PRESUPUESTO CIERRE PROGRES

Presupuesto
Subpresupuesto CIERRE PROGRESIVO

Item Descripción

01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS


01.01 MOVILIZACION DE EQUIPOS
01.02 DESMOVILIZACION DE EQUIPOS
02 LABORES MINERAS
02.01 LABORES SUBTERRANEAS
02.01.01 BOCAMINA ANIMAS NIVEL 6
02.01.01.01 DESMONTAJE DE TUBERIAS DE DIAMETRO VARIADOS
02.01.01.02 DESMONTAJE DE RIELES DE 30 Lb
02.01.01.03 DESMONTAJE DE VAGON
02.01.01.04 DESMANTELAMIENTO EN EL AREA DE COMEDOR
02.01.01.05 DESMANTELAMIENTO EN EL AREA CASETA DE VIGILANCIA
02.01.01.06 DESMONTAJE DE TRANSFORMADOR ELECTRICO
02.01.01.07 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
02.01.01.08 RETIRO DE ELEMENTOS FIJOS Y MOVILES
02.01.01.09 TRANSPORTE DE EQUIPOS E INFRAESTRUCTURAS A ZONA RESERV.
02.01.01.10 DEMOLICION: CºAº BASE TRANSFORMADOR ELECTRICO
02.01.01.11 DEMOLICION: PISO EN AREA DE COMEDOR
02.01.01.12 DEMOLICION: PISO EN AREA DE VIGILANCIA
02.01.01.13 DEMOLICION DE MURO DE ALBAÑILERIA
02.01.02 BOCAMINA ANIMAS NIVEL 7
02.01.02.01 DESMONTAJE DE VENTILADORA ELECTRICA
02.01.02.02 DESMONTAJE DE TUBERIAS DE DIAMETRO VARIADOS
02.01.02.03 DESMONTAJE DE RIELES DE 30 Lb
02.01.02.04 DESMONTAJE DE VAGON
02.01.02.05 DESMANTELAMIENTO EN EL AREA DE COMEDOR
02.01.02.06 DESMANTELAMIENTO EN EL AREA CASETA DE VIGILANCIA
02.01.02.07 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
02.01.02.08 RETIRO DE ELEMENTOS FIJOS Y MOVILES
02.01.02.09 TRANSPORTE DE EQUIPOS E INFRAESTRUCTURAS A ZONA RESERV.
02.01.02.10 DEMOLICION: CºAº BASE TRANSFORMADOR ELECTRICO
02.01.02.11 DEMOLICION: PISO EN AREA DE COMEDOR
02.01.02.12 DEMOLICION: PISO EN AREA DE VIGILANCIA
02.01.02.13 DEMOLICION DE MURO DE ALBAÑILERIA
02.01.03 TAPON DE CºAº EN BOCAMINAS ANIMAS 2 UND
02.01.03.01 PERFORACION PARA RANURAS
02.01.03.02 ENCOFRADO Y DESENCOFRADO PARA TAPON
02.01.03.03 CONCRETO F'C=175 kg/cm2
02.01.03.04 ACERO DE REFUERZO
02.01.04 MURO DE MAMPOSTERIA EN BOCAMINA ANIMAS 2 UND
02.01.04.01 MURO DE CONCRETO ARMADO
02.01.05 BOCAMINA PUMAHUASI NIVEL 12
02.01.05.01 DESMONTAJE DE TUBERIAS DE DIAMETRO VARIADOS
02.01.05.02 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
02.01.05.03 RETIRO DE ELEMENTOS FIJOS Y MOVILES
02.01.05.04 DEMOLICION: PISO EN AREA DE SEGURIDAD
02.01.05.05 DEMOLICION DE MURO DE ALBAÑILERIA
02.01.06 BOCAMINA SANTA CATALINA NIVEL 7
02.01.06.01 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
02.01.06.02 DESMANTELAMIENTO DE CASETA DE SEGURIDAD
02.01.06.03 RETIRO DE ELEMENTOS FIJOS Y MOVILES
02.01.06.04 TRANSPORTE DE EQUIPOS E INFRAESTRUCTURAS A ZONA RESERV.
02.01.06.05 DEMOLICION: PISO EN AREA DE SEGURIDAD
02.01.06.06 DEMOLICION DE MURO DE ALBAÑILERIA
03 INSTALACIONES DE MANEJO DE RESIDUOS
03.01 DEPOSITO DE RELAVES
03.01.01 DEPOSITO DE RELAVES N 2 (RELAVE ACTIVA) (MODIFICACION)
03.01.01.01 REFINE Y NIVELACION
03.01.01.02 COBERTURA TIPO II
03.01.01.03 COBERTURA TIPO IA
03.01.01.04 REVEGETACION
03.01.01.05 CANAL TIPO I
03.01.01.06 CANAL TIPO II
03.01.01.07 CANAL TIPO III
03.01.01.08 CAJA COLECTORA
03.02 DEPOSITO DE DESMONTE
03.02.03 BOTADERO ANIMAS NIVEL 8
03.02.03.01 CARGUIO Y ACARREO DE MATERIAL DE DESMONTE
03.02.03.02 TRANSPORTE DE MATERIAL A BOCAMINA ANIMAS NIV. 8 d=0.5 km
