / RCC sumps in M-300 mix. of required capacity including
excavation in all types of strata, foundation concrete, container
walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement
plaster with water proofing compound in CM 1:3 proportion. to
inside face of the container,including epoxy paint from inside
including refilling and disposing of surplus stuff within lead of 50 M,
all labour and material charges, for laying and jointing of pipe
assembly for inlet, outlet washout, over flow and bye-pass
arrangement consisting of C.I./ M.S. D/F. pipes, specials and valves of
given diameters, providing and fixing accessories such as M.S. ladder
inside and outside, C.I. Manhole frame and cover, at top slab, B.B.
masonry chamber for all valves, ventilating shafts, including giving
satisfactory hydraulic test and water tightness test as per IS code and
providing three coat of cement paints to all expose surface of
structure including roof surface etc. complete as per design data,
criteria, obligatory requirements and detailed specifications.
2) Only M.S. bars grade I conforming to I.S. 432 part-I or high yield
strength deformed bars conforming to I.S. 1786 or I.S.1139 shall be
used.Grade- II M.S. bars shall not be used.
3) Entire structure shall be in M-300 only.
4) The scope of pipe assembly work shall be upto 5 metre beyond out
side face of the wall, cost of pipes valves and specials is not included
in the rate but labour cost for laying and jointing is included.
1) Aeration fountain
2) Inlet arrangements
3) Mixing channel with ventury flume and flow measuring arrangement
4) Inlet channel
5) Flocculator- Conforming to I.S. 7208-1974 (Type-C) with
detention period of 30 minutes
6) Tube settlers-Designing, fabricating and constructing Tube Settlers
with square or any other shaped tube like Circular, Cheveron,
Hexagonal etc .having proven performance
7) Rapid sand gravity filters
8) Filter house
9) Chemical house
10) Alum tanks- 2 Nos. with mixing, carrying and dosing arrangements
with piping.
11) Gravity feed gas chlorinator with 100% standby.
12) TCL solution tank with mixing, carrying and dosing arrangement with
piping.
13) Bye-pass arrangement
14) External and internal electrification
15) Laboratory equipments
16) Wash water tanks of capacity equal to 12 minutes to wash specified
number of filter beds at time at 600 lit/m2/m under head of 12 m at
under drain.
Sr. Description Unit Approved Remarks
No. Rate (In Rs.)
17) Wash water pumps with 100% standby
18) Air blowers capable of delivering 600 LMP per square metre of free
air of filter area at 0.4 Kg / sqcm at the under drains (100 % standby).
20) Pure water pump house over the sump / by the side of sump.
21) Drainage arrangements
22) Alum store
23) Sanitary block with necessary water supply and drainage
arrangements and internal WBM roads.
24) These rates are applicable for seismic zones 2, 3 and 4.
25) Rates given below are inclusive of uplift pressure if any and
dewatering during the entire work.
26) All RCC structures shall be constructed in M-250. Structures in
contact with water shall be in M-300.
27) Unconventional Treatment Plant less than 1 MLD capacity shall not
be cons tructed
Note: Conditions from Sr. No. 1 to 27 shall form a part and parcel of
the tender and must be included in draft tender papers for the
work of unconventional treatment plants.
Unconventional Water Treatment Plant
1) Fixed cost for 1 MLD P/Job 5724000.00
2) Add for capacity above 1 MLD upto 2 MLD P/Mld 2592000.00
3) Cost of 2 MLD treatment plant P/Job 8316000.00
4) Add for capacity above 2 MLD upto 5 MLD P/Mld 1944000.00
5) Cost of 5 MLD treatment plant P/Job 14148000.00
6) Add for capacity above 5 MLD P/Mld 1512000.00
7) Cost of 10 MLD treatment plant P/Job 21708000.00
113 Conventional Water Treatment Plant
Designing (aesthetically ), providing constructing and
commissioning Conventional Water Treatment Plant consisting of
all Civil, Mechanical and Electrical works including cost of
providing and applying epoxy paint to inside surface of water
retaining structures in contact with chlorine and providing
antitermite treatment to entire structure below ground level,
mechanical and electrical
components of various sub-works as given below, including
necessary hydraulic testing, structural testing, equipment testing
and trial run for a period of 3 months, etc. complete as directed
by Engineer-in-charge (turn-key job).
Sr. Description Unit Approved Remarks
No. Rate (In Rs.)
1) Aeration Fountain- Plan are a not less than 0.625 square metre per
MLD
2) Ventury Flume - With necessary devices, consisting of simple
mechanical indicator. (Pedestal type gauge)
3) Flash Mixer-Rapid mixing device, detention time 60 seconds to give
velocity gradient 300 to 400 sec -1, vane mixer type conforming to
I.S. 7090 of 1985.
4) Flocculator – Conforming to I.S.7208-1974 (Type-C) with detention
period of 30 minutes.
5) Clarifier - Horizontal flow circular tank, detention period 2-5 hours,
overflow rate 30 cubic metre per square metre per day (to be
specified), Weir loading not more than 300 cubic metre per metre
per day, with mechanical sludge scraper conforming to I.S. No. 10313-
1982. with necessary inlet arrangements.
6) Rapid Sand Filter sand Filter House-Filter designed for filteration rate
of 5,000 litres per square metre per hour, minimum 2 beds for plant
upto 10 MLD, for larger plants as specified, filters to be located in
filter house with roof slab, pipe gallery and platform minimum 5.5
metre in width with constant rate filtration or declining rate filtration.
19) Rates given below are inclusive of up lift pressure if any and
dewatering during entire work.
20) Disposal of waste from WTP : Safe disposal arrangement to nearby
nalla including cost of pipes.
21) For WTP of capacity 30 mld and more additional arrangements for
backwash water recycle shall be provided, icluding sump, pumping
machinary, rising main etc. complete.
22) All pipes conduits channel with 20% overloading.
23) These rates are applicable for seismic zones 2, 3 and 4.
24) All RCC structures shall be constructed in M-300
25) All pipes and conduits channel with 20% overloading capacity.
Note: Conditions from Sr. No. 1 to 19 shall form a part and parcel of
the tender and must be incorporated in draft tender papers of
conventional treatment plants (proposed).
Conventional Water Treatment Plant
1) Upto 5 MLD P/Mld 3564000
2) Cost of 5 MLD treatment plant P/Job 17820000
3) Add for capacity above 5MLD upto 10 MLD P/Mld 2592000
4) Cost of 10 MLD treatment plant P/Job 30780000
5) Add for capacity above 10 MLD upto 20 MLD P/Mld 1620000
6) Cost of 20 MLD treatment plant P/Job 46980000
7) Add for capacity above 20 MLD upto 50 MLD P/Mld 1512000
8) Cost of 50 MLD treatment plant P/Job 88980000
9) Add for capacity above 50 MLD upto 100 MLD P/Mld 1296000
10) Cost of 100 MLD treatment plant P/Job 148980000
11) Add for capacity above 100 MLD P/Mld 1000000
Sl. Sl. Code No. Description Unit Approved Remraks
No. No. Rate
(In Rs.)
1 2 3 4 5 6
114 GPT :
Drilling by Rotary drill machine of size
300mm & 400mm dia with T.C. drill bit for tubewells in
all kinds of soil including moorum, hard soil, soil mixed
with pebbles, shingles, compacted soil, clay, soft and
decomposed rock etc, up to 60 meters depth including
reaming to facilitate smooth lowering of casing pipe etc.
as per specification and direction of E/I.
123 TRANSFORMER
1 TR-1 Transformer
Approved
Power Transformer (with off load Tap changer) Unit Rate Remraks
(In Rs.)
Supplying outdoor type copper wound transformer
continuously rated for 3Ph, 50 Hz, at full load and temp.
rise not exceeding 450 C by thermometer in oil and 500 C
by the resistance in winding after continuous run at full
load rating, the transformer should have oil immersed
winding having vector group DY11, HT side connected in
delta and LT side connected in star with neutral brought
out connected to provide separate earthing. The
Transformer shall have power terminal arrangement,
bushing/ cable end box on HT side and cable end box on
LT side. 2Nos channels with stoppers shall be provided
and fixed on the provided plinth for mounting the
transformer. The transformer should have following
standard fittings. Transformer shall be latest
manufacturing standards as per amended IS
specifications and the load & No load losses shall be
limited to the values given below or as per IS or Norms
issued by MSEDC Ltd / JSEB which ever are lower-
TR1-1 63 KVA ( No load loss 180w and load loss 1235w) Each 176294
TR1-2 100 KVA (No load loss 260w and load loss 1760w) Each 225940
TR1-3 160KVA (No load loss 260w and load loss 1760w) Each 270893
TR1-4 200KVA(No load loss 500w and load loss3000w) Each 327210
TR1-5 250KVA (No load loss 580w and load loss 3000w) Each 380471
TR1-6 315 KVA (No load loss 715w and load loss 4200w) Each 439846
TR1-7 400 KVA (No load loss 1500w and load loss 5000w) Each 525374
TR1-8 750 KVA (No load loss 1500w and load loss 8000w) Each 854040
2 TR-4 Power Transformer (with on load Tap changer)
Supplying out door type copper wound transformer
continuously rated for 3ph, 50Hz, at full Load & temp.
rise not exceeding 450 C by thermometer in oil and 500 C
by the resistance in winding after continuous run at full
load rating, the transformer should have oil immersed
winding having vector group DY11, HT side connected in
delta and LT side connected in star with neutral brought
out connected to provide separate earthing. The
Transformer shall have power terminal arrangement,
bushing/ cable end box on HT side and cable end box on
LT side. 2Nos channels with stoppers shall be provided
and fixed on the provided plinth for mounting the
transformer. The transformer should have following
standard fittings. The OLTC should be suitable for
minimum 50
3 core 35 sq mm Per M
CB 10-1 918
3 core 50 sq mm Per M
CB 10-2 1036
3 core 70 sq mm Per M
CB 10-3 1513
3 core 95 sq mm Per M
CB 10-4 1759
3 core 120 sq mm Per M
CB 10-5 1997
3 core150sq mm Per M
CB 10-6 2206
3 core 185 sq mm Per M
CB 10-7 2525
3 core 240sq mm Per M
CB 10-8 2969
3 core 300 sq mm Per M
CB 10-9 3417
3 core 400 sq mm Per M
CB 10-10 4016
6 CB 11 Aluminium conductor three core, XLPE / PVC insulated
& unarmoured cable .
Supplying XLPE / PVC insulated, unarmoured cable 1100
V grade with ISI mark Three core, solid / stranded
aluminium conductor with 6 mm thick 25 mm width
M.S. spacer with G.I. Earth wire 6 sq mm, complete in
an approved manner.
CB 11-2 3 core 4 sq mm Per M
77
CB 11-3 3 core 6 sq mm Per M
93
CB 11-4 3 core 10 sq mm Per M
120
CB 11-5 3 core 16 sq mm Per M
154
CB 11-6 3 core 25 sq mm Per M
214
CB 11-7 3 core 35 sq mm Per M
274
CB 11-8 3 core 50 sq mm Per M
355
CB 11-9 3 core 70 sq mm Per M
492
CB 11-10 3 core 95 sq mm Per M
625
CB 11-11 3 core 120 sq mm Per M
773
CB 11-12 3 core 150 sq mm Per M
957
CB 11-13 3 core 185 sq mm Per M
1190
CB 11-14 3 core 240 sq mm Per M
1521
CB 11-15 3 core 300 sq mm Per M
1871
CB 11-16 3 core 400 sq mm Per M
2407
7 CB12 Aluminium conductor 3.5 core, XLPE / PVC insulated &
unarmoured cable
CB12-2 Supplying XLPE / PVC insulated, unarmoured cable 1100
V grade with ISI mark Three and half core, stranded
aluminium conductor with 6 mm thick 25 mm width
M.S. spacer with G.I. Earth wire 6 sq mm, complete in
an approved manner.
CB12-3 3.5 core 25 sq mm Per M
250
CB12-4 3.5 core 35 sq mm Per M
311
CB12-5 3.5 core 50 sq mm Per M
410
CB12-6 3.5 core 70 sq mm Per M
567
CB12-7 3.5 core 95 sq mm Per M
723
CB12-8 3.5 core 120 sq mm Per M
909
CB12-9 3.5 core 150 sq mm Per M
1095
CB12-10 3.5 core 185 sq mm Per M
1376
CB12-11 3.5 core 240 sq mm Per M
1756
CB12-12 3.5 core 300 sq mm Per M
2160
CB12-13 3.5 core 400 sq mm Per M
2787
Copper Cable
CABLE
1 CB 1 3 Core PVC insulated, PVC sheathed copper conductor Approved
flat submersible cable . Unit Rate Remraks
(In Rs.)
Supplying , Flat flexible submersible cable with, copper
conductor, PVC insulated, and PVC sheathed .
