Vous êtes sur la page 1sur 5

OCCUPATION : LANDSCAPE SUPERVISOR

DUTY NO. 04 DUTY CARRY OUT PLANTING ACTIVITIES

TASK NO. 04.10 TASK VERIFY PLANTING WORKS

PERFORMANCE STANDARD :
Verify planting works WITH GIVEN organization chart and work order USING tools
and equipment SUCH AS cangkul, shovel, hand trowel, fork and PPE SO THAT work
LEVEL 3
order and work program obtained; planting medium preparation works, planting
works, plant support installation works, mulching works and watering works confirmed
and work reported to superior in accordance with job requirements.

ENABLING REQUIREMENTS
STEP TOOL/EQUIPMENT/MATERIAL
(Knowledge, Skills, Attitude and Safety)

1. Obtain work order Knowledge of :


- Types of work order  Organization Chart
- Usage off work order  Work Program
- Landscape Construction Plan and Utilities Plan  Site Diary
- Organisational structure  Inspection Report
 Stationeries
Ability to :- o Pen
- Determine the specific work order o Pencil
- Identify method and procedure of obtaining
o Highlighter
work order
o Marker pen
- Identify and interpret Landscape Construction
Plan and Utilities Plan o Calculator
o Tally counter
o Ruler
 Measuring tape
 PPE
ENABLING REQUIREMENTS
STEP TOOL/EQUIPMENT/MATERIAL
(Knowledge, Skills, Attitude and Safety)

2. Obtain work program Knowledge of :


- Work program
- Usage of work program
- Organisational structure

Ability to :-
- Identify and interpret work program
- Identify method and procedure of obtaining
work program

3. Confirm planting medium Knowledge of :


preparation works - Types of work order
- Organisational structure
- Worksite
- Material types, specification and quantity
- Plant species to be planted
- Material handling and mixing techniques
- Planting medium component ratio
- Various types and usage of tools and
equipment
- Storage site and requirement

Ability to :-
- Approve types of materials
- Inspect medium preparation site
- Ensure method and procedure of obtaining
work order
- Ensure serviceability and use of tools and
equipment
- Evaluate type of planting medium
- Assess storage site
ENABLING REQUIREMENTS
STEP TOOL/EQUIPMENT/MATERIAL
(Knowledge, Skills, Attitude and Safety)

4. Confirm planting works Knowledge of :


- Work program and planting schedule
- Landscape construction drawing
- Worksite and area coverage
- Plants: types, specification, species and
quantity
- Types of Planting medium and quantity
required
- Planting medium application
- Preparation of plant for planting
- Various types and usage of tools and
equipment
- Material and plant handling techniques
- Planting technique

Ability to :-
- Understand work program and landscape
construction drawing
- Establish worksite and area coverage
- Record plants: types, specification, species
and quantity
- Record types and quantity of Planting medium
required
- Justify planting medium application
- Justify preparation of plant for planting
- Justify various types and usage of tools and
equipment
- Justify material and plant handling
- Justify planting
ENABLING REQUIREMENTS
STEP TOOL/EQUIPMENT/MATERIAL
(Knowledge, Skills, Attitude and Safety)

5. Confirm plant support Knowledge of :


installation works - Work program and plant support installation
schedule
- Worksite and area coverage
- Various types and usage of tools and
equipment
- Types, specification and characteristic plant
support and their accessories according to
Plants types
- Plant support handling and installation
techniques

Ability to :-
- Establish work program and plant support
installation schedule
- Justify the selection of tools and equipment
- Relate plant support – plant type suitability
- Justify plant support handling and installation

6. Confirm mulching works Knowledge of :


- Work program and mulching application
schedule
- Worksite and area coverage
- Various types and usage of tools and
equipment
- Types, specification and characteristic of mulch
according to Plants types
- Mulch handling and application techniques
ENABLING REQUIREMENTS
STEP TOOL/EQUIPMENT/MATERIAL
(Knowledge, Skills, Attitude and Safety)

Ability to :-
- Establish work program and mulching
application schedule
- Justify the selection of tools and equipment
- Relate mulch – plant type suitability
- Justify mulch handling and application

7. Confirm watering works Knowledge of :


- Work program and watering schedule
- Worksite and area coverage
- Plant types
- Various types and usage of tools and
equipment
- Watering methods

Ability to :-
- Establish work program and watering schedule
- Approve types of tree and their characteristics
- Justify watering needs
- Justify the selection of tools and equipment
required
- Record watering

8. Report to superior Knowledge of :


- Reporting procedures and method

Ability to :-
- Prepare report

Vous aimerez peut-être aussi