03.02.03.03 PREPARACION DE MATERIAL DE PRESTAMO
03.02.03.04 CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO d<5 km
03.02.03.05 RELLENO Y PERFILADO CON MATERIAL DE PRESTAMO e=0.20 m
04 INSTALACIONES PARA EL MANEJO DE AGUAS
04.01 PLANTA DE POTABILIZACION DE AGUA
04.01.01 DESACTIVACION DE TUBERIAS
04.01.02 DESMANTELAMIENTO DE ESTRUCTURA METALICA
04.01.03 DESMANTELAMIENTO DE TANQUES SEPTICOS
04.01.04 DEMOLICION DE CONCRETO SIMPLE
04.01.05 DESMANTELAMIENTO DE LA LINEA DE CONDUCCION ( TUBERIA HDPE DE 2")
04.01.06 COBERTURA TIPO III
04.01.07 REFINE Y NIVELACION
04.01.08 REVEGETACION (A RAZON DE 6 ESQUEJES)
05 OTRAS INFRAESTRUCTURAS RELACIONADAS CON EL PROYECTO
05.01 PLANTA DE RELLENO HIDRAULICO
05.01.01 DEMOLICION DE CONCRETO SIMPLE
05.01.02 DEMOLICION DE CONCRETO ARMADO
05.01.03 DESMANTELAMIENTO DE ESTRUCTURAS METALICAS
05.01.04 DESMANTELAMIENTO DE TUBERIAS HDPE DE 4"
05.01.05 DESMONTAJE DE BARRERAS DE MADERA CON EQUIPO
05.02 CASA FUERZA
05.02.01 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
05.02.02 DESMANTELAMIENTO DE TECHO
05.02.03 DESMONTAJE DE ESTRUCTURA DE MADERA
05.02.04 DESMONTAJE DE ELEMENTOS DE MADERA
05.02.05 DESMONTAJE DE ELEMENTOS METALICOS
05.02.06 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO
05.02.07 DEMOLICION DE ESTRUCTURAS DE CONCRETO SIMPLE
05.02.08 DEMOLICION: PISO EN CAMPAMENTO
05.02.09 DEMOLICION DE MURO DE ALBAÑILERIA
05.02.10 DEMOLICION DE MURO DE ADOBE
05.03 CIERRE DE VIAS DE ACCESO
05.03.01 COBERTURA DE ACCESO
06 SERVICIOS DE ALOJAMIENTOS Y OTRAS INFRAESTRUCTURAS PARA EL USO DE LOS TRABAJADORES
06.04 CAMPAMENTO AGUA DULCE
06.04.01 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
06.04.02 DESMANTELAMIENTO DE REDES
06.04.03 DESMANTELAMIENTO DE TECHO
06.04.04 DESMONTAJE DE APARATOS SANITARIOS
06.04.05 DESMONTAJE DE ESTRUCTURA DE MADERA
06.04.06 DESMONTAJE DE ELEMENTOS DE MADERA
06.04.07 DESMONTAJE DE ELEMENTOS METALICOS
06.04.08 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO
06.04.09 DEMOLICION DE ESTRUCTURAS DE CONCRETO SIMPLE
06.04.10 DEMOLICION: PISO EN CAMPAMENTO
06.04.11 DEMOLICION DE MURO DE ALBAÑILERIA
06.04.12 DEMOLICION DE MURO DE ADOBE
06.04.13 CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO d<5 km
06.04.14 RELLENO Y PERFILADO CON MATERIAL DE PRESTAMO e=0.20 m
06.05 CAMPAMENTO SANTA CATALINA
06.05.01 DESMANTELAMIENTO DE INSTALACIONES ELECTRICAS
06.05.02 DESMANTELAMIENTO DE REDES
06.05.03 DESMANTELAMIENTO DE TECHO
06.05.04 DESMONTAJE DE APARATOS SANITARIOS
06.05.05 DESMONTAJE DE ESTRUCTURA DE MADERA
06.05.06 DESMONTAJE DE ELEMENTOS DE MADERA
06.05.07 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO
06.05.08 DEMOLICION DE ESTRUCTURAS DE CONCRETO SIMPLE
06.05.09 DEMOLICION: PISO EN CAMPAMENTO
06.05.10 DEMOLICION DE MURO DE ALBAÑILERIA
06.05.11 CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO d<5 km
06.05.12 RELLENO Y PERFILADO CON MATERIAL DE PRESTAMO e=0.20 m
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
INGENIERIA
SUPERVISIÓN, ADMINISTRACIÓN Y FISCALIZACIÓN
CONTINGENCIAS
=====================================
SUB TOTAL
IGV 18%
=====================================
PRESUPUESTO TOTAL