I S2 F.A.S.D starter
S 2-1 10 H.P. each 9500
S 2-2 15 H.P. each 9635
S 2-3 20 H.P. each 10450
S 2-4 25 HP each 10695
S 2-5 35 HP each 18660
S 2-6 40 H.P. each 27055
S 2-7 50 HP each 27930
S 2-8 75 HP each 48565
S 2-9 100 HP each 67360
S 2-10 125 HP each 86370
S 2-11 150 HP each 71780
S 2-12 250 HP each 129360
II Auto Transformer Starter with air break contactor
S3 (Fabricated)
g0@& g0@&
lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& vfHk;ark izeq[k] lfefr &lg& vfHk;ark izeq[k]
is;ty ,oa LoPNrk foHkkx] >kj[k.M] jk¡ph Hkou fuekZ.k foHkkx] >kj[k.M] jk¡ph
g0@& g0@&
lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& vfHk;ark izeq[k] lfefr &lg& vfHk;ark izeq[k
ty lalk/ku foHkkx] >kj[k.M] jk¡ph xzkeh.k dk;Z foHkkx] >kj[k.M] jk¡ph
g0@& g0@&
la;kstd] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& eq[; vfHk;ark lfefr &lg& eq[; vfHk;ark rduhdh ijh{k.k
mtkZ foHkkx] >kj[k.M] jk¡ph dks"kkax] eaf=eaMy ¼fuxjkuh½ foHkkx]
>kj[k.M] jk¡ph
g0@&
la;kstd] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& vfHk;ark izeq[k]
iFk fuekZ.k foHkkx] >kj[k.M] jk¡ph
CHAPTER - 2
LABOUR
Approved Labour Rates for Drinking Water & Sanitation Department Vide Labour and
employment department letter No. 2/MW- 2071/2010, 1858 dt. 05.09.2013
Daily
Minimu
m Rates
of VD.A. as
Wages per Total
Minimu
(in Rs) labour (3+4)
m
as per Deptt. Minimu
Labour
Sl. No. Name of the Employment Labour Notificati m
Rate
Deptt. on No. Labour
(Monthly
Notificati 656, dt. Rate
)
on No. 13.04.20 (Daily)
932 15
Dated
01.04.20
11
1 2 3 4 5 6
1 Unskilled Labour 127 60.43 187.43 4873.2
2 Mate 139 60.43 199.43 5185.2
3 Head Mason 172 75.19 247.19 6426.9
4 Mason 153 67.57 220.57 5734.8
5 Painter Class - I 164 75.19 239.19 6218.9
6 Painter Class - II 153 67.57 220.57 5734.8
7 Head Carpenter 164 75.19 239.19 6218.9
8 Carpenter 153 67.57 220.57 5734.8
9 Head Black Smith 172 75.19 247.19 6426.9
10 Black Smith 153 67.57 220.57 5734.8
11 Glazier 137 60.43 197.43 5133.2
12 Stone Dresser 164 75.19 239.19 6218.9
13 Water Carrier 127 60.43 187.43 4873.2
14 Fitter Class - I 176 75.19 251.19 6530.9
15 Fitter Class - II 153 67.57 220.57 5734.8
16 Helper 135 60.43 195.43 5081.2
17 Hammer Man 135 60.43 195.43 5081.2
18 Bellow Man 127 60.43 187.43 4873.2
19 Road Roller Driver 222 90.89 312.89 8135.1
20 Concrete Mixer Operator Class - I 164 75.19 239.19 6218.9
Daily
Minimu
m Rates
of
Wages Total
Minimu
(in Rs) (3+4)
m
as per Minimu
Labour
Sl. No. Name of the Employment Labour D.A. m
Rate
Deptt. Labour
(Monthly
Notificati Rate
)
on No. (Daily)
932
Dated
01.04.20
11
1 2 3 4 5 6
21 Concrete Mixer Operator Class - II 153 67.57 220.57 5734.8
22 Stone Crusher Driver Class - I 164 75.19 239.19 6218.9
23 Stone Crusher Driver Class - II 153 67.57 220.57 5734.8
24 Truck Driver 182 75.19 257.19 6686.9
25 Compresser Operator Class - I 164 75.19 239.19 6218.9
26 Compresser Operator Class - II 153 67.57 220.57 5734.8
27 Pump Driver Class - I 164 75.19 239.19 6218.9
28 Pump Driver Class - II 153 67.57 220.57 5734.8
29 Concrete Mixer Attendent 135 60.43 195.43 5081.2
30 Cleaner or Oilman 128 60.43 188.43 4899.2
31 Tar Boiler Man 153 67.57 220.57 5734.8
32 Plumber 164 75.19 239.19 6218.9
33 Thatcher 137 60.43 197.43 5133.2
34 Khalasi / Chain Man 137 60.43 197.43 5133.2
35 Sweeper 128 60.43 188.43 4899.2
36 Watchman 128 60.43 188.43 4899.2
37 Stone Breaker 128 60.43 188.43 4899.2
38 Work Sarkar 145 67.57 212.57 5526.8
39 Time Keeper 152 67.57 219.57 5708.8
40 Welder Grade - I 193 90.89 283.89 7381.1
41 Welder Grade - II 164 75.19 239.19 6218.9
42 Wire Man / Line Man 147 67.57 214.57 5578.8
43 Mechanic Grade - I 199 90.89 289.89 7537.1
44 Mechanic Grade - II 182 75.19 257.19 6686.9
45 Sarang 182 75.19 257.19 6686.9
Daily
Minimu
m Rates
of
Wages Total
Minimu
(in Rs) (3+4)
m
as per Minimu
Labour
Sl. No. Name of the Employment Labour D.A. m
Rate
Deptt. Labour
(Monthly
Notificati Rate
)
on No. (Daily)
932
Dated
01.04.20
11
1 2 3 4 5 6
46 Drill Operator 153 67.57 220.57 5734.8
47 Tractor Operator 182 75.19 257.19 6686.9
48 Gauge Reader-cum-slit Observer 135 60.43 195.43 5081.2
49 Crane Operator Grade - I 218 90.89 308.89 8031.1
50 Crane Operator Grade - II 193 90.89 283.89 7381.1
51 Dragling / Scraper / Showel Operator Grade - I 218 90.89 308.89 8031.1
52 Dragling / Scraper / Showel Operator Grade - II 193 90.89 283.89 7381.1
53 Dumper Operator 185 75.19 260.19 6764.9
54 Fore Man 218 90.89 308.89 8031.1
55 Junior Fore Man 193 90.89 283.89 7381.1
56 Charge Man 185 75.19 260.19 6764.9
57 Electrician Grade - I 164 75.19 239.19 6218.9
58 Electrician Grade - II 153 67.57 220.57 5734.8
59 Electrician Grade - III 135 60.43 195.43 5081.2
60 Turner 153 67.57 220.57 5734.8
61 Compounder 153 67.57 220.57 5734.8
62 Supervisor ( Diploma Holder ) 207 90.89 297.89 7745.1
63 Surveyour /Supervisor 153 67.57 220.57 5734.8
64 Blue Printer 135 60.43 195.43 5081.2
65 Tracer 135 60.43 195.43 5081.2
66 Vibrator Operator 143 67.57 210.57 5474.8
67 Cleark / Typist / Typist cleark 151 67.57 218.57 5682.8
68 Earth Excavator
(i) For every 110 cubic feet of soft earth 127 60.43 187.43 4873.2
Daily
Minimu
m Rates
of
Wages Total
Minimu
(in Rs) (3+4)
m
as per Minimu
Labour
Sl. No. Name of the Employment Labour D.A. m
Rate
Deptt. Labour
(Monthly
Notificati Rate
)
on No. (Daily)
932
Dated
01.04.20
11
1 2 3 4 5 6
(ii) For every 100 cubic feet of hard earth 127 60.43 187.43 4873.2
(iii) For every 90 cubic feet of highly hard earth 127 60.43 187.43 4873.2
69 Any other category of semi - skilled
workers not mentioned above. 135 60.43 195.43 5081.2
70 Any other category of Skilled
workers not mentioned above. 151 67.57 218.57 5682.8
71 Blaster 214 90.89 304.89 7927.1
72 Car/ Jeep driver 162 75.19 237.19 6166.9
g0@& g0@&
lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& vfHk;ark izeq[k] lfefr &lg& vfHk;ark izeq[k]
is;ty ,oa LoPNrk foHkkx] >kj[k.M] jk¡ph
g0@& g0@&
lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k lnL;] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& vfHk;ark izeq[k] lfefr &lg& eq[; vfHk;ark rduhdh ijh{k.k
ty lalk/ku foHkkx] >kj[k.M] jk¡ph dks"kkax] eaf=eaMy ¼fuxjkuh½ foHkkx]
>kj[k.M] jk¡ph
g0@&
la;kstd] jkT; Lrjh; vuqlwfpr nj fu/kkZj.k
lfefr &lg& vfHk;ark izeq[k]
iFk fuekZ.k foHkkx] >kj[k.M] jk¡ph
rduhdh ijh{k.k
CHAPTER 3.1
WATER SUPPLY WORKS
Item No. Item of work Unit Rate (in Rs)
1 2 3 4
3.1.1.1. Earth work in excavation (As per I.S. 3114/1965 for laying of different
types and sizes of pipes so as to give one meter average cover
over the socket of pipe with disposal of excavated earth within
initial lead and lift as per specification and direction of Engineer-
in-Charge.
(a) For classification of Soil item - A Per M3 64.66
(a) For classification of Soil item - B Per M3 86.22
3.1.1.2. Earth work in back filling the trenches after laying different types
and size of pipes with earth removed during excavation within
initial lead and lift as per specification and direction of Engineer-
in-Charge. (For classification for Soil item - A & B) Per M3 53.89
3.1.1.3. Extra for earthwork in all kinds of soil for each additional lift of 1m
or part there of over the initial lift of 1.5m as per specification and
direction of Engineer-in-Charge. Per M3 7.54
3.1.2. Laying of G.I. pipes of approved make in trenches with red lead and
yarn with socket and screw joints and cutting pipes to sizes and
threading ends where necessary etc. all complete as per specifi-
cation and direction or Engineer-in-Charge.(Pipes to be supplied
departmentally free of cost).
(i) 15 mm dia G.I. pipe Per M 6.71
(ii) 20 mm dia G.I. pipe Per M 6.88
(iii) 25 mm dia G.I. pipe Per M 10.52
(iv) 32 mm dia G.I. pipe Per M 11.03
(v) 40 mm dia G.I. pipe Per M 14.59
(vi) 50 mm dia G.I. pipe Per M 15.70
(vii) 65 mm dia G.I. pipe Per M 27.92
(viii) 80 mm dia G.I. pipe Per M 28.61
(ix) 100 mm dia G.I. pipe Per M 42.35
3.1.3. Supplying labour and tools for fixing G.I. pipes with Red lead and
yarn of following nominal bore with screwed and socketted joints
on wall, ceiling and floor including supplying and fitting of wall
hooks or pipe clamps, wooden plugs, cutting pipes to size and
threading ends if required etc. all complete as per specification
and direction of Engineer-in-Charge. (Pipe with socket to be supplied
departmentally free of cost).
(i) 15 mm dia nominalbore G. I. pipe Per M 28.87
(ii) 20 mm dia nominalbore G. I. pipe Per M 29.05
(iii) 25 mm dia nominalbore G. I. pipe Per M 29.32
(iv) 32 mm dia nominalbore G. I. pipe Per M 39.48
(v) 40 mm dia nominalbore G. I. pipe Per M 50.42
TUBE WELL
3.1.47. Boring by Jet or Dheki and lowering G.I. pipe of requisite dia
cutting the pipe and threading them if necessary, fitting and fixing
(a) strainer of standard quality (b) iron shoe plug and (c) Sockets
etc. all complete including providing all tools and plants required
for the job as per specification and directioin of E/I. (Materials
like G.I. pipe, strainer, shoe plug, handpump, cylinder, G.I. flange
etc. to be supplied departmentally free of cost of departmental
goddown).
(A) From G.L. to 30.5M depth below (Vide classification of soil
item-A).
(i) For 40 mm dia G.I. pipe Per M N.D.
(ii) For 80 mm dia G.I. pipe Per M N.D.
3.1.1.1. Earth work in excavation (As per I.S. 3114/1965 for laying of different types
and sizes of pipes so as to give one meter average cover over the
socket of pipe with disposal of excavated earth within initial lead and lift
as per specification and direction of Engineer-in-Charge.
3.1.1.2. Earth work in back filling the trenches after laying different types and
size of pipes with earth removed during excavation within initial lead and
lift as per specification and direction of Engineer-in-Charge. (For clas-
sification for Soil item - A & B)
3.1.1.3. Extra for earthwork in all kinds of soil for each additional lift of 1m or
part there of over the initial lift of 1.5m as per specification and direction
of Engineer-in-Charge.
3.1.2. Laying of G.I. pipes of approved make in trenches with red lead and yarn
with socket and screw joints and cutting pipes to sizes and threading
ends where necessary etc. all complete as per specification and direction
or Engineer-in-Charge.(Pipes to be supplied departmentally free of cost).
(i) 15 mm dia G.I. pipe Rs. 6.705236 Unit per metre
(ii) 20 mm dia G.I. pipe Rs. 6.877736 Unit per metre
(iii) 25 mm dia G.I. pipe Rs. 10.51621 Unit per metre
(iv) 32 mm dia G.I. pipe Rs. 11.03371 Unit per metre
(v) 40 mm dia G.I. pipe Rs. 14.59333 Unit per metre
(vi) 50 mm dia G.I. pipe Rs. 15.69733 Unit per metre
(vii) 65 mm dia G.I. pipe Rs. 27.91668 Unit per metre
(viii) 80 mm dia G.I. pipe Rs. 28.60668 Unit per metre
(ix) 100 mm dia G.I. pipe Rs. 42.35108 Unit per metre
A. Materials 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm 65 mm 80 mm 100 mm
Red lead, hemp,
oil, cement, sand
grit etc. 3% of
cost of G.I. socket 0.42 0.57 0.81 1.26 1.65 2.61 3.87 4.47 6.12
B. Labours
For fitting and fixing
and laying of pipe
for 10 mtr length
(i) Plumber Grade I
0.08 0.08 0.12 0.12 0.16 0.16 0.25 0.25 0.37
nos. nos. nos. nos. nos. nos. nos. nos. nos.
19.1352 19.1352 28.7028 28.7028 38.2704 38.2704 59.7975 59.7975 88.5003
@ Rs. each
(ii) Skilled mazdoor
0.16 0.16 0.25 0.25 0.33 0.33 0.66 0.66 1
nos. nos. nos. nos. nos. nos. nos. nos. nos.
34.9712 34.9712 54.6425 54.6425 72.1281 72.1281 144.2562 144.2562 218.57
@ Rs. each
Total (i) + (ii) 54.1064 54.1064 83.3453 83.3453 110.3985 110.3985 204.0537 204.0537 307.0703
Rs.
Rate for 1 mtr. 5.41064 5.41064 8.33453 8.33453 11.03985 11.03985 20.40537 20.40537 30.70703
Rs.
Total A + B 5.83064 5.98064 9.14453 9.59453 12.68985 13.64985 24.27537 24.87537 36.82703
Rs.
Rs. 5.83064 5.98064 9.14453 9.59453 12.68985 13.64985 24.27537 24.87537 36.82703
Add 10% CP+OHC 5% 0.874596 0.897096 1.37168 1.43918 1.903478 2.047478 3.641306 3.731306 5.524055
Grand Total 6.705236 6.877736 10.51621 11.03371 14.59333 15.69733 27.91668 28.60668 42.35108
Calculate rate per metre for all dia Rs.
3.1.3. Supplying labour and tools for fixing G.I. pipes with Red lead and yarn
of following nominal bore with screwed and socketted joints on wall, ceiling
and floor including supplying and fitting of wall hooks or pipe clamps,
wooden plugs, cutting pipes to size and threading ends if required etc.
all complete as per specification and direction of Engineer-in-Charge. (Pipe
with socket to be supplied departmentally free of cost).
3.1.4.1. Supplying and fixing of G.M. ferrule of approved make in existing C.I. main
including drilling and taping C.I. main all complete as per specification
and direction of Engineer-in-Charge.
(a) 3 mm, 6 mm, 10 mm dia ferrule weight not less 425 gms. Rs. 416.0102 Unit-each
(b) 12 mm, 16 mm and 20 mm ferrule weight not less than 625 gms. Rs. 547.2827 Unit-each
(c) 22 mm and 25 mm dia ferrule weight not less than 900 gms. Rs. 810.9087 Unit-each
Item of work to (a) 3mm, 6mm, 10mm (b) 12mm, 16 mm, (c) 22mm and 25 mm
1. Materials
3.1.4.2. Supplying and fixing G.M. ferrule with necessary adopter of approved make
from existing U.P.V.C./H.D.P.E./A.C. main (pressure pipe) including drilling
and tapping to main all complete as per specification and direction of
Engineer-in-Charge.
1. Materials
1. Weight -same as
item no. 12.1.4.1
2. Cost of G.M. ferrule Rs. Rs. Rs.
3. Cost of addopter Rs. Rs. Rs.
4. Cost of redlead
hemp, tools etc. Rs. 0.5 Rs. 0.6 Rs. 0.75
Rs. Rs. Rs.
B. Labours
1. Drilling and tapping C.I. main
(i) 5% of labours
to be adopted of
item 12.1.4.1 for
U.P.V.C./H.D.P.E. Rs. Rs. Rs.
Rs. Rs. Rs.
(A) Item of work (a) 3mm, 6mm, & (b) 12mm, 16mm & (c) 22mm, 25mm
1. Materials
B.F. of Total Rs. Rs. Rs.
2+3+4
(ii) Labours
60% of labour of item
12.1.4.1 for A.C.
Pressure to be adopted Rs. Rs. Rs.
3.1.5.1. Providing and fixing male ended 15mm dia brass bib cock of approved
quality (Wt. not less than 350gms.) with extra socket all complete as
per specification and direction of E/I.
Unit-Each
Materials
1. Cost of bib cock including taxes 1 no. @ Rs. 224 Rs. 224.00
3.1.5.2. Providing and fixing 15mm dia male ended C.I.Body brass spindle valve
and seat bib cock of approved quality (Wt. not less than 400gms.) with
extra socket all complete as per specification and direction of E/I.
