Daily SOC Report

Reported By: Mohsin Raza Tariq RIG Name: Hilong 05 Well Name: Rajani-1

S# Date Position Company Description Category

Tripping hazard noticed at a place in the rig area due to improper


1 16-Aug-16 HSE Hilong Housekeeping
houskeeping.

Some Crown block painting was done properly ; good cleaning first and
2 16-Aug-16 Floorman Hilong Appreciation
then paint applied, increasing quality of work.

3 16-Aug-16 HSE Hilong Third party workers did not do housekeeping after completing their job. Housekeeping

All safety pins and cut pins were collected and placed at their proper
4 16-Aug-16 Driller Hilong Appreciation
locations.

One worker not using safety glasses while working on a platform in direct
5 16-Aug-16 HSE Hilong PPE
sun; he was said to wear and he agreed.

Observed by a worker, crane hook line damaged and then changed by a Tools &
6 16-Aug-16 Floorman Hilong
new line, safe practice followed. Equipment

9
10

Cards
S# Category
Quantity

1 Confined Space Entry 0

2 Cost Saving Opportunity 0

3 Driving Safety 0

4 Dropped Objects 0

5 Energy Isolation 0

6 Environmental Hazards 0

7 Ground Disturbance 0

8 Health Hazards 0

9 Housekeeping 2

10 HSE Suggestion 0

11 Lifting Operations 0

12 Management of Change 0

13 Maintenance 0

14 Permit to Work 0

15 PPE 1

16 Procedures & Orderliness 0

17 Appreciation 2

18 Slip/Trip/Fall 0

19 Tools & Equipment 1

20 Working at Heights 0
21 Manual lifting 0

22 Pinch Point 0

Total 6
Rajani-1

Location of Target
Status Remarks
Observation Date

HL-05 Closed N/A

HL-05 Closed N/A

HL-05 Closed N/A

HL-05 Closed N/A

HL-05 Closed N/A

HL-05 Closed N/A