TOTAL SIN IGV


TO CIERRE PROGRESIVO ACTUALIZADO 2017

METRADO PDC METRADO METRADO POR


Und. Precio U$ 2017 Parcial U$ 2017 Factor CREPCO Precio U$ 2018
APROB. 2017 EJECUTADO AL 2017 EJECUTAR 2018

27,358.72 0.96
glb 2.00 0.00 2.00 6839.68 13,679.36 0.96 6572.82
glb 2.00 0.00 2.00 6,839.68 13,679.36 0.96 6572.82
Err:522 Err:522 151,704.75 0.96
Err:522 Err:522 151,704.75 0.96
Err:522 Err:522 49,932.39 0.96
m 1,450.00 Err:522 Err:522 27.12 39,324.00 0.96 26.06
m 250.00 Err:522 Err:522 23.78 Err:522 0.96 22.85
d 2.00 Err:522 Err:522 22.67 Err:522 0.96 21.79
d 3.00 Err:522 Err:522 22.66 Err:522 0.96 21.78
d 0.50 Err:522 Err:522 10.88 Err:522 0.96 10.46
u 1.00 Err:522 Err:522 38.15 Err:522 0.96 36.66
d 2.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
d 1.00 Err:522 Err:522 44.55 Err:522 0.96 42.81
vje 5.00 Err:522 Err:522 79.39 Err:522 0.96 76.29
m3 3.50 Err:522 Err:522 10.69 Err:522 0.96 10.27
m3 14.50 Err:522 Err:522 14.92 Err:522 0.96 14.34
m3 5.25 Err:522 Err:522 14.88 Err:522 0.96 14.30
m2 65.00 Err:522 Err:522 25.52 Err:522 0.96 24.52
Err:522 Err:522 55,645.54 0.96
u 1.00 Err:522 Err:522 8.74 Err:522 0.96 8.40
m 1,600.00 Err:522 Err:522 27.12 Err:522 0.96 26.06
m 280.00 Err:522 Err:522 23.78 Err:522 0.96 22.85
d 4.00 Err:522 Err:522 22.67 Err:522 0.96 21.79
d 3.00 Err:522 Err:522 22.66 Err:522 0.96 21.78
d 1.50 Err:522 Err:522 10.88 Err:522 0.96 10.46
d 2.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
d 2.00 Err:522 Err:522 44.55 Err:522 0.96 42.81
vje 12.00 Err:522 Err:522 79.39 Err:522 0.96 76.29
m3 3.50 Err:522 Err:522 10.69 Err:522 0.96 10.27
m3 15.20 Err:522 Err:522 14.92 Err:522 0.96 14.34
m3 6.50 Err:522 Err:522 14.88 Err:522 0.96 14.30
m2 75.80 Err:522 Err:522 25.52 Err:522 0.96 24.52
Err:522 Err:522 3,577.62 0.96 0.00
m3 2.10 Err:522 Err:522 15.77 Err:522 0.96 15.15
m2 55.00 Err:522 Err:522 29.38 Err:522 0.96 28.23
m3 9.60 Err:522 Err:522 133.25 Err:522 0.96 128.05
kg 340.00 Err:522 Err:522 1.91 Err:522 0.96 1.84
Err:522 Err:522 839.33 0.96 0.00
m3 9.60 Err:522 Err:522 87.43 Err:522 0.96 84.02
Err:522 Err:522 38,370.52 0.96 0.00
m 1,300.00 Err:522 Err:522 27.12 Err:522 0.96 26.06
d 2.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
d 3.00 Err:522 Err:522 44.55 Err:522 0.96 42.81
m3 10.20 Err:522 Err:522 12.82 Err:522 0.96 12.32
m2 30.40 Err:522 Err:522 25.52 Err:522 0.96 24.52
Err:522 Err:522 3,339.35 0.96 0.00
d 2.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
d 1.00 Err:522 Err:522 246.89 Err:522 0.96 237.26
d 3.00 Err:522 Err:522 44.55 Err:522 0.96 42.81
vje 2.00 Err:522 Err:522 79.39 Err:522 0.96 76.29
m3 5.25 Err:522 Err:522 12.82 Err:522 0.96 12.32
m2 25.80 Err:522 Err:522 25.52 Err:522 0.96 24.52
Err:522 Err:522 476,032.34 0.96 0.00
Err:522 Err:522 322,566.82 0.96 0.00
Err:522 Err:522 322,566.82 0.96 0.00
m2 92,300.00 Err:522 Err:522 0.40 Err:522 0.96 0.38
m2 78,200.00 Err:522 Err:522 0.44 Err:522 0.96 0.42
m2 14,100.00 Err:522 Err:522 2.53 Err:522 0.96 2.43
m2 92,300.00 Err:522 Err:522 0.26 Err:522 0.96 0.25
m 2,266.00 Err:522 Err:522 75.56 Err:522 0.96 72.61
m 151.00 Err:522 Err:522 103.56 Err:522 0.96 99.52
m 15.00 Err:522 Err:522 101.45 Err:522 0.96 97.49
u 13.00 Err:522 Err:522 245.35 Err:522 0.96 235.78
Err:522 Err:522 153,465.52 0.96 0.00
Err:522 Err:522 153,465.52 0.96 0.00