Unit-Each
Materials
1. C.I. Body brass spindle valve 1 no. @ Rs. 94 Rs. 94.00
and seat bib cock
2. Cost of 15 mm dia G.I. socket 1 no. @ Rs. 14 Rs. 14.00
3. Red, lead, hemp etc. 3% of cost of G.I. socket Rs. 0.42
Labours
Plumber Gr. I 0.1 nos. @ Rs. 239.19 Rs. 23.92
3.1.5.3. Providing and fixing 15mm dia male ended C.I.Body M.S. spindle valve
and C.I.seat (Wt. not less than 400gms.) of approved quality with extra
socket all complete as per specification and direction of E/I.
Unit-Each
Rate vide item 12.1.5.1 except cost of bib cock which
will be different Rs.
Materials
1. C.I. Body M.S. spindle valve 1 no. @ Rs. 94 Rs. 94.00
and C.I. seat bib cock (wt. Not less than 400 gms.
2. Cost of 15 mm dia G.I. socket 1 no. @ Rs. 14 Rs. 14.00
3. Red, lead, hemp etc. 3% of cost of G.I. socket Rs. 0.42
Labours
Plumber Gr. I 0.1 nos. @ Rs. 239.19 Rs. 23.92
Unit-Each
Rate vide item 12.1.5.1 except cost of bib cock which
will be different Rs.
Materials
1. C.I. Plug cock 1 no. @ Rs. 19 Rs. 19.00
wt. Not less than 400 gms.
2. Cost of 15 mm dia G.I. socket 1 no. @ Rs. 14 Rs. 14.00
3. Red, lead, hemp etc. 3% of cost of G.I. socket Rs. 0.42
Labours
Plumber Gr. I 0.1 nos. @ Rs. 239.19 Rs. 23.92
3.1.5.5. Providing and fixing 15mm dia male ended C.I.Push cock (Wt. not less
than 400gms.) of approved quality with extra socket all complete as per
specification and direction of E/I.
Unit-Each
Rate vide item 12.1.5.1 except cost of bib cock which
will be different Rs.
1. C.I. Push cock 1 no. @ Rs. 76 Rs. 76.00
wt. Not less than 400 gms.
2. Cost of 15 mm dia G.I. socket 1 no. @ Rs. 14 Rs. 14.00
3. Red, lead, hemp etc. 3% of cost of G.I. socket Rs. 0.42
Labours
Plumber Gr. I 0.1 nos. @ Rs. 239.19 Rs. 23.92
Total Rs. 114.34
Add 10% C.P.+O.H.C. 5% Rs. 17.15
Grand Total Rs. 131.49
Calculate rate for each Rs. 131.49
3.1.6. Providing and fixing brass/C.I.Stop cock of approved quality all compelte
as per specification and direction of E/I.
A. Materials
1. cost of one brass stop cock
wt. not less than 350 gms 425 gms 575 gms 850 gms 1.15 kgs 2.15 kgs
@ Rs. 178 240 327 498 647 1139
Red lead, hemp, etc. Rs. 3% of cost of G.I. socket 0.42 0.57 0.81 1.26 1.65 2.61
B. Labours
Plumber Gr. I 0.1 0.11 0.15 0.17 0.2 0.35
nos. nos. nos. nos. nos. nos.
@ Rs. 23.919 26.3109 35.8785 40.6623 47.838 83.7165
B. Materials
1. Cost of one
3.1.7. Providing and fixing G.M. non-return valve Horizontal/vertical type of approved
qualilty as per specification and direction of Engineer-in-Charge.
(A) Horizontal
(a) 15mm dia Rs. 245.3399 Unit Each
(b) 20mm dia Rs. 340.263 Unit Each
(c) 25mm dia Rs. 502.1918 Unit Each
(d) 32mm dia Rs. 758.9106 Unit Each
(e) 40mm dia Rs. 1122.961 Unit Each
(f) 50mm dia Rs. 1571.369 Unit Each
(B) Vertical
(a) 15mm dia Rs. 218.8899 Unit Each
(b) 20mm dia Rs. 320.713 Unit Each
(c) 25mm dia Rs. 443.5418 Unit Each
(d) 32mm dia Rs. 660.0106 Unit Each
(e) 40mm dia Rs. 905.6112 Unit Each
(f) 50mm dia Rs. 1348.269 Unit Each
(g) 60mm dia Rs. Unit Each
(h) 80mm dia Rs. Unit Each
Item of work 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm 60 mm 80 mm
to be done
A. Materials
w1. Cost of one no
G.M. Non return value
Horizontal type as per
approved specifications
wt. not less than 150 gms 250 gms 375 gms 600 gms 700 gms 1.00 Kg.
@ Rs. 189 269 400 618 927 1304
Red lead, hemp 3% of cost of
G.I. socketetc. Rs. 0.42 0.57 0.81 1.26 1.65 2.61
B. Labour
Plumber Grade I 0.1 0.11 0.15 0.17 0.2 0.25
nos. nos. nos. nos. nos. nos.
B. Materials
w1. Cost of one no
G.M. Non return value
Vertical type as per
approved specifications
wt. not less than 150 gms 250 gms 375 gms 600 gms 700 gms 1.00 Kg.
@ Rs. 166 252 349 532 738 1110
Red lead, hemp 3% of cost of
G.I. socket etc. Rs. 0.42 0.57 0.81 1.26 1.65 2.61
B. Labour
Plumber Grade I 0.1 0.11 0.15 0.17 0.2 0.25
nos. nos. nos. nos. nos. nos.
3.1.8. Providing and fixing lead connection pipe with heavy quality brass coupling
2nos. at both ends etc. all complete as per specification and direction
of Engineer-in-Charge.
Materials
(i) Lead connection pipe with
coupling 1 no. @ Rs. 100 Rs. 100.00
(ii) Red lead, hemp 3% of cost of G.I. socket Rs. 0.42
Labours
(i) Plumber Gr. I 0.1 nos. @ Rs. 239.19 Rs. 23.92
3.1.9. Providing and fixing 15 mm. dia and 45cm. long P.V.C. connection pipe
with heavy quality brass coupling at both ends etc. all complete as per
specification and direction of Engineer-in-Charge.
Unit - Each
3.1.10. Providing and fixing N.P/C.P. brass /P.V.C. porcelain shower rose of 15mm
inlet etc. all complete as per specification and direction of Engineer - in -
Charge.
(A). Materials
1. Cost of N.P. / C.\P.
Brass / P.V.C. / Procelain shower with tax
(B). Labours
(i) Plumber Gr. I Rs. 0.1 Rs. 0.1 Rs. 0.1 Rs. 0.1
23.919 23.919 23.919 23.919
3.1.11. Providing and fixing 15mm size C.P. brass pillar cock (Weight not less
than 350gms). C.I.body brass spindle pillar cock of approved quality as
per specification and direction of Engineer-in-Charge.
Total 213.339
Add 10% C.P.+5% O.H.C. 32.00085
Grand Total 245.3399
3.1.12. Providing and fixing Gun metal full way valve of approved quality, all
complete, as per specification and direction of E/I.
(a) 15mm dia Rs. 293.6399 Unit - Each
(b) 20mm dia Rs. 393.163 Unit - Each
(c) 25mm dia Rs. 483.7918 Unit - Each
(d) 32mm dia Rs. 673.8106 Unit - Each
(e) 40mm dia Rs. 1209.211 Unit - Each
(f) 50mm dia Rs. 1348.269 Unit - Each
Materials
dia in mm (a) 15 mm (b) 20 mm (c) 25 mm (d) 32 mm (e) 40 mm (f) 50 mm
weight not 300 gms 400 gms 500 gms 700 gms 1.0 kgs 1.50 kgs
less than
3.1.13. Supplying and fixing G.I. fittings of approved make all complete as per
specification and direction of E/I.
A. Elbow
(a) 15mm dia. Rs. 46.38985 Unit - Each
(b) 20mm dia. Rs. 60.81304 Unit - Each
(c) 25mm dia. Rs. 85.89178 Unit - Each
(d) 32mm dia. Rs. 113.7606 Unit - Each
(e) 40mm dia. Rs. 148.9112 Unit - Each
(f) 50mm dia. Rs. 228.1686 Unit - Each
(g) 65mm dia. Rs. 348.969 Unit - Each
(h) 80mm dia. Rs. 456.8111 Unit - Each
(i) 100mm dia. Rs. 765.9606 Unit - Each
B. TEE (PLAIN)
(a) 15mm dia. Rs. 52.13985 Unit - Each
(b) 20mm dia. Rs. 71.16304 Unit - Each
(c) 25mm dia. Rs. 99.69178 Unit - Each
(d) 32mm dia. Rs. 134.4606 Unit - Each
(e) 40mm dia. Rs. 168.4612 Unit - Each
(f) 50mm dia. Rs. 250.0186 Unit - Each
(g) 65mm dia. Rs. 342.069 Unit - Each
(h) 80mm dia. Rs. 443.0111 Unit - Each
(i) 100mm dia. Rs. 503.7606 Unit - Each
(D) Nipple
(a) 15mm dia. Rs. 45.23985 Unit - Each
(b) 20mm dia. Rs. 57.36304 Unit - Each
(c) 25mm dia. Rs. 78.99178 Unit - Each
(d) 32mm dia. Rs. 98.81065 Unit - Each
(e) 40mm dia. Rs. 112.1112 Unit - Each
(f) 50mm dia. Rs. 135.0186 Unit - Each
(g) 65mm dia. Rs. 150.019 Unit - Each
(h) 80mm dia. Rs. 170.4611 Unit - Each
(i) 100mm dia. Rs. 200.1606 Unit - Each
(E) PLUGS
(a) 15mm dia. Rs. 34.88985 Unit - Each
(b) 20mm dia. Rs. 42.41304 Unit - Each
(c) 25mm dia. Rs. 54.84178 Unit - Each
(d) 32mm dia. Rs. 72.36065 Unit - Each
(e) 40mm dia. Rs. 86.8112 Unit - Each
(f) 50mm dia. Rs. 101.6686 Unit - Each
(g) 65mm dia. Rs. 120.119 Unit - Each
(h) 80mm dia. Rs. 152.0611 Unit - Each
(i) 100mm dia. Rs. 184.0606 Unit - Each
(A) ELBOW
Materials
Cost of one no
Total Rs. 40.339 52.8809 74.6885 98.9223 129.488 198.4075 303.4513 397.227 666.0527
Add 10% C.P.+5% O.H.C. 6.05085 7.932135 11.20328 14.83835 19.4232 29.76113 45.5177 59.58405 99.90791
Grand Total 46.38985 60.81304 85.89178 113.7606 148.9112 228.1686 348.969 456.8111 765.9606
Calculate rate for each for all dia Rs.
Total Rs. 45.339 61.8809 86.6885 116.9223 146.488 217.4075 297.4513 385.227 438.0527
Add 10% C.P.+5% O.H.C. 6.80085 9.282135 13.00328 17.53835 21.9732 32.61113 44.6177 57.78405 65.70791
Grand Total 52.13985 71.16304 99.69178 134.4606 168.4612 250.0186 342.069 443.0111 503.7606
Calculate rate for each for all dia Rs.
Total Rs. 44.339 55.8809 81.6885 98.9223 138.488 203.4075 278.4513 419.227
Add 10% C.P.+5% O.H.C. 6.65085 8.382135 12.25328 14.83835 20.7732 30.51113 41.7677 62.88405
Grand Total 50.98985 64.26304 93.94178 113.7606 159.2612 233.9186 320.219 482.1111
Calculate rate for each for all dia Rs.
(D) Nipple
Materials
Cost of one no
Labours 0.1 0.11 0.15 0.17 0.2 0.25 0.27 0.3 0.33
Plumber Gr. I 23.919 26.3109 35.8785 40.6623 47.838 59.7975 64.5813 71.757 78.9327
same as (A)
Total Rs. 39.339 49.8809 68.6885 85.9223 97.488 117.4075 130.4513 148.227 174.0527
Add 10% C.P.+5% O.H.C. 5.90085 7.482135 10.30328 12.88835 14.6232 17.61113 19.5677 22.23405 26.10791
Grand Total 45.23985 57.36304 78.99178 98.81065 112.1112 135.0186 150.019 170.4611 200.1606
Calculate rate for each for all dia Rs.
(E) Plug
Materials
Cost of one no
Labours 0.1 0.11 0.15 0.17 0.2 0.25 0.27 0.3 0.33
Plumber Gr. I 23.919 26.3109 35.8785 40.6623 47.838 59.7975 64.5813 71.757 78.9327
same as (A)
Total Rs. 30.339 36.8809 47.6885 62.9223 75.488 88.4075 104.4513 132.227 160.0527
Add 10% C.P.+5% O.H.C. 4.55085 5.532135 7.153275 9.438345 11.3232 13.26113 15.6677 19.83405 24.00791
Grand Total 34.88985 42.41304 54.84178 72.36065 86.8112 101.6686 120.119 152.0611 184.0606
Calculate rate for each for all dia Rs.
Total Rs. ---- 66.7309 85.4485 118.4723 151.098 210.4475 315.1913 451.627 639.4027
Add 10% C.P.+5% O.H.C. 10.00964 12.81728 17.77085 22.6647 31.56713 47.2787 67.74405 95.91041
Grand Total 76.74054 98.26578 136.2431 173.7627 242.0146 362.47 519.3711 735.3131
Calculate rate for each for all dia Rs.
Materials
Cost of one no
Labours 0.1 0.11 0.15 0.17 0.2 0.25 0.27 0.3 0.33
Plumber Gr. I 23.919 26.3109 35.8785 40.6623 47.838 59.7975 64.5813 71.757 78.9327
same as (A)
Total Rs. 67.339 83.8809 113.6885 163.9223 190.488 242.4075 274.4513 421.227 629.0527
Add 10% C.P.+5% O.H.C.10.10085 12.58214 17.05328 24.58835 28.5732 36.36113 41.1677 63.18405 94.35791
Grand Total 77.43985 96.46304 130.7418 188.5106 219.0612 278.7686 315.619 484.4111 723.4106
Calculate rate for each for all dia Rs.
(H) Socket
Materials
Cost of one no
Labours 0.1 0.11 0.15 0.17 0.2 0.25 0.27 0.3 0.33
Plumber Gr. I 23.919 26.3109 35.8785 40.6623 47.838 59.7975 64.5813 71.757 78.9327
same as (A)
Total Rs. 38.339 45.8809 63.6885 83.9223 104.488 149.4075 197.4513 225.227 289.0527
Add 10% C.P.+5% O.H.C. 5.75085 6.882135 9.553275 12.58835 15.6732 22.41113 29.6177 33.78405 43.35791
Grand Total 44.08985 52.76304 73.24178 96.51065 120.1612 171.8186 227.069 259.0111 332.4106
Calculate rate for each for all dia Rs.
Labours 0.1 0.11 0.15 0.17 0.2 0.25 0.27 0.3 0.33
Plumber Gr. I 23.919 26.3109 35.8785 40.6623 47.838 59.7975 64.5813 71.757 78.9327
same as (A)
Total Rs. 45.339 52.8809 76.6885 109.9223 124.488 155.4075 297.4513 348.227 520.0527
Add 10% C.P.+5% O.H.C. 6.80085 7.932135 11.50328 16.48835 18.6732 23.31113 44.6177 52.23405 78.00791
Grand Total 52.13985 60.81304 88.19178 126.4106 143.1612 178.7186 342.069 400.4611 598.0606
Calculate rate for each for all dia Rs.
