PROGRESS OF INCLINED ROCK ANCHORS STAGE - II @ 7.0 m level. As on Date 8/16/2017

Activity Secoundary
SI Fabricating & Fixing Fabricating & Fixing Drilling of Rock Primary Grouting Fabricate & Fixing of Boxing & Stiffner
Homig of HT Strands Stressng of Anchors Grouting of Free
No of MS Liner Plate of Bottom Waller Anchors (Fixed Length) Top Wallers Plates assembly
Anchor No Length

Balance 44 44 44 44 44 44 44 44 44

Total 44 44 44 44 44 44 44 44 44

1 E1
2 E2
3 1
4 2
5 3
6 4
7 5
8 6
9 7
10 8
11 9
12 10
13 11
14 12
15 13
16 14
17 15
18 16
19 17
20 18
21 19
22 20
23 21
24 22
25 23
26 24
27 25
28 26
29 27
30 28
31 29
32 30
33 31
34 32
35 33
36 34
37 35
38 36
39 37
40 38
41 39
42 40
43 N1
44 N2
GODREJ TWO:: GEM ENGSERV PVT LIMITED
BORE LOG- INCLINED ROCK ANCHORS As on Date 8/16/2017

ANCHOR NO.

TOTAL LENGHTH

ANCHOR LENGTH

0-2

2-3.5

3.5-5

5-6.5

6.5-8

8-9.5

9.5-11

11-12.5

12.5-14

FIXED LENGHTH
GROUTING

7 DAYS CUBE

STRESSING

FREE LENGHTH
GROUTING
GODREJ TWO:: GEM ENGSERV PVT LIMITED
PROGRESS OF INCLINED ROCK ANCHORS STAGE - I @ 3.0 m level. As on Date 7/28/2017

Activity Secoundary
SI Fabricating & Fixing Fabricating & Fixing Drilling of Rock Primary Grouting Fabricate & Fixing of Boxing & Stiffner
Homig of HT Strands Stressng of Anchors Grouting of Free
No of MS Liner Plate of Bottom Waller Anchors (Fixed Length) Top Wallers Plates assembly
Anchor No Length

