Académique Documents
Professionnel Documents
Culture Documents
Reported By: Mohsin Raza Tariq RIG Name: Hilong 05 Well Name: Rajani-1
Some Crown block painting was done properly ; good cleaning first and
2 16-Aug-16 Floorman Hilong Appreciation
then paint applied, increasing quality of work.
3 16-Aug-16 HSE Hilong Third party workers did not do housekeeping after completing their job. Housekeeping
All safety pins and cut pins were collected and placed at their proper
4 16-Aug-16 Driller Hilong Appreciation
locations.
One worker not using safety glasses while working on a platform in direct
5 16-Aug-16 HSE Hilong PPE
sun; he was said to wear and he agreed.
Observed by a worker, crane hook line damaged and then changed by a Tools &
6 16-Aug-16 Floorman Hilong
new line, safe practice followed. Equipment
9
10
Cards
S# Category
Quantity
3 Driving Safety 0
4 Dropped Objects 0
5 Energy Isolation 0
6 Environmental Hazards 0
7 Ground Disturbance 0
8 Health Hazards 0
9 Housekeeping 2
10 HSE Suggestion 0
11 Lifting Operations 0
12 Management of Change 0
13 Maintenance 0
14 Permit to Work 0
15 PPE 1
17 Appreciation 2
18 Slip/Trip/Fall 0
20 Working at Heights 0
21 Manual lifting 0
22 Pinch Point 0
Total 6
Rajani-1
Location of Target
Status Remarks
Observation Date