Académique Documents
Professionnel Documents
Culture Documents
DELIVERY Unit
Date LOCATION ARTICLES Quantity
RECEIPT Price
Prepared by:
SHIRLY G. TAPON
Const.Firm Staf Checked by:
20,460.00
16,680.00
4,480.00
8,350.00
11,950.00
110,950.00
50,100.00
67,600.00
11,950.00
16,700.00
8,960.00
9,600.00
93,440.00
1,670.00
12,525.00
12,420.00
50,100.00
41,800.00
67,600.00
15,030.00
4,780.00
80,835.00
23,900.00
111,600.00
9,560.00
863,040.00
REMIGIO GENERAL CONSTRUCTION
Brgy. 12, V. Lagasca St.,Laoag City
Tel. No. (077)770-4897
Email Address: rgcdel@yahoo.com
MATERIALS
DELIVERY
Date LOCATION ARTICLES Quantity Unit Price
RECEIPT
5/23/2018 MMSU- DINGRAS 025600 Flat Latex 2 pails 1760
Patching Compound 1 sack 790
Oakley #100 10 f 65
Roller Foam w/ plate 7" 5f 150
Paint Brush 2" (white) 5 pcs 50
Sphero Epoxy Primer Gray 2 gals 725
Welding Rod (20 kls China) 1 box 80
5/25/2018 MMSU- DINGRAS 025612 Flat Latex w/coat 4 pails 1760
CWN 2" 1 kl 75
CWN 3" 2 kls 70
Cutting Disc 14" 1 pc 900
5/26/2018 MMSU- DINGRAS 025623 Latex gloss (Davies) 5 pails 2550
1/4 ltr. Raw Sienna (Acry color) 8 can 80
5/28/2018 APAYAO ROAD 025630 MPW 1/2 5 pcs 785
PVC Pipe Black 3" 5 pcs 295
Tie Wire #16 1 roll 2350
Hack Saw Blade 5 pcs 65
5/28/2018 MMSU- DINGRAS 025628 PVC Pipe Orange 4" S1000 4 pcs 690
4 x 2 WYE Reducer 10 pcs 230
CNW 3" 1 kg 100
CWN 2" 1 kg 100
5/28/2018 CAPARIAN MARCOS 025631 Tie Wire #16 5 kg 75
CWN 4" 1 kg 100
5/30/2018 BODEGA 025645 G.I Pipe 2" 3 pcs 1840
W-rod (china) 5 kg 80
Tie Wire #16 2 kg 75
5/31/2018 CAPARIAN MARCOS 025652 1 1/2 Irrigation hose (MAXEY) 1 roll
1 1 /4 Irrigation Hose (MAXEY) 100 f
6/4/2018 CAPARIAN MARCOS 025679 Flat Nail 1 gal 610
Electrical Wire #14 PDX 1 roll 3350
Gardenhose 3/4 (60mtrs) 1 roll 2640
7" Roller Brass 1 pc 80
1/2 Elbow PVC 2 pcs 15
6/4/2018 MMSU- DINGRAS 025681 NNC Type IP 65 bags 241
Tie Wire #16 (s) 1/2 roll 2350
Hack Saw Blade 3 pcs 65
6/4/2018 MMSU-DORM 025683 NEMA 3R 1 pc 890
C.B Single 60 AMP Bolt -on 1 pc 290
C.B Single 20 AMP Bolt -on 1 pc 290
Surface Type 1 pc 45
C.O Eagle 2 gang 1 pc 550
Screw Ball 1 pc 45
Entrance cap 3/4 w/ camp 1 pc 110
RSC Pipe 3/4 1 pc 420
THHN #14 12 mtr 20
PDX # 12 1 mtr 62
E Tape (b) 1 pc 40
PVC Clamp 3/4 4 pcs 6
6/5/2018 BADIO BRIDGE CR.09456 Galva 10f .50 10 pcs 540
CWN 3" 2 kls 70
T. Nail 1/2 k 90
CWN 2" 1/2 k 70
M/B Sand Flex 2 pcs 65
6/5/2018 CABULALAN BRIDGE 025688 Tie Wire #16 (s) 2 rolls 2350
6/5/2018 LUBNAC BRIDGE 025687 Tie Wire #16 (s) 2 rolls 2350