Balance 0 0 0 0 0 0 0 0 0

Total 44 44 44 44 44 44 44 44 44

1 E1 6/12/2017 6/12/2017 6/12/2017 6/23/2017 6/24/2017 6/22/2017 7/1/2017 7/17/2107 7/19/2017


2 E2 6/12/2017 6/12/2017 6/13/2017 6/21/2017 6/22/2017 6/22/2017 7/1/2017 7/13/2017 7/19/2017
3 1 6/12/2017 6/12/2017 6/13/2017 7/2/2017 7/3/2017 6/22/2017 7/2/2017 7/17/2017 7/19/2017
4 2 6/12/2017 6/12/2017 6/13/2017 7/5/2017 7/6/2017 6/24/2017 7/2/2017 7/13/2017 7/19/2017
5 3 6/12/2017 6/12/2017 6/13/2017 7/6/2017 7/7/2017 6/24/2017 7/4/2017 7/20/2017 7/21/2017
6 4 6/13/2017 6/12/2017 6/24/2017 6/25/2017 6/26/2017 6/29/2017 7/4/2017 7/13/2017 7/18/2017
7 5 6/13/2017 6/12/2017 6/13/2017 6/20/2017 6/21/2017 6/29/2017 7/4/2017 7/4/2017 7/18/2017
8 6 6/13/2017 6/12/2017 6/24/2017 6/23/2017 6/24/2017 6/29/2017 7/4/2017 7/4/2017 7/18/2017
9 7 6/13/2017 6/12/2017 6/13/2017 6/21/2017 6/22/2017 6/29/2017 7/8/2017 7/13/2017 7/18/2017
10 8 6/13/2017 6/13/2017 6/24/2017 6/23/2017 6/24/2017 6/29/2017 7/8/2017 7/13/2017 7/19/2017
11 9 6/13/2017 6/13/2017 6/20/2017 6/21/2017 6/22/2017 7/1/2017 7/8/2017 7/13/2017 7/19/2017
12 10 6/13/2017 6/15/2017 6/23/2017 6/23/2017 6/24/2017 7/1/2017 7/11/2017 7/13/2017 7/19/2017
13 11 6/13/2017 6/15/2017 6/20/2017 6/21/2017 6/22/2017 7/1/2017 7/11/2017 7/13/2017 7/19/2017
14 12 6/13/2017 6/15/2017 6/23/2017 6/23/2017 6/24/2017 7/1/2017 7/11/2017 7/17/2017 7/19/2017
15 13 6/14/2017 6/21/2017 6/21/2017 6/22/2017 6/23/2017 7/2/2017 7/11/2017 7/20/2017 7/21/2017
16 14 6/14/2017 6/21/2017 6/23/2017 6/23/2017 6/24/2017 7/2/2017 7/11/2017 7/17/2017 7/19/2017
17 15 6/15/2017 6/21/2017 6/21/2017 6/22/2017 6/23/2017 7/2/2017 7/11/2017 7/17/2017 7/19/2017
18 16 6/15/2017 6/21/2017 6/23/2017 6/23/2017 6/24/2017 7/3/2017 7/11/2017 7/17/2017 7/19/2017
19 17 6/21/2017 6/21/2017 6/22/2017 6/23/2017 6/24/2017 7/3/2017 7/11/2017 7/17/2017 7/19/2017
20 18 6/21/2017 6/21/2017 6/22/2017 6/23/2017 6/24/2017 7/3/2017 7/12/2017 7/17/2017 7/19/2017
21 19 6/21/2017 6/21/2017 6/22/2017 6/25/2017 6/26/2017 7/5/2017 7/12/2017 7/17/2017 7/19/2017
22 20 6/21/2017 6/22/2017 6/26/2018 6/28/2017 6/29/2017 7/5/2017 7/12/2017 7/17/2017 7/19/2017
23 21 6/21/2017 6/22/2017 6/26/2017 6/28/2017 6/29/2017 7/5/2017 7/12/2017 7/25/2017 7/21/2017
24 22 6/22/2017 6/23/2017 6/27/2017 6/28/2017 6/29/2017 7/5/2017 7/22/2017 7/22/2017 7/24/2017
25 23 6/22/2017 6/23/2017 6/27/2017 6/29/2017 6/30/2017 7/5/2017 7/22/2017 7/22/2017 7/24/2017
26 24 6/23/2017 6/23/2017 6/27/2017 6/29/2017 6/30/2017 7/7/2017 7/22/2017 7/22/2017 7/24/2017
27 25 6/23/2017 6/23/2017 6/27/2017 6/30/2017 7/1/2017 7/7/2017 7/22/2017 7/22/2017 7/24/2017
28 26 6/24/2017 6/23/2017 6/27/2017 6/29/2017 6/30/2017 7/7/2017 7/22/2017 7/25/2017 7/28/2017
29 27 6/24/2017 6/24/2017 6/28/2017 6/29/2017 6/30/2017 7/8/2017 7/22/2017 7/22/2017 7/24/2017
30 28 6/24/2017 6/24/2017 6/28/2017 6/29/2017 6/30/2017 7/8/2017 7/22/2017 7/25/2017 7/27/2017
31 29 6/24/2017 6/24/2017 6/28/2017 6/29/2017 6/30/2017 7/10/2017 7/22/2017 7/25/2017 7/27/2017
32 30 7/4/2017 6/24/2017 6/28/2017 6/29/2017 6/30/2017 7/10/2017 7/22/2017 7/25/2017 7/27/2017
33 31 7/4/2017 7/8/2017 7/10/2017 7/11/2017 7/12/2017 7/10/2017 7/22/2017 7/25/2017 7/27/2017
34 32 7/6/2017 7/8/2017 7/10/2017 7/11/2017 7/12/2017 7/10/2017 7/22/2017 7/25/2017 7/27/2017
35 33 7/6/2017 7/8/2017 7/11/2017 7/11/2017 7/12/2017 7/10/2017 7/22/2017 7/25/2017 7/27/2017
36 34 7/6/2017 7/8/2017 7/10/2017 7/11/2017 7/12/2017 7/10/2017 7/22/2017 7/25/2017 7/27/2017
37 35 7/8/2017 7/8/2017 7/11/2017 7/11/2017 7/12/2017 7/10/2017 7/22/2017 7/25/2017 7/26/2017
38 36 7/8/2017 7/8/2017 7/10/2017 7/12/2017 7/13/2017 7/10/2017 7/22/2017 7/25/2017 7/25/2017
39 37 7/9/2017 7/8/2017 7/11/2017 7/12/2017 7/13/2017 7/10/2017 7/22/2017 7/25/2017 7/25/2017
40 38 7/9/2017 7/8/2017 7/10/2017 7/12/2017 7/13/2017 7/10/2017 7/22/2017 7/25/2017 7/26/2017
41 39 7/9/2017 7/10/2017 7/12/2017 7/12/2017 7/13/2017 7/10/2017 7/22/2017 7/25/2017 7/26/2017
42 40 7/9/2017 7/10/2017 7/12/2017 7/12/2017 7/13/2017 7/10/2017 7/22/2017 7/25/2017 7/26/2017
43 N1 7/10/2017 7/13/2017 7/14/2017 7/14/2017 7/15/2017 7/18/2017 7/19/2017 7/25/2017 7/28/2017
44 N2 7/10/2017 7/13/2017 7/14/2017 7/14/2017 7/15/2017 7/18/2017 7/19/2017 7/25/2017 7/28/2017
GODREJ TWO:: GEM ENGSERV PVT LIMITED
BORE LOG- INCLINED ROCK ANCHORS As on Date 7/29/2017

