Vous êtes sur la page 1sur 6

What's New in Maptek Vulcan 11

Vulcan 11 continues the trend of automated functions and workflows supported by high impact
visualisation and faster processing. New functionality and enhanced tools target productivity
improvements and efficiency gains within Vulcan and on the Maptek Workbench.

• Geostatistics • Overbreak/underbreak • Split pit solids


• Variogram analysis • Panel caving design • Underground scheduling
• Geological sculpting • Grade control • Visualisation and graphics
• Scripting options • Mining block generation • User experience

Overview
New and existing users will find a lot to
like in Vulcan 11.

New functionality that streamlines


operations from design and modelling
through to planning and scheduling is
delivered alongside automated regimes
and workflows, high end visualisation and
enhanced computing performance.

New geostatistical options ensure the


widest range of analysis techniques,
with greater flexibility for simulation and
validation studies.
New graphics and visualisation options
Vulcan Data Analyser offers enhanced Vulcan 11 and Maptek Workbench 2
provide powerful ways for users to
variography, intuitive workflows and are available for download in a single
view and interact with data for better
faster performance for resource installer from a secure link in the
understanding of spatial relationships.
modelling applications. Maptek Users Area.
The Maptek Workbench is a unified
Enhanced functionality makes for Visit users.maptek.com to login or
platform that allows users to share
smoother mine planning–scheduling register with your corporate email
workflows and data. It provides a
interaction. New options in mining for access. Current maintenance is
dynamic workspace for running Maptek
block generation improve workflow and a pre-requisite.
applications and standard tools that
productivity for open pit mines. Strip mines
support design and modelling tasks. Download file size is 1.2 GB. If you
gain better control with more options for
Version 2 delivers enhanced workflow have difficulty downloading files, a
creating and splitting solids.
editor, search facility and technical USB key can be mailed on request.
Grade Control Optimiser features an support features.
improved core optimisation engine, which Contact the Maptek support team to
The Workbench home page reveals new resolve any issues.
guarantees locally optimised results.
look product icons, which are part of a
Faster sample processing and the wider 2018 Maptek brand refresh. www.maptek.com/support/
incorporation of Perl and Python scripting
At Maptek we're already working on the
have enhanced the Grade Control
next release. Talk to your local Maptek
module. Plotting and reporting has also
office about the exciting projects on our
been improved.
development roadmap for Vulcan 12
and the Maptek Workbench.

www.maptek.com >
WHAT'S NEW / VULCAN

Multivariate transform
The projection pursuit methodology
joins the Vulcan suite of multivariate
transformation tools for analysis and
manipulation of sample data. This
method allows users to reduce any
dataset to an uncorrelated multivariate
Gaussian distribution. Realisations are
simulated on the transformed data.

The associated back transformation


restores the original multivariate
dependencies to the realisations. orward
and backward transformations can be
stored for repeated usage.

Variogram analysis
Vulcan Data Analyser (VDA) is easy to
use and is fully integrated with geological
Geostatistics resource data. Major improvements to
Kriging Neighbourhood Analysis (KNA) the user experience are backed up with
is fully integrated into the Vulcan grade new options for analysis.
estimation process. Charts are readily
saved for reporting and it is fast and Vulcan 11 includes updates to variogram
modelling and many visualisation
intuitive to set up and run.
enhancements. Variogram properties 3D geological sculpting
The ability to determine and optimise can now be saved for use between 3D Geological Sculpting allows solids
input parameters for the kriging process variograms and projects. Variogram created through implicit modelling or
minimises conditional biases during cloud charts show variations between all other techniques to be modified using
estimation. Block size, minimum and samples at each lag. a freehand or snapping mode to sculpt,
maximum numbers of samples, search deform, pinch and smooth geological
distances and discretisation parameters Data highlighting is a streamlined way to
models on screen. Updates in Vulcan 11
can be charted to show their impact on check spatial locations of chart outliers
allow incorporation of production data
kriging efficiency and slope of regression. and assess their potential impact during
and samples databases. Search and filter
resource estimation. Users can simply
algorithms now perform up to 40 times
KNA can be run on a single (local) select data on an existing histogram,
faster. Auditability has also improved.
and/or multiple block (global) basis. cumulative frequency chart or scatter
The optimised settings can be fed plot and highlight the selected data in 3D.
directly into a grade estimation run for
efficient processing. Multiple points can now be selected for Stratigraphic
Vulcan users can now perform grade
creating deferred scatter plots, which
helps users when validating simulations
reconciliation
estimation using Simple CoKriging, of block grades. New madogram Compare Stratigraphic Models allows
Standardised CoKriging and Ordinary charts are available for validation of users to directly compare or reconcile
CoKriging in the Gaussian Simulation Gaussian simulations. an entire suite of grids or triangulations
module, with up to five variables for representing the site resource model
complex multi-commodity operations. Subsequent to Vulcan 11, VDA will against the previous output, without the
replace the current Advanced Statistics need to create macros or scripts.
functions, including box plots, support for
additional data types and the capability Comparison can be done at the directory
for chart generation to be scripted. level, with outputs created automatically
and reported statistically, or as contoured
variable differences ready for display
and plotting. The process is saved as
a specification, which can be rerun for
reconciliation of future models.

