Vous êtes sur la page 1sur 29

COMPANY INTRODUCTION

TABLE OF CONTENT

1. Establishment and Addresses

2. CEO Message

3. Target sectors and services offered

4. Key Professionals

5. Human Resources list

6. Projects – Ongoing

7. Projects – Completed

8. Industrial Sectors Served – Management Experience

9. Major Clients

10. Tool & Plant

11. Quality Policy

12. HSE Policy

13. Registration Certificates

14. Completion Certificates

15. Associates / Partners


1- ESTABLISHMENT AND ADDRESS

Name : WATCON Engineering

Short Name : WATCON

98-A CMA Colony, Abid Majeed Road,


Office Address :
Lahore Cantt., Pakistan

Telephone No : +92 42 37187067

Fax : +92 42 37187067

E-mail : info@watconengg.com

Website www.watconengg.com

Contact Person : Muhammad Taj Dad


Director Operation & BD
Mobile No : +92 300 4116189

Works : Under Plan Kasur Road Lahore

Status of Company : Partnership

Company Reg. No : Registrar of Firm: 1952 | Y-2015-6

PEC Registration : C4 / 09615

Income Tax No : 7202494-1

Sales Tax No : 32-77-8761-227-66

Punjab Sales Tax No : P7202494-1


2- CEO Message

WATCON is a young, exciting, fast growing engineering company, which has a strong dedication to
customer satisfaction, and a drive to provide positive technical contributions to the nation’s most difficult
technological problems. We love to work on exciting and complex problems that challenge us to bring
best out of the top engineering minds.

In today’s global market place we recognize you have many choices to pick a service provider with all very
impressive credentials. Team WATCON ensures you if given an opportunity to serve your needs our
organization will strive to create best possible experience for you without a doubt. It is our firm belief
that by embracing these values, we will achieve success:

Leadership
Leaders set quantifiable objectives and define the direction for the group. As today’s thought leaders
they create and embrace change and set the example for all to follow. Leaders demonstrate initiative,
and follow through.

Integrity
The golden rule of business is doing it with highest degree of integrity between words and deeds.

Vision
Delivering world class integrated solutions to our clients while building long-term relationships based on
mutual trust.

Mission
We believe in simplicity of ideas that’s why our mission is straight forward “deliver on promise by
building best team to execute”

This is an exciting time to be at WATCON, and we’ve really only just begun. With a strong foundation of
talented people, work ethics and the right strategy, we’re defining new opportunities that will help us
achieve good growth, deliver value to all our stakeholders and lead us to a bolder future where we’re an
even greater company.

A. Waheed Khan
Chief Executive Officer
3- Target sectors and services offered

The management team of WATCON Engineering brings more than two decades of expertise in
engineering trade with strong work ethics to provide project management services in the field of
construction engineering, plant overhauling / maintenance related to civil, electrical and mechanical
engineering across the geographical regions.

WATCON engineering draws it strength from being a dynamic young enterprise, which is fully geared to
deal with complex engineering problems of today’s world. We serve following sectors

 Power Sector; Thermal / WHR / Hydro Power


 Oil & Gas
 Petro-chemical Industry
 Foods & Agro Based Industries
 Cement Industry
 Fertilizer Industry
 Civil /MEP and Infrastructure

We believe in long term relationships forged with our clients, partners, vendors, sub-contractors and
more important our own employees. WATCON engineering has team of highly trained engineers and
skilled craftsmen who are part of our growing enterprise and ready to be deployed to any challenging
environment. Keeping such strengths in view we offer following services:

 Design & Engineering Services for Process Industry & Plant Construction
 Industrial/ Plants Construction & Maintenance Services (E&M)
 Project Management & Construction Supervision and allied Consulting Services
 Shop as well as on site Fabrication of Equipment, Steel Structure, Tanks and Piping
 Site installations; Stationary/ Rotary Equipment, Steel Structure, Tanks and Piping & Civil
Construction
 Supply of Plants Materials for E&M and Civil/ MEP
 Supply & installation of PEB, HVAC & Firefighting (Fire Safety System/EPC)
 Insulation, Refractory, Coating/ Wrapping & Industrial Painting
 Underground Piping for Process Plants & Infrastructure Network
 Procurement & Installation of Electrical Systems and Instrumentation & Controls
 Chemical Cleaning, Plant Testing & Commissioning Assistance
 Plant Maintenance /Turn Around Services
 Supply Chain/ Procurement Services
 Skilled Manpower Supply
4- Key Professionals
The company is founded and managed by a group of professional engineers who have diversified work
experience across different sectors and geographical regions – following is a brief description of its key
management players:

