• Store tile in the room in which you plan to install for 48 hours. Keep room
at minimum of 65° F (18° C) during that time and during installation.
After installation, temperature should not fall below 65° F (18° C) for the
first 48 hours, and not below 55° F (13° C) after that.
• If room is heated by radiant coils in the subfloor, the temperature of the
floor surface should not exceed 85° F (29° C).
• Install over smooth, well-bonded resilient floors; dry concrete; and wood
floors with a plywood overlay.
• Subfloor must be level, clean, and free of wax, grease, oil, or dust.
• If necessary, patch or fill any cracks with S-184 Fast-Setting Patch and
Underlayment.
• Use Armstrong One-Part Embossing Leveler to smooth any texture or
embossing on the old floor.
What You Should Know About Existing Resilient Floor Covering Structures
Some flooring materials and adhesives contain asbestos fibers. The presence of the
asbestos in these products is not readily identifiable. Unless absolutely positive beyond
any doubt that the product is a nonasbestos-containing material, always assume it does
contain asbestos.
These products may contain either asbestos fibers or crystalline silica. Avoid creating
dust. Inhalation of such dust is a cancer and respiratory tract hazard. Smoking by
individuals exposed to asbestos fibers greatly increases the risk of serious bodily harm.
Unless positively certain that the product is a nonasbestos-containing material, you must
presume it contains asbestos. Regulations may require that material be tested to
determine asbestos content and may govern the removal and disposal of material.
Whenever possible, existing resilient flooring should be left in place and the new floor
installed over the top. If you must remove the flooring material, contact your retailer or
Armstrong Customer Response Center, P.O. Box 3001, Lancaster, PA 17604, 1-800-233-
3823 for a copy of recommended work practices. These should be followed.
Preparation
Laying Tile
CAUTION
Do not stand or walk on release paper or a tile with
release paper on the back as it is extremely slippery.
Place it in a wastebasket immediately upon removal
from tile.
• To fit partial tiles, lay the tile to be cut exactly over the
last full tile; place another full tile against the wall and
mark the cutting line where the tiles overlap.
• Cut tile on line. Before peeling the backing paper of
self-adhering tile, check that the cut tile fits. Do not
force it into place.
• Install tile (removing paper from self-adhering tile),
and press tile firmly into position.
Finishing Up