Vous êtes sur la page 1sur 80

METRADOS DE UNA CASA HABITACION DE 2 NIVELES

01 ESTRUCTURAS ESTRUCTURAS

01.01 OBRAS PRELIMINARES

OE 1.01 LIMPIEZA DEL TERRENO MANUAL (M2)

DESCRIPCION ancho largo S (m2)


Superficie del terreno 1 12 21 252.00
252.00

OE 1.02 TRAZO Y REPLANTEO INICIAL (M2)

DESCRIPCION A B S (m2)
Area que encierra trazo 252.00

OE 1.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA (M2)

DESCRIPCION S Pisos S (m2)


Superficie del terreno 252.00 2 504

01.02 MOVIMIENTO DE TIERRAS


01.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS (M3)

EJE TRAMO REPITE a (m) l (m) P (m)


A-A y H-H Entre: 1-2 2 0.70 4.02 1.35
A-A y H-H Entre: 2-3 2 0.70 2.63 1.35
A-A y H-H Entre: 3-4 2 0.70 3.69 1.35
A-A y H-H Entre: 4-5 2 0.70 0.31 1.35
A-A y H-H Entre: 5-6 2 0.70 4.15 1.35
A-A y H-H Entre: 6-7 2 0.70 5.95 1.35
B-B Entre: 1-2 1 0.70 4.02 1.35
D-D Entre: 1-2 1 0.70 4.02 1.35
D-D Entre: 5-6 1 0.70 4.15 1.35
E-E Entre:3-6 1 0.70 3.71 1.35
F-F Entre: 4-6 1 0.70 4.46 1.35
1-1 , 6-6 Y 7-7 Entre: A -H 3 0.70 11.72 1.35
2-2 Entre A-D 1 0.70 4.70 1.35
3-3 Entre: A-C 1 0.70 4.30 1.35
4-4 Entre: E-G 1 0.70 3.02 1.35
5-5 Entre: B-D 1 0.70 1.48 1.35
01.02.02 NIVELACION INTERIOS APISONADO MANUAL (M2)

EJE TRAMO REPITE a (m) l (m) V (m3)


A-A y H-H Entre: 1-2 2 0.55 4.02 4.42
A-A y H-H Entre: 2-3 2 0.55 2.63 2.89
A-A y H-H Entre: 3-4 2 0.55 3.69 4.06
A-A y H-H Entre: 4-5 2 0.55 0.31 0.34
A-A y H-H Entre: 5-6 2 0.55 4.15 4.57
A-A y H-H Entre: 6-7 2 0.55 5.95 6.55
B-B Entre: 1-2 1 0.55 4.02 2.21
D-D Entre: 1-2 1 0.55 4.02 2.21
D-D Entre: 5-6 1 0.55 4.15 2.28
E-E Entre:3-6 1 0.55 3.71 2.04
F-F Entre: 4-6 1 0.55 4.46 2.45
1-1 , 6-6 Y 7-7 Entre: A -H 3 0.55 11.72 19.34
2-2 Entre A-D 1 0.55 4.70 2.59
3-3 Entre: A-C 1 0.55 4.30 2.37
4-4 Entre: E-G 1 0.55 3.02 1.66
5-5 Entre: B-D 1 0.55 1.48 0.81
60.79
01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO (M3)

EJE TRAMO REPITE a (m) l (m) h (m)


A-A y H-H Entre: 1-2 2 0.55 4.02 0.15
A-A y H-H Entre: 2-3 2 0.55 2.63 0.15
A-A y H-H Entre: 3-4 2 0.55 3.69 0.15
A-A y H-H Entre: 4-5 2 0.55 0.31 0.15
A-A y H-H Entre: 5-6 2 0.55 4.15 0.15
A-A y H-H Entre: 6-7 2 0.55 5.95 0.15
B-B Entre: 1-2 1 0.55 4.02 0.15
D-D Entre: 1-2 1 0.55 4.02 0.15
D-D Entre: 5-6 1 0.55 4.15 0.15
E-E Entre:3-6 1 0.55 3.71 0.15
F-F Entre: 4-6 1 0.55 4.46 0.15
1-1 , 6-6 Y 7-7 Entre: A -H 3 0.55 11.72 0.15
2-2 Entre A-D 1 0.55 4.70 0.15
3-3 Entre: A-C 1 0.55 4.30 0.15
4-4 Entre: E-G 1 0.55 3.02 0.15
5-5 Entre: B-D 1 0.55 1.48 0.15

Volumen de material de relleno: 8.22*1.80 = 16.41 m3


01.02.04 ELMINACION CON TRANSPORTE (CARGIO A MANO) R=25 M3/DIA

DESCRIPICION m3
Vol. excavado 146.22
Vol. mat. Relleno 16.41
Vol, a eliminar 129.81

01.03 OBRAS DE CONCRETO SIMPLE

01.03.01 CONCRETO SOLADO e=0.10m, f'c=80 kg/cm2 VACIADO MANUALMENTE (m3)

EJE TRAMO REPITE a (m) l (m) h (m)


A-A y H-H Entre: 1-2 2 0.70 4.02 0.10
A-A y H-H Entre: 2-3 2 0.70 2.63 0.10
A-A y H-H Entre: 3-4 2 0.70 3.69 0.10
A-A y H-H Entre: 4-5 2 0.70 0.31 0.10
A-A y H-H Entre: 5-6 2 0.70 4.15 0.10
A-A y H-H Entre: 6-7 2 0.70 5.95 0.10
B-B Entre: 1-2 1 0.70 4.02 0.10
D-D Entre: 1-2 1 0.70 4.02 0.10
D-D Entre: 5-6 1 0.70 4.15 0.10
E-E Entre:3-6 1 0.70 3.71 0.10
F-F Entre: 4-6 1 0.70 4.46 0.10
1-1 , 6-6 Y 7-7 Entre: A -H 3 0.70 11.72 0.10
2-2 Entre A-D 1 0.70 4.70 0.10
3-3 Entre: A-C 1 0.70 4.30 0.10
4-4 Entre: E-G 1 0.70 3.02 0.10
5-5 Entre: B-D 1 0.70 1.48 0.10
01.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

EJE TRAMO REPITE a (m) l (m) h(m)


A-A y H-H Entre: 1-2 2 0.70 4.02 1.00
A-A y H-H Entre: 2-3 2 0.70 2.63 1.00
A-A y H-H Entre: 3-4 2 0.70 3.69 1.00
A-A y H-H Entre: 4-5 2 0.70 0.31 1.00
A-A y H-H Entre: 5-6 2 0.70 4.15 1.00
A-A y H-H Entre: 6-7 2 0.70 5.95 1.00
B-B Entre: 1-2 1 0.70 4.02 1.00
D-D Entre: 1-2 1 0.70 4.02 1.00
D-D Entre: 5-6 1 0.70 4.15 1.00
E-E Entre:3-6 1 0.70 3.71 1.00
F-F Entre: 4-6 1 0.70 4.46 1.00
1-1 , 6-6 Y 7-7 Entre: A -H 3 0.70 11.72 1.00
2-2 Entre A-D 1 0.70 4.70 1.00
3-3 Entre: A-C 1 0.70 4.30 1.00
4-4 Entre: E-G 1 0.70 3.02 1.00
5-5 Entre: B-D 1 0.70 1.48 1.00
01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 M M2

EJE TRAMO REPITE # Lados a (m) l (m)