Abdul Waheed Khan


Chief Executive Officer
Waheed provides strategic leadership of WATCON and is responsible for the execution of corporate goals
and operations. Prior to founding WATCON Engineering, Waheed’s last job was at a global financial
institution Morgan Stanley in New York City as Vice President catering to some of largest global hedge
funds. Waheed lead a global cross-divisional team, which designed, implemented and rolled out Morgan
Stanley’s real time portfolio analytical platform used by some of largest clients. He is a senior leadership
level executive with 22 years plus experience in project finance, product development, marketing,
business development, corporate strategy and vendor management. Waheed holds Bachelors of Science
degree in Electrical engineering from UET, Lahore and Master in Business Administration from Drexel, PA,
USA.

Muhammad Taj Dad


Director Operation & BD
Taj provides engineering acumen to WATCON as leading partner in the firm. He holds a Bachelor Degree
in Mechanical Engineering with MS in TQM and has more than 22 years of experience in project planning
and management for plant construction & maintenance services related to oil and gas, cement, chemical,
agro-based industry, hydro/ thermal power plants and infrastructure development projects.
Before WATCON he worked in leadership roles at some of leading firms like, DESCON, EKL & SENDAN Int’l
(KSA) in local as well as overseas assignment (Qatar, UAE & KSA) successfully and attained a good repute
within Professional Network and Engineering sector/ market (National & MNCs). A few of his major
projects:
 Incharge Planning & Control at 184 MW Chashma Hydropower Project
 Project Manager at Rafhan Maize Products Project at Jaranwala
 Project Manager at 52 MW Naudero Rental Power - Larkana
 Manager Planning & Monitoring at SENDAN Int’l for E&I works at Sadara Petro-chemical Plants
/YASREF YERP-3 Oil Refinery & Rabigh Power Plant-2 in KSA
 Project Manager at Installation of Gas Plant for UEP – Tando Adam
Muhammad Akmal
Director Logistics
Akmal is an accomplished telecom expert with excellent project management, team management and
analysis skills. He has done graduation in Elect Engineering from UET Lahore and brings a deep knowledge
of Middle East & Pakistan’s telecom and wire line sector including fiber optics and HFC networks. He has
a good exposure to work in multi-disciplinary environment in coordination with clients and various
consultants & contractors. His expertise includes designing of diversified wireless and wire-line
networks; turn key projects delivery with installation and Operation & Maintenance of network. Some of
his previous assignments are as below,
 National Manager Fiber & HFC Networks, WorldCall Telecom Ltd.
 Regional Manager Fiber Optics Operations, Mobilink (ORASCOM TELECOM)
 Project Manager, SIS (C-COR/PHILIPS) (DUBAI, UAE)
 Testing & Commissioning Engineer, Alcatel NSD (DUBAI, UAE)
 Application Engineer, Allied Engineering & Services Ltd. (Pakistan)
 Assistant Manager Elect, Gharibwal Cement & Power Ltd (Pakistan)
 Electrical Engineer, Friends Power Limited (Pakistan)

Faisal Ayub
Manager Projects
Faisal heads projects control department and responsible for project management and control at project
sites and at the head office. He is also responsible for all technical issues related to project planning,
scheduling, monitoring, proposal preparation, and resources (material, man-hours, consumables, and
tools). His responsibilities also include project estimations, evaluations, budget monitoring, comparative
analysis of cost trends against actual and forecast costs, and the evaluation of changes in scope through
field directives and change requests. He prepares execution and inspection procedures and bills of
material, as well as marking and cutting plans, drawings, sketches, as-builds and piping isometrics. Before
joining WATCON he worked with firms like, DESCON & EKL in local as well as overseas assignments
successfully in engineering sector/ market (National & MNCs). He holds Bachelor of Science degree in
Chemical Engineering and Master of Science degree with more than 12 years of experience.
5- Human Resources List
S. # Name Designation Qualification Yrs. of Exp.

