8 ∅ @ 200 mmc/c

150 150 VERTICAL AND


GL
HORIZONTAL BARS NOTE:-
1500 10∅ @ 150c/c 1.ALL DIMENSIONS ARE IN 'MM'
1500

@ top BOTHWAY 2.Use M25 Grade concrete & Fe 500 Steel


3.SBC of soil considered as 12T / SQ.M.
10∅@ 150mmc/c
@ bottom BOTHWAY
400

200
150

400 THK RUBBLE SOLING


8 ∅ @ 200 mmc/c
VERTICAL AND
HORIZONTAL BARS
ELEVATION
10 ∅ @ 150c/c
1800 @ top BOTHWAY
150
1500

250X250 PEDESTAL
AT EACH CORNER
4-12T- MAIN BAR
1800X1800X400 RCC FOOTING TIES- 8@150 C/C
1800

1850X1850X100 THK PCC


PLAN AT GROUND LEVEL

PROJECT AND SITE :-

CONTRACTOR :

10 ∅@ 150mmc/c CONSULTANT :-

@ bottom BOTHWAY TITLE FOUNDATION DETAILS OF LIFT


SUPPORT STRUCTURE (20M)

PLAN AT FOOTING TOP AMK AMK AMK


Scale Drawing No Page Rev
20.11.2018 FOR APPROVAL
NTS 1 of 1 R0