A-A y H-H Entre: 1-2 2 2 0.15 4.02
A-A y H-H Entre: 2-3 2 2 0.15 2.63
A-A y H-H Entre: 3-4 2 2 0.15 3.69
A-A y H-H Entre: 4-5 2 2 0.15 0.31
A-A y H-H Entre: 5-6 2 2 0.15 4.15
A-A y H-H Entre: 6-7 2 2 0.15 5.95
B-B Entre: 1-2 1 2 0.15 4.02
D-D Entre: 1-2 1 2 0.15 4.02
D-D Entre: 5-6 1 2 0.15 4.15
E-E Entre:3-6 1 2 0.15 3.71
F-F Entre: 4-6 1 2 0.15 4.46
1-1 , 6-6 Y 7-7 Entre: A -H 3 2 0.15 11.72
2-2 Entre A-D 1 2 0.15 4.70
3-3 Entre: A-C 1 2 0.15 4.30
4-4 Entre: E-G 1 2 0.15 3.02
5-5 Entre: B-D 1 2 0.15 1.48

01.03.04 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS M3


EJE TRAMO REPITE a (m) l (m) h (m)
A-A y H-H Entre: 1-2 2 0.15 4.02 0.30
A-A y H-H Entre: 2-3 2 0.15 2.63 0.30
A-A y H-H Entre: 3-4 2 0.15 3.69 0.30
A-A y H-H Entre: 4-5 2 0.15 0.31 0.30
A-A y H-H Entre: 5-6 2 0.15 4.15 0.30
A-A y H-H Entre: 6-7 2 0.15 5.95 0.30
B-B Entre: 1-2 1 0.15 4.02 0.30
D-D Entre: 1-2 1 0.15 4.02 0.30
D-D Entre: 5-6 1 0.15 4.15 0.30
E-E Entre:3-6 1 0.15 3.71 0.30
F-F Entre: 4-6 1 0.15 4.46 0.30
1-1 , 6-6 Y 7-7 Entre: A -H 3 0.15 11.72 0.30
2-2 Entre A-D 1 0.15 4.70 0.30
3-3 Entre: A-C 1 0.15 4.30 0.30
4-4 Entre: E-G 1 0.15 3.02 0.30
5-5 Entre: B-D 1 0.15 1.48 0.30

01.03.05 FALSO PISO e=4'' f'c=140 kg/cm2 VACIADO MANUALMENTE


PRIMER PISO
EJE TRAMO a (m) l (m) h (m) A (m2)
A-A 1 2 11.5 3.77 0.10 4.34
H -H
C-C 2 3 7.75 2.38 0.10 1.84
H-H
A-A 3 4 5 11.5 3.75 0.10 4.31
H -H
A-A 4 5 4.5 2.65 0.10 1.19
D-D
D -D 4 5 6 4.3 3.17 0.10 1.36
F-F
11.69
01.04 CONCRETO ARMADO

01.04 ZAPATAS
01.04.01 CONCRETO EN ZAPATAS F"C=210 kg/cm2

0.6 v=(0.60)*(1.5)*(1.5)*(18)
v=24.3

1.5

01.04.02 Acero f"y=4200 kg/cm2 para zapatas

diseño de fierro diámetro n° de elementos n° de piezas de elementos longitud


5/8" 6 7 1.4
1.4 5/8" 6 7 1.4
longitud
Pe
total

01.05 vigas de cimentación


concreto en vigas de cimentación F"C= 210 KG/CM2

V=0.40*0.15*147.81
V=8.86
01.05 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN

A=(147.81 *0.4) A=59.124

01.04.01 COLUMNAS

01.04.01.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3

PRIMER PISO

COLUMNA SECCIÓN ALTURA # VECES VOLUMEN


b t PARCIAL
C-1 0.25 0.25 3.60 15.00 3.38
C-2 0.25 0.15 3.60 6.00 0.81
4.19
SEGUNDO PISO

COLUMNA SECCIÓN ALTURA # VECES VOLUMEN


b t PARCIAL
C-1 0.25 0.25 2.60 12.00 1.95
C-1 0.25 0.15 2.60 6.00 0.59
2.54
TOTAL: 6.72 m3

01.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2

PRIMER PISO
COLUMNA # VECES # Lados Ancho ALTURA AREA
C-1 15 2.00 0.15 2.6 11.70
C-2 6 2.00 0.15 2.6 4.68
16.38

SEGUNDO PISO

COLUMNA # VECES # Lados Ancho ALTURA AREA


C-1 12 2.00 0.15 2.6 9.36
C-2 6 2.00 0.15 2.6 4.68
14.04

TOTAL: 30.42 m2

01.04.01.03 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg

PRIMER PISO

DESCRIPCION l (m) # ELEMENTOS VECES QUE Ø 1/4"


ESTRUCTUR. SE REPITE (m)
C -1 2.60 15 4 1/2"
C -2 2.60 6 4 1/2 "
Estribos
C -1 1.04 15 21 1/4" 327.60
C -2 0.84 6 21 1/4 " 105.84
433.44

SEGUNDO PISO

DESCRIPCION l (m) # ELEMENTOS VECES QUE Ø 1/4"


ESTRUCTUR. SE REPITE (m)
C -1 2.60 12 4 1/2"
C -2 2.60 6 4 1/2 "
Estribos
C -1 1.04 12 21 1/4" 262.08
C -2 0.84 6 21 1/4 " 105.84
367.92

TOTAL: (m) kg.


1/4 " 801.36 200.34
1/2 " 405.60 401.544
601.884
01.04.02 VIGAS

01.04.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 M3

PRIMER PISO

EJE TRAMO a (m) l (m) h (m) REPITE


A-A y H-H Entre: 1-2 0.25 4.02 0.25 2
B-B Entre: 1-2 0.15 4.02 0.25 1
A-A Y H-H Entre: 2-3 0.25 2.63 0.25 2
A-A Entre: 3-5 0.25 4.00 0.25 1
H-H Entre: 3-4 0.25 3.69 0.25 1
A-A Entre: 5-6 0.25 4.15 0.25 1
D-D Entre: 5-6 0.15 4.15 0.25 1
F-F Entre: 4-6 0.15 4.46 0.25 1
H-H Entre: 4-6 0.25 4.46 0.25 1
A-A Y H-H Entre: 6-7 0.25 5.95 0.25 2
1-1 Y 2-2 Entre: A- B 0.25 1.95 0.2 2
1-1 Entre: B-E 0.25 4.55 0.2 1
1-2 Entre: E-G 0.25 3.02 0.2 1
1-3 Entre: G-H 0.25 2.23 0.2 1
2-2 Entre: B-C 0.25 1.85 0.2 1
3-3 Entre: A-C 0.25 3.8 0.2 1
4-4 Entre: E-G 0.25 3.02 0.2 1
6-6 Entre: D-F 0.25 4.46 0.2 1
6-6 Entre: F-H 0.25 2.59 0.2 1

SEGUNDO PISO

EJE TRAMO a (m) l (m) h (m) REPITE


A-A y H-H Entre: 1-2 0.25 4.02 0.25 2
C-C Entre: 2-3 0.25 2.63 0.25 1
B-B Entre: 1-2 0.25 4.02 0.25 1
H-H Entre: 2-3 0.25 2.63 0.25 1
A-A Entre: 3-5 0.25 4.00 0.25 1
H-H Entre: 3-4 0.25 3.69 0.25 1
A-A Entre: 5-6 0.25 4.15 0.25 1
D-D Entre: 5-6 0.25 4.15 0.25 1
F-F Entre: 4-6 0.25 4.46 0.25 1
1-1 Y 2-2 Entre: A- B 0.25 1.95 0.2 2
1-1 Entre: B-E 0.25 4.55 0.2 1
1-2 Entre: E-G 0.25 3.02 0.2 1
1-3 Entre: G-H 0.25 2.23 0.2 1
2-2 Entre: B-C 0.25 1.85 0.2 1
3-3 Entre: A-C 0.25 3.8 0.2 1
4-4 Entre: E-G 0.25 3.02 0.2 1
5-5 Entre: A-D 0.25 4.7 0.2 1
6-6 Entre: D-F 0.25 4.46 0.2 1