m3 66,117.16 Err:522 Err:522 0.40 26,446.86 0.96 0.38
m3 49,587.88 Err:522 Err:522 0.80 39,670.30 0.96 0.77
m3 13,661.00 Err:522 Err:522 2.46 33,606.06 0.96 2.36
m3 2,732.00 Err:522 Err:522 0.42 1,147.44 0.96 0.40
m2 13,661.00 Err:522 Err:522 3.85 52,594.85 0.96 3.70
Err:522 Err:522 9,421.95 0.96 0.00
Err:522 Err:522 9,421.95 0.96 0.00
m 30.00 Err:522 Err:522 17.17 Err:522 0.96 16.50
m2 30.00 Err:522 Err:522 15.72 Err:522 0.96 15.11
u 4.00 Err:522 Err:522 521.26 Err:522 0.96 500.92
m3 7.65 Err:522 Err:522 69.36 Err:522 0.96 66.65
m 421.06 Err:522 Err:522 13.55 Err:522 0.96 13.02
m2 51.00 Err:522 Err:522 1.58 Err:522 0.96 1.52
m2 51.00 Err:522 Err:522 0.40 Err:522 0.96 0.38
m2 51.00 Err:522 Err:522 0.26 Err:522 0.96 0.25
Err:522 Err:522 449,276.46 0.96 0.00
Err:522 Err:522 351,075.42 0.96 0.00
m3 6.80 Err:522 Err:522 69.36 Err:522 0.96 66.65
m3 7.30 Err:522 Err:522 23.78 Err:522 0.96 22.85
d 100.00 Err:522 Err:522 3,483.15 Err:522 0.96 3347.25
m 50.00 Err:522 Err:522 14.31 Err:522 0.96 13.75
glb 3.00 Err:522 Err:522 466.56 Err:522 0.96 448.36
Err:522 Err:522 37,921.36 0.96 0.00
d 1.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
m2 2,898.57 Err:522 Err:522 1.27 Err:522 0.96 1.22
m2 2,304.00 Err:522 Err:522 3.69 Err:522 0.96 3.55
u 41.00 Err:522 Err:522 48.47 Err:522 0.96 46.58
u 20.00 Err:522 Err:522 87.03 Err:522 0.96 83.63
m3 12.56 Err:522 Err:522 20.52 Err:522 0.96 19.72
m3 44.41 Err:522 Err:522 18.08 Err:522 0.96 17.37
m3 81.11 Err:522 Err:522 15.06 Err:522 0.96 14.47
m2 636.89 Err:522 Err:522 25.52 Err:522 0.96 24.52
m3 153.32 Err:522 Err:522 15.90 Err:522 0.96 15.28
Err:522 Err:522 60,279.68 0.96 0.00
m 31,072.00 Err:522 Err:522 1.94 Err:522 0.96 1.86
Err:522 Err:522 46,258.93 0.96 0.00
Err:522 Err:522 33,350.40 0.96 0.00
d 4.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
d 10.00 Err:522 Err:522 0.66 Err:522 0.96 0.63
m2 1,622.45 Err:522 Err:522 1.27 Err:522 0.96 1.22
u 18.00 Err:522 Err:522 13.11 Err:522 0.96 12.60
m2 214.14 Err:522 Err:522 3.69 Err:522 0.96 3.55
u 133.00 Err:522 Err:522 48.47 Err:522 0.96 46.58
u 4.00 Err:522 Err:522 87.03 Err:522 0.96 83.63
m3 11.74 Err:522 Err:522 20.52 Err:522 0.96 19.72
m3 45.39 Err:522 Err:522 18.08 Err:522 0.96 17.37
m3 114.83 Err:522 Err:522 15.06 Err:522 0.96 14.47
m2 223.20 Err:522 Err:522 25.52 Err:522 0.96 24.52
m3 353.97 Err:522 Err:522 15.90 Err:522 0.96 15.28
m3 264.40 Err:522 Err:522 0.42 Err:522 0.96 0.40
m2 1,321.50 Err:522 Err:522 3.85 Err:522 0.96 3.70
Err:522 Err:522 12,908.53 0.96 0.00
d 2.00 Err:522 Err:522 1,037.15 Err:522 0.96 996.68
d 5.00 Err:522 Err:522 0.66 Err:522 0.96 0.63
m2 533.29 Err:522 Err:522 1.27 Err:522 0.96 1.22
u 2.00 Err:522 Err:522 13.11 Err:522 0.96 12.60
m2 14.36 Err:522 Err:522 3.69 Err:522 0.96 3.55
u 19.00 Err:522 Err:522 48.47 Err:522 0.96 46.58
m3 2.86 Err:522 Err:522 20.52 Err:522 0.96 19.72
m3 1.81 Err:522 Err:522 18.08 Err:522 0.96 17.37
m3 29.44 Err:522 Err:522 15.06 Err:522 0.96 14.47
m2 95.96 Err:522 Err:522 25.52 Err:522 0.96 24.52
m3 314.00 Err:522 Err:522 0.42 Err:522 0.96 0.40
m2 1,568.30 Err:522 Err:522 3.85 Err:522 0.96 3.70
DIRECTO 1,166,091.10
10.00% 116,609.11
10.00% 116,609.11
2.00% 23,321.82
7.00% 81,626.38
2.00% 23,321.82
=======
1,527,579.35
274,964.28
=======
1,802,543.63

