Item 100 – Clearing and Grubbing

ITEM 100 – CLEARING AND GRUBBING


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

100.4 Basis of Payment

The accepted quantities, measured as prescribed in Section 100.3, shall be paid for at the Contract
unit price for each of the Pay Items listed below that is included in the Bill of
Quantities, which price and payment shall be full compensation for furnishing all labor, equipment,
tools and incidentals necessary to complete the work prescribed in this Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement
100 (1) Clearing and Grubbing Hectare

Item 100 – Clearing and Grubbing Page 1


Item 101 – Removal of Existing Structures and Obstructions

Removal/Demolition of Existing Structures


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

101.4 Basis of Payment

The accepted quantities, measured as prescribed in Section 101.3, shall be paid for at the Contract
unit price or lump sum price bid for each of the Pay Items listed below that is included in the Bill of
Quantities which price and payment shall be full compensation for removing and disposing of
obstructions, including materials, labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item. The price shall also include backfilling, salvage of materials removed,
their custody, preservation, storage on the right-of-way and disposal as provided herein.
Payment will be made under:

Pay Item Number Description Unit of


Measurement
101 (1) Removal of Existing Structures Linear meter

Page 1
Item 103 – Structural Excavation

ITEM 103 – STRUCTURAL EXCAVATION


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

103.3.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 103.3, shall be paid for at the
contract unit price for each of the particular pay items listed below that is included in the Bill of
Quantities. The payment shall constitute full compensation for the removal and disposal of
excavated materials including all labor, equipment, tools and incidentals necessary to complete
the work prescribed in this Item.

Pay Item Number Description Unit of Measurement


103 (1) Structural Excavation Cubic Meter

Item 103 – Structural Excavation Page 1


Item 104 – Embankment

Item 104 – Embankment


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

104.5 Basis of Payment

The accepted quantities, measured as prescribed in Section 104.4, shall be paid for at the
Contract unit price for each of the Pay Items listed below that is included in the Bill of
Quantities. The payment shall continue full compensation for placing and compacting all
materials including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.
Payment will be made under:

Pay Item Number Description Unit of Measurement


104 (1) Embankment Cubic Meter

Item 104 - Embankment Page 1


Item 401 – Metalworks

Item 401 – Metalworks


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

Fabrication and installation of metal handrail for stairs and ramp and decorative panels for the
lounge.

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of metal rails for stairs which price and payment shall be full compensation for
furnishing and placing all materials, including all labor, equipment, tools and incidentals
necessary to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


401 Hand Rail and Decorative Panels Lump Sum

Item 401 – Metalworks Page 1


Item 404 – Reinforcing Steel

ITEM 404 – REINFORCING STEEL


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

404.5 Basis of Payment


The accepted quantity, measured as prescribed in Section 404.4, shall be paid for at the contract
unit price for Reinforcing Steel which price and payment shall be full compensation for furnishing
and placing all materials, including all labor, equipment, tools and incidentals necessary to complete
the work prescribed in this Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement
404 Reinforcing Steel Kilogram

Item 404 – Reinforcing Steel Page 1


Item 405 – Structural Concrete

Item 405 – Structural Concrete


Refer to DPWH Bluebook & Standard Specifications 2004 Volume II

The concrete strength which shall be use are the following:

Super and Sub structure – 4000 psi at 28th day of curing


Suspended Slab (2nd level) – 4000 psi at 7th day of curing
Suspended slab (roof deck/3rd level) – 4000 psi at 28th day of curing
Slab on-fill and other concrete works – 3000 psi at 28th days of curing

405.6 Basis of Payment

The accepted quantities, measured as prescribed in Section 405.5, shall be paid for at the contract unit
price for each of the Pay Item listed below that is included in the Bill of Quantities.
Payment shall constitute full compensation for furnishing, placing and finishing concrete including all
labor, equipment, tools and incidentals necessary to complete the work prescribed in the item.
Payment will be made under:

Pay Item Number Description Unit of Measurement


405 (1) Structural Concrete Cubic Meter

Item 405 – Structural Concrete Page 1


Item 804b – Gravel Bedding

Item 804b – Gravel Bedding


Refer to the plan on gravel bedding; should have a thickness of 75mm using ¾ sized gravel.

Basis of Payment
The accepted quantities, measured per cubic meter which price and payment shall be full compensation
for furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary to
complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


804b Gravel Bedding Cubic Meter

Item 804(b) – Gravel Bedding Page 1


Item 1000 – Soil Poisoning

Item 1000 – Soil Poisoning


Apply soil-poisoning solution for soil treatment.

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for Soil
Poisoning which price and payment shall be full compensation for application and placing all
materials, including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement
1000 Soil Poisoning Square meter

Item 1000 – Soil Poisoning Page 1


Item 1002 – Plumbing and Sanitary

Item 1002 - Plumbing and Sanitary


Refer to the plan for the installation of plumbing and sanitary and for bathroom fixtures. Provide air vent
and clean out for every unit. Use materials of premium brand of quality.
Includes connection to the nearest tapping point.