ANCHOR NO. E-1 E-2 S-1 S-2 S-3 S-4 S-5 S-6 S-7 S-8 S-9 S-10

TOTAL LENGHTH 12.5 12.5 10 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5

ANCHOR LENGTH

0-2 soil soil soil soil soil soil soil soil soil soil soil soil

2-3.5 soil soil soil soil soil soil soil soil soil soil soil soil

3.5-5 soil soil soil soil soil soil soil soil soil soil soil soil

5-6.5 rock soil soil soil soil soil soil soil soil rock soil soil

6.5-8 rock rock soil soil soil rock rock rock soil rock rock rock

8-9.5 rock rock soil rock rock rock rock rock rock rock rock rock

9.5-11 rock rock rock rock rock rock rock rock rock rock rock rock

11-12.5 rock rock NA rock rock rock rock rock rock rock rock rock

12.5-14 NA NA NA NA NA NA NA NA NA NA NA NA

FIXED LENGHTH 6/24/2017 6/22/2017 7/3/2017 7/6/2017 7/7/2017 6/26/2017 6/21/2017 6/24/2017 6/22/2017 6/24/2017 6/22/2017 6/24/2017
GROUTING

7 DAYS CUBE 7/1/2017 6/29/2017 7/10/2017 7/13/2017 7/14/2017 7/3/2017 6/28/2017 7/1/2017 6/29/2017 7/1/2017 6/29/2017 7/1/2017

STRESSING 7/17/2107 7/13/2017 7/17/2017 7/13/2017 7/20/2017 7/13/2017 7/4/2017 7/4/2017 7/13/2017 7/13/2017 7/13/2017 7/13/2017

FREE LENGHTH 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/21/2017 7/18/2017 7/18/2017 7/18/2017 7/18/2017 7/19/2017 7/19/2017 7/19/2017
GROUTING
S-11 S-12 S-13 S-14 S-15 S-16 S-17 S-18 S-19 S-20