(J) Jam Nut
Materials
Cost of one no
Total Rs. 32.339 35.8809 51.6885 66.9223 81.488 107.4075 124.4513 144.227 168.0527
Add 10% C.P.+5% O.H.C. 4.85085 5.382135 7.753275 10.03835 12.2232 16.11113 18.6677 21.63405 25.20791
Grand Total 37.18985 41.26304 59.44178 76.96065 93.7112 123.5186 143.119 165.8611 193.2606
Calculate rate for each for all dia Rs.
3.1.14. Making long screw in G.I.pipe including supplying and fitting Jam nuts
and extra socket etc. all complete as per specification and direction of
E/I.
Labours
Plumber Gr. I 0.07 0.09 0.1 0.12 0.2 0.22 0.25 0.27 0.3
nos. nos. nos. nos. nos. nos. nos. nos. nos.
@ Rs. 16.7433 21.5271 23.919 28.7028 47.838 52.6218 59.7975 64.5813 71.757
Unskilled 0.07 0.09 0.1 0.12 0.2 0.22 0.25 0.27 0.3
Mazdoor nos. nos. nos. nos. nos. nos. nos. nos. nos.
@ Rs. 13.1201 16.8687 18.743 22.4916 37.486 41.2346 46.8575 50.6061 56.229
Total Rs. 52.2834 66.9658 85.472 119.4544 173.974 228.4664 295.525 336.6574 421.106
Add 10% C.P.+5% O.H.C. 7.84251 10.04487 12.8208 17.91816 26.0961 34.26996 44.32875 50.49861 63.1659
Grand Total 60.12591 77.01067 98.2928 137.3726 200.0701 262.7364 339.8538 387.156 484.2719
3.1.15. Making bend and offset in G.I. pipe as per specification and direction of
Engineer-in-Charge.
3.1.16. Cutting drain width wise above G.L. for laying G.I. pipes and restoring
with brick in cement mortar (1:4) 12mm cement plaster in (1:4) with neat
cement punning as per specification and direction of Engineer-in-Charge.
Unit - Each
3.1.17. Cutting chajja or cornice for laying G.I. pipe and restoring the same with
R.C.C.(1:2:4) brick work in cement mortar (1:4) and cement plaster(1:4)
as per specification and direction of Engineer-in-Charge.
3.1.18. Making holes in walls for laying G.I. pipes and restoring the same after
pipe laying as per specification and direction of E/I.
Labours
1. Skilled Mazdoor
for cutting holes
0.2 0.25 0.3 0.33 0.2
nos. nos. nos. nos. nos.
@ Rs. 218.57 43.714 54.6425 65.571 72.1281 43.714
2. For restoring
(i) Mason Gr. II
0.05 0.07 0.08 0.1 0.05
nos. nos. nos. nos. nos.
@ Rs. 220.57 11.0285 15.4399 17.6456 22.057 11.0285
(ii) Unskilled Mazdoor
0.05 0.07 0.08 0.1 0.05
nos. nos. nos. nos. nos.
@ Rs. 187.43 9.3715 13.1201 14.9944 18.743 9.3715
3. Mortar etc. 0.07 0.08 0.1 0.05
Rs. 5 10 15 20 15
3.1.19.1 Supplying tools and cutting road as well restoring the same as per specification
and direction of E/I.
(A) Pucca road (except black top only taken out materials to be used)
For cutting road as per requirement.
Skilled Mazdoor 1.5 Nos. @ Rs. 218.57 Rs. 327.86
For restoring the cut road refer Item 6.3.19
For 700 Sqm.
(i) Unskilled Mazdoor 40 Nos. @ Rs. 187.43 Rs. 7497.20
(ii) Semi Skilled Mazdoor 25 Nos. @ Rs. 195.43 Rs. 4885.75
(iii) Mate 2 Nos. @ Rs. 199.43 Rs. 398.86
For 1 Sqm Rs. 18.26
Total Rs. 346.11
Add 15% C.P. & O.H.C. Rs. 51.92
Grand Total Rs. 398.03
Calculate rate per Sq. Meter Rs. 398.03
(B) Water bound macadum road (taken out materials will be used) Unit-per M2
For cutting road as per requirement
Skilled Mazdoor 1 Nos. @ Rs. 218.57 Rs. 218.57
For restoring the cut road
Skilled Mazdoor 0.25 Nos. @ Rs. 218.57 Rs. 54.64
Total Rs. 273.21
Add 15% C.P. & O.H.C. Rs. 40.98
Grand Total Rs. 314.19
Calculate rate per Sq. Meter Rs. 314.19
3.1.19.2 Cutting floor for laying G.I. pipes and restoring the same as per specification
and direction of E/I.
3.1.20. Supplying tools and making connection of new G.I. distribution branch
15mm to 50mm dia with existing G.I. main by providing and fixing G.I.
Tee including cutting of pipe at two places and threading their ends, providing
long screw and one G.I. Nipple, all complete, as per specification and
direction of E/I.
Materials
Item of work to 15 mm 20 mm 25 mm 32 mm 40 mm 50 mm
be done dia dia dia dia dia dia
1. Cost of one no.
Labours
1. Plumber Gr. I 0.2 0.2 0.2 0.25 0.33 0.33
nos. nos. nos. nos. nos. nos.
@ Rs. 239.19 47.838 47.838 47.838 59.7975 78.9327 78.9327
2. Skilled mazdoor 0.2 0.2 0.2 0.25 0.33 0.33
nos. nos. nos. nos. nos. nos.
@ Rs. 218.57 43.714 43.714 43.714 54.6425 72.1281 72.1281
3. Cost of making long
screw vide
item no. 3.1.14. 52.2834 66.9658 85.472 119.4544 173.974 228.4664
3.1.21. Supplying, fitting and fixing the following items complete with all materials
as per specification and direction of E/I.
Materials
No. of item 600x125mm Mirror 4mm 600x20mm C.P. Brass C.P. Brass P.V.C.
glass sheet thick with C.P. towel soap liquid liquid
complete hard wood rail dish container soap con-
backing or tainer
450mm 3mm ply
x125mm wood
glass 600mmx
shelf 450/450mm
300mm
1. Cost of item
with sale tax Rs. 370 248 1030 801 370 99 248 ---- ----
3.1.22. Supplying materials and construction single mounted R.C.C. (1:2:4) stand
posts as per approved design. drawing and specification including supplying
and fixing 15mm dia brass bib cock of approved make and weight not
less than 350gms and 2 meter of 15 mm dia G.I. pipe prcperly embeded
including fixing and supplying of elbows, nipple, socket as required but
excluding the cost of platform and drain as per specification and direction
of E/I. (G.I pipe to be supplied departemantelly)
Materials Unit-each
R.C.C. (1:2:4) work - /4x(0.225)2 x 1.15 = 0.0596 M3
vide item no. 5.3.12 0.0596 cum @ Rs. 5599.348 Rs. 333.72
Mild steel reinforcement 5.0 kgs.
item no. 5.5.1 5 kg @ Rs. 53.59812 Rs. 267.99
1. Fitting 15 mm dia G.I. pipe 2.00 metre
vide item 3.1.2 2 m @ Rs 5.83064 11.66
2. Supplying and fitting 15 mm dia Elbow
vide item no. 3.1.13. 2 nos. @ Rs. 40.339 Rs. 80.68
3. Supplying and fitting 15 mm dia barrel nipple
vide item no. 3.1.13. 1 nos. @ Rs. 39.339 Rs. 39.34
4. Supplying and fitting 15 mm dia G.I. socket
vide item no. 3.1.13. 1 nos. @ Rs. 38.339 Rs. 38.34
5. Supplying and fitting 15 mm dia brass bib cock weight
not less than 350 gms
vide item no. 3.1.5.1 1 nos. @ Rs. 262.339 Rs. 262.34
6. For fixing with P.C.C. (1:2:4) Cement 2 kgs @ Rs. 6.4068 Rs. 12.81
Sand 0.0283 M3 @ Rs. 209.13 Rs. 5.92
Stone chips 0.0566 M3 @ Rs. 974 Rs. 55.13
Labour
Mason Gr. II 0.5 nos. @ Rs. 220.57 Rs. 110.29
Unskilled mazdoor 0.5 nos. @ Rs. 187.43 Rs. 93.72
3.1.23. Supplying materials and construction of brick masonry drain 150mm width
and 150mm depth with 250mm apron on both sides over 50mm thick
P.C.C.[1:3:6] over a brick flat soling, apron laying, brick work in C.M. [1:6],
12mm cement plaster [1:3] with punning on exposed surface all complete
job as per specification and direction of E/I.
3.1.24. Supplying materials labour for construction of brick masonry drain over
80mm thick P.C.C. [1:3:6] over brick flat soling 150mm wide and 250mm
av. depth with brick work in cement mortar [ 1:6 ] in apron on both sides
and 12mm thick cement plaster [1:3] with neat cement punning on exposed
surface, all complete, as per specification and direction of E/I.
TABLE 3.1.25
(See table attached)
______________________________________________________________________________________________
Sl. Capacity of R.C.C. Free Size of bottom Size of top Size of side 12 mm C.P. (1:3)
No. Tank in litres/gallon Board slab in cm slab in cm slab in cm Total R.C.C. (1:2:4) with 5% including
inside dimension in cm in M3 and its cost cico area in m2 &
in cm its cost
______________________________________________________________________________________________________________
1 2 3 4 5 6 7 8
3.1.26. Supplying, fitting and fixing the following G.I. Tank make from 18 B.W.
gauge G.I.sheet confirming to I.S.S.having M.S.angle of size 30mmx30mmx3mm
upto 675 litres capacity and 30mmx30mmx5mm size above 675 litres
capacity duly welded at all corners of the tank hoisting on the place as
required providing ball cock of required size with floating polythene ball
one number and supplying 450mm dia G.I. cover with frame at the top
with locking arrangement including making holes in the tank for providing
connetion with rising delivery overflow scour pipe etc. with required G.I.
fitting (Nipple, socket, jamnuts, flanges) including two coats of aluminium
painting outside all complete as per specification and direction of Engineer-
in-Charge.
3.1.27. Supplying fitting and fixing angle iron or R.S. joist with P.C.C. (1:3:6)
including cutting the joist to required size complete job as per specification
and direction of E/I.
Umit-per M.
Cost of angle iron or,
R.S. joist of required size (1.0 M length) @ Rs. Rs.
Fitting, fixing and cutting to required size including
supplying necessary fixing materials L.S. Rs. 10.00
Total Rs.
Add 10% C.P. Rs.
Grand Total Rs.
Calculate rate per M. Rs. N.D.
Unit-Each
Earth work :- 1x1x1.05 = 1.05 M2 @ Rs. 85.96057 Rs. 90.26
vide item no. 5.1.1.
Brick flat soling 1.0x1.0x1.0 = 1.00 M2
vide item no. 5.6.3 1 M2 @ Rs. 213.9102 Rs. 213.91
P.C.C.(1:3:6) : 1.0x1.0x0.08 = 0.08 M3 @ Rs. 3773.734 Rs. 301.90
vide item no. 5.3.3
Brick work (1:6)
Long wall 2x0.65 = 1.7 Mtr.
Short wall 2x0.60 = 1.2 Mtr.
2.9 Mtr.
2.90x0.90x0.125 = 0.326 M3
vide item no. 5.2.6 0.326 M3 @ Rs./ M3 3595.729 Rs. 1172.21
Inside Plaster
Sides 2x(0.6+0.6)x0.90 = 2.16 M2
Bottom 0.6x0.6 = 0.36 M2
2.52 M2
vide item no. 5.7.3 2.52 M2 @ Rs./ M2 105.3395 Rs. 265.46
R.C.C. slab (1:2:4) 0.85x0.85x0.05 M3 = 0.0361 M3
vide item no. 5.3.2 0.0361 M3 @ Rs./ M2 5294.674 Rs. 191.14
M.S. lifting ring of 12 mm dia 2 nos. @ Rs. 7 Rs. 14.00
Total Rs. 2248.87
Add 15% C.P. O.H.C. on lifting ring Rs. 2.10
Grand Total Rs. 2250.97
Calculate rate for each Rs. 2250.97
3.1.29. Supplying and fixing water meter I.S.S. 779-1978 grade of approved make
as per specification and direction of E/I. Unit-Each
3.1.30. Supplying materials labour for painting exposed new G.I. pipe and fitting,
with one coat of approved aluminium paint over priming coat of red
oxide all complete as per specification and direction of E/I.
For laying of s/s spun pipe 80 mm, 100 mm and 125 mm dia
(Assuming 10 metre length of pipe
Labour
Plumber Gr. I 0.1 nos. @ Rs. 239.19 Rs. 23.92
Plumber Gr. II 0.2 nos. @ Rs. 239.19 Rs. 47.84
Skilled mazdoor 1.25 nos. @ Rs. 218.57 Rs. 273.21
Note :- For laying C.I.S/S spun pipe of higher dia the following multiplying factor
will apply over mentioned above to arrive al laying rate of respectives
range of dia of pipe.
3.1.32. Supplying labours, tools, tackles, lubricant etc. for laying and jointing C.I.S/S
tyton pipes (class LA) /D.I. pipe in trenches supplying rubber gasket (Rubber gaskets
confirming to I.S.S.- 5382- 1969) and making gasket joints including providing
night guard,barrier and red light to safe guard against accident, all complete
(Pipe to be suppllied departmenatlly free of cost and laying of pipes is to be
done as per I.S.S.3114-1985) as per design, specification and direction of E/I.
3.1.33. Supplying labours tools and tackles, lubricant etc. for laying and jointing
G.I.S./S conventional glass L-A- pipe with pushtite joints in trenches
including supplying of approved quality rubber gasket for making joints
providing night guard barrier and red light to safe guard against accident
etc. all complete (Pipes to be supplied departmentally free of cost and
pipes is to be laid as per I.S.S.-3114-1985) as per design, specification
and direction of E/I.
3.1.34. Supplying labour and tools for laying and jointing C.I. specials in trenches
including supplying lead and yarn (Pig lead confirming to ISS: 782-1978
and yarn confirming to ISS : 658/-1972) and making lead caulked joints
as per IS specification and direction of E/I. (C.I. specials to be supplied
departmentally free of cost).
3.1.35 Supplying labour and tools for fixing C.I. sluice valve in trenches with
a pair of C.I. Tail piece, including making lead caulked joints and flanged
joint as per I.S.S. specification, including supplying all jointing materials
(Pig lead confirming to I.S.S. 782- 1978, yarn confirming to I.S.S. 6587-
1972 and nuts and bolts confirming to I.S.S. 1364-1983) including drilling
holes in flanges if required as per specification and direction of Engineer-
in-charge ( Sluice valve and pieces to be supplied departmentally free of
cost).
3.1.36 Supplying labours and tools for laying and jointing U.P.V.C. pipe in trenches
and making joints with U.P.V.C. collar and solvent cement, including providing
night guard, barrier & red light to safe guard against accident, all
complete as per specification and direction of Engineer-in-charge (U.P.V.C.
pipe with collar and solvent cement to be supplied departmentally free of cost).
1 2 3 4 5 6
A. 90/90 1/75
0.02 nos. 0.02 0.1 nos.
wk31 wk84 wk1
Rs. 4.7838 Rs. 4.7838 Rs. 18.743 Rs. 28.31
b. 110/100 1/89 0.025 nos. 0.025 nos. 0.15 nos.
Rs. 5.97975 Rs. 5.97975 Rs. 28.1145 Rs. 40.07
c. 140/125 1/83 0.025 nos. 0.025 nos. 0.15 nos.
Rs. 5.97975 Rs. 5.97975 Rs. 28.1145 Rs. 40.07
d. 10/150 1/25 0.03 nos. 0.03 nos. 0.2 nos. Rs.