1 Abdul Waheed Khan Chief Executive B.Sc. Engg. (Elect.), MBA (USA) 22

2 Muhammad Taj Dad Director Operations B.Sc. Engg. (Mech.), MS TQM 22

3 Muhammad Akmal Director Logistics B.Sc. Engg. (Elect.) 22

4 Faisal Ayub Manager Projects B.Sc. Chemical, M.Sc. 12

5 Jawad Haider Project Engineer B.Sc. Engg. (Mech.) 06

6 Jawad Alam Khan Proposal & BD Engg. B.Sc. Engg. (Mech.) 05

7 Allah Rakha Site Manager DAE (Mech.) 15

8 Muhammad Ayub Site Manager DAE (Mech.) 16

9 M Babar Khan Site Manager MBA, BGAS Painting Inspector GII 15

10 Muhammad Arif Painting Supdt. Certificate 19

11 Dilshad Hussain Project Engineer B. Sc. 15

12 Asad Raza Manager Accounts CA 05

13 Noor ur Rehman Project Engineer B.Sc. Engg. (Mech.) 03

14 Zeshan Ahmad Planning Engr. B.Sc. Engg. (Mech.) 02

15 Adeel Nawaz NDT Sup. B. Tech (Mech.) 04

16 Muhammad Riaz Supdt. Rep./Maint. DAE (Mech.) 25

17 Mudassar Hussain I/c HSE Inter + NEBOSH/ Certificates 15

18 Muhammad Hameed Civil Engineer B. Tech (Civil) 12

20 Farrukh Azeem Civil Engineer DAE (Civil) 10

21 Iftikhar Hussain Sup. Elect. DAE (Elect.) 05

22 M. Wajid Mill Wright Supdt. TTC 15

23 Muhammad Akbar Project Engineer DAE (Mech.) 12

24 Umar Hayat Sup. Electrical DAE (Elect.) 02


6- Projects – On-going
Sr.# Proj.# Description of Work Cost (mils) Client
6 P-118 Construction of 10,000 Sft. Private Residence 20.0 Private
AHTC; Al-Hussain
Services of Tower Painting (Erected) WPP-09 Lot-2
5 P-114 2.44 Traders
Transmission Line from Gharo to Jhimpir – Sindh
Contractors
Fabrication, Laying & Commissioning of U/G Gas
4 P-112 Pipeline MS pipe size 1-1/4” & 2” at Pasroor – Sialkot 7.5 SNGPL
Region
Surface Cleaning and Paint application of Oil Tanks at 0.7 Attock Petroleum
2 P-111
APL, Rawalpindi Limited
Rehabilitation of Steel Structure, Sandblasting & 63.0 DGKCCL/ Nishat
1 P-106
Painting at DGK Cement Factory, Dera Ghazi Khan Group

7- Projects – Completed
(a- WATCON completed projects)
Sr. # Proj. # Description of Work Cost (mils) Client
Office Renovation for Impact Media Solutions (Pvt.)
14 P-115 0.48 Impact
Ltd. Lahore
Supply of Stores (Compressor Parts) to KCP-1 PAEC, Kundian
13 P-116 0.49
Joharabad Chemical Plant-1
Supply, Fabrication & Installation of Safety Railing &
12 P-117 Ladders at Warehouse APL Depot – Machhike 0.325 APL
Sheikhupura
Surface Cleaning & Paint application (incl. 12.5 Nanjing Daji Steel
P-105 Procurement of Paint) on Steel Tower for CPP-02 Tower
11
(b) Project (NTDC) 1,180 ton, at NTDC Warehouse Manufacturing Co.,
Jamshoro – Sindh Ltd. China
Procurement and services of Fiberglass-reinforced 0.8
Oil & Gas
Plastic (FRP) Coating for condensate storage tank (T-
10 P-110 Development
4405 A & T-4401B) at OGDCL Qadirpur, Ghotki –
Company Ltd.
Sindh
Sand Blasting of Chemical Tank at Pharas Chemical 0.5
9 P-113 Pharas Chemicals
Industry Multan Road Lahore

