BAB III
PERHITUNGAN CURAH HUJAN
Curah Hujan
No. Tahun
Sta A Sta B Sta C
1 1992 213 160 235
2 1993 160 175 180
3 1994 185 225 140
4 1995 175 175 220
5 1996 150 210 265
6 1997 245 150 270
7 1998 240 235 175
8 1999 90 165 190
9 2000 210 135 235
10 2001 215 235 215
11 2002 110 240 205
12 2003 210 190 160
13 2004 260 190 105
14 2005 215 240 110
15 2006 90 215 260
16 2007 170 240 235
17 2008 200 160 175
18 2009 195 250 190
19 2010 215 160 210
20 2011 165 225 200
21 2012 165 215 186
3.2 PERHITUNGAN CURAH HUJAN RENCANA
Curah Hujan
No. Tahun X X² (X-X) (X-X)² (X-X)³ (X-X)⁴
Sta A Sta B Sta C
1 1992 213 160 235 202.667 41073.778 8.556 73.198 626.246 5357.879
2 1993 160 175 180 171.667 29469.444 -22.444 503.753 -11306.458 253767.172
3 1994 185 225 140 183.333 33611.111 -10.778 116.160 -1251.952 13493.260
4 1995 175 175 220 190.000 36100.000 -4.111 16.901 -69.483 285.652
5 1996 150 210 265 208.333 43402.778 14.222 202.272 2876.752 40913.802
6 1997 245 150 270 221.667 49136.111 27.556 759.309 20923.171 576549.614
7 1998 240 235 175 216.667 46944.444 22.556 508.753 11475.209 258829.703
8 1999 90 165 190 148.333 22002.778 -45.778 2095.605 -95932.137 4391560.057
9 2000 210 135 235 193.333 37377.778 -0.778 0.605 -0.471 0.366
10 2001 215 235 215 221.667 49136.111 27.556 759.309 20923.171 576549.614
11 2002 110 240 205 185.000 34225.000 -9.111 83.012 -756.335 6891.050
12 2003 210 190 160 186.667 34844.444 -7.444 55.420 -412.569 3071.349
13 2004 260 190 105 185.000 34225.000 -9.111 83.012 -756.335 6891.050
14 2005 215 240 110 188.333 35469.444 -5.778 33.383 -192.878 1114.406
15 2006 90 215 260 188.333 35469.444 -5.778 33.383 -192.878 1114.406
16 2007 170 240 235 215.000 46225.000 20.889 436.346 9114.776 190397.552
17 2008 200 160 175 178.333 31802.778 -15.778 248.938 -3927.693 61970.263
18 2009 195 250 190 211.667 44802.778 17.556 308.198 5410.579 94985.718
19 2010 215 160 210 195.000 38025.000 0.889 0.790 0.702 0.624
20 2011 165 225 200 196.667 38677.778 2.556 6.531 16.690 42.652
21 2012 165 215 186 188.667 35595.111 -5.444 29.642 -161.384 878.647
Jumlah 4076.333 797616.111 0.000 6354.519 -43593.276 6484664.834
Rata-Rata 194.111
A. Standar Deviasi
( x - x )2
Sx = ( )½
n-1
6354.519
= ( )½
20
= 17.8248682
n.å ( xi - x )³
Cs =
(n-1).(n-2).Sx³
-915458.790123447
=
2152100.64484666
-0.425
=
n².å ( xi - x )⁴
Ck =
(n-1).(n-2).(n-3).Sx⁴
13000086093081.2 2.86E+09
=
201633988382483 4.436E+10
= 0.064
D. Harga Koefisien Variasi Syarat :
Distribusi Log Normal Distribusi Log Pearson III
Sx Cv = 0.17 Cs = BEBAS
Cv =
X Cs = 3.Cv+Cv² Ck = BEBAS