Rs. 7.1757 Rs. 7.1757 Rs. 37.486 Rs. 51.84
e. 210/200 1/15 0.03 nos. 0.03 nos. 0.2 nos. Rs.
Rs. 7.1757 Rs. 7.1757 Rs. 37.486 Rs. 51.84
7 8 9 10 11 12 13 14
3.1.37. Supplying labours and tools for laying and jointing H.D.P.E. pipes in mirror,
jack etc. and providing night guard, barrier and red light to safe guard
against ancident, all complete as per specification and direction of Engineer-
In-Charge. (H.D.P.E. pipes will be supplied departmentally free of cost).
3.1.38 Supplying labours and tools for laying and jointing A.C.pressure pipe in
trenches (As per I.S.S.) with G.I. detachable joints with O rings, including
night guard, light, barrier and red light etc. as per specification and
direction of Engineer-in-charge. (A.C. pressure pipe with C.I. detachable
jointing with "O" rings will be supplied departmentally free of cost).
1 2 3 4 5 6
7 8 9 10 11 12
3.1.39. Supplying labours and tools for laying & jointing U.P.V.C. specials in
trenches as per specification and direction of E/I. (U.P.V.C. special, like,
tee, bends taper collar and solvant cement to be supplied free of cost
departmentally)
3.1.40. Suppplying labour for laying & jointing H.D.P.E. Specials as per I.S.S.
specification and direction of E/I. (H.D.P.E. specials like Tee, bend and
taper to be supplied departmentally free of cost.
(A) Bend or Taper
(i) 90 mm outer dia Rs. 65.23747 Unit-Each
(ii) 110 mm outer dia Rs. 84.08362 Unit-Each
(iii) 140 mm outer dia Rs. 87.32181 Unit-Each
(iv) 160 mm outer dia Rs. 111.3031 Unit-Each
(v) 200 mm outer dia Rs. 111.4181 Unit-Each
(B) Tee
(i) 90 mm outer dia Rs. 110.6392 Unit-Each
(ii) 110 mm outer dia Rs. 148.3315 Unit-Each
(iii) 140 mm outer dia Rs. 154.8079 Unit-Each
(iv) 160 mm outer dia Rs. 200.787 Unit-Each
(v) 200 mm outer dia Rs. 201.017 Unit-Each
A. Bend or Taper
90 mm 110 mm 140 mm 160 mm 200 mm
Particulars of
O.D. O.D. O.D. O.D. O.D.
item to be done
1. Jointing charge for Vide jointing charge per joint for H.D.P.E. pipe
each special item no 12.1.37 multiplied by one for Bend & Tapper
Rs. 39.47976 Rs. 55.86772 Rs. 58.68353 Rs. 77.81203 Rs. 77.91203
2. Laying charge Laying charge will be 50% of item 12.1.31
Rs. 17.24848 Rs. 17.24848 Rs. 17.24848 Rs. 18.97332 Rs. 18.97332
Total 56.72823 73.11619 75.93201 96.78535 96.88535
Add 15% C.P. & O.H.C 8.509235 10.96743 11.3898 14.5178 14.5328
Grand Total 65.23747 84.08362 87.32181 111.3031 111.4181
Calculate rate each for all Rs.
3.1.41. Supplying labours for laying & Jointing plain and C.I. specials as for A.C.
pressure pipe in trenches as per I.S.S. specification and direction of E/
I. (A.C. pressure pipe, C.I. specials, C.I. joints with 'O' ring to be supplied
departmetally free of cost).
(B) Tee
(i) 80 mm outer dia Rs. 113.1302 Unit-Each
(ii) 100 mm outer dia Rs. 151.4142 Unit-Each
(iii) 125 mm outer dia Rs. 151.4142 Unit-Each
(iv) 150 mm outer dia Rs. 178.5234 Unit-Each
(v) 200 mm outer dia Rs. 178.5234 Unit-Each
(vi) 250 mm outer dia Rs. 209.9441 Unit-Each
(vii) 300 mm outer dia Rs. 209.9441 Unit-Each
B. Tee
Particulars of
item to be done
1. Jointing charge for Vide jointing charge per joint for A.C. pressure pipe
each C.I. special item no 12.1.38 multiplied by 2 for Tee
Rs. Rs. Rs. Rs. Rs. Rs. Rs.
70.7765 104.067 104.067 124.8804 124.8804 151.5128 151.5128
2. Laying charge Laying charge will be 80% of item no. 12.1.31
Rs. Rs. Rs. Rs. Rs. Rs. Rs.
27.59756 27.59756 27.59756 30.35732 30.35732 31.04726 31.04726
Total Rs. 98.37406 131.6646 131.6646 155.2377 155.2377 182.5601 182.5601
Add 15% C.P. & O.H.C Rs. 14.75611 19.74968 19.74968 23.28566 23.28566 27.38401 27.38401
Grand Total Rs. 113.1302 151.4142 151.4142 178.5234 178.5234 209.9441 209.9441
3.1.42. Supplying labour & tools for fixing C.I. double acting Air valve in trenches
as per specification and direction of E/I. (C.I. double acting Air valve to
be supplied departmentally free of cost).
2. Labour
i. Plumber Gr. I 0.1 0.1 0.15 0.2 0.25 0.3
nos. nos. nos. nos. nos. nos.
@ Rs. - each Rs. Rs. Rs. Rs. Rs. Rs.
23.919 23.919 35.8785 47.838 59.7975 71.757
ii. Plumber Gr. II 0.1 0.1 0.15 0.2 0.25 0.3
nos. nos. nos. nos. nos. nos.
@ Rs. - each Rs. Rs. Rs. Rs. Rs. Rs.
23.919 23.919 35.8785 47.838 59.7975 71.757
Item 80 100 125 150 200 250 300 350 400 450 500.00 600 700 750
mm mm mm mm mm mm mm mm mm mm mm mm mm mm
dia dia dia dia dia dia dia dia dia dia dia dia dia dia
1. Labour
I. Plumber Gr. II
0.05 0.06 0.07 0.1 0.15 0.15 0.2 0.25 0.3 0.35 0.40 0.5 0.6 0.65
nos. nos. nos. nos. nos. nos. nos. nos. nos. nos.
@ Rs. -each
wk31
Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
11.9595 14.3514 16.7433 23.919 35.8785 35.8785 47.838 59.7975 71.757 83.7165 95.68 119.595 143.51 155.4735
B. Skilled Mazdoor
0.05 0.06 0.07 0.1 0.15 0.15 0.2 0.25 0.3 0.35 0.40 0.5 0.6 0.65
nos. nos. nos. nos. nos. nos. nos. nos. nos. nos.
@ Rs. -each
Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
10.9285 13.1142 15.2999 21.857 32.7855 32.7855 43.714 54.6425 65.571 76.4995 87.43 109.285 131.14 142.0705
Total 22.888 27.4656 32.0432 45.776 68.664 68.664 91.552 114.44 137.328 160.216 183.10 228.88 274.66 297.544
15% C.P. & O.H.C.
3.4332 4.11984 4.80648 6.8664 10.2996 10.2996 13.7328 17.166 20.5992 24.0324 27.47 34.332 41.198 44.6316
G.Total 26.3212 31.58544 36.84968 52.6424 78.9636 78.9636 105.2848 131.606 157.9272 184.2484 210.57 263.212 315.85 342.1756
Calculate rate for each separately for all Rs.
3.1.44. Labour charge for one cutting of H.D.P.E./U.P.V.C./A.C. pressure pipe -do--do- as in item
3.1.43. as per specification and direction of E/I.
3.1.45.1 Supplying materials labours for making one flange job with C.I. or G.I.
pipe as the case may be as per specification and direction of E/I. (D/
F pipes specials and valves are to be supplied free of cost by the department).
2. Labour
i. Plumber Gr. I 0.33 nos. @ Rs.
As per item no. 3.1.42
Rs. Rs. Rs. Rs. Rs. Rs. Rs.
---- ---- ---- ---- ---- ---- ----
ii. Plumber Gr. II 0.33 nos. @ Rs.
Rs. Rs. Rs. Rs. Rs. Rs. Rs.
3.1.45.2 Supplying labour & tools for laying & jointing C.I. or G.I. D/F pipe in
trenches as per specification and direction of E/I.
a. 80 mm dia. N.D. Unit-Each
b. 100 mm dia. N.D. Unit-Each
c. 125 mm dia. N.D. Unit-Each
d. 150 mm dia. N.D. Unit-Each
e. 200 mm dia. N.D. Unit-Each
f. 250 mm dia. N.D. Unit-Each
g. 300 mm dia. N.D. Unit-Each
Unit-per M.
Item of work to be 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm
done dia dia dia dia dia dia dia
i. Cost of jointing
for each joint
vide item no. 3.1.45.1 Rs. Rs. Rs. Rs. Rs. Rs. Rs.
---- ---- ---- ---- ---- ---- ----
(a) Hence cost of
jointing per metre Rs. Rs. Rs. Rs. Rs. Rs. Rs.
---- ---- ---- ---- ---- ---- ----
2. For laying only
vide item no. 3.1.31
per metre Rs. Rs. Rs. Rs. Rs. Rs. Rs.
---- ---- ---- ---- ---- ---- ----
Calculate rate per metre separately for all Rs. N.D.
3.1.45.3 Supplying labour & tools for laying & C.I. or G.I. D/F pipe on ground
as per specification and direction of E/I.
a. 80 mm dia. N.D. Unit-Each
b. 100 mm dia. N.D. Unit-Each
c. 125 mm dia. N.D. Unit-Each
d. 150 mm dia. N.D. Unit-Each
e. 200 mm dia. N.D. Unit-Each
f. 250 mm dia. N.D. Unit-Each
g. 300 mm dia. N.D. Unit-Each
3.1.46. Supplying labours, tools and tackles for testing of laid C.I. or U.P.V.C.
or H.D.P.E. or A.C. pressure pipe upto 60metre head of water all complete
as per specification and direction of E/I. (Water to supplied free of cost
departmentally).
TUBE WELL
3.1.47. Boring by Jet or Dheki and lowering G.I. pipe of requisite dia cutting
the pipe and threading them if necessary, fitting and fixing (a) strainer
of standard quality (b) iron shoe plug and (c) Sockets etc. all complete
including providing all tools and plants required for the job as per specification
and directioin of E/I. (Materials like G.I. pipe, strainer, shoe plug, handpump,
cylinder, G.I. flange etc. to be supplied departmentally free of cost of
departmental goddown).
Labour
Tubwell Mistry for 21/2 days 1 no. @ Rs.-day Rs.
Semi skilled Mazdoor for 21/2 days 2 Nos. @ Rs.-day Rs.
Unskilled mazdoor for 21/2 days 3 Nos. @ Rs.-day Rs.
Add 1% sundries on labour only Rs.
Materials
Yarn and rope for jointing pipe 0.75 kg @ Rs./kg Rs.
Bamboo for Dheki kanti etc. 2 nos. @ Rs. Rs.
(Assuming its use for two times hence
50% cost should be taken)
Tools and plant and Red lead, hemp etc. L.S. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
Materials
Same as item (A) (i) Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
3.1.48. Providing labour for fitting and fixing deep well cylinder with necessary
connecting rod and drilling flanges including supplying, jointing materials,
all tools and plant etc. required for the job for low water level, all complete,
as per specification and direction of E/I. (Tube well materials to be supplied
departmentally free of cost from departmental godown).
Unit-Each
Assistant T/W mistry 0.2 Nos. @ Rs./day Rs.
Semi skilled mazdoor 0.4 Nos. @ Rs./day Rs.
Add 1% sundries on labour only Rs.
for tools and plants and jointing materials etc. L.S. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.49. Providing labour for fitting and fixing hand pump No.6 over flanges connected
with G.I. Tube-well including replacing leather bucket, leather flap valves,
nuts and bolts, etc. as well as all tools and plants required for the job,
all complete, as per specification and direction of E/I. (Hand pump No.6
to be supplied departmentally free of cost from departmental godown).
Materials
Leather flap valve 1 No. @ Rs./each Rs.
Leather bucket 1 No. @ Rs./each Rs.
Nuts and Bolts , tools and plants etc. L.S. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.50. Providing labour for developing and testing the tube well for two days
till the discharge of water mixed with sand vanishes and flow of clear
water starts as per specification and direction of E/I.
Unit-Each
Labour
Unskilled mazdoor for 2 days 1 No. @ Rs. Rs.
Sundries 1% on labour only Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.51. Carriage by bullock cart including loading, unloading of complete one set
of tube well materials to worksite including pre cast R.C.C. platform and
drain etc.(If required) from departmental store all complete including percast
R.C.C. platform and drain etc (If required) from departmental godown
including returning of surplus material from work site to departmental godown
as per specification and direction of E/I. (Average lead to be taken into
consideration for payment) approx weight of per tube well set with 5 no
of G.I. Per MT pipe is 500Kg. so weight of such tube well sets = 2 Metric Ton.
Labour
Tube well Mistry for 11/2 days 0.5 Nos. @ Rs./day Rs.
Semi skilled mazdoor for 11/2 days 0.5 Nos. @ Rs./day Rs.
Unskilled mazdoor for 11/2 days 2 Nos. @ Rs./day Rs.
Add sundries 1% on labour only Rs.
Tools and plants etc. L.S. Rs.
Rate per metre of penetration = X/30.5 Total Rs. X
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
Labour
Tube well Mistry for 21/2 days 0.5 Nos. @ Rs./day Rs.
Semi skilled mazdoor for 21/2 days 2 Nos. @ Rs./day Rs.
Unskilled mazdoor for 21/2 days 3 Nos. @ Rs./day Rs.
Add sundries 1% on labour only Rs.
Tools and plants etc. L.S. Rs.
Rate of extracting of one tube well
having 30.5 M depth = X/ 30.5 = Total Rs. X
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
3.1.53. Providing labour for fitting and fixing 900x900x100mm precast R.C.C (1:2:4)
platform including providing and fixing hollow blocks having 150mm thickness
all round and 600mm deep made of P.C.C.(1:3:6) with jhama metal and
sand including smooth finishing and punning of exposed portion all complete
(Excluding the cost of carriage of precast R.C.C.platform to worksite) as
per specification and direction of E/I.
Unit-Each
i. Cost of P.C.C. (1:3:6) with
jhama metal and sand p/ 4(0.34)2 x 0.60 = 0.054 M3
@ Rs. -per M3 vide item no. 5.3.3. Rs.
(ii) Cement punning on top position p 0.29x0.34(0.25)2 = 0.032 M2
@ Rs. -per M2 vide item no. 5.7.11 Rs.
(iii) Placing the precast R.C.C. platform in position L.S. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.54 Providing labour for fitting anf fixing the precast R.C.C.(1:2:4) drain in
position at the tube well site including jointing adjacent gap in cement
mortar (1:3) all complete as per specification and direction of E/I.
Unit-per Joint
12 mm cement mortar (1:3)
= 0.2 x 0.6 = 0.12 M2
In Joint 0.2x0.075 x 0.1x0.08 = 0.02 M2
= 0.14 M2
vide item 5.7.1. @ Rs. - per M2 Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per Joint Rs. N.D.
3.1.55. Boring by jet of Dheki by 40mm dia G.I. pipe and bore reamed by 40mmx50mm
reducer or by suitable cutter or reducer as the case may be and lowering
U.P.V.C. blue casing pipe of 40 mm. internal dia, cutting the pipe if necessary,fitting
and fixing strainer of standard quality iron shoe plug and sockets etc.
all complete including providing all tools and plants required for the job
as per specification and direction of E/I. (U.P.V.C. pipe, strainer with G.I.
shoe plug and jointing materials of U.P.V.C. pipe, G.I. pipe and reducer
for boring to be supplied free of cost departmentally, out of which G.I.
pipes and recucer and surplus materials are to be returned back to the
department).