P-105 Surface Cleaning & Paint application on Steel Tower 71.5 Nanjing Daji Steel
8 for CPP-02 Project (NTDC) ~ 6,000 ton, at NTDC Tower
(a)
Manufacturing Co.,
Warehouse Jamshoro – Sindh Ltd. China
Sandblasting & painting works at Fauji Cement Rehab 5.0 Mechcon (Pvt) Ltd.
7 P-101 Project at FCCL site (1,200 tons/ 21,000 sqm.), Jhang Islamabad
Bahtar – Attock
Procurement and services of Fiberglass-reinforced 1.2
Oil & Gas
Plastic (FRP) Coating for condensate storage tank (T-
6 P-107 Development
2821) Capacity 3000 BBL at OGDCL Qadirpur, Ghotki –
Company Ltd
Sindh
Procurement and services of Fiberglass-reinforced 1.4
Oil & Gas
Plastic (FRP) Coating for condensate storage tank (T-
5 P-109 Development
2801) Capacity 3000 BBL at OGDCL Qadirpur, Ghotki –
Company Ltd
Sindh
Procurement and services of Fiberglass-reinforced Oil & Gas
4 P-108 Plastic (FRP) Coating for condensate storage tank (CPI 0.5 Development
4401A) at OGDCL Qadirpur, Ghotki – Sindh Company Ltd
Procurement and services of Fiberglass-reinforced 2.0 Oil & Gas
Plastic (FRP) Coating for condensate storage tank (T-
3 P-104 Development
2821) at OGDCL Qadirpur, Ghotki – Sindh material at
Company Ltd
Qadirpur, Ghotki – Sindh
Procurement, Manufacturing (LT & MCC Panels) and 3.5 RIE Metals (Pvt)
2 P-102
Electrical Installation Works Ltd. SIE Lahore
EPC for Retrofitting/ DBN Process of Chemical Plant 2.0 Tahir Asad
1 P-103 at TA Industries, Manga Mandi – Lahore Industries (Pvt) Ltd.
Lahore
Projects
(b- Proficient Engineers (now merged into WATCON) till 2015)
List of important projects before merging the operations of M/s. Proficient Engineers
S# Description of Work Cost (mils) Client
Construction of PCC & soling 1200 meters Road in UC Ara TMA CS Shah,
12 2.3
Tehsil CS Shah Chakwal Chakwal
Rehabilitation work and construction of civil facilities in BHU
11 3.0 NLC
Ara, Chakwal
Excavation, Fabrication, Installation and Hydro-testing,
Pakistan Petroleum
10 Pneumatic testing and pigging of feeder Line Ø4” well #14, 3.0
Limited
Aadhi Field, Gujar Khan
Construction of Control House Buildings & Misc. Civil Works at Potential Engineers
9 2.8
500/220/132 kVA Grid Station (Pvt.) Ltd. Lahore
Sandblasting Painting of Cement Factory fabricated structure ORASCOM
8 (5,000 ton) and Insulation work of Pakistan Cement Co. Ltd; 25.5 Construction
Kalar Kahar, Chakwal Industries – Asia
Excavation, Fabrication, Installation and Pneumatic Testing of
7 4.0 SNGPL Lahore
Ø18” Gas pipeline, 4 km SNGPL, SMS-2 to Defense Road Lahore
Construction of retaining wall of Askari Housing Scheme, Al-Syed Enterprises
6 0.85
Rawalpindi
Execution of laying canal water line from Mohajar canal to OCL Olympia Chemical
5 2.72
plant, Warchha
Provision of Plant O&M Services i.e. Supply of Skillful Tahir Asad
4 Manpower on Call out Basis 4.5 Industries (Pvt.)
Ltd; Lahore
Sandblasting & Painting of Steel Towers of WAPDA /NTDC Potential Engineers
3 (2,000 ton) for Construction of Transmission Line in Hub 5.8 Pvt. Ltd; Lahore
Chowki, Karachi
Manpower Supply Contract to at Pakistan Cement Project for Orascom
2 1.8
mechanical erection works Construction Ind.
Manpower supply for construction of cement mill and civil Gammon Pakistan
1 1.5
structure at Chakwal Cement Ltd.
8- Industrial Sectors Served – Management Experience
WATCON management brings in two decades of exposure to global and local industrial sector while
serving their respective employers they worked on some of major projects around the globe. When
today you will hire WATCON to do a certain project you are hiring astute professionals whose experience
is honed over years of hard work and service to their clients. Some of such projects planned and executed
where senior management participated are listed hereunder:
Major Industrial Projects completed in:
 Oil & Gas;

1- LNG/ LPG Extraction /


Processing Plants
2- Wellhead Gathering
Facilities
3- Oil Refineries

Gas Processing Facility Expansion Project; EPIC of ADHI LPG/NGL Plant-II. for
PPL and Orient Petroleum GPF NaimatBassal