12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5

TYPE OF SOIL

soil soil soil soil soil soil soil soil soil soil

soil soil soil soil soil soil soil soil soil soil

soil soil soil soil soil soil soil soil soil soil

rock soil rock soil soil soil soil soil rock soil

rock rock rock rock rock soil rock rock rock rock

rock rock rock rock rock soil rock rock rock rock

rock rock rock rock rock rock rock rock rock rock

rock rock rock rock rock rock rock rock rock rock

NA NA NA NA NA NA NA NA NA NA

6/22/2017 6/24/2017 6/23/2017 6/24/2017 6/23/2017 6/24/2017 6/24/2017 6/24/2017 6/26/2017 6/29/2017

6/29/2017 7/1/2017 6/30/2017 7/1/2017 6/30/2017 7/1/2017 7/1/2017 7/1/2017 7/3/2017 7/6/2017

7/13/2017 7/17/2017 7/20/2017 7/17/2017 7/17/2017 7/17/2017 7/17/2017 7/17/2017 7/17/2017 7/17/2017

7/19/2017 7/19/2017 7/21/2017 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/19/2017
S-21 S-22 S-23 S-24 S-25 S-26 S-27 S-28 S-29 S-30 S-31 S-32 S-33 S-34 S-35

12.5 12.5 14 12.5 14 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5

SOIL

soil soil soil soil soil soil soil soil soil soil soil soil soil soil soil

soil soil soil soil soil soil soil soil soil soil soil soil soil soil soil

soil soil soil soil soil soil soil soil soil soil soil soil soil soil soil

soil soil soil soil rock soil soil soil soil soil soil soil soil soil soil

soil rock soil soil rock rock rock soil soil soil soil soil soil soil rock

rock rock rock rock rock rock rock rock rock rock rock soil rock soil rock

rock rock rock rock rock rock rock rock rock rock rock rock rock rock rock

rock rock rock rock rock rock rock rock rock rock rock rock rock rock rock

NA NA rock NA rock NA NA NA NA NA NA NA NA NA NA

6/29/2017 6/29/2017 6/30/2017 6/30/2017 7/1/2017 6/30/2017 6/30/2017 6/30/2017 6/30/2017 6/30/2017 7/12/2017 7/12/2017 7/12/2017 7/12/2017 7/12/2017

7/6/2017 7/6/2017 7/7/2017 7/7/2017 7/8/2017 7/7/2017 7/7/2017 7/7/2017 7/7/2017 7/7/2017 7/19/2017 7/19/2017 7/19/2017 7/19/2017 7/19/2017

7/25/2017 7/22/2017 7/22/2017 7/22/2017 7/22/2017 7/25/2017 7/22/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017

7/21/2017 7/24/2017 7/24/2017 7/24/2017 7/24/2017 7/28/2017 7/24/2017 7/27/2017 7/27/2017 7/27/2017 7/27/2017 7/27/2017 7/27/2017 7/27/2017 7/26/2017
S-36 S-37 S-38 S-39 S-40 N-1 N-2

12.5 12.5 12.5 12.5 12.5 12.5 12.5

soil soil soil soil soil soil soil

soil soil soil soil soil soil soil

soil soil soil soil soil soil soil

soil soil soil soil rock rock soil

soil rock rock rock rock rock rock

rock rock rock rock rock rock rock

rock rock rock rock rock rock rock

rock rock rock rock rock rock rock

NA NA NA NA NA NA NA

7/13/2017 7/13/2017 7/13/2017 7/13/2017 7/13/2017 7/15/2017 7/15/2017

7/20/2017 7/20/2017 7/20/2017 7/20/2017 7/20/2017 7/22/2017 7/22/2017

7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017 7/25/2017

7/25/2017 7/25/2017 7/26/2017 7/26/2017 7/26/2017 7/28/2017 7/28/2017