www.maptek.com >
WHAT'S NEW / VULCAN

Open pit scheduling


workflows
Vulcan offers different approaches when
generating mining blocks for scheduling.
Enhancements to Mining Blocks
Generation and Open Pit Solids provide
greater efficiency and improved mine
planning−scheduling connectivity.
Overbreak/underbreak
A new tool for comparing designs
and as-builts will help surveyors and
engineers who need to frequently
calculate overbreak and underbreak in
underground voids. Clicking on each
cross-section displays dimensions for as-
built, design, overbreak and underbreak
as well as percentage of deviation.

Highwall ramps
Engineers can now create highwall
templates with improved flexibility in ramp Mining Blocks Generation employs a
design, including the ability to incorporate simple, repeatable approach, where any
multiple ramps. Reserving is improved, accumulation variable, such as insitu
with flow on to more accurate scheduling metals or volume, can be selected and
in Evolution. The update supports applied as a target. Dynamic adjustment
Open Pit Solids provides a workflow
dragline passes. of blocks allows simple, interactive solid
for creating solids for strip mines,
and attribute modification on the fly.
with reliable output applicable to all
Users can easily add costs and tonnages Maptek mine planning and scheduling
as populated variables for block models processes. As well as exerting greater
and produce block models for import control and flexibility over how pits
into Maptek Evolution. This saves time are split, users can stipulate colours
and effort and reduces risk arising from and devise formula-created attributes
manual editing or miscalculation of cost from generated attributes. Improved
and tonnage variables. The specification options support amalgamated projection
can be saved for auditing. methods, projection on grids, stacking
and splitting in any sequence.
Users can also populate Vulcan block
Dragline models with the results from Evolution
optimisation, enabling the creation of
Dragline functionality has been enhanced
end-of-period maps and animation of
to create single menu workflows. Updates
the scheduling phases.
include automated bench templates, the
ability to follow floor undulations more
closely when creating the maximum spoil
profile, options to doze to RL and doze
as flat as possible, and unlimited offset
blocks for the spoil report.

www.maptek.com >
WHAT'S NEW / VULCAN

Grade control optimiser


Continually refined since release in 2017,
the standalone Grade Control Optimiser
module helps operations improve the
value of deposits. The latest update
includes enhancements to the core
optimisation engine, which guarantees
locally optimal results.

Underground The tool also includes an option to


apply different mining widths. Users can
scheduling choose to populate the classification grid
by reading the variables directly from the
Vulcan Gantt Scheduler (VGS) is an
block model. The mineable optimisation
activity-based scheduler that allows
area can be specified via an additional
users to create activities directly from
block selection, and the known upper
Vulcan designs and triangulations which
bound is reported by the optimiser.
can then be sequenced, resourced,
animated, levelled and reported. The time limit for the optimiser now
Panel caving designer The performance of spatial precedences
applies to the entire problem, while
New Panel Caving Designer completes recognising that the problem is split into
and resource levelling has been
the mining value chain for caving. A multiple pieces.
significantly improved to create a more
footprint created in Maptek’s strategic robust scheduler that can be used
CaveLogic application can be passed
to Panel Caving Designer for designing
across various planning horizons. Grade control
infrastructure and output integrated Reserves can be broken down to New Grade Control features dramatically
with activity scheduling in Vulcan a period as small as a day for large increase speed for resolving samples,
Gantt Scheduler. triangulation blocks or long centrelines. additional date formats and the ability
This allows for better understanding of to use Perl and Python scripts. Plotting
This allows users to efficiently plan and the grade distribution across periods. output has been improved, bench plans
quickly prepare the operational sectors
can be saved, blast reporting panels
necessary to comply with production Users can now report every activity on
re-sized and grade blocks edited by a
plans defined in the strategic planning a weekly, monthly or yearly basis with
pick list.
stage, using for example CaveLogic. a simple export or copy to csv option.
This allows for detailed information to be
The automated process for creating reported by period and easily formatted
3D CAD level production and sink into desired output. Additionally, the
level mining designs incorporates grade can be reported per individual
geometric, technical and operational activity, which is helpful when reporting
parameters. Changes made to pillar short range plans.
dimensions and orientations, and drive
widths and heights are automatically VGS utilities include resource charting
reflected in designs. Design scenarios complete with histograms, easier
can be compared, taking into account precedence arrow navigation, Gantt bar
operational factors and costs. colouring and labelling. New objects
and triangulations can be generated by
The new module is applicable to naturally splitting and colouring by scheduled
and artificially supported, as well as periods. The result is a diverse toolset
unsupported caving methods. that helps planners create, validate and
communicate a schedule.

www.maptek.com >
WHAT'S NEW / VULCAN

Usability features
Clip to fault block - Controls fault blocks
through CAD data such as pit pickups or
seismic interpretations. Clipping avoids
pre-processing of data and ensures that
data relates to fault domains.