TOTAL: 8.48 m3
01.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2

PRIMER PISO

EJE TRAMO # Lados l (m) h (m) REPITE


A-A y H-H Entre: 1-2 3 4.02 0.25 2
B-B Entre: 1-2 3 4.02 0.25 1
A-A Y H-H Entre: 2-3 3 2.63 0.25 2
A-A Entre: 3-5 3 4.00 0.25 1
H-H Entre: 3-4 3 3.69 0.25 1
A-A Entre: 5-6 3 4.15 0.25 1
D-D Entre: 5-6 3 4.15 0.25 1
F-F Entre: 4-6 3 4.46 0.25 1
H-H Entre: 4-6 3 4.46 0.25 1
A-A Y H-H Entre: 6-7 3 5.95 0.25 2
1-1 Y 2-2 Entre: A- B 3 1.95 0.2 2
1-1 Entre: B-E 3 4.55 0.2 1
1-2 Entre: E-G 3 3.02 0.2 1
1-3 Entre: G-H 3 2.23 0.2 1
2-2 Entre: B-C 3 1.85 0.2 1
3-3 Entre: A-C 3 3.8 0.2 1
4-4 Entre: E-G 3 3.02 0.2 1
6-6 Entre: D-F 3 4.46 0.2 1
6-6 Entre: F-H 3 2.59 0.2 1

SEGUNDO PISO

EJE TRAMO # Lados l (m) h (m) REPITE


A-A y H-H Entre: 1-2 3 4.02 0.25 2
C-C Entre: 2-3 3 2.63 0.25 1
B-B Entre: 1-2 3 4.02 0.25 1
H-H Entre: 2-3 3 2.63 0.25 1
A-A Entre: 3-5 3 4.00 0.25 1
H-H Entre: 3-4 3 3.69 0.25 1
A-A Entre: 5-6 3 4.15 0.25 1
D-D Entre: 5-6 3 4.15 0.25 1
F-F Entre: 4-6 3 4.46 0.25 1
1-1 Y 2-2 Entre: A- B 3 1.95 0.2 2
1-1 Entre: B-E 3 4.55 0.2 1
1-2 Entre: E-G 3 3.02 0.2 1
1-3 Entre: G-H 3 2.23 0.2 1
2-2 Entre: B-C 3 1.85 0.2 1
3-3 Entre: A-C 3 3.8 0.2 1
4-4 Entre: E-G 3 3.02 0.2 1
5-5 Entre: A-D 3 4.7 0.2 1
6-6 Entre: D-F 3 4.46 0.2 1

TOTAL: 105.50 m2
01.04.02.03 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg

PRIMER PISO
EJE DESCRIPCION TRAMO l (m) longitud total # ELEMENTOS
(traslape) ESTRUCTUR.
A-A V. de amarre 1-7. 20.96 21.46 1
B-B V. de amarre 1-2. 4.23 4.73 1
C-C V. de amarre 2-3. 2.84 3.34 1
D-D V. de amarre 3-5. 4.21 4.71 1
D- D V. de amarre 5-6. 4.31 4.31 1
F-F V. de amarre 5-6. 4.62 4.62 1
H -H V. de amarre 1-7. 20.96 21.46 1

1 1 V. solera A-H 11.96 11.96 1


2 2 V. solera A-C 3.56 3.56 1
3 3 V. solera A-D 3.56 3.56 1
4 4 V. solera G-H 2.36 2.86 1
6 6 V. solera A-H 11.96 11.96 1

Estribos
A-A y H-H Viga amarre Entre: 1-2 4.02 4.02 2
B-B Viga amarre Entre: 1-2 4.02 4.02 1
A-A Y H-H Viga amarre Entre: 2-3 2.63 2.63 2
A-A Viga amarre Entre: 3-5 4.00 4.00 1
H-H Viga amarre Entre: 3-4 3.69 3.69 1
A-A Viga amarre Entre: 5-6 4.15 4.15 1
D-D Viga amarre Entre: 5-6 4.15 4.15 1
F-F Viga amarre Entre: 4-6 4.46 4.46 1
H-H Viga amarre Entre: 4-6 4.46 4.46 1
A-A Y H-H Viga amarre Entre: 6-7 5.95 5.95 2
1-1 Y 2-2 Viga solera Entre: A- B 1.95 1.95 2
1-1 Viga solera Entre: B-E 4.55 4.55 1
1-2 Viga solera Entre: E-G 3.02 3.02 1
1-3 Viga solera Entre: G-H 2.23 2.23 1
2-2 Viga solera Entre: B-C 1.85 1.85 1
3-3 Viga solera Entre: A-C 3.8 3.8 1
4-4 Viga solera Entre: E-G 3.02 3.02 1
6-6 Viga solera Entre: D-F 4.46 4.46 1
6-6 Viga solera Entre: F-H 2.59 2.59 1

SEGUNDO PISO
EJE DESCRIPCION TRAMO l (m) longitud total # ELEMENTOS
(traslape) ESTRUCTUR.
A-A V. de amarre 1-7. 20.96 21.46 1
B-B V. de amarre 1-2. 4.23 4.73 1
C-C V. de amarre 2-3. 2.84 3.34 1
D-D V. de amarre 3-5. 4.21 4.71 1
D- D V. de amarre 5-6. 4.31 4.31 1
F-F V. de amarre 5-6. 4.62 4.62 1
H -H V. de amarre 1-7. 20.96 21.46 1

1 1 V. solera A-H 11.96 11.96 1


2 2 V. solera A-C 3.56 3.56 1
3 3 V. solera A-D 3.56 3.56 1
4 4 V. solera G-H 2.36 2.86 1
6 6 V. solera A-H 11.96 11.96 1
A-A y H-H Viga amarre Entre: 1-2 4.02 4.02 2
C-C Viga amarre Entre: 2-3 2.63 2.63 1
B-B Viga amarre Entre: 1-2 4.02 4.02 1
H-H Viga amarre Entre: 2-3 2.63 2.63 1
A-A Viga amarre Entre: 3-5 4.00 4.00 1
H-H Viga amarre Entre: 3-4 3.69 3.69 1
A-A Viga amarre Entre: 5-6 4.15 4.15 1
D-D Viga amarre Entre: 5-6 4.15 4.15 1
F-F Viga amarre Entre: 4-6 4.46 4.46 1
1-1 Y 2-2 Viga solera Entre: A- B 1.95 1.95 2
1-1 Viga solera Entre: B-E 4.55 4.55 1
1-2 Viga solera Entre: E-G 3.02 3.02 1
1-3 Viga solera Entre: G-H 2.23 2.23 1
2-2 Viga solera Entre: B-C 1.85 1.85 1
3-3 Viga solera Entre: A-C 3.8 3.8 1
4-4 Viga solera Entre: E-G 3.02 3.02 1
5-5 Viga solera Entre: A-D 4.7 4.7 1
6-6 Viga solera Entre: D-F 4.46 4.46 1

TOTAL: (m) kg.