MAJOR PROJECTS:
1. Repair/ Maintenance of Tanks at PRL Karachi; cleaning, refurbishment, rebuilding &
construction of oil storage tanks, works schedule: Aug. 2014 ~ Jun. 2016
2. UEP’ United Energy Pak. Ltd; (former BP) Installation of 160 MMSCFD Gas Train; Naimat Ph-
5, Project Schedule: Nov-2014 ~ May 2015
3. ARL Up-gradation Project - Rawalpindi; Fab. & Erection of Piping , Steel Str. Equip & Tanks
and misc. works with EPCC Hyundai for about 3.8 million man-hours, Project Schedule:
2014~2016
4. MOL Pakistan Ltd.; Construction of SWHF’ Surface Well Head Facilities (4 Nos.) at MOL Karak
Block KPK, Project Completion: 2015
5. EPC for Fire Protection System: Berth No. 54 & 62 at KFI Port Jubail KSA for SATORP (E&M
Part; Piping, Structure, Equipment and I &C), Project Sch. May 2014~Dec 2015)
6. Sadara Gas Supply Project: CAS (Civil, Arch. & Str.) Works for 1x16 NPS GAN pipeline: 16km &
2x24 NPS pipelines (GAN & GOX): 5km,from Jubail-1 Sadara Chemical Complex (KSA)
subcontract from ETEC Arabia Ltd under SABIC PMT, fast-track Project (Jan ~ Jun-2014)
7. Yanbu Export Refinery Project; Pkg-3&4; E&I installation works subcontract from DAELIM
Arabia Ltd (EPC) more than 03 Million Planned Man-hours – Yanbu KSA (Y-2012~2014)
8. Ruwais Sulfur Handling Terminal-2; erection of steel str./equipment & piping (13 months/
1.5 Million Mhrs job) with Al-Jaber as a main Contractor (for GASCO) – Abu Dhabi (Y-2012)
9. 13.5 KM 8” ND Gas Pipe Line; from OPL Ratana Gas Fields to POL Mayal Gas (LPG) Plant
(Pak), a fast track Project thru Rocky/Hilly Terrain (2 month time schedule) – April ~ May
2012
10. OGDCL Dakhni Expansion Project (Pak) a PCC’ Procurement, Construction & Commissioning
Contract for SRU (Civil, E&M) under PMT Supervision of the consultant “ENAR Pak Pvt. Ltd”
works schedule (Aug-2011 ~ Jun-2012)
11. EPC for LPG/LNG Expansion Project; PPL – Adhi Gas Field – Rawalpindi Pakistan (Y-2004-5)
12. JJVL LPG/LNG Extraction Project; Jamshoro (Pak); EPC with Hanover Inc. SA for Associated
Group Lahore (Y-2004)
13. Qatar Gas DBN; LPG/LNG Expansion Project; – Qatar (with DESCON Engineering Ltd.) EPC
with CTJV; Chiyoda Technip JV (Y-2003)
14. ATA/ Maintenance Jobs:
 Plants Services/Refurbishment Jobs; in East / West Provinces KSA with SENDAN Int’l
Co. Ltd. for O&G / Petrochemical Industry (2012~14)
 Pakistan various O&G Operating Companies (in 4 Provinces) likewise; OGDCL (Uch &
Dhakhni Gas Plants), PPL (Adhi Gas Plant), ARL,PARCO, OMV (Sawan)& ENI (Bhit) etc…
Overseas: at Qatar Gas DBN-2003
 Thermal & Hydro Power;
1- WHR Systems
(Waste Heat
Recovery)