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of plumbing, sanitary and bathroom fixtures and accessories which price and payment
shall be full compensation for furnishing and placing all materials, including all labor, equipment,
tools and incidentals necessary to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1002 Plumbing/Sanitary/Fixtures Lump Sum

Item 1002 – Plumbing and Sanitary Page 1


Item 1003 – Carpentry

Item 1003 – Carpentry

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of metal rails for stairs which price and payment shall be full compensation for
furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary
to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1003 Ceiling Lump Sum

Item 1003 – Carpentry Page 1


Item 1008 – Windows

Item 1008(1) – Windows


Refer to the plan for the Installation glass window for the lounge.

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of windows which price and payment shall be full compensation for furnishing and
placing all materials, including all labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item.

Payment will be made under:


Pay Item Number Description Unit of Measurement
1008 Windows Lump Sum

Item 1000 – Windows Page 1


Item 1010 – Doors Frames and Accessories

Item 1010(a) – Door Frames and Accessories


Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of doors which price and payment shall be full compensation for furnishing and placing
all materials, including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1010(a) Doors Lump Sum

Item 1010 – Doors Frames and Accessories Page 1


Item 1013 – Banawe Roofing

Item 1013 – Roofing (Banawe)


Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation/fabrication of steel trusses and roofing materials which price and payment shall be full
compensation for furnishing and placing all materials, including all labor, equipment, tools and
incidentals necessary to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1013 Roofing Lump Sum

Item 1013 – Banawe Roofing Page 1


Item 1018 – Tileworks

Item 1018 – Tileworks


Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation and setting of tiles which price and payment shall be full compensation for furnishing
and placing all materials, including all labor, equipment, tools and incidentals necessary to complete
the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1008 Tiles Square meter

Item 1018 - Tileworks Page 1


Item 1027 – Cement Plaster Finish

Item 1027 – Cement Plaster Finish


Use Plaster mixture proportion of class A w/ a thickness of 20mm.

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
plastering of wall which price and payment shall be full compensation for furnishing and placing all
materials, including all labor, equipment, tools and incidentals necessary to complete the work
prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1027 Plastering Square meter

Item 1027 – Cement Plaster Finish Page 1


Item 1032 – Painting Works

Item 1032 – Painting Works


Apply 2 base coats.
Internal wall – Base paint white
Ceiling (Straight to Finish) and Wall Partition – Semi Gloss
External wall – Semi gloss Latex
Woven Thatch – Painted Varnish
Roof Deck – w/ Waterproofing Finish

Basis of Payment

The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
painting works for each area and furniture which price and payment shall be full compensation for
furnishing and placing all materials, including all labor, equipment, tools and incidentals necessary
to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1032 Painting Square meter

Item 1032 – Painting Works Page 1


Item 1046 – Masonry Works

ITEM 1046 – MASONRY WORKS

Refer to DPWH DO No. 230, DPWH Standard Specifications for Item 1046 – Masonry works

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation masonry units which price and payment shall be full compensation for furnishing and
placing all materials, including all labor, equipment, tools and incidentals necessary to complete the
work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


506 Masonry Units Square meter

Item 1046 – Masonry Works Page 1


Item 1100/1/2 – Electrical Works

Item 1100/1/2 – Electrical Works


Refer to the plan for the installation of electrical wirings devices and switches. Use materials of premium
brand of quality. Entrance of line is underground.

Basis of Payment
The accepted quantity, measured as prescribed, shall be paid for at the contract unit price for
installation of electrical devices, switches and utilities which price and payment shall be full
compensation for furnishing and placing all materials, including all labor, equipment, tools and
incidentals necessary to complete the work prescribed in this Item.

Payment will be made under:

Pay Item Number Description Unit of Measurement


1100/1/2 Electrical switches/devices/utilities Lump Sum

Item 1100/1/2 - Electrical Works Page 1


Part B: Other General Requirements

PART B: OTHER GENERAL REQUIREMENTS

B.1 OFFICES, SHOPS, STORES AND WORKMENS ACCOMMODATION FOR


CONTRACTOR

The contractor shall provide and maintain such offices, stores, workshops latrines, housing and messing
accommodations as are necessary. These should be located in the Contractor’s compound, distinct and
separate from the Engineer’s compound (BCDA Clark PMO). The location dimensions and layout of such
buildings and places shall be subject to the approval of the Engineer. The Contractor shall not be
permitted to erect temporary buildings or structures on the site without the specific permission in
writing of the Engineer including approval of the dimensions of such buildings or structures. Before the
commencement of the period of Warranty, the Contractor shall fence of the Contractor’s store area
from the rest of the Site. By the end of the Period of Warranty, the Contractor shall remove this fence,
all buildings shall be cleared, and the area shall be graded as required by the Engineer.

B.2 MEDICAL ROOM AND FIRST AID FACILITIES

1. The Contractor shall provide and maintain throughout the duration of the Contract, a medical room
together with all necessary supplies to be sited in the Contractor’s main area. The medical room shall be
waterproof; it could be a building or room designated and used exclusively for the purpose and has a
floor area of at least 15 square meters and a glazed window area of at least two square meters.

2. The Contractor shall employ permanently on the site a fully trained Medical Aide who shall be
engaged solely from medical duties.

3. The location of the medical room and any other arrangements shall be made known to all employees
by posting on prominent locations suitable notices in the Site.

4. The Contractor’s arrangement to comply with this Section shall be subject to the approval of the
Engineer and to the approval of any qualified Medical Officer designated by the Government to
supervise medical arrangements on the Site.

Part B: Other General Requirements Page 1