1/4 " 2213.41 553.35 1275.46
1/2 " 729.40 722.11

LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2
01.04.03
PRIMER PISO
01.04.03.01
EJE TRAMO a (m) l (m) A (m2)
A-A 1 2 11.5 3.77 43.36
H -H
C-C 2 3 7.75 2.38 18.45
H-H
A-A 3 4 5 11.5 3.75 43.13
H -H
A-A 4 5 4.5 2.65 11.93
D-D
D -D 4 5 6 4.3 3.17 13.63
F-F
116.85
SEGUNDO PISO

EJE TRAMO a (m) l (m) A (m2)


A-A 1 2 11.5 3.77 43.36
H -H
C-C 2 3 7.75 2.38 18.45
H-H
A-A 3 4 5 11.5 3.75 43.13
H -H
A-A 4 5 4.5 2.65 11.93
D-D
D -D 4 5 6 4.3 3.17 13.63
F-F
116.85

TOTAL: 233.70
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 M3

Volumen de la losEta: 0.05*1*1 = 0.05


01.04.03.02 Volumen de la vigueta 2.5*0.1*0.15 = 0.0375
0.0875 m3/m2

PRIMER PISO
V= 10.22

SEGUNDO PISO
V= 10.22

TOTAL:

Volumen de concreto: 20.45

LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO

PRIMER PISO
01.04.03.03
# de ladrillos: 1169

SEGUNDO PISO

# de ladrillos: 1169

TOTAL:
# de ladrillos: 2338
ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS kg

PRIMER Y SEGUNDO PISO


01.04.03.04
DESCRIPCION DESCRIPCION VECES QUE # ELEMENTOS l (m) Ø
SE REPITE ESTRUCTUR.
Eje AA -BB, Tramo 1-2 1 7 0.90 3/8 "

Eje AA -BB, Tramo 1-2 1 7 0.90 3/8 "

Eje AA -DD, Tramo 2-3 2 10 1.60 1/2 "

Eje AA -DD, Tramo 2-3 1 10 0.90 3/8 "

Eje AA -DD, Tramo 2-3 1 10 0.90 3/8 "

Eje AA -DD, Tramo 3-4 2 11 1.60 1/2 "

Eje AA -DD, Tramo 3-4 1 11 0.90 3/8 "

Eje AA -DD, Tramo 3-4 1 11 0.90 3/8 "

Eje CC -DD, Tramo 3 - 4 1 12 0.90 3/8 "

Eje CC -DD, Tramo 3 - 4 1 12 0.90 3/8 "

Eje AA -BB, Tramo 3 - 4 1 4 0.90 3/8 "

Eje AA -BB, Tramo 3 - 4 1 4 0.90 3/8 "


Eje CC -DD, Tramo 3 - 4 1 4 0.90 3/8 "

Eje CC -DD, Tramo 3 - 4 1 4 1.60 1/2 "

Eje AA -GG Tramo 5 -6 1 12 0.90 3/8 "

Eje AA -GG Tramo 5 -6 5 12 1.60 1/2 "

Eje AA -GG Tramo 5 -6 1 12 0.98 3/8 "

Acero de por m2: area: 1/4 "


Temperatura 8m 169.19

TOTAL: (m) kg.


1/4 " 4060.56 1015.14
3/8 " 604.08 338.2848
1/2 " 508.80 503.71
1857.14
ESCALERA

CONCRETO EN ESCALERAS f'c=210 kg/cm2 M3


01.04.04
DESCRIPCION a (m) l(m) h(m) # elementos V (m3)
01.04.04.01 Cimiento
Losa de 1er tramo 1.00 1.50 0.15 1 0.23
Gradas del 1er tramo 0.26 1.00 0.17 6 0.13
Descanso 1.00 2.00 0.15 1 0.30
Losa de 2er tramo 1.00 1.76 0.15 1 0.26
Gradas del 2er tramo 0.26 1.00 0.17 7 0.15
1.08

TOTAL: 3.2289 m3

ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2

DESCRIPCION h y a (m) l(m) # elementos A (m2)


01.04.04.02 1.00 1.50 1 1.50
Losa del 1er tramo
0.17 1.50 2 0.51
Gradas del 1er tramo 0.17 1.00 6 1.02
Descanso 0.15 2.00 1 0.30
1.00 1.76 1 1.76
Losa de 2er tramo
0.17 1.76 2 0.60
Gradas del 2er tramo 0.17 1.00 7 1.19
6.88

TOTAL: 20.6352

ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS kg


NUMERO DESCRIPCION VECES QUE l (m) Ø 3/8 "
01.04.04.03 SE REPITE (m)
1 3 1.45 3/8 " 4.35

2 3 3.62 1/2 "

3 3 1.40 3/8 " 4.2

4 11 0.95 3/8 " 10.45

5 3 1.73 3/8 " 5.19

6 3 1.35 3/8 " 4.05

Descanso 6 2.20 3/8 " 13.2

7 3 1.80 3/8 " 5.4

8 3 1.40 3/8 " 4.2

9 3 4.00 1/2 "

10 3 1.50 3/8 " 4.5

11 3 1.35 3/8 " 4.05

12 11 0.95 3/8 " 10.45

70.04

TOTAL: (m) kg.


3/8 " 70.04 39.22
1/2 " 22.86 22.63
ALBANILERIA

AMARRE DE SOGA JUNTA 1.5 cm MORTERO 1:4 M2


01.05
PRIMER PISO DE SOGA
01.05.01
DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO
A-A y B-B Entre: 1-1 0 0 1 0.00 1.8
B-B y E-E Entre: 1-1 2.4 2.98 1 7.15 0
E-E y G-G Entre: 1-1 2.4 3.17 1 7.61 0
G-G Y H-H Entre: 1-2 2.4 3.70 1 8.88 0
B-B y C-C Entre: 1-2 2.4 3.55 1 8.52 0
D-D Entre: 2-3 2.4 0.6 1 1.44 0.9
B-B y D-D Entre: 2-3 2.4 1.88 1 4.51 0
A-A y C-C Entre: 5-6 0 0.37 1 0.00 0.9
A-A y C-C Entre: 5-7 2.4 1.77 1 4.25 0.9
B-B y D-D Entre: 4-6 2.4 1.20 1 2.88 0
E-E Y F-F Entre: 4-6 2.4 2.75 1 6.60 0
F-F y H-H Entre: 6-6 0 2.75 1 0.00 0
D-D y F-F Entre: A -B y H 2.4 1.75 1 4.20 1.5
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0

SEGUNDO PISO DE SOGA

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO

EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO


A-A, B-B Y H-H Entre: 1-2 2.4 3.9 4 37.44 0
C-C Y H-H Entre: 2-3 2.4 2.55 3 18.36 0
A-A , C-C, F-F
Y H-H Entre: 3-5 2.4 3.65 4 35.04 0
A-A,D-D y H-H Entre: 5-6 2.4 4.15 4 39.84 0
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0

TOTAL 349.64
V (m3)
7.60
4.97
6.97
0.59
7.84
11.25
3.80
3.80
3.92
3.51
4.21
33.23
4.44
4.06
2.85
1.40
104.44
V (m3)
0.66
0.43
0.61
0.05
0.68
0.98
0.33
0.33
0.34
0.31
0.37
2.90
0.39
0.35
0.25
0.12
9.12
V (m3)
0.56
0.37
0.52
0.04
0.58
0.83
0.28
0.28
0.29
0.26
0.31
2.46
0.33
0.30
0.21
0.10
7.74
V (m3)
5.63
3.68
5.17
0.43
5.81
8.33
2.81
2.81
2.91
2.60
3.12
24.61
3.29
3.01
2.11
1.04
77.36
h (m) V (m3)
0.30 0.72
0.30 0.47
0.30 0.66
0.30 0.06
0.30 0.75
0.30 1.07
0.30 0.36
0.30 0.36
0.30 0.37
0.30 0.33
0.30 0.40
0.30 3.16
0.30 0.42
0.30 0.39
0.30 0.27
0.30 0.13
9.95