2- Steam Turbines /
Combined Cycle

Construction of Thermal Power Plants GTG & Diesel/ HFO Generation


3- Diesel/ HFO Gen- Projects Captive Power

Sets

4- Low Heads / High


Heads Hydro Power
Projects

184 MW Chashma Hydropower Project; Installations, Testing &


Commissioning of Hydro Electric Equipment
MAJOR PROJECTS:
1. Rafhan Maize Product Co-Gen Plant Jaranwala-Pak; Installation & Commissioning of 12 MW
Coal Fired Power Plant; Project Schedule Aug-15 ~ Jan-16
2. Sitara Energy (SCIL) Faisalabad-Pak; Installation & Commissioning of 35 MW Coal Fired
Power Plant; Project Schedule: Jun-15 ~ Nov-15
3. DOOSAN Heavy Industries; EPC/ Rabigh Power Plant-II KSA; E&I Construction for 2/4 units
Thermal Power Plant (4x700: 2800 MW) Man-hours: 2.7 Millions – 2012 ~ 14
4. Pro Energy Services Pak (Pvt.) Ltd. the EPCC of Walter Power Intl. (USA)in Pakistan;
Construction (Civil, Mech. E&I and Testing/Commissioning) of 51MW Fast-Track Rental Power
Project ‘2 x Rolls Royce GTG’ at Naudero Sindh.– 2010
5. HUBCO Power Narowal / MAN Diesel Pakistan (Pvt.) Ltd. 220MW Power Plant (MAN
Diesel): Construction (E&M) of 11 x 18V 48/60 Gen. Set with Co-gen. exhaust boilers, exhaust
gas & steam system & auxiliaries – 2010
6. WHR_PP in Cement Sector; Bestway, Maple Leaf, Cherat, Attock& DG Cement BCCL: 14 MW,
MLCF: 13.9 MW, CCCL: 7 MW, ACPL: 12 MW & DGKCCL: 8.6 MW (2008~2012)
7. Orient Energy Systems Pvt. Ltd. Karachi; Supply, fabrication, erection, construction works for
90MW (32 engines) gas fired power plant project at K.E.S.C. S.I.T.E., Karachi – 2009
8. Century Paper & Board Mills Ltd; Multan Road Lahore Installation of 4 Nos. GTG Sets.
Kawasaki Type GPB-70, and 4 Nos. HRSG of capacity 15 tons/hr at 14 bar including associated
ducts, accessories & stacks etc. – 2007.
9. Consortium of Mitsui Corporation & Toshiba Plant Construction Ltd. Japan, 1450MW (290
MW X 5 units – Francis Turbine)Ghazi Brotha Hydro Power Project; assembly & installation
work of Generator units & Auxiliaries (Electro Mech.) supplied by Toshiba Corporation Ltd.,
Japan – 2004
10. Marubeni Corporation & Fuji Electric Co – Japan Erection & Testing of Hydro Electric
Equipment at 184MW Chashma Hydropower Project Mianwali;(Low-head Bulb-nose
Turbines: 8 x 23) – 2001; Man-hours: 1.5 Million in 1999 to 2001
11. Tomen Power (Japan) Singapore at Gul Ahmed Energy Ltd. Karachi; Fabrication,
Erection /Commissioning of 136.17 MW (9 DG Set by Wartsila, Finland) Furnace Oil Fired
Power Plant, GAEL Karachi – 1996-7
 Chemical Process Industry;

1. Chemical, Petro-chemical/
Processing Plants

2. E&M and Civil Structure

Civil Construction & Super Structure for Industrial Building; Sadara KSA &
P&G Plant at Port Qasim – Karachi

MAJOR PROJECTS:
i. P&G Pakistan Port Qasim – Karachi; Civil Construction (RCC & Steel Str.) of Process Building
& Warehouse Schedule: Dec-2015 to May-2016
ii. DAELIM Arabia Ltd. at Sadara Petro-chemical Complex, Jubail- KSA; E&I Construction Works
at two major projects; MFC & Isocyanate of about 2.3 Million Mhrs/ Schedule: Y-2012-
iii. JGC Gulf Intl. Co. Ltd., Al Khobar – KSA; Civil, E&I Construction Projects at Sadara Aromatics
& KJO – Khafji/ Schedule: 2013
iv. Ibrahim Fibers Ltd; Faisalabad – Pakistan; Construction (Mech., E&I) for 600 TPD S/L
Polyester Fiber Plant in 2012 and 400 TPD line in 2001-2; Tech. by Zimmer AG
 Cement Industry;

Fabrication & Installation (E &M) of Cement Plants; 6700 Cement Plants Rehabilitation Work at FCCL & Retrofitting at
TPD in Pakistan Plant Mfg. by FLS Denmark PAKCEM _ BCCL KalarKahar

MAJOR PROJECTS:
i. Lafarge Pakistan Cement Co. Ltd. KallarKahar (5,500 TPD) for its Retrofitting & Expansion
Projects; Procurement, Detail Engineering, Fabrication & Erection of:
(Jan-2011 to Apr 2012)
b. Alternate Fuel (Coal) Belt Conveyor to Pre-Calciner
c. Kiln Feed Bucket Elevator (Energy Efficient) System
d. Repair of Insulation for Pre-heater
e. Steel Silo for Cement
i. Procurement, Fabrication & Erection of WHR Power Plants; at BCCL, MLCF, DGK CCL
&Attock CCL. (Jan-2009~ Oct-2011)
ii. Fabrication & Erection of Gulf Cement Co. (5000 TPD) Qatar; as Subcontractor of M/s.
Simplex Infrastructure Ltd. for Material Storage & Misc. Loose Parts & Manpower Supply.
(Apr-2008 to Dec-2008)
iii. DG Khan Cement Co. Ltd. Chakwal (6,000 TPD) for its Fabrication & Erection of: Locally
Manufactured; Steel Structure (+5000 ton) & Equipment (2000 ton) and Off-shore Equipment
(1850 ton) for Clinker Cooler, Cement Mill & Packing Plant (by FLS-Denmark) (Jan-2005 to
Mar-2007)
iv. Procurement, Fabrication & Erection of Coal Firing Plants; at Askari & Fauji Cement Plants in
Hassan Abdal (2003~2004)
v. Maintenance Jobs at Cement Plants as follows: (2007~2008)
 Replacement of Kiln Shell at:
 Askari Cement Hassan Abdal
 Maple Leaf Cement Mianwali
 Gharibwal Cement Jhelum
 Refractory Repair at QNCC Qatar
vi. Engineering & Expansion Works at Gharibwal Cement Co. Ltd. Jhelum; (1800 TPD) for
Fabrication & Erection of EP, Coal Firing Plant, Misc. Maintenance & Refurbishment Jobs.
Sep-1995~Oct-1996
 Food Processing/ Agro-based Industry;