6/6/2018 APAYAO ROAD 025700 Tie Wire #16 2 rolls 2350
PVC Pipe Black 3" 5 pcs 295
Hack Saw Blade 5 pcs 65
Tali #20 20 mtr 38
6/7/2018 MMSU- DINGRAS 025662 Flat Latex 4 pails 2180
L-Thinner 1 gal 250
Cons. Neutralizer 1 gal 650
Epoxy Gray Sphero 2 gals 725
Roller Foam 7" 4 pcs 70
6/7/2018 MMSU-DINGRAS 025714 Flat Latex Davies 2 pails 2180
Roller Foam Orig 7" 4 pcs 120
6/7/2018 MUMULAAN PAOAY 025713 Fuji Welding Rod 5 kgs 170
Bolt & Nut 9/16 x 2 1/2 30 pcs 55
Sanding Disc Circular #50 5 pcs 55
6/8/2018 MMSU-DINGRAS CR.09490 Gloss Latex d/Y 3 pails 2540
6/11/2018 MMSU- CHS 025726 Elbow 1/8 x 4" 2 pcs 110
Elbow 1/4 x 4" 2 pcs 120
Solvent Cement 1/8 ltr 80
6/12/2018 MMSU-DINGRAS 025742 CWN 2" 3 kls 75
CWN 3" 2 kls 70
CWN 4" 2 kls 70
6/13/2018 MMSU-DINGRAS 025745 Oakey #100 2f 65
Baby Roller 2 pcs 70
P.Brush 2" 3 pcs 50
Hack Saw Blade 2 pcs 65
Epoxy Primer gray w/catalyst 5 gals 725
L-Thinner 5 gals 250
6/13/2018 MMSU-DORM 025744 Utility Box Polly 100 pcs 25
TOTAL
Prepared by:
SHIRLY G. TAPON
Const.Firm Staf
Checked by:
3,520.00
790.00
650.00
750.00
250.00
1,450.00
1,600.00
7,040.00
75.00
140.00
900.00
12,750.00
640.00
3,925.00
1,475.00
2,350.00
325.00
2,760.00
2,300.00
100.00
100.00
375.00
100.00
5,520.00
400.00
150.00
2,950.00
1,270.00
610.00
3,350.00
2,640.00
80.00
30.00
15,665.00
1,175.00
195.00
890.00
290.00
290.00
45.00
550.00
45.00
110.00
420.00
240.00
62.00
40.00
24.00
5,400.00
140.00
45.00
35.00
130.00
4,700.00
4,700.00
4,700.00
1,475.00
325.00
760.00
8,720.00
250.00
650.00
1,450.00
280.00
4,360.00
480.00
850.00
1,655.00
275.00
7,620.00
220.00
240.00
80.00
225.00
140.00
140.00
130.00
140.00
150.00
130.00
3,625.00
1,250.00
2,500.00
139,376.00
REMIGIO GENERAL CONSTRUCTION
Brgy. 12, V. Lagasca St.,Laoag City
Tel. No. (077)770-4897
Email Address: rgcdel@yahoo.com
Prepared by:
SHIRLY G. TAPON
Const.Firm Staf
Checked by:
Amount
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
4,700.00
272,600.00
CAIZHER JHON GENERAL MERCHANDISE
For the Month of MAY to JUNE, 2018
CEMENT
DELIVER
Date LOCATION Y ARTICLES Quantity
RECEIPT
5/23/2018 MMSU Dingras 25600 Cement 100 bags
TOTAL
IZHER JHON GENERAL MERCHANDISE
For the Month of MAY to JUNE, 2018
CEMENT
241 24,100.00
241 24,100.00
241 19,280.00
241 24,100.00
241 3,615.00
241 8,435.00
257 257,000.00
257 257,000.00
241 12,050.00
241 12,050.00
241 24,100.00
241 7,230.00
241 24,100.00
241 7,230.00
241 24,100.00
241 241,000.00
###