V (m3)
0.36
0.24
0.33
0.03
0.37
0.54
0.18
0.18
0.19
0.17
0.20
1.58
0.21
0.19
0.14
0.07
4.97
longitud (5/8")
58.8
58.8
117.6
1.56
183.46
1/2"
(m)
156.00
62.40
218.40

1/2"
(m)
124.80
62.40

187.20
V (m3)
0.50
0.15
0.33
0.25
0.23
0.26
0.16
0.17
0.28
0.74
0.20
0.23
0.15
0.11
0.09
0.19
0.15
0.22
0.13
4.54

V (m3)
0.50
0.16
0.25
0.16
0.25
0.23
0.26
0.26
0.28
0.20
0.23
0.15
0.11
0.09
0.19
0.15
0.24
0.22
3.94
A (m2)
6.03
3.02
3.95
3.00
2.77
3.11
3.11
3.35
3.35
8.93
2.34
2.73
1.81
1.34
1.11
2.28
1.81
2.68
1.55
58.25

A (m2)
6.03
1.97
3.02
1.97
3.00
2.77
3.11
3.11
3.35
2.34
2.73
1.81
1.34
1.11
2.28
1.81
2.82
2.68
47.25
VECES QUE Ø 1/4 " 1/2 "
SE REPITE (m) (m)
4 1/2 " 85.84
4 1/2 " 18.92
4 1/2 " 13.36
4 1/2 " 18.84
4 1/2 " 17.24
4 1/2 " 18.48
4 1/2 " 85.84

4 1/2 " 47.84


4 1/2 " 14.24
4 1/2 " 14.24
4 1/2 " 11.44
4 1/2 " 47.84

16 1/4 " 128.64


20 1/4 " 80.4
20 1/4 " 105.2
23 1/4 " 92
22 1/4 " 81.18
23 1/4 " 95.45
22 1/4 " 91.3
19 1/4 " 84.74
16 1/4 " 71.36
16 1/4 " 190.4
16 1/4 " 62.4
14 1/4 " 63.7
14 1/4 " 42.28
19 1/4 " 42.37
12 1/4 " 22.2
12 1/4 " 45.6
12 1/4 " 36.24
12 1/4 " 53.52
12 1/4 " 31.08
1253.62 394.12

VECES QUE Ø 1/4 " 1/2 "


SE REPITE (m) (m)
4 1/2 " 85.84
4 1/2 " 18.92
4 1/2 " 13.36
4 1/2 " 18.84
4 1/2 " 17.24
4 1/2 " 18.48
4 1/2 " 85.84

4 1/2 " 47.84


4 1/2 " 14.24
4 1/2 " 14.24
4 1/2 " 11.44
4 1/2 " 47.84
16 1/4 " 11.44
20 1/4 " 47.84
20 1/4 "
23 1/4 "
22 1/4 " 64
23 1/4 " 73.8
22 1/4 " 83
19 1/4 " 95.45
16 1/4 " 98.12
16 1/4 " 89.7
16 1/4 " 100.1
14 1/4 " 57.38
14 1/4 " 35.68
14 1/4 " 29.6
14 1/4 " 42.28
14 1/4 " 65.8
14 1/4 " 62.44
14 1/4 " 62.44
959.79 335.28
1/2 " 3/8 " 1/4 "
(m) (m) (m)
6.30

6.30

32.00

9.00

9.00

35.20

9.90

9.90

10.80

10.80

3.60

3.6
3.60

6.40

10.80

96.00 96.00

11.76

1353.52

169.6 201.36 1353.52


1/2 "
(m)

10.86

12

22.86
MURO BAJO ÁREA ÁREA
PARCIA
LONG L2 TOTAL
1.7 3.06 3.06
0.00 0.00 7.15
0.00 0.00 7.61
0.00 0.00 8.88
0.00 0.00 8.52
1.30 1.17 2.61
0.00 0.00 4.51
0.00 0.00 0.00
3.82 3.44 7.69
0.00 0.00 2.88
0.00 0.00 6.60
0.00 0.00 0.00
6.30 9.45 13.65
0.00 0.00 15.84
2.27 2.04 4.56
0.00 0.00 0.00
8.55 15.40 20.15
5.57 10.03 13.13
0.00 0.00 5.09
0.00 0.00 1.80
1.36 1.22 2.74
0.00 0.00 9.60
TOTAL 146.06

MURO BAJO ÁREA ÁREA


PARCIA
LONG L2 TOTAL
0 0.00 37.44
0.00 0.00 18.36

0.00 0.00 35.04


0.00 0.00 39.84
0.00 0.00 15.84
2.27 2.04 4.56
0.00 0.00 0.00
8.55 15.40 20.15
5.57 10.03 13.13
0.00 0.00 5.09
0.00 0.00 1.80
1.36 1.22 2.74
0.00 0.00 9.60
TOTAL 203.58
01 ARQUITECTURA

01.01 ALBANILERIA

01.01.01 AMARRE DE SOGA JUNTA 1.5 cm MORTEM2

PRIMER PISO DE SOGA


DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA ÁREA
PARCI
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG AL 2 TOTAL
A-A y B-B Entre: 1-1 0 0 1 0.00 1.8 1.7 3.06 3.06
B-B y E-E Entre: 1-1 2.4 2.98 1 7.15 0 0.00 0.00 7.15
E-E y G-G Entre: 1-1 2.4 3.17 1 7.61 0 0.00 0.00 7.61
G-G Y H-H Entre: 1-2 2.4 3.70 1 8.88 0 0.00 0.00 8.88
B-B y C-C Entre: 1-2 2.4 3.55 1 8.52 0 0.00 0.00 8.52
D-D Entre: 2-3 2.4 0.6 1 1.44 0.9 1.30 1.17 2.61
B-B y D-D Entre: 2-3 2.4 1.88 1 4.51 0 0.00 0.00 4.51
A-A y C-C Entre: 5-6 0 0.37 1 0.00 0.9 0.00 0.00 0.00
A-A y C-C Entre: 5-7 2.4 1.77 1 4.25 0.9 3.82 3.44 7.69
B-B y D-D Entre: 4-6 2.4 1.20 1 2.88 0 0.00 0.00 2.88
E-E Y F-F Entre: 4-6 2.4 2.75 1 6.60 0 0.00 0.00 6.60
F-F y H-H Entre: 6-6 0 2.75 1 0.00 0 0.00 0.00 0.00
D-D y F-F Entre: A -B y H 2.4 1.75 1 4.20 1.5 6.30 9.45 13.65
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 15.84
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 4.56
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 0.00
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 20.15
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 13.13
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 5.09
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 1.80
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2.74
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 9.60
TOTAL 146.06

SEGUNDO PISO DE SOGA

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA ÁREA


PARCI
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG AL 2 TOTAL
A-A, B-B Y H-H Entre: 1-2 2.4 3.9 4 37.44 0 0 0.00 37.44
C-C Y H-H Entre: 2-3 2.4 2.55 3 18.36 0 0.00 0.00 18.36
A-A , C-C, F-F Y H-
H Entre: 3-5 2.4 3.65 4 35.04 0 0.00 0.00 35.04
A-A,D-D y H-H Entre: 5-6 2.4 4.15 4 39.84 0 0.00 0.00 39.84
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 15.84
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 4.56
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 0.00
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 20.15
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 13.13
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 5.09
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 1.80
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2.74
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 9.60
TOTAL 203.58