Fabrication & Installation (E &M) of CPC Rafhan Maize Installation of Bio Blitz Green House Project and a PEB
Products Co. Ltd. 450 TPD; Jaranwala (Faisalabad) Shed’ Gujar Khan Rawalpindi

MAJOR PROJECTS:

i. Koh e Noor Sugar Mills, Wali Oil Mills, Dalda Oils, Nestle, Engro Foods, Milac Foods;
Construction Projects: Distilleries, Vegetable Oil, Beverages, Rice Processing, & Milk Plants
etc… done during Year 2001-2012
ii. CPC Rafhan Maize Products Pak. (Pvt.) Ltd. Construction (Mech., E&I) for major Plants; at
Jaranwala 2001-2003 & at Hyderabad in 2011-2012
 Infrastructure Projects;
MAJOR PROJECTS:
i. Sadara Gas Supply Project: CAS (Civil, Arch.& Str.) Works for 1x16 NPS GAN pipeline: 16km &
2x24 NPS pipelines (GAN & GOX): 5km, from Jubail-1 Sadara Chemical Complex (KSA) subcontract
from ETEC Arabia Ltd under SABIC PMT, fast-track Project (Jan ~ Jun-2014)
ii. 9 KM 14 NPS Water Pipeline; from SADAF Petro-chem. Plant to EDC Plant within RC Corridor
Jubail-1 (KSA) in 2014
iii. Improvement of Water Supply Project (under JICA~WASA – Faisalabad): The Extension of Water
Supply System; water source, collector main, transmission and distribution facilities (U/G 36 NPS
Pipeline: 11 KM) capacity of water supply: 91,000m3/day. (2009~2011)
iv. Taunsa Barrage Rehabilitation Works for Gates (Mechanical, Electrical & Civil) Project: under
KURIMOTO LTD. Minato-ku, Tokyo Japan (main contractor) from Govt. of Punjab PID’ schedule:
2006 ~ 2009

 Telecom Sector;
MAJOR PROJECTS:
i. ETISALAT Broad Band Access Network Project: Designing, Installation, Testing & Commissioning
and Operation & Maintenance of Etisalat’s 1st broadband access network project in Dubai &Abu
Dhabi.
ii. ETISALAT Wireless Broad Band Access Network Project: Designing, Installation, Testing &
Commissioning and Operation & Maintenance of Etisalat’s 1st broadband wireless access network
project in Ajman & Al Ain.
iii. Dubai International Airport Project: Designing, Installation, Testing & Commissioning of Dubai
Airport Project on Hybrid Fiber & Coax segment.
iv. Mobilink: Deployment, Testing and O&M of Fiber network for long haul and Metro fiber