Materials
Same as in item 3.1.47 A(i) Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
Materials
Same as in item 3.1.46 A (i) Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
(F) For depth beyond 61 metre below G.L. but up to 91.5 metre
(vide classification of soil item 'B')
(i) For 40 mm dia blue casing U.P.V.C. pipe
Rate per metre = 1.25 x Rate of 40 mm dia U.P.V.C. pipe
(vide item no. 3.1.55 (D) (i) Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
3.1.56. Providing labour for fitting and fixing deep well 65mm/80mm brass/C.I.
steel pipe cylinder along with special Hand pump No.6 or ordinary hand
pump No.6 without 90mm plunger flap valve and leather bucket with necessary
length of 12mm dia M.S. bright steel connecting rod 40mm/32mm down
pipe, 25mm or 21mm dia pipes drilling holes in flanges if so required
including replacing leather bucket of cylinder as required during developing
and testing of tube well with all tools and plants, jointing materials like
rubber insertion etc. all complete job as per specification and direction
of E/I. (Cylinder, hand pump, connecting rod, flange coupling as required
for connection rod, 40mm/32mm down pipe, 25mm dia suction pipe will
be supplied departmentally free of cost from departmental store).
NOTE : This rate will be applicable for G.I. pipe as well as U.P.V.C. blue casing
pipe tube well.
Unit-Each
Labour
Tube well/ Mistri/ plumber Gr. I 0.25 nos. @ Rs.-each Rs.
Skilled mazdoor 0.25 nos. @ Rs.-each Rs.
Unskilled mazdoor 0.25 nos. @ Rs.-each Rs.
Sundries 1% on labour only Rs.
Leather bucket 65 mm or 70 mm 1 no. @ Rs.-each Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.57. Supplying labour and materials for constructions per cast R.C.C. (1:2:4)
platform of size 900 x 900 x 75mm with 75mmx75mm edges all along
excluding cost of reinforcement with top and size finished with 12mm cement
plaster (1:3) without neat cement punning for fine finish all around as
per specification and direction of E/I.
Unit-Each
(i) R.C.C. bd slab = 9mtr x 0.9 mtr x 0.075mtr = 0.06075 M3
Edges 4 x 0.825mtr x 0.075 mtr x 0.075 mtr = 0.01856 M3
0.07931 M3
Deduction for small hole 100 mm dia in bed and
125 mm width is edging for drain
(-)0.001135 M3
p / 4 x (0.10)2 x 0.075 --------------------------
0.07769 M3
vide item 5.3.5 + 0.075 x 0.075 x 0.125 Rs./M3 Rs.
(ii) 12mm cement plaster (:3) with neat cement punning
Top surface (0.9+0.15x2)2 = 0.930x0.930 = 0.865 M2
Out side edge = 0.930 x 4 x 0.015 = 0.558 M2
Inside edges 4(0.900-2x0.075-2x0.012)x0.075
= 0.0726 x 4 x 0.075 = 0.218 M2
Total- 1.641 M2
vide item 5.7.1. & 5.7.11 @ Rs. per M2 Rs. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.59. Providing designation class 100B brick masonry drain in C.M. (1:6) of
size 125mm wide, 75mm, deep with 125mm approved on both side over
375mm brick flat of brick designation class 75 B soling on 80mm. thick
dry rammed khoa with 12mm C.P.(1:4) as well as neat Cement punning
all complete as per specification and direction of E/I.
Unit-per metre
Taking 3 metre long drain Earth work
0.375 mtr x 0.08 mtr x 3 mtr = 0.09 M3
vide item no. 12.1.1 @ Rs./M2 Rs.
75 B Brick flat soling = 0.375 X 0.3 = 1.125 M2 Rs.
80 mm dry rammed khoa same as soling area = 1.125 M2
vide item no. 5.6.5 (work out proportionate @ Rs./M2 Rs.
cost of 80 mm. )
Designation class 100 B brick work in C.M. (1:6)
2 x 0.125 mtr x 0.008 mtr x 3 mtr = 0.06 M6
vide item no. 5.2.6 @ Rs./M3 Rs.
12 mm cement plaster (1:4) with neat cement
punning 0.75 mtr x 3 mtr = 2.25 M2 @ Rs. Rs.
vide item no. 5.7.2. and item no. 5.7.11.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate per metre Rs. N.D.
3.1.60. 115mmx40mm dia drilled tube well. (1) Drilling in all kinds of soil and
rock in rural area for installation of hand pumps with D.I.H. rigs all complete
including supplying all materials labours, tools, drilling rigs, air compressor
and equipments as well as fuel, lubricant for making 115mm dia boring
etc. and cost of transportation charge of Rig machine and other vehicle
from garrage charge of rig upto the site of works as per specification
and directin of E/I
(i) Drilling in all kinds of soil and rock in rural area for installation of hand
pumps with D.I.H. rigs all complete including supplying all materials labours,
tools, drilling rigs, air compressor and equipments as well as fuel, lubricant
for making 115mm machine and other vehicle from garrage charge of rig
machine and other vechile from garage upto the site of the works as
per specification and directin of E/I
Unit-per mtr.
(I) Hourly use rate of drilling rig machine
(a) Depreciation charges :-
(i) Cost of drilling rig machine on truck complete with compressor, drilling
machine and all other associated equipments except winch motor and
rotation motor.
(ii) Rated life in hours - 8000
(iii) Depreciation / hour = 0.9 X I/ 8000 Rs.
(b) Repair and maintenance charge
= 80% of (a)
The above cost has been worked out for drilling between 0 to 38 metre
depth below G.L. while drilling beyond 38 metre upto 60 metre depth.
The depth covered per hour gets reduced to 2.5 metre in place of 3 metre
per hour, thereby affecting the cost of drilling as per item (B). All other
items remaining the same hence cost of drilling / metre = R/2.5= Q.
Cost of drilling per metre = (Q) above + (C) as for in previous case. Rs. N.D.
NOTE :
1. In case of drilling in urban areas the lead involved in transportation of
rig machine will be within 10 K.M.
3.1.62. Supplying labour, sand and equipment for grouting at casing pipe (Cement
and calcium chloride to be supplied departmentally free of cost at de-
partmental store) after lowering in bore all complete as per specification
and direction of E/I.
Unit Each
Angular space of 115 mm dia x 12 metres depth to be grouted
i. Carriage of cement and calcium chloride from
departmental store to work site on average of 50 K.M. L.S. Rs.
ii. Cost of sand at site L.S. Rs.
iii. Mason Gr. II 0.333333 nos. @ Rs. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.63. Supplying labour and equipment including supplying 100mm dia G.I. pipe
cap and fitting and fixing it over the tube well properly as per specification
and direction of E/I.
Unit Each
i. Cost of 100 mm dia G.I. pipe 1 no. @ Rs. Rs.
ii. Plumber Gr. II 0.5 nos. @ Rs. Rs.
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.64. Supplying labour and equipment for digging well vide classification of
soil item-A including removing the spoils to a safe distance upto 50m
from the edge of the well all complete as per specification and direction
of E/I.
Labour
Mate 0.25 nos. @ Rs. 199.43 Rs. 49.86
Unskilled mazdoor 12 nos. @ Rs. 187.43 Rs. 2249.16
(b) Extra for earth work for each subsequent lift of 1 metre over the initial
lift of 3 metre as per specification and direction of Engineer-in-charge.
3.1.65. Supplying labour and equipments for digging well (vide classification of
soil items C).With chisel and hammer including disposal of excavated
materials and stacking the spoils to safe distance at 50metre all complete
as per specification and direction of E/I.
3.1.66. Supplying labour and equipment for digging well in hard rock (vide clas-
sification of soil item D) by blasting with disposal of blasted materials
and stcking at 30m lead and supplying all blasting materials and tools
etc. including dressing the sides etc. all complete as per specification
and direction of E/I.
A 4586.83
B. Blasting materials including excise, sale tax
and carriage from Gomia to work site storage
etc. special Gelatin 2.75 kg @ Rs. -per kg.
2.75 kg @ Rs. 119 Rs. 327.25
Detonator 18 nos. @ Rs. 4.5 Rs. 81.00
Fuse coil 3 nos. @ Rs. 22 Rs. 66.00
B 474.25
C. Tools and Plants
Cost of hire charge of compressor, drilling
equipment and other
Accessories 5% of Item B Rs. 23.71
C 23.71
Total A+B+C Rs. 5084.79
Add 15% C.P. & O.H.C. Rs. 762.72
Grand Total Rs. 5847.51
Calculate rate per M3 Rs. 206.41
3.1.67. Extra for additional lift of 1 Metre over the initial lift of 3 metre as per
specification and direction of E/I.
3.1.68. Supplying materials and labour for providing R.C.C. well curb (1:2:4)
including centering and shuttering but excluding the cost of reinforcement
all complete job as per specification and direction of E/I.
Unit per M3
3.1.69. Supplying materials and labour for providing following masonry work in
cement mortar (1:6) in steining well of the well and in the parapet and
well around in the platform including shuttering scaffolding if needed and
providing adequate number of weep holes from bottom upto 4.5m below
G.L. etc. all complete as per specification and direction of E/I.
A. In steining well
(i) Rough dressed stone masonry in C.M. (1:6) Unit per M3Rs. 2073.62
(ii) Brick work with designation 75B in cement mortar (1:6) Unit per M3Rs. 3613.71
(iii) Brick work with designation class 75A in (1:6) cement mortar. Unit per M3Rs. 3613.71
B. Extra for each additional lift of 1m over the initial lift of 3m for
masonry work.
Unit per M3Rs. 12.93
C. In perapet well and drai above G.L.
(i) Rough dressed stone masonry in cement mortar (1:6) Unit per M3Rs. 2063.30
(ii) Brick work with designation 75B (1:6) Unit per M3Rs. 3595.73
(iii) -- do -- do -- 75 A (1:6) in cement mortar Unit per M3Rs. 3595.73
Unit per M3Rs.
iii. Brick work with designation class 75A in cement mortar (1:6)
vide item no. 5.2.3 1 cum @ Rs. 3126.721 Rs. 3126.72
Add extra for scaffolding 0.5% of masonary work Rs. 15.63
B. Extra each additional lift for metre over the initial lift of 3 metre for
masonary work
(Assuming 10 M3)
Unskilled mazdoor 0.5 nos. @ Rs. 187.43 Rs. 93.72
3.1.70. Supplying materials and labours for providing (1:3) cement mortar flush
pointing in steining well including curing centering and scaffolding etc. all
complete as per specification and direction of E/I.
Unit per M2
A. Flush pointing in C.M. (1:3) vide item no. 5.7.8 1@ Rs. 69.2369 Rs. 69.24
Add extra for scaffolding 20% of labour cost L.S. Rs. 13.85
3.1.71. Supplying materials and labour for fixing 20mm dia M.S. bar steps in stening
well of 0.3 m interval and staggered in (1:2:4) cement concrete including
scaffolding and curing etc. all complete as per specification and direction
of E/I.
Unit-Each
i. Weight of 20 mm dia M.S. rod 1.15 metre long = 2.82 kg
vide item 5.5.2 2.82 Kg @ Rs. 43750 Rs. 123.38
ii. For fixing steps in (1:2:4) cement concrete
0.3mx0.175mx0.1m = 0.00525 M3
vide item 5.3.5 0.00525 cum @ Rs. 4604.064 Rs. 24.17
3.1.72 Supplying materials and labours for 12mm thick cement plaster(1:3) cement
mortar with neat cement punning on parapet including scaffolding and curing
etc. all complete job as per specification and direction of E/I.
Unit per M2
For 12 mm cement palaster in cement mortar (1:3)
with neat cement punning vide item no. 5.7.1 & 5.7.11
5.7.1 1 M2 @ Rs. 125.8451 Rs. 125.85
5.7.11 1 M2 @ Rs. 37.57638 Rs. 37.58
Total Rs. 163.42
Calculate rate per M2 Rs. 163.42
3.1.73. Supplying materials and labours for rough dressed stone masonry in (1:4)
cement mortar over the platform including curing etc. all complete as per
specification and direction of E/I.
Unit per M3
3.1.74. Supplying materials and labour for providing 12 mm thick cement plaster
in C.M. (1:4) over the exposed surface of platform and drain including
neat cement punning, all complete as per specification and direction of
E/I.
Unit per M2
Vide item no. 5.7.2 1 M2 @ Rs. 116.7574 Rs. 116.76
Vide item no. 5.7.11 1 M2 @ Rs. 37.57638 Rs. 37.58
Calculate rate for M2 Rs. 154.33
3.1.75. Supplying equipment and labour for desilting the well all complete as
per specification and direction of E/I.
Unit-Each
Labour
Unskilled mazdoor for 2 days 4 nos. @ Rs. 187.43 Rs. 749.72
Materials
Rope, cane, baskets etc. 5% of labour cost Rs. 37.49
3.1.76. Supplying equipment and labour for back filling the excavated earth around
steining well all complete as per specification and direction of E/I.
Unit per M3
Vide item no. 3.1.1.2 1 M3 @ Rs. 53.88613 Rs. 53.89
Calculate rate for M3 Rs. 53.89
3.1.77. Supplying all materials and labours for providing 125mmx 80mmx6mm
thick R.S. joist of 2.15 meter long for supplying the pulley, including,
erection, fitting and fixing all complete as per specification and direction
of E/I.
3.1.78. Supplying materials for providing 150mm dia and 25mm dia iron puley
including fitting and fixing with R.S. joists as per specification and direction
of E/I.
Unit-Each
i. Cost of 150 mm dia and 25 mm wide pulley
1 nos. @ Rs. Rs.
ii. Cost of cutting joist & proving axle piece
and welding etc. Rs.
Total Rs.
Add 10% C.P. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
3.1.79. Supplying equipment and labour for dewatering including supplying diesel
pump as per requirement and its fuel etc. all complete as per specification
and direction of E/I.
3.1.80 Supplying materials and labours for fitting and fixing following ball cock
(Polythene or plastic ball and brass cock) of approved make, all complete
as per specification and direction of E/I.
a. 15 mm dia Unit-Each
b. 20 mm dia Unit-Each
c. 25 mm dia Unit-Each
15 mm dia 20 mm dia 25 mm dia
1. Cost of one no ball cock Rs. Rs. Rs.
2. Red lead, hemp etc L.S. Rs. 0.25 Rs. 0.25 Rs. 0.3
3. Labour
Plumber Gr. I 0.1 nos. 0.1 nos. 0.15 nos.
@ Rs. -each Rs. Rs. Rs.
4. Sundries 1% on labour only Rs. Rs. Rs.
Total Rs.
Add 10% C.P. Rs.
Grand Total Rs.
Calculate rate separately for each Rs. N.D.
CHAPTER 3.2
SANITARY INSTALLATION
3.2.1. Supplying, fitting and fixing vitreous white glazed earthen ware I.W.C.
of parry Hindustan or any other I.S.S.approved make with 100mm H.C.I.
‘p’ trap 15 litres C.I. pull and let go flushing cistern of names or other
I.S.S.equivalent make, complete with all fittings,C.I. or C.C.brackets 32mm
alkathene/P.V.C. telescopic flush, pipe about 2 M long with one brass
coupling and clamps G.I. chain and pull including supplying and fixing a
pair of vitreous white glazed earthenware ware footrest to be fixed in
floor 15mm C.I. body brass spindle stope cock of weight not less than
50grms, 15mm P.V.C. connection pipe 450 mm. long and the exposed
pipe and cistern with two coats of approved paint over a coat of red
oxide primer etc. all complete as per specification and direction of E/I.