TOTAL 349.64
01.02 REVOQUES ENLUCIDOS Y MOLDADURAS

01.02.01 TARRAJEO DE MUROS INTERIORES (m2)


PRIMER PISO

OE 4.01 DE SOGA

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA ÁREA


PARCIAL a (m)
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG 2 TOTAL
A-A y B-B Entre: 1-1 0 0 1 0.00 1.8 1.7 3.06 3.06 0.15
B-B y E-E Entre: 1-1 2.4 2.98 1 7.15 0 0.00 0.00 7.15 0.15
E-E y G-G Entre: 1-1 2.4 3.17 1 7.61 0 0.00 0.00 7.61 0.15
G-G Y H-H Entre: 1-2 2.4 3.70 1 8.88 0 0.00 0.00 8.88 0.15
B-B y C-C Entre: 1-2 2.4 3.55 1 8.52 0 0.00 0.00 8.52 0.15
D-D Entre: 2-3 2.4 0.6 1 1.44 0.9 1.30 1.17 2.61 0.15
B-B y D-D Entre: 2-3 2.4 1.88 1 4.51 0 0.00 0.00 4.51 0.15
A-A y C-C Entre: 5-6 2.4 0.37 1 0.89 0.9 0.00 0.00 0.89 0.15
A-A y C-C Entre: 5-7 2.4 1.77 1 4.25 0.9 3.82 3.44 7.69 0.15
B-B y D-D Entre: 4-6 2.4 1.20 1 2.88 0 0.00 0.00 2.88 0.15
E-E Y F-F Entre: 4-6 2.4 2.75 1 6.60 0 0.00 0.00 6.60 0.15
F-F y H-H Entre: 6-6 0 2.75 1 0.00 0 0.00 0.00 0.00 0.15
D-D y F-F Entre: A -B y H 2.4 1.75 1 4.20 1.5 6.30 9.45 13.65 0.15
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 15.84 0.15
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 4.56 0.15
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 0.00 0.15
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 20.15 0.15
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 13.13 0.15
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 5.09 0.15
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 1.80 0.15
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2.74 0.15
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 9.60 0.15
TOTAL 146.95
SEGUNDO PISO

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA ÁREA


PARCIAL
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG 2 TOTAL
a (m)
A-A, B-B Y H-H Entre: 1-2 2.4 3.9 4 37.44 0 0 0.00 37.44
C-C
A-A Y H-H
, C-C, F-F Y Entre: 2-3 2.4 2.55 3 18.36 0 0.00 0.00 18.36 0.15
H-H Entre: 3-5 2.4 3.65 4 35.04 0 0.00 0.00 35.04 0.15
A-A,D-D y H-H Entre: 5-6 2.4 4.15 4 39.84 0 0.00 0.00 39.84 0.15
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 15.84 0.15
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 4.56 0.15
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 0.00 0.15
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 20.15 0.15
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 13.13 0.15
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 5.09 0.15
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 1.80 0.15
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2.74 0.15
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 9.60 0.15
TOTAL 203.58

TOTAL: 350.53 m2
01.02.01 TARRAJEO DE MUROS EXTERIORES (m2)

PRIMER PISO

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA # LADOS ÁREA


PARCIAL a (m)
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG 2 TOTAL
A-A y B-B Entre: 1-1 0 0 1 0.00 1.8 1.7 3.06 1 3.06 0.15
B-B y E-E Entre: 1-1 2.4 2.98 1 7.15 0 0.00 0.00 1 7.15 0.15
E-E y G-G Entre: 1-1 2.4 3.17 1 7.61 0 0.00 0.00 1 7.61 0.15
G-G Y H-H Entre: 1-2 2.4 3.70 1 8.88 0 0.00 0.00 1 8.88 0.15
B-B y C-C Entre: 1-2 2.4 3.55 1 8.52 0 0.00 0.00 1.5 12.78 0.15
D-D Entre: 2-3 2.4 0.6 1 1.44 0.9 1.30 1.17 2 5.21 0.15
B-B y D-D Entre: 2-3 2.4 1.88 1 4.51 0 0.00 0.00 2 9.02 0.15
A-A y C-C Entre: 5-6 2.4 0.37 1 0.89 0.9 0.00 0.00 2 1.78 0.15
A-A y C-C Entre: 5-7 2.4 1.77 1 4.25 0.9 3.82 3.44 2 15.38 0.15
B-B y D-D Entre: 4-6 2.4 1.20 1 2.88 0 0.00 0.00 2 5.76 0.15
E-E Y F-F Entre: 4-6 2.4 2.75 1 6.60 0 0.00 0.00 2 13.20 0.15
F-F y H-H Entre: 6-6 0 2.75 1 0.00 0 0.00 0.00 2 0.00 0.15
D-D y F-F Entre: A -B y H 2.4 1.75 1 4.20 1.5 6.30 9.45 1 13.65 0.15
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 2 31.68 0.15
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 2 9.12 0.15
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 1.5 0.00 0.15
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 2 40.30 0.15
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 2 26.25 0.15
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 1 5.09 0.15
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 2 3.60 0.15
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2 5.47 0.15
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 1.5 14.40 0.15
Escalera 2.5 2.85 3 21.38 0.00 0 0.00 1 21.38 0.15
TOTAL 260.77

SEGUNDO PISO
DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA # LADOS ÁREA a (m)
PARCIAL
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG 2 TOTAL
A-A, B-B Y H-H Entre: 1-2 2.4 3.9 4 37.44 0 0 0.00 1 37.44 0.15
C-C Y H-H Entre: 2-3 2.4 2.55 3 18.36 0 0.00 0.00 1 18.36 0.15
A-A , C-C, F-F Y
H-H Entre: 3-5 2.4 3.65 4 35.04 0 0.00 0.00 1 35.04 0.15
A-A,D-D y H-H Entre: 5-6 2.4 4.15 4 39.84 0 0.00 0.00 1 39.84 0.15
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 1 15.84 0.15
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 2 9.12 0.15
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 2 0.00 0.15
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 1.5 30.22 0.15
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 2 26.25 0.15
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 2 10.18 0.15
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 2 3.60 0.15
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2 5.47 0.15
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 1 9.60 0.15
TOTAL 240.97

TOTAL: 501.74 m2
OE 2.00 CIELO RASO CON MEZCLA (m2)
OE 2.01 CIELO RASO CON MEZCLA

PRIMER PISO

AREA
DESCRIPCION CONSTRUID AREA DE AREA TOTAL
A MURO
CIELO RASO 147.96 6.65 141.3051
141.3051

SEGUNDO PISO

AREA
DESCRIPCION CONSTRUID AREA DE AREA TOTAL
A MURO
CIELO RASO 147.96 4.26 143.70365
143.70365
TOTAL: 285.01

OE 3.00 CARPINTERIA DE MADERA (Pza)

OE 3.01 PUERTAS DE MADERA


OE 3.01.01 PUERTA DE CEDRO

TIPO a (m) h (m) A (m2) Pza


P' 1 2 2 1
P1 1 2.1 2.1 13
P2 0.7 2 1.4 7
P3 0.9 2 1.8 2
P4 1 2.1 2.1 3
P5 0.7 1.8 1.26 2
MP-1 2.5 2.1 5.25 1
TOTAL: 15.91 29.00