References; WATCON Top Management Exposure / Experience with Multinational EPC Contractors:
 Oil & Gas Sector;
a. Hyundai Engineering Korea / ARL Pakistan
b. SAMSUNG Engineering Korea /KSA
c. Mitsubishi ‘MHI Japan / KSA
d. Siemens GmbH / KSA
e. DAELIM / SK E&C/ eTEC of Korea / KSA
f. Ranhill Engineers & Constructors Sdn Bhd – Malaysia
g. Chiyoda Corporation Japan/ TECHNIP Middle East FZCO (France): CTJV at Qatar Gas
h. Hanover International S.A (USA)
i. Marubeni Corp. Japan
j. CPECC; China Petroleum
k. ABB for OMV Pakistan
l. OPII ‘Orient Petroleum Intl. Inc.’
 Power Sector;
a. Nanjing Daji Steel Tower Manufacturing Co., Ltd. China
b. DOOSAN DHI Korea / KSA
c. Mitsui Corp./ Toshiba Plant Kensetsu Co. Ltd. Japan
d. Fuji Electric Co. Ltd. Japan
e. Tomen Power Singapore / Toshiba Japan
f. Wartsila NSD Corporation Finland
g. PREUSSAG Noell Stahl – und Maschienbou GmbH
h. ALSTOM (CEGELEC) France
i. VOITH HYDRO Germany
j. ALFA-LAVAL Sweden
k. MAN of Germany
 Petro-Chemical / Process Industry;
a. Fluor Arabia
b. Zimmer AG
c. FLSmith and Co. Denmark
d. MEM-BAU / CEMAG Group (Cement Plants etc) GmbH
e. ORASCOM Construction Industry Asia
f. CBMC (China)

 Misc. Jobs;
a. Consortium Taisei Corp. & Kurimoto Limited of Japan
b. Kone Cranes Components Finland
c. Shin Nippon Air Technologies (Pvt.) Ltd. (SNK) Singapore
9- Major Clients (WATCON Engineering)
Sr. Company Logo Company Name Role/ Status

11 ATTOCK PETROLEUM LIMITED Client

SUI NORTHERN GAS PIPELINES


10 Client
LIMITED

NISHAT GROUP
9 D.G. KHAN CEMENT COMPANY LTD; Client
DG KHAN

NANJING DAJI TOWERS


7 Client
MANUFACTURING CO. LTD., CHINA

NATIONAL TRANSMISSION &


6 Sponsor
DISPATCH COMPANY “NTDC”, WAPDA

5. NESPAK (PVT) LTD., LAHORE Consultant

OIL & GAS DEVELOPMENT COMPANY


4 LIMITED Client
“QADIRPUR GAS FIELDS”

3 TMA INTERNATIONAL, LAHORE Client

RIE METALS (PVT.) LTD., SUNDAR


2 Client
(LAHORE)

FAUJI CEMENT COMPANY LIMITED


JHANG BAHTAR
1 Client
with
MECHCON (PVT.) LTD., ISLAMABAD
10- Tools/ Equip. & Plants
S. # Tools/ Equipment Description Qty/ Nos. Remarks

1 Crane Hydraulic 45 T (Tandano) 01 RT

2 Crane Hydraulic 25 T (Tandano) 02 1 TM / 1 RT

3 Air Compressor (Elect.) 08

4 Air Compressor (Diesel) 02

5 Welding Plant/ Gen. Set 08

6 Gas Cutting Set 04

7 Grinder/ Wheel Cutter Lot

8 Chain Blocks/ Rigging Tools Lot

9 Mechanical Hand Tools Lot

10 Painting machines/ accessories 10 set

11 Containers Store 20’ 02

12 Dumper Trucks 02

13 Excavator 01

14 Tractor/ Trolley 02

15 Hilux Pick-up 01

16 Mixer Machine (01 Bag) 01

17 Water Tanker 01

18 Compactor m/c 01

19 Concrete cutter 01

20 Hand Tools for Digging 1 Lot

21 Shuttering Material Lot

22 Scaffolding Pipes & Planks Lot

23 Insulation Tools / Accessories 3 Set


24 Hand Tools (Civil Works) Lot

25 Hand Tools (Elect. Works) 5 Set

Important Note:

(Company own & associated/ vendors; services of reliable venders are aligned upon award of any project
including fresh purchase of desired machinery, tools and materials)
11- Quality Policy

Quality Policy
WATCON Engineering
is committed to serve its customers by
understanding their requirement and
endeavoring to meet the same safely,
professionally, reliably, timely,
economically & consistently.

for WATCON Engineering


Chief Executive Officer
12- HSE Policy

HSE Policy
WATCON Engineering
has a primary and continuing commitment to
conduct its activities in a manner to ensure, the
safety and health of its employees, its
customers and others impacted by its activities,
the protection of the environment; protection
of employees, capital, information and other
assets from deliberate harm, damage or loss.

for WATCON Engineering


Chief Executive Officer
13- Registration Certificates
14- Completion Certificates
15- Associates / Partners

1. Electrical (I&C); GAIN Control Systems Lahore {PEC RegC-5}


URL: www.gain.com.pk | https://www.facebook.com/gaincontrolsystems

2. Civil; AMS Engineers & Contractors {PEC RegC-3}


URL: www.amsengineers.com

Vous aimerez peut-être aussi