8. Cost of foot rest of glazed earthenware 1 pair @ Rs. 212 Rs. 212.00
9. Red lead, white lead & gaskets etc.
Cement sand grit wooden plug etc. 2% of item A(2) Rs. 38.90
Labour
1. Plumber Gr.I 1.25 nos. @ Rs. 239.19 Rs. 298.99
2. Mason Gr.II 0.5 nos. @ Rs. 220.57 Rs. 110.29
3. Skilled mazdoor 1 no. @ Rs. 218.57 Rs. 218.57
Labour
1. Plumber Gr.I 1.25 nos. @ Rs. 239.19 Rs. 298.99
2. Mason Gr.II 0.5 nos. @ Rs. 220.57 Rs. 110.29
3. Skilled mazdoor 1 no. @ Rs. 218.57 Rs. 218.57
3.2.2. Supplying, fitting and fixing 40mm high vitreous white glazed earthen
E.W.C. with ‘p’ trap of parry hindustan or any other approved I.S.S. make
including supplying and fixing 15 litres C.I. mosquito proof low down flushing
cistern of approved make with complete fittings with C.I.handle and R.S.
or bracket with telescopic flush pipe with brass coupling and plumbers
joints spindle stop cock of approved quality weight not less than 450grams
15mm P.V.C. connection pipe 45cm. long with brass coupling at both ends
and white/black plastic solid state seal and lead of commander/cuckoo
or other I.S.S. make with hinges or screws etc. painting pipe and cistern
etc. with 2 coats of approved paint over a coat of red oxide priming,
all complete as per specification and direction of E/I.
A. With 'P' trap Unit-Each
B. E.W.C. with 'S' trap Unit-Each
(A.) With 'P' Trap Unit-Each
1. 450 mm high E.W.C. wit 'P' trap 1 no. @ Rs. 1052 Rs. 1052.00
2. 15 litres/12.5 litres capacity C.I. cistem
handle with mosquito proof couplig 1 no. @ Rs. 972 Rs. 972.00
3. C.I. brackets 1 pair @ Rs. 84 Rs. 84.00
4. P.V.C. flush pipe with brass union 1 no. @ Rs. 181 Rs. 181.00
5. 15 mm P.V.C. Connection pipe 45 cm long 1 no. @ Rs. 59 Rs. 59.00
6. 15 mm C.I. body brass spindle & stop
cock weight not less than 450 gms. 1 no. @ Rs. 94 Rs. 94.00
7 Plastic seat cover stock / white 1 no. @ Rs. 413 Rs. 413.00
8 Red lead, white lead & gaskets etc.
Cement sand grit wooden plug etc. 2% of cost C.I. cistern Rs. 19.44
9 Painting of cistem & bracket etc. two coasts
over red oxide primer 1.2 M2 @ Rs. 41.17 Rs. 49.40
Labour
1. Plumber Gr.I 1.25 nos. @ Rs. 239.19 Rs. 298.99
2. Mason Gr.II 0.5 nos. @ Rs. 220.57 Rs. 110.29
3. Skilled mazdoor 1 no. @ Rs. 218.57 Rs. 218.57
3.2.3. Supplying, fitting and fixing flat back or angular, lipped front vitreous white
glazed earthen ware urinal of ‘Hindustan "Parry" or any other approved
I.S.S make with 5 liters capacity C.I. automatic fulsing cistern of reliance
for any other I.S.S. approved make with all fittings with C.I.or R.S. brackets,
standard size G.I. flush pipe with fitting clamps, 15mm C.I. body brass
spindle stop cock of approved quality weight not less than 400grams, 15mm
P.V.C.connection pipe 450mm longwith brass coupling at both ends and doing
plumber joints including painting of exposed part with two coats of approved
paint over a priming coat of red oxide, cutting wall and floor, making
good the same etc. all complete as per specification and direction of E/I.
Labour
1. Plumber Gr.I 0.88 nos. @ Rs. 239.19 Rs. 210.49
2. Mason Gr.II 0.88 nos. @ Rs. 220.57 Rs. 194.10
3. Skilled mazdoor 1.5 nos. @ Rs. 218.57 Rs. 327.86
4. Add 1% sundries on labour only Rs. 7.32
Total - A Rs. 2835.98
Total - B Rs. 2766.98
Add 15% C.P. & O.H.C. A Rs. 425.40
Add 15% C.P. & O.H.C. B Rs. 415.05
Grand Total A Rs. 3261.37
Grand Total B Rs. 3182.02
Calculate rate for each A Rs. 3261.37
Calculate rate for each B Rs. 3182.02
3.2.4. Supplying, fitting and fixing vitreous white glazed earthen ware indian squating
type 600x350mm urinal plate of parry, Hindustan or any other I.S.S. approved
make with internal flushing rim, 100mm white glazed earthen ware channel
about 1m. long 5 litre capacity C.I. automatic flushing cistern of reliance
or any other approved make with fittings R.S. or C.I. brackets 15mm
and 45 cm long PVC connection pipe standard G.I. flush pipe for back
and front with spreader fittings and brass coupling etc. 15 mm C.I. body
brass spindle stop cock weight not less than 450 grams. all complete
including painting of exposed parts with 2 coats of approved paint over
a coat of red oxide primer and cutting the wall and floor and making
good the same as per specification and direction of E/I.
Labour
1. Plumber Gr.I 1.25 nos. @ Rs. 239.19 Rs. 298.99
2. Mason Gr.II 0.5 nos. @ Rs. 220.57 Rs. 110.29
3. Skilled mazdoor 1 no. @ Rs. 218.57 Rs. 218.57
3.2.5. Supplying fitting and fixing vitreous white glazed earthen ware wash hand
basin of parry or Hindustan or any other I.S.S. approved make supported
on painted C.I. or R.S. brackets 32mm C.I.brass waste, 15 mm dia C.I.
body brass spindle stop cock of approved quality of weight not less than
350grams, 32mm P.V.C. waste pipe 750mm long with brass coupling at
one end and making plumber joints etc. all complete as per specification
and direction of E/I.
Unit-Each
Materials
1. Wash hand basin of particular size 1 no. @ Rs. 618 Rs. 618.00
2. C.I. Brackets for W.H.B. 1 pair @ Rs. 120 Rs. 120.00
3. 15 mm C.P. Brass pillar cock weight not
less than 350 gm. 1 no. @ Rs. 300 Rs. 300.00
4. 32 mm P.V.C. waste pipe 750 mm long 1 no. @ Rs. 72 Rs. 72.00
5. 32 mm C.P. Brass waste without Rubber
plug and chain 1 no. @ Rs. 157 Rs. 157.00
6. 15 mm dia C.I. body brass spindle stop
cock of weight not less than 450 gms. 1 no. @ Rs. 94 Rs. 94.00
7. 15 mm P.V.C. waste pipe 450 mm long 1 no. @ Rs. 59 Rs. 59.00
8. Red lead, gasket, cement, sand grit,
wooden plug etc. 3% 0f W.H.B. cost 18.54
Labour
1. Plumber Gr.I 0.33 nos. @ Rs. 239.19 Rs. 78.93
2. Mason Gr.II 0.33 nos. @ Rs. 220.57 Rs. 72.79
3. Skilled mazdoor 0.67 nos. @ Rs. 218.57 Rs. 146.44
3.2.6. Supplying fitting and fixing white glazed fire’s clay sink of approved make
with overflow arrangements supported on C.I. or R.S. painted brackets
40mm. dia C.P.Brass waste with C.P.brass chain and rubber plug 40 mm
dia P.V.C. waste pipe about 750mm long with brass coupling at one end
and 15mm C.I. body brass spindle bib cock of approved quality of weight
not less than 450grams. including cutting wall and making good the same
etc. all complete as per specification and direction of E/I.
Materials
1. White glazed sink of particulars size 1 no. @ Rs. 3224 Rs. 3224.00
2. C.I. Brackets/R.S. bracket for above 1 pair @ Rs. 168 Rs. 168.00
3. 40 mm P.V.C. waste pipe about 750 mm long 1 no. @ Rs. 90 Rs. 90.00
4. 32 mm c.P. Brass waste with C.P. brass chain
and rubber plug chain 1 no. @ Rs. 205 Rs. 205.00
5. 15 mm dia c.I. body brass spindle bib cock
of weight not less than 450 gms. 1 no. @ Rs. 94 Rs. 94.00
Red lead, gasket, cement, sand grit,
wooden plug etc. 1% 0f Sink cost 32.24
Labour
1. Plumber Gr.I 0.22 nos. @ Rs. 239.19 Rs. 52.62
2. Mason Gr.II 0.33 nos. @ Rs. 220.57 Rs. 72.79
3. Skilled mazdoor 0.56 nos. @ Rs. 218.57 Rs. 122.40
3.2.7. Supplying fitting and fixing H.C.I. pipes with ear of approved make confirming
to I.S.I. 1729 including supplying nails and bobins short pieces, cutting
loose collars,lead and yarn for making lead caulked joints, cutting pipes
to size including earth work or scaffolding where necessary etc. all complete
as per specification and direction of E/I.
Materials
i. Cost of 18/17.1 Metre H.C.I. pipe A 1M @ Rs. 508.3333 Rs.(A) 508.33
ii. Earth work and reffilling etc. or providing scaffolding
iii. Cost of nails and bobin 4% of pipe cost Rs. 20.33
3. Labour
1. Plumber Gr.I 0.42 nos. @ Rs. 239.19 Rs. 100.46
2. Plumber Gr.II 0.21 nos. @ Rs. 239.19 Rs. 50.23
3. Skilled mazdoor 0.83 nos. @ Rs. 218.57 Rs. 181.41
Total Rs. -------- (R) 352.44
Cost of laying per metre excluding cost of
OF H.C.I. pipe = R / 17.10 (A1) Rs. 20.61
for making lead cawked joint taking one joint
Materials
i. Pig lead 0.8 kg 2 Rs. 189 Rs. 151.20
ii. Yam 0.11 kg 2 Rs. 84 Rs. 9.24
iii. wood etc. 2 Kg Rs. 10 Rs. 20.00
Labour
1. Plumber Gr.I 0.06 nos. @ Rs. 239.19 Rs. 14.35
2. Plumber Gr.II 0.06 nos. @ Rs. 239.19 Rs. 14.35
3. Skilled mazdoor 0.12 nos. @ Rs. 218.57 Rs. 26.23
Labour
1. Plumber Gr.I 0.35 nos. @ Rs. 239.19 Rs. 83.72
2. Plumber Gr.II 0.17 nos. @ Rs. 239.19 Rs. 40.66
3. Skilled mazdoor 0.7 nos. @ Rs. 218.57 Rs. 153.00
Cost of laying per M excluding cost of H.C.I. pipe Total Rs. -------(R) 292.00
= R/17.10 = A2/M = Rs. 17.08
Labour
1. Plumber Gr.I 0.05 nos. @ Rs. 239.19 Rs. 11.96
2. Plumber Gr.II 0.05 nos. @ Rs. 239.19 Rs. 11.96
3. Skilled mazdoor 0.09 nos. @ Rs. 218.57 Rs. 19.67
Materials
i. Cost of 18/17.1 Metre H.C.I. pipe C 1M @ Rs. 293.3333 Rs. 293.33
Labour
1. Plumber Gr.I 0.25 nos. @ Rs. 239.19 Rs. 59.80
2. Plumber Gr.II 0.14 nos. @ Rs. 239.19 Rs. 33.49
3. Skilled mazdoor 0.56 nos. @ Rs. 218.57 Rs. 122.40
Materials
i. Pig lead 0.4 kg 2 Rs. 189 Rs. 75.60
ii. Yarn 0.07 kg 2 Rs. 84 Rs. 5.88
iii. Wood etc. 2 kg Rs. 10 Rs. 20.00
Labour
1. Plumber Gr.I 0.04 nos. @ Rs. 239.19 Rs. 9.57
2. Plumber Gr.II 0.04 nos. @ Rs. 239.19 Rs. 9.57
3. Skilled mazdoor 0.08 nos. @ Rs. 218.57 Rs. 17.49
3.2.8. Supplying and fixing H.C.I. fittings of approved make confirming to I.S.S.1729
including supplying nails and bobines lead and yarn from making lead
caulked joints including earth work or providing scaffolding as the case
may be all complete as per specification and direction of E/I.
(A) H.C.I. single junction with door but without ear except socket
(i) 100 mm dia (wt. 10.5 Kg. app.) Rs. 1132.805 Each
(ii) 80 mm dia (wt. 7 kg) Rs. 914.9844 Each
(iii) 50 mm dia (wt. 4.25 kg) Rs. N.D. Each
(B) 100 mm dia H.C.I. "P" Trap with
Anti Syphonage Hom (wt. 8.5 kg app.) Rs. 749.4278 Each
(C) H.C.I. Heal Rest bend
(i) 100 mm dia (wt. 5.5 Kg. app.) Rs. 671.2278 Each
(ii) 80 mm dia (wt. 4 kg app.) Rs. 531.4016 Each
(iii) 50 mm dia (wt. 3.5 kg app.) Rs. 461.2516 Each
(D) H.C.I. double junction with door and ear
(i) 100 mm dia (wt. 15.5 kg. app.) Rs. 1375.882 Each
(ii) 80 mm dia (wt. 15.5 kg app.) Rs. 1173.217 Each
(iii) 50 mm dia (wt. 6 kg app.) Rs. 829.8503 Each
(E) H.C.I. double inverted Jn.
(100 mm x 50 mm x 50 mm size) Rs. 1137.21 Each
(F) H.C.I. offsets with ear
(i) 100 mm dia (wt. 6 kg. app.) Rs. 599.9278 Each
(ii) 80 mm dia (wt. 4 kg app.) Rs. 461.2516 Each
(iii) 50 mm dia (wt. 3.26 kg app.) Rs. 319.0184 Each
(G) H.C.I. Bend with door and ear
(i) 100 mm dia (wt. 6.5 kg. app.) Rs. 644.7778 Each
(ii) 80 mm dia (wt. 4.5 kg app.) Rs. 64.96325 Each
(iii) 50 mm dia (wt. 4 kg app.) Rs. 332.8184 Each
(H) H.C.I. plain bend with ear
(i) 100 mm dia (wt. 5.5 kg. app.) Rs. 611.4278 Each
(ii) 80 mm dia (wt. 3.75 kg app.) Rs. 465.8516 Each
(iii) 50 mm dia (wt. 3.25 kg app.) Rs. 323.6184 Each
(I) H.C.I. shoe with year
(i) 100 mm dia (wt. 5 kg. app.) Rs. N.D. Each
(ii) 80 mm dia (wt. 3.75 kg app.) Rs. N.D. Each
(iii) 50 mm dia (wt. 1.25 kg app.) Rs. N.D. Each
(J) Floor trap with grantings
(i) 100 mm dia Rs. 558.5278 Each
(ii) 80 mm dia Rs. N.D. Each
(iii) 50 mm dia Rs. N.D. Each
(K) Norton patent H.C.I. Cowel
(i) 100 mm dia (wt. 3.25 kg. app.) Rs. 518.2778 Each
(ii) 80 mm dia (wt. 2.25 kg app.) Rs. 373.8516 Each
(iii) 50 mm dia (wt. 1 kg app.) Rs. 262.6684 Each
(L) H.C.I. pass over
(i) 100 mm dia Rs. 683.8778 Each
(ii) 80 mm dia Rs. N.D. Each
(iii) 50 mm dia Rs. 469.6684 Each
(M) H.C.I. single inverted junction with year
(100mm x 50mm) Rs. 854.1945 Each
A. H.C.I. single junction with ear and door
i. Laying and fixing of 100 mm dia
(weight 10.50 kg. approx)
Materials
i. Cost of single jn. with door 1 no. @ Rs. 504 Rs. 504.00
ii. Cost of jointings
2 nos joints 2 x P1 vide item no. 3.2.7 2 nos @ Rs. 235.3712 Rs. 470.74
iii. Cost of laying 0.5 A1 of item no. 3.2.7 0.5 no. @ Rs. 20.6103 Rs. 10.31
Total Rs. 985.05
Add 15% C.P. & O.H.C. Rs. 147.76
Grand Total Rs. 1132.80
Calculate rate for each Rs. 1132.80
ii. 75 mm dia
Cost of 75 mm dia H.C.I. pass over 1 no. @ Rs. Rs.
