Objective: This document gives project based priorities concerning the roads of the Master
Plan. All Aurovillian roads are included.
Introduction
Surveying & marking and managed clearing
Designing & construction
Budget
Introduction
Billinger’s Mobility Plan (August 2001) has been chosen as a central point of reference.
Apart from this study a few other studies are taken into account. Auroville Mobility 2005 is
one of them. This document bridges the Billinger concept into a road-plan. In short these
document states:
Hierarchy:
Peace area & Inner City: Mainly pedestrian (even cyclists will be partly excluded);
Pedestrians take priority and cyclists are allowed where they do not disturb; Other vehicles in
certain times of the day; Max speed: 15km/hour;
Electrical moped should be allowed for people above 70.
Crown Road: Inner part: pedestrians; Outer part: cyclists & non-polluting
traffic/busses/electrical cars; 15km/h;
Radials: Section similar as the Crown Road;
Inside the zones: depends on local conditions with the rule of security and non-polluting;
Outer ring road: All types of vehicles; Garages etc. close to the outer ring road;
Main access roads: All types of traffic;
1
The objectives of Road Map 2012 are:
Categories of development/implementation:
Activity Description/Remarks
Surveying & marking All roads should be (re)-surveyed by a competent
surveying agency. Marking should be done only
when the lands are in possession of the Auroville
Foundation and only after sufficient communication
feed back.
Managed clearing Managed clearing means that we envision a step by
General step implementation of sections of roads by a
activities L’avenir task force where the section is studied,
proposed and for feedback asked. At the same time
‘other’ roads are closed. Light paving might be
optional.
Clearing can be done in a path-way width (app. 1
meter) or in the future width. Only after
communication and feed back.
Designing See the table below for the different design aspects
Specific of roads.
activities Fixing technical All roads are technically standardized by L’avenir
specifications d’Auroville.
Road Construction See table below
2
Surveying & marking and managed clearing
The next Master Plan roads are proposed to be surveyed & marked and managed cleared.
1
Priority scale 1 to 3 (1 = high, 2 = neutral, 3 = low)
3
Implementation scheme Surveying & marking and managed clearing
Road Description
Inner City: Crown Road/Solar kitchen junction to Matrimandir junction
4
Implementation planning, designing and construction
Radials
1. Residential zone
2. Residential zone
3. Cultural zone
4. Industrial
Access Roads
1. Residential
2. International
Other roads
1.Visitor Center to Matrimandir
2.Solar kitchen plaza
5
Budget Surveying & Marking and clearing
CROWN ROAD 4335 667 237 321 109 15249 13973 5000 8973 71780
two lines of pegs
OUTER RING ROAD 8500 654 100 5 549 76838 36000 0 36000 288000
center line
6
Summary of Traffic Planning Guidelines (in meters)
3. 4.Width Trees
2. Width
1. Width Radius lined 5.Width Cycle 6. Building
Right-of- Length m² Name
Carriageway to road Pedestrian Path Line Setback
Way
centre boulevard
on on
One Two One Both
Category Zone / No: one both
side sides side sides
side sides
Crown Road 8.00 16.00 4,335 34,680 690.00 3.00 2.50 2.50 Crown Road
Cultural 1 6.00 11.50 741 4,446 3.00 2.50 2.00 Access NE
2 4.00 9.50 292 1,168 3.00 2.50 2.00 Sports facilities, stadia
Residential 3 4.00 9.50 610 2,440 3.00 2.50 2.00 Gaia Radial
4 6.00 11.50 664 3,984 3.00 2.50 2.00 Vikas Radial
5 6.00 11.50 676 4,056 3.00 2.50 2.00 Solar Radial
6 8.00 19.00 673 5,384 3.00 2.50 2.00 Center Radial
Radials
7 10.00 21.00 674 6,740 3.00 2.50 2.00 Aurodam Radial
International 8 4.00 9.50 385 1,540 3.00 2.50 2.00 Access SW
9 6.00 11.50 762 4,572 3.00 2.50 2.00 CIRHU Radial
Industrial 10 8.00 19.00 710+258 7,744 3.00 2.50 2.00 Pony Farm
11 8.00 19.00 724+541 5,052 3.00 2.50 2.00 Verite
12 8.00 19.00 775.00 6,200 3.00 2.50 2.00 Sve Dam
GREEN Corridor 7>30 88,006 <1.5 <1.5 Vehicle-free paths
Outer Ring Road 10.00 21.00 8500.00 1250.00 3.00 2.50 2.00 Auroville Ring Road
Service Road 3.50 6.00
Res. South 1 10.00 30.00
Access Inten. West 2 10.00 30.00
Roads Ind. North 3 10.00 30.00
Cult. East 4 10.00 30.00
7
8