OE 04.00 CERRAJERIA (pza)

OE 04.01 CERRADURA PARA PUERTAS

TIPO Nº de pts Parcial


P' 1 1
P1 13 5
P2 7 2
P3 2 2
P4 3 3
P5 2 1
MP-1 1 1
TOTAL 15.00

OE 04.02 BISAGRAS (pza)

PRIMER PISO

PUERTAS # DE # DE BIS./ PARCIAL


PUERTAS PUERTA Pza
P 1 hoja 14.00 3 42
42

PUERTAS # DE # DE BIS./ PARCIAL


PUERTAS PUERTA Pza
P 2 hojas 1 3 3
3
TOTAL: 45.00
OE 06.00 PINTURA
OE 06.01 PINTURA EN INTERIORES
PRIMER PISO

OE 4.01 DE SOGA

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA # LADOS ÁREA


PARCIAL
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG 2 TOTAL
A-A y B-B Entre: 1-1 0 0 1 0.00 1.8 1.7 3.06 1 3.06
B-B y E-E Entre: 1-1 2.4 2.98 1 7.15 0 0.00 0.00 1 7.15
E-E y G-G Entre: 1-1 2.4 3.17 1 7.61 0 0.00 0.00 1 7.61
G-G Y H-H Entre: 1-2 2.4 3.70 1 8.88 0 0.00 0.00 1 8.88
B-B y C-C Entre: 1-2 2.4 3.55 1 8.52 0 0.00 0.00 1.5 12.78
D-D Entre: 2-3 2.4 0.6 1 1.44 0.9 1.30 1.17 2 5.21
B-B y D-D Entre: 2-3 2.4 1.88 1 4.51 0 0.00 0.00 2 9.02
A-A y C-C Entre: 5-6 2.4 0.37 1 0.89 0.9 0.00 0.00 2 1.78
A-A y C-C Entre: 5-7 2.4 1.77 1 4.25 0.9 3.82 3.44 2 15.38
B-B y D-D Entre: 4-6 2.4 1.20 1 2.88 0 0.00 0.00 2 5.76
E-E Y F-F Entre: 4-6 2.4 2.75 1 6.60 0 0.00 0.00 2 13.20
F-F y H-H Entre: 6-6 0 2.75 1 0.00 0 0.00 0.00 2 0.00
D-D y F-F Entre: A -B y H 2.4 1.75 1 4.20 1.5 6.30 9.45 1 13.65
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 2 31.68
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 2 9.12
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 1.5 0.00
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 2 40.30
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 2 26.25
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 1 5.09
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 2 3.60
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2 5.47
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 1.5 14.40
Escalera 2.5 2.85 3 21.38 0.00 0 0.00 1 21.38
TOTAL 260.77

SEGUNDO PISO

OE 4.01 DE SOGA

DESCRIPCIÓN MURO ALTO ÁREA MURO BAJO ÁREA # LADOS ÁREA


PARCIAL
EJE TRAMO ALTO LONG VECES PARCIAL 1 ALTO LONG 2 TOTAL
A-A, B-B Y H-H Entre: 1-2 2.4 3.9 4 37.44 0 0 0.00 1 37.44
C-C Y H-H Entre: 2-3 2.4 2.55 3 18.36 0 0.00 0.00 1 18.36
A-A , C-C, F-F Y
H-H Entre: 3-5 2.4 3.65 4 35.04 0 0.00 0.00 1 35.04
A-A,D-D y H-H Entre: 5-6 2.4 4.15 4 39.84 0 0.00 0.00 1 39.84
1-1 y 2-2 Entre: D-D 2.4 2.20 3 15.84 0 0.00 0.00 1 15.84
1-1 y 2-2 Entre: C-C 2.4 1.05 1 2.52 0.9 2.27 2.04 2 9.12
2-2 y 3-3 Entre: E-E 0 2.88 1 0.00 0 0.00 0.00 2 0.00
Entre 3-3 y 6-6 Entre: D-D 2.4 1.98 1 4.75 1.8 8.55 15.40 1.5 30.22
5-5 y 6-6 Entre: F-F 2.4 1.29 1 3.10 1.8 5.57 10.03 2 26.25
Entre 3-3 y 6-6 Entre: H-H 2.4 2.12 1 5.09 0 0.00 0.00 2 10.18
3-3 Y 4-4 Entre: H-H 2.4 0.75 1 1.80 0 0.00 0.00 2 3.60
4-4 y 6-6 Entre: A-A y H-H 2.4 0.63 1 1.51 0.9 1.36 1.22 2 5.47
6-6 Y 7-7 Entre:C-D 2.4 2.00 2 9.60 0 0.00 0.00 1 9.60
TOTAL 240.97

TOTAL: 501.74 m2
OE 06.02 PINTURA EN CIELO RASO

PRIMER PISO

AREA
DESCRIPCION CONSTRUID AREA DE AREA TOTAL
A MURO
CIELO RASO 147.9463 6.65 141.2914
141.2914

SEGUNDO PISO

AREA
DESCRIPCION CONSTRUID AREA DE AREA TOTAL
A MURO
CIELO RASO 147.9463 4.26 143.68995
143.68995

TOTAL: 284.98

OE 07.00 PISOS Y PAVIMENTOS

OE 7.01 CONTRAPISO 2"

PRIMER PISO

AREA
DESCRIPCION CONSTRUID AREA DE AREA TOTAL
A MURO
CIELO RASO 184 6.65 177.3451
177.3451

SEGUNDO PISO
AREA
DESCRIPCION CONSTRUID AREA DE AREA TOTAL
A MURO
CIELO RASO 147.9463 4.26 143.68995
143.68995

TOTAL: 321.04

OE 7.02 PISO CON CERAMICA

PRIMER PISO: 177.35 m2


SEGUNDO PISO: 143.69 m2 TOTAL: 321.04 m2

OE 7.03 VEREDAS (e=0.10m.)

DESCRIPCION a l h Area (m2)


v. exterior 1.00 10.05 0.1 1.01
v. interior 1.10 2.60 0.1 0.29
2.35 4.05 0.1 0.95
2.24
area de
muro
alto
0.255
0.447
0.4755
0.555
0.5325
0.2844
0.282
0.0555
0.2655
0.18
0.4125
0.4125
0.2625
0.33
0.1575
0.432
0.297
0.1935
0.318
0.1125
0.0945
0.3
6.65

area de
muro
alto
0.585
0.385
0.5475
0.6225
0.33
0.1575
0.432
0.297
0.0194
0.318
0.2625
0.3
4.26
area de
muro
alto
0
0.447
0.4755
0.555
0.5325
0.09
0.282
0.0555
0.2655
0.18
0.4125
0.4125
0.2625
0.33
0.1575
0.432
0.297
0.1935
0.318
0.1125
0.0945
0.3
0.4275
6.63
area de
muro
alto
0.585
0.3825

0.5475
0.6225
0.33
0.1575
0.432
0.297
0.1935
0.318
0.1125
0.0945
0.3
4.37
01 INSTALACIONES ELECTRICAS

01.01 SALIDAS

Partida: 01.01.01 Salida Para centros de luz Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

VIVIENDA 27.00
Total (pto)

Partida: 01.01.02 Salida Para Interruptores simples Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

VIVIENDA 3 PISOS 28.00


Total (pto)

Partida: 01.01.03 Salida Para tomacorriente Unipolar Doble Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

VIVIENDA 3 PISOS 30.00


Total (pto)