Cost of laying and jointing as per item no. 3.2.7 (B) Rs.
P2 + 0.5 A2
Total Rs.
Add 15% C.P. & O.H.C. Rs.
Grand Total Rs.
Calculate rate for each Rs. N.D.
iii. 50 mm dia
Cost of 50 mm dia H.C.I. pass over 1 no. @ Rs. 264 Rs. 264.00
Cost of laying and jointing as per item no. 3.2.7 (C)
P3 + 0.5 A3 Rs. 144.41
Total Rs. 408.41
Add 15% C.P. & O.H.C. Rs. 61.26
Grand Total Rs. 469.67
Calculate rate for each Rs. 469.67
3.2.9. Supplying all tools and labours and cutting chajja, Cornice, for laying
H.C.I. pipes and making good the same as per specification and direction
of E/I.
Unit-Each
Vide item no. 3.1.17 Rs. 99.74
3.2.10. Cutting drain width wise above G.L. for laying H.C.I. pipe and restoring
brick work in cement mortar (1:4) 12mm cement plaster in (1:4) with neat
cement punning as per specification and direction of E/I.
Unit-Each
Vide item no. 3.1.16 Rs. 94.62
3.2.11 Making holes in walls for laying H.C.I. pipes and restoring the same
after pipe laying as per specification and direction of E/I.
3.2.12. Supplying materials and labour for painting the exposed H.C.I. pipes and
fittings with 2 coats of approved paint over a coat of red oxide primer
etc. all complete as per specification and direction of E/I.
3.3.1. Earth work in excavation for laying of different types and sizes of R.C.C.
spun pipes with disposal of excavated earth within initial lead and lift as
per specification and direction of E/I.
3.3.2. Earthwork in back filling the trench after laying different types and sizes
of R.C.C. spun pipes with earth removed during excavation within initial
lead and lift as per specification and direction of E/I.
Unit per cum
3.3.3. Extra for earthwork in all kinds of soil foreach additional lift of 1M.
or part there of over the intial lift of 1.5M. as per specification and
direction of E/I.
3.3.4. Close timbering in trenches including strutting, shoring and packing cavities
(when ever required) depth not exceeding 1.5m complete as per specification
and direction of E/I.
Carriage
Cost of carriage of materials including loading, unloading &
stacking @ 1% of total cost of materials Rs. 673.00
Total Rs. 67972.60
Deduct Credit of materials 75% of the cost of materials (-) Rs. 50474.70
Assuming 4 uses Net Rs. (B) 17497.90
Therefore cost of per use = B/4 4374.47
Labour
Carpenter Gr. I 0.75 Nos. @ Rs. 220.57 Rs. 165.43
Unskilled Mazdoor 2 @ Rs. 187.43 Rs. 374.86
3.3.6. Labour for laying, fitting and fixing NP2 R.C.C. spun pipe with collars
in lines, level and grade and providing approved jointing materials and joints
properly filled to make them leak, proof including providing sight rails,
bonning rod, night guard, Red light and barrier etc. all complete as per
specification and direction of E/I.
Unit per M.
3.3.6.1. 100 mm dia R.C.C. spun pipe
Upto 3.0 metre depth of invert below G.L.
Assuming 4 pipes 2 metre length and 3 joints
Materials
Cement 0.009 cum @ Rs. 9421.763 Rs. 84.80
Sand 0.009 cum @ Rs. 209.13 Rs. 1.88
Jute 1 Kg. @ Rs. 38 Rs. 38.00
Labour
Head Mason 0.25 Nos. @ Rs. 220.57 Rs. 55.14
Unskilled mazdoor 2 Nos. @ Rs. 187.43 Rs. 374.86
Fitter Gr. I 0.25 Nos. @ Rs. 251.19 Rs. 62.80
Calculate rate separately per all vide as per item no. 3.3.6.1
3.3.7. Supplying labours, tools and tackles for testing of laid, R.C.C. spun pipes
upto specified lead of water all complete as per specification and direction
of E/I. (water to be supplied free of cost departmentally).
3.3.8. Supplying materials and labours for constructing inspection chamber of designation
class 75B bricks size 750mm deep, 600x450mm internal dimension having
250 mm wall thickness in cement mortar ( 1 : 6 ) including 12mm cement
plaster (1:4) with punning on inside and cement plaster (1:6) with 600x475mm
C.I. Cover with frame (weight not less than 36kg.) alongwith earth work
in excavation and 80 mm thick P.C.C. ( 1 : 3 : 6 ) in foundation and refilling
all complete as per specification and direction of E/I.
3.3.9. Supplying labours, tools and tackles for cleaning filled and choaked man
hole, septic tank, inspection-chamber, gullay pits, sewerage tank etc. in
all lift and disposal of spoils upto a lead of 50M all complete as per
specification and direction of E/I.
Sweeper 1.5 nos. @ Rs. 188.43 Rs. 282.65
Fuel
Pig lead Cost of Spun yarn Cost of wood in Cost of Cost of
internal per joint Pig lead per joint Spun yarn kg per Cost of Cost of K Plumber Plumber Plumber Plumber
SL. No. dia in mm in kg. in Rs. in kg. per in Rs. joint Fuel in Rs K oil in lit. oil in Rs. Gr. I Rs. Gr. I Rs. Gr. II Rs. Gr. II Rs.
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1. 80 1.8 340.2 0.1 8.4 1 10 0.038 0.54644 0.1 23.519 0.1 23.519
2. 100 2.2 415.8 0.18 15.12 2.3 23 0.038 0.54644 0.1 23.519 0.1 23.519
3. 125 2.6 491.4 0.2 16.8 3.3 33 0.076 1.09288 0.15 35.2785 0.15 35.2785
4. 150 3.4 642.6 0.2 16.8 4.2 42 0.076 1.09288 0.2 47.038 0.2 47.038
5. 200 5 945 0.3 25.2 5.6 56 0.076 1.09288 0.2 47.038 0.2 47.038
6. 250 6.1 1152.9 0.35 29.4 6.5 65 0.114 1.63932 0.25 58.7975 0.25 58.7975
7. 300 7.2 1360.8 0.48 40.32 7.5 75 0.152 2.18576 0.3 70.557 0.3 70.557
8 350 8.4 1587.6 0.6 50.4 9.5 95 0.17 2.4446 0.3 70.557 0.3 70.557
9 400 9.5 1795.5 0.75 63 12 120 0.17 2.4446 0.4 94.076 0.4 94.076
10 450 14 2646 0.95 79.8 12.5 125 0.227 3.26426 0.45 105.8355 0.45 105.8355
11 500 15 2835 1 84 13.1 131 0.227 3.26426 0.48 112.8912 0.48 112.8912
12 600 19 3591 1.2 100.8 16.5 165 0.283 4.06954 0.65 152.8735 0.65 152.8735
13 700 22 4158 1.35 113.4 21.4 214 0.341 4.90358 0.77 181.0963 0.77 181.0963
14 750 25 4725 1.45 121.8 25.1 251 0.4 5.752 0.8 188.152 0.8 188.152
15 800 27 5103 1.55 130.2 27 270 0.5 7.19 0.83 195.2077 0.83 195.2077
Rate for laying & jointing of G.I. S/S pipe(class LA) with pig lead cauking Unit per metre
Total cost
of Labour
and
Materials Laying Add 1% cost of Rate of
Total cost cost / m for night laying laying &
Cost of Rs.(4+6+8 of Jointing vide Total cost guard, &jointing jointing /
Skilled Skilled +10+12+1 jointing Length in cost per 12.1.31 / m (Rs.) barrier /m Add 15% m Rs.
Mazdoor Mazdoor 4+16) (17+18) M m in Rs. Rs. 21+22 etc. Rs.(23+24) C.P. + OHC (25+26)
15 16 17 18 19 20 21 22 23 24 25 26
0.2 43.714 449.8984 449.8984 4 112.4746 34.49695 146.9716 1.469716 148.4413 22.26619 170.7075
0.2 43.714 545.2184 545.2184 5.5 99.13063 34.49695 133.6276 1.336276 134.9639 20.24458 155.2084
0.3 65.571 678.4209 678.4209 5.5 123.3493 34.49695 157.8462 1.578462 159.4247 23.9137 183.3384
0.4 87.428 883.9969 883.9969 5.5 160.7267 37.94665 198.6734 1.986734 200.6601 30.09901 230.7591
0.4 87.428 1208.797 1208.797 5.5 219.7813 37.94665 257.7279 2.577279 260.3052 39.04578 299.351
0.5 109.285 1475.819 1475.819 5.5 268.3308 38.80907 307.1399 3.071399 310.2113 46.53169 356.7429
0.5 109.285 1728.705 1728.705 5.5 314.31 38.80907 353.119 3.53119 356.6502 53.49753 410.1477
0.6 131.142 2007.701 2007.701 5.5 365.0365 43.12119 408.1577 4.081577 412.2392 61.83589 474.0751
0.8 174.856 2343.953 2343.953 5.5 426.1732 43.12119 469.2944 4.692944 473.9873 71.0981 545.0854
0.9 196.713 3262.448 3262.448 5.5 593.1724 51.74543 644.9178 6.449178 651.367 97.70505 749.0721
0.95 207.6415 3486.688 3486.688 5.5 633.9433 51.74543 685.6887 6.856887 692.5456 103.8818 796.4275
1.3 284.141 4450.758 4450.758 5.5 809.2286 60.36966 869.5983 8.695983 878.2943 131.7441 1010.038
1.45 316.9265 5169.423 5169.423 5.5 939.895 60.36966 1000.265 10.00265 1010.267 151.5401 1161.807
1.6 349.712 5829.568 5829.568 5.5 1059.921 68.9939 1128.915 11.28915 1140.205 171.0307 1311.235
1.65 360.6405 6261.446 6261.446 5.5 1138.445 68.9939 1207.439 12.07439 1219.513 182.9269 1402.44
Item No. 12.1.31
Fuel
Pig lead Cost of Spun yarn Cost of wood in Cost of Cost of
internal per joint Pig lead per joint Spun yarn kg per Cost of Cost of K Plumber Plumber Plumber Plumber
SL. No. dia in mm in kg. in Rs. in kg. per in Rs. joint Fuel in Rs K oil in lit. oil in Rs. Gr. I Rs. Gr. I Rs. Gr. II Rs. Gr. II Rs.
1 2 3 4 5 6 7 8 9 10 11 12 13 14
2. 100 2.2 415.8 0.18 15.12 2.3 23 0.038 0.54644 0.1 23.519 0.1 23.519
3. 125 2.6 491.4 0.2 16.8 3.3 33 0.076 1.09288 0.15 35.2785 0.15 35.2785
4. 150 3.4 642.6 0.2 16.8 4.2 42 0.076 1.09288 0.2 47.038 0.2 47.038
5. 200 5 945 0.3 25.2 5.6 56 0.076 1.09288 0.2 47.038 0.2 47.038
6. 250 6.1 1152.9 0.35 29.4 6.5 65 0.114 1.63932 0.25 58.7975 0.25 58.7975
7. 300 7.2 1360.8 0.48 40.32 7.5 75 0.152 2.18576 0.3 70.557 0.3 70.557
8 350 8.4 1587.6 0.6 50.4 9.5 95 0.17 2.4446 0.3 70.557 0.3 70.557
9 400 9.5 1795.5 0.75 63 12 120 0.17 2.4446 0.4 94.076 0.4 94.076
10 450 14 2646 0.95 79.8 12.5 125 0.227 3.26426 0.45 105.8355 0.45 105.8355
11 500 15 2835 1 84 13.1 131 0.227 3.26426 0.48 112.8912 0.48 112.8912
12 600 19 3591 1.2 100.8 16.5 165 0.283 4.06954 0.65 152.8735 0.65 152.8735
13 700 22 4158 1.35 113.4 21.4 214 0.341 4.90358 0.77 181.0963 0.77 181.0963
14 750 25 4725 1.45 121.8 25.1 251 0.4 5.752 0.8 188.152 0.8 188.152
15 800 27 5103 1.55 130.2 27 270 0.5 7.19 0.83 195.2077 0.83 195.2077
Rate for laying & jointing of G.I. S/S pipe(class LA) with pig lead cauking Unit per metre
Total cost
of Labour
and
Materials 1% Laying Add 1% cost of Rate of
Sundries Total cost cost / m for night laying laying &
Cost of Rs.(4+6+8 on of Jointing vide Total cost guard, &jointing jointing /
Skilled Skilled +10+12+1 (12+14+1 jointing Length in cost per 12.1.31 / m (Rs.) barrier /m Add 10% m Rs.
Mazdoor Mazdoor 4+16) 6) Rs. (17+18) M m in Rs. Rs. 21+22 etc. Rs.(23+24) C.P. (25+26)
15 16 17 18 19 20 21 22 23 24 25 26 27
0.2 43.714 545.2184 0.90752 546.126 5.5 99.29563 34.49695 133.7926 1.337926 135.1305 13.51305 148.6436
0.3 65.571 678.4209 1.36128 679.7822 5.5 123.5968 34.49695 158.0937 1.580937 159.6746 15.96746 175.6421
0.4 87.428 883.9969 1.81504 885.8119 5.5 161.0567 37.94665 199.0034 1.990034 200.9934 20.09934 221.0927
0.4 87.428 1208.797 1.81504 1210.612 5.5 220.1113 37.94665 258.0579 2.580579 260.6385 26.06385 286.7023
0.5 109.285 1475.819 2.2688 1478.088 5.5 268.7433 38.80907 307.5524 3.075524 310.6279 31.06279 341.6907
0.5 109.285 1728.705 2.50399 1731.209 5.5 314.7652 38.80907 353.5743 3.535743 357.11 35.711 392.821
0.6 131.142 2007.701 2.72256 2010.423 5.5 365.5315 43.12119 408.6527 4.086527 412.7392 41.27392 454.0131
0.8 174.856 2343.953 3.63008 2347.583 5.5 426.8332 43.12119 469.9544 4.699544 474.6539 47.46539 522.1193
0.9 196.713 3262.448 4.08384 3266.532 5.5 593.9149 51.74543 645.6604 6.456604 652.117 65.2117 717.3287
0.95 207.6415 3486.688 4.334239 3491.022 5.5 634.7313 51.74543 686.4768 6.864768 693.3415 69.33415 762.6757
1.3 284.141 4450.758 5.89888 4456.656 5.5 810.3012 60.36966 870.6708 8.706708 879.3775 87.93775 967.3153
1.45 316.9265 5169.423 6.791191 5176.214 5.5 941.1298 60.36966 1001.499 10.01499 1011.514 101.1514 1112.666
1.6 349.712 5829.568 7.26016 5836.828 5.5 1061.241 68.9939 1130.235 11.30235 1141.538 114.1538 1255.692
1.65 360.6405 6261.446 7.510559 6268.956 5.5 1139.81 68.9939 1208.804 12.08804 1220.892 122.0892 1342.981