Question
For most drilling organizations, the greatest drilling problem worldwide in terms of time and financial
cost occurs when high-contact forces caused by low reservoir pressures, high wellbore pressures, or
both, are exerted over a sufficiently large area of the drill string. This results in a condition whereby the
drill string cannot be rotated or pulled along the axis of the wellbore. What term is used to describe this
dreaded condition?
Mention 3 deflection tools in drilling operation!
Mention 3 sign or condition when well kick happened in drilling operation!
In determining slip velocity with Rudi Rubiandini’s Method, there are 3 times of correction. What are they
In drilling analysis, an amount of energy that needs to move a volumetric unit of rock called?
In geothermal area, that contain a high number of temperature and gas contain, what a drilling method th
What the function of retarder?
To make a foamed cement, what kind of gas that we injected?
52 psi
intermediate
balanced tangencial,
angle averaging, radius
of curvature, minimum
of curvature
PDM drilling
200 pipe
differential sticking
dynadrill, turbodrill
ROP increase, MUD increase in mud pit, contain gas in mud pit, WOB reduces, pump pressure is decrease
inclination, mud
density, & rotary
speed.
Specific energy
Underbalanced drilling
To increase the thickening time
Nitrogen
( squeeze cementing)