Partida: 01.01.04 Conexión a Red externa y medidor Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

VIVIENDA 3 PISOS 1.00 10.00


Total (ml)

01.02 TABLEROS

Partida: 01.02.01 Tablero General de distribucion Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tablero automático 1.00


Total (und)

01.03.00 TUBERIAS PVC PARA ACOMETIDA

Partida: 01.03.01 Tubería PVC SAP D=3/4" Para Acometida Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tubería PVC-SEL Elect 20 mm. 1.00 258.92


Total (ml)
01.04.00 CABLE ELECTRICO

Partida: 01.04.01 Cable Electrico TW AWG-MCM # 14 - 2.5 mm2 Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Cable Electrico TW AWG Nº 14 - 2 2.00 258.92


Cable Electrico TW AWG Nº 14 - 2. 3.00 114.35
Total (ml)
Partida: 01.04.02 Cable Electrico TW AWG # 12 - 4.0 mm2 Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Cable Electrico TW AWG Nº 12 - 4 2.00 4.00


Total (ml)

01.05.00 LAMPARAS Y ARTEFACTOS

Partida: 01.05.01 Fluorescente circular circolux el x 32W Incluyendo Equipo y Pantalla Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Fluorescente circular circolux el x 3 27.00


Total (und)

01.06.00 TOMACORRIENTES

Partida: 01.06.01 Tomacorrientes Dobles Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Tomacorrientes dobles 30.00


Total (und)

01.07.00 INTERRUPTORES

Partida: 01.07.02 Interruptor simple Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Interruptores simples 28.00


Total (und)
01.08.00 POZO PUESTA A TIERRA

Partida: 01.08.01 Pozo Puesta a Tierra Unidad:

Gráfico Descripción Cantidad Long (m) Ancho (m) Alto (m)

Pozo de tierra del Sistema elé 1.00


Total (und)
Pto
Metrado
Parcial
27.00
27.00

Pto
Metrado
Parcial
28.00
28.00

Pto
Metrado
Parcial
30.00
30.00

ml
Metrado
Parcial
10.00
10.00

und
Metrado
Parcial
1.00
1.00

ml
Metrado
Parcial
258.92
258.92
ml
Metrado
Parcial
517.84
343.05
860.89
ml
Metrado
Parcial
8.00
8.00

und
Metrado
Parcial
27.00
27.00

und
Metrado
Parcial
30.00
30.00

und
Metrado
Parcial
28.00
28.00

und
Metrado
Parcial
1.00
1.00
01 INSTALACIONES SANITARIAS

0.1.01 SISTEMA DE DESAGUE

01.01.01 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" 28.03

DESCRIPCION 1 PISO 2 PISO TOTAL


Tubería (m) 20.73 7.3 28.03

01.01.02 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 4" 36.01

DESCRIPCION 1 PISO 2 PISO TOTAL


Tubería (m) 29.57 6.44 36.01

01.01.03 MONTANTE DE VENTILACION DE PVC SAL 2" 10

DESCRIPCION 1 PISO 2 PISO TOTAL


Montantes 5 5 10
MONTANTE DE TUBERIA PVC SAL
01.01.04 4" 6

DESCRIPCION 1 PISO 2 PISO TOTAL


Montantes 3 3 6

01.01.05 REGISTRO DE BRONCE 4" 5

DESCRIPCION 1 PISO 2 PISO TOTAL


Registro 2 3 5

01.01.06 REGISTRO DE BRONCE 2" 3

DESCRIPCION 1 PISO 2 PISO TOTAL


Registro 1 2 3

01.01.06 CAJAS DE REGISTRO DE DESAGUE 1 1

DESCRIPCION 1 PISO 2 PISO TOTAL


Caja de Registro 1 0 1

01.01.07 SUMIDERO DE BRONCE ROSCADO 2 9

DESCRIPCION 1 PISO 2 PISO TOTAL


Sumidero 4 5 9
0.1.02 GRIFERIAS

01.02.01 GRIFERIA SIMPLE PARA LAVATORIO

DESCRIPCIO 1 PISO 2 PISO TOTAL


Lavatorio 5 3 8

01.02.02 GRIFERIA MEZCLADORA DE DUCHA

DESCRIPCIO 1 PISO 2 PISO TOTAL


Ducha 0 2 2

01.02.03 GRIFERIA PARA LAVADERO

DESCRIPCIO 1 PISO 2 PISO TOTAL


Lavadero 2 2 4

01.02.04 VALVULA CHECK DE BRONCE DE 1"

DESCRIPCIO 1 PISO 2 PISO TOTAL


Valvula chec 3 3 6

0.1.03 APARATOS SANITARIOS

01.03.01 INODORO NACIONAL SIFON JET BL

DESCRIPCIO 1 PISO 2 PISO TOTAL


Inodoro 4 2 6

01.03.02 LAVATORIO NACIONAL BLANCO

DESCRIPCIO 1 PISO 2 PISO TOTAL


Lavatorio 5 3 8

01.03.03 DUCHA NACIONAL ESPAÑOLA

DESCRIPCIO 1 PISO 2 PISO TOTAL


Ducha 0 2 2

01.03.04 PAPELERA LOSA BLANC

DESCRIPCIO 1 PISO 2 PISO TOTAL


papelera 6 2 8
01.03.05 JABONERA LOSA BLANC

DESCRIPCIO 1 PISO 2 PISO TOTAL


Jabonera 2 2 4
01.03.06 TOALLERO DE LOSA BL

DESCRIPCIO 1 PISO 2 PISO TOTAL


Toallero 0 2 2

01.03.07 LAVADERO DE ACERO INOXIDABLE UNA POZA CON ESCURRIDERO

DESCRIPCIO 1 PISO 2 PISO TOTAL


Lavadero 2 1 3

01.03.08 LAVADERO DE ROPA DE FIERRO FU

DESCRIPCIO 1 PISO 2 PISO TOTAL


Lavadero 0 1 1

01.03.09 COLOCACION DE APARATOS SANITA

DESCRIPCION 1 PISO
APARATOS SANITARIOS 20

01.03.10 COLOCACION DE ACCESORIOS SANITARIOS

DESCRIPCION 1 PISO
SANITARIOS SANITARIOS 14

0.1.04 SISTEMA DE AGUA FRIA

01.04.01 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 1/2'' UND

DESCRIPCION 1 PISO 2 PISO TOTAL


Tubería (m) 4.67 6.81 11.48

01.04.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 3/4'' UND

DESCRIPCION 1 PISO 2 PISO TOTAL


Tubería (m) 19.94 30.38 50.32

01.04.03 VALVULA COMPUERTA DE


UND

DESCRIPCIO 1 PISO 2 PISO TOTAL


Valvula 1 2 3

01.04.04 TANQUE DE AGUA ETERNIT DE 1000 LITROS INCLUYE ACC. INTERNOS UND
DESCRIPCION TOTAL TOTAL
TANQUE 1 1
0.1.04 SISTEMA DE AGUA CALIENTE

01.04.01 SALIDA PARA AGUA CALIENTE TUBERIA CPVC D 1/2" UND

DESCRIPCION 1 PISO 2 PISO TOTAL


PUNTOS 2 5 7

01.04.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC C-10 DE 3/4'' UND

DESCRIPCION 1 PISO 2 PISO TOTAL


Tubería (m) 19.94 17 36.94

01.04.03 VALVULA COMPUERTA DE


UND

DESCRIPCIO 1 PISO 2 PISO TOTAL


Valvula 1 2 3

Vous aimerez peut-être aussi