SIN IGV 1,527,579.35


Parcial U$ 2018

0.00
0.00
0.00
839.33
839.33
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
0.00
0.00
0.00
0.00
0.00
839.33
839.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
0.00
0.00
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
351,075.42
351,075.42
0.00
0.00
0.00
0.00
0.00
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
0.00
0.00
0.00
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
0.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
351,914.75
35,191.48
35,191.48
7,038.30
24,634.03
7,038.30
=======
461,008.32
82,981.50
=======
543,989.82
2017 2018 Promedio
Inflacion Julio Agosto
2017 2018 0.20% 0.13%
34 437.57 503.52 438.44514 504.174576 471.31
39 444.64 448.81 445.52928 449.393453 447.46
47 580.9 582.52 582.0618 583.277276 582.67
49 292.36 299.9 292.94472 300.28987 296.62
53 670.24 406.6 671.58048 407.12858 539.35
Crepco

1.1507187
1.0093784
1.0027888
1.0257901
0.6066484
Promedio 0.9590649
Inflacion 0.960983
M Tn
Reservas probadas 155
Reservas probables 350
Demostradas 505
Inferidos 385
Identificados 462

Vida Util 20.0 años

Infla 1.90%
Tasa 2.35%

Progresivo
Final
Post Cierre
Monto
Igv 18%
Garantia año anterior

Garantia Anual Final Base


Garantia Anual Post Cierre base
Tn/dia Tn/año
Produccion 70000 25200000

Año Base 2014

Actualizada
1
Costo Inflación acumulada
$ 27,738,793.00
$ 97,738,793.00
$ 13,650,014.00
$ 83,650,014.00

$ 23,384,668.00

$ 23,384,668.00

$ 16,730,002.80
$ 1,516,668.22