= 3.(0,170) + (0,170)²
17.8248682 = 1.51
=
194.111111 Cs/Cv = 3
n= 21
48.0110
Log X = 21 = 2.2862385
0.0338 21 . -0.0010
= 20 = 20 19 . 0.04 3
= 0.0411 = -0.7874951
Berdasarkan nilai Cs -0.787495 maka diperoleh nilai K untuk setiap periode ulang (tabel log person III)
Log X = Log X + K . Sx
Tabel 1.16
T (tahun) K Log X Sx Xi (mm)
2 0.131 2.2862 0.04110 195.71 195.7119
5 0.857 2.2862 0.04110 209.63 209.6333
10 1.168 2.2862 0.04110 215.90 215.8973
15 1.358 2.2862 0.04110 219.81 219.8126
Curah Hujan Rata -Rata dengan Metode Log Pearson Type III
1 2 195.71
2 5 209.63
3 10 215.90
4 15 219.81
3.3 PERHITUNGAN INTENSITAS CURAH HUJAN
R 24
I = X ( )2/3
24 t
Diketahui :
R2 = 195.712 mm
R5 = 209.633 mm
R10 = 215.897 mm
R15 = 219.813 mm
Untuk t = 1 jam
195.712 24
I2 = x ( )2/3 = 67.850 mm/jam
24 1
209.633 24
I5 = x ( )2/3 = 72.676 mm/jam
24 1
215.897 24
I10 = x ( )2/3 = 74.847 mm/jam
24 1
219.813 24
I15 = x ( )2/3 = 76.205 mm/jam
24 1
Untuk t = 2 jam
195.712 24
I2 = x ( )2/3 = 42.743 mm/jam
24 2
209.633 24
I5 = x ( )2/3 = 45.783 mm/jam
24 2
215.897 24
I10 = x ( )2/3 = 47.151 mm/jam
24 2
219.813 24
I15 = x ( )2/3 = 48.006 mm/jam
24 2
Untuk t = 3 jam
I2 = 195.712 24
x ( )2/3 = 32.619 mm/jam
24 3
I5 = 209.633 24
x ( )2/3 = 34.939 mm/jam
24 3
I10 = 215.897 24
x ( )2/3 = 35.983 mm/jam
24 3
I15 = 219.813 24
x ( )2/3 = 36.635 mm/jam
24 3
Untuk t = 4 jam
I2 = 195.712 24
x ( )2/3 = 26.926 mm/jam
24 4
I5 = 209.633 24
x ( )2/3 = 28.841 mm/jam
24 4
I10 = 215.897 24
x ( )2/3 = 29.703 mm/jam
24 4
I15 = 219.813 24
x ( )2/3 = 30.242 mm/jam
24 4
Untuk t = 5 jam
195.712 24
I2 = x ( )2/3 = 23.204 mm/jam
24 5
209.633 24
I5 = x ( )2/3 = 24.855 mm/jam
24 5
215.897 24
I10 = x ( )2/3 = 25.597 mm/jam
24 5
219.813 24
I15 = x ( )2/3 = 26.062 mm/jam
24 5
t Intensitas (mm/jam)
(jam) I2 I5 I 10 I 15
1 67.850 72.676 74.847 76.205
2 42.743 45.783 47.151 48.006
3 32.619 34.939 35.983 36.635
4 26.926 28.841 29.703 30.242
5 23.204 24.855 25.597 26.062
6 20.548 22.010 22.668 23.079
7 18.542 19.861 20.454 20.825
8 16.962 18.169 18.712 19.051
9 15.681 16.797 17.299 17.612
10 14.618 15.658 16.125 16.418
11 13.718 14.694 15.133 15.407
12 12.945 13.866 14.280 14.539
13 12.272 13.145 13.538 13.783
14 11.681 12.511 12.885 13.119
15 11.155 11.949 12.306 12.529
16 10.686 11.446 11.788 12.001
17 10.262 10.992 11.321 11.526
18 9.879 10.581 10.898 11.095
19 9.529 10.207 10.512 10.702
20 9.209 9.864 10.158 10.343
21 8.914 9.548 9.833 10.012
22 8.642 9.256 9.533 9.706
23 8.389 8.986 9.255 9.422
24 8.155 8.735 8.996 9.159
Intensitas ( mm/jam ) GRAFIK INTENSITAS CURAH HUJAN METODE MONONOBE