Creating triangle solids - Returns to


previous status if user inadvertently exits
Visualisation Python scripting the option.

Dynamically visualising multiple block Python scripting links a user's data Database recovery - Locates
variables allows quick assessment of all science framework to Vulcan, opening compressed blocks in the database
realisations of a simulation. Users can set up possibilities for improving outcomes and unpacks them to an output file,
up animations to run through all equi- in many applications. Python helps reassembling blocks in the correct order.
probable solutions. customise solutions for working Drillhole radius labelling - Specifying
with large data arrays in block subsets of drillholes to label by radius
The update makes it quicker and easier models, databases, mapfiles, grids
to understand spatial distribution of grade better controls the number of labels
and triangulations. being displayed.
variables in relation to one another, and if
pit shells are flagged then pit shells or pit Vulcan 11 adds support for Envisage Implicit modelling - Running implicit
optimiser results can be compared with functionality with new and improved modelling without creating any solids
grade and other block model variables. interactive abilities for accessing and allows results to be saved into block
passing of design data structures. model more quickly.
A new live topography option in the open Python is also enabled for use in the
pit design sawtooth tool allows users to Maptek Workbench Workflow Editor. Optional extents for DG1 - Data
preview what a mining plan looks like as window automatically resizes to fit the
periods progress. data in use.
Graphics Run multiple estimations - Save
Three new icons on the Graphics toolbar time by running multiple estimations
- Solid Slice, Quick Section, Tile and Tie - concurrently from a new user interface.
target niche tasks with big impact.

Labs
Vulcan users can now test prototypes
of new features and provide feedback
New ellipsoid display dynamically to Maptek for ongoing development.
updates the samples that will be selected Users can access these options via the
for use in grade estimation as the Workbench settings menu.
ellipsoid boundary changes. The strike,
dip and plunge orientations and the Solid Slice allows users to generate CSV editor - Formula editor and several
search lengths along each ellipsoid axis slices from closed solids for viewing formatting options have been added.
can be easily manipulated on screen. data. Slices retain the colour of the
Repair triangle solids - Enhanced
parent triangulation, and transparency
This is very effective for visual validation triangulation creation and editing tools
is optional. A slice can be created in
of sample data and fine tuning estimation focus on determining the best way
either or both front and back ends of the
criteria prior to the estimation process, and to resolve triangulation validity issues
section, or as a single slice in the middle.
is a powerful method for understanding the and easily separate small areas and
impact of estimations. The new Quick Section two-click vertical surfaces.
operation requires input of two points
to define a plane for slicing.

Tile and Tie allows users to view multiple


windows simultaneously; moving data
in one window shows the data from the
same reference point in each window.

www.maptek.com >
WHAT'S NEW / VULCAN

Workbench updates
The Maptek Workbench is the interface An updated search feature allows
where all Maptek applications will searching for a specific term and then
ultimately be available. Workbench 2 running the function from the relevant
release incorporates Vulcan 11, with options returned in the search.
Eureka 5 to be added in the near future.

The Workbench platform enhances


interaction with data and improves
access to integrated text and spread-
sheet applications that support design The Workflow Editor allows users to build
and modelling. interactive command sequences linking
Vulcan and Workbench menu items with
Users can create their own toolbars, entirely new capabilities.
menus, command lists and shortcut
keys, to suit preferred work patterns. Users can drag and drop components
and link them to explorer data to easily New charts created from the latest
Toolbars can be resized into any run automations in context. Customised Vulcan applications are now easily
rectangular shape. Docked toolbar components can be saved to reuse in dockable in the Workbench workspace.
windows can be set to auto-hide and other workflows. Prompts can be built in, Users will be able to request support
only appear when needed. Users variables can be queried and users can directly via the Workbench and
can dynamically switch between troubleshoot workflows. automatically generated log files
supported languages. help in resolving issues.

Vulcan 11 and Maptek Workbench 2


are available for download in a single
installer from a secure link in the
Maptek Users Area.

Visit users.maptek.com to login or


register with your corporate email
for access. Current maintenance is
a pre-requisite for downloading and
running the latest version.

Release Notes containing a summary


of the changes in this release are also
located in the Users Area.

© 2018 Maptek Contact www.maptek.com/support/

Vous aimerez peut-être aussi