DATA GENERALS
DATE: JANUARY 26, 2017
MADE BY: ROBERTO GÓMEZ
PROJECT: NOKIA CHASIS
ASSY P/N: KB82-0018-10-02
SERIAL NUMBER: 6S164390722
CHASSIS SERIAL NUMBER AT FAIL: NS164662197
DATE CON AND BATCH: 35 16 893 3701
DESCRIPTION PCBSA, 12 SLOT BACKPLANE, 40G - NELCO 400
SUPPLIER SANMINA
FAILURE DESCRIPTION: Link test 2751 failed at a 2nd time at 10G speed (after CPM/SFM
pair switched slots), but passed at 6G speed.
INTRODUCTION
Debug technicians have informed about unit with several Links failures in Functional test.
***********************************************************************
Test Run Report
Sequence File Name: c:\Helios\tests\Functional_Test\3HE07654AAAA\SRx_Shelf_FT.seq
Sequence File Version: 1.0.0.146
Socket_Batch_ID: 7X50_FT_0049-20161122-034027-0
Station ID: 7X50_FT_0049
Test Socket Index: 0
Date: martes, 22 de noviembre de 2016
Time: 03:41:28 a.m.
Operator: 160121105711169
Execution Time: 252.09 minutes
Test Run Result: Failed
NS164662197 (UUT - 3HE00183CAAH05): Failed
***********************************************************************
Test_with_Both_SFMs: Failed
***********************************************************************
3G / 10G Link Test: Failed
ru te 2751: Failed at 10G but Passed at 6G: Failed
Link test 2751 failed a 2nd time at 10G speed (after CPM/SFM pair switched
slots), but passed at 6G speed
diag(SFM*)11 ú>
(END COM FLUSH)
tag -e
diag(SFM*)11 >
tag -e
diag(SFM*)11 >
speed auto l=1
************************************************
* IMPORTANT *
************************************************
Chassis Fabric speed changed to 6.25G.
Please power cycle for the new speed to take effect.
diag(SFM*)11 >
tag -e
.
Verifying IOM links...
No Link Failures Detected
Verifying CPM links...
No Link Failures Detected
Checking Pchip CRC errors...
.End 2751 - CPM/IOM Traffic Soak : PASS
==========================================================================
GOOD: 001 ERRS: 000 INTR: 000 NPRE: 000 NA: 000 LOOP: 001 SECS: 1853
Last test: CPM/IOM Traffic Soak
==========================================================================
diag(SFM*)11 >
tag -e
diag(SFM*)11 >
Note that after the first fail the test is executed another time after swap the CPM/SFM5
boards. If the test fails again the sequence restarts but now at 6G.
In this case the unit fails two times and pass at 6G.
ANALYSIS/PROCEDURE/RESULTS
• First of all, It were performed visual inspection looking for assembly errors,
inspecting for issues on KGUs connectors, looking for dust or other strange
elements. No issues were found.
• The entire load of KGUs were changed and the test sequence was executed
again and the fails are persistent.
• The unit was disassembled an inspected looking for damage on connectors and
surfaces, impedance on the pins related to failed links was checked. No issues
were found.
• Using a microscope, visual inspection was performed to find back drills
inconsistencies like out of center perforations and/or barrels remains (“stubs”)
that can behave as antennas and may cause interference.
• The board was entirely inspected, in just few cases rests of dust was detected,
no more issues were found.
CONCLUSION