90.000
80.000
70.000
60.000
50.000 Co
lu
m
n
40.000 D
30.000
20.000
10.000
0.000
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5
Waktu ( jam )
8.5 8 7.5 7 6.5 6.0 5.5 5.0
b c d
i
A0 A1 A2 A3 A4 A5 A6 A7
I B II C III D
h
C4 C1 C4
9 IV
j
B0 B1 B2 B3 B4 B5 C2
C0 C1 C2 C3
D0 D1
V
g
C1 0.5714
9.5 E0 E1
F0 F1 VI
m
A C3
VII
k
G0 G1 G2 G3 C2
VIII IX H0 H1 H2 H3
f C3 C3 F
10 0.6667
I0 I1 I2 I3
X XI l
Q3 J0 J1 J2 J3 J4 C4 J5 J6 C1 J7
E Q1 Q2
a
e
Diketahui :
Q1 = 0.3 m3/detik C1 = 0.4 C4 = 0.6
Q2 = 0.4 m3/detik C2 = 0.5
Q3 = 0.5 m3/detik C3 = 0.7
Lt
n
R 108
m
110
109
Perhitungan Elevasi Awal dan Akhir
R X P = Jarak areal ke garis berikutnya (m)
=
P r R = Jarak antar kontur (m)
r = Interval antar kontur yang membatasi titik
Sehingga tinggi elevasi = Kontur -X
Kemiringan Lahan
E awal - E akhir
St x 100%
Lt
Mencari Luas lahan
A = m x n
2 tc
Cs = tc = to + td
2 tc + td
Ls
td =
v
Lt
to = 0.0197
St
ket. :
A = Luas areal (Ha)
Ls = Panjang Saluran (m)
Lt = Panjang lahan terjauh (m)
St = Kemiringan lahan (%)
to = Waktu untuk mengalir dari permukaan lahan ke saluran terdekat (menit)
td = Waktu pengaliran dalam saluran (menit)
tc = Waktu pengumpulan air (menit)
Cs = Koefisien penampungan
Cr = Koefisien pengaliran rata-rata
I = Intensitas curah hujan (mm/jam)
v = Kecepata rencana (m/dtk)
(diasumsikan, v = 0.4 m/dtk)
Lt 0.77
to = 0.0197 x
St
223.6068 0.77
to = 0.0197 x
0.0685
to = 9.9992 menit
Ls
td = v= 0.4 m/det
v
100
td = = 4.1667 menit
0.4 x 60
tc = to + td
tc = 9.9992 + 4.1667
tc = 14.1658 menit
2 tc 28.3317
Cs = =
2 tc + td 28.3317 + 4.1667
= 0.8718
Qs = 0.00278 x Cs x Cr x I x A
Qs = 0.00278 x 0.872 x 0.722 x 177.61778 x 2.00
Qs = 0.6218 m3/dtk
Qkomulatif = Q2 + Q (J0-J1)
= 0.5 + 0.6218
= 1.1218 m3/dtk
Saluran J1 - G1
diketahui data-data sbb :
AL = 2.00 Ha = 20000 m2
AJ= 0.5 Ha = 5000 m2
Ls = 200 m
Lt = 223.61 m
St = 0.0047
Cj = 0.9
CL= 0.7
Lt 0.77
to = 0.0197 x
St
223.6068 0.77
to = 0.0197 x
0.0685
to = 9.9992 menit
Ls
td = v= 0.4 m/det
v
200
td = = 8.3333 menit
0.4 x 60
tc = to + td
tc = 9.9992 + 8.3333
tc = 18.3325 menit
2 tc 36.6650
Cs = =
2 tc + td 36.6650 + 8.3333
= 0.8148
Qs = 0.00278 x Cs x Cr x I x A
Qs = 0.00278 x 0.815 x 0.740 x 160.20508 x 2.00
Qs = 0.5371 m /dtk
3
Lt 0.77
to = 0.0197 x
St
141.4214 0.77
to = 0.0197 x
0.0959
to = 5.4255 menit
Ls
td = v= 0.4 m/det
v
100
td = = 4.1667 menit
0.4 x 60
tc = to + td
tc = 5.4255 + 4.1667
tc = 9.5922 menit
2 tc 19.1844
Cs = =
2 tc + td 19.1844 + 4.1667
= 0.8216
Qs = 0.00278 x Cs x Cr x I x A
Qs = 0.00278 x 0.822 x 0.660 x 254.09644 x 1.00
Qs = 0.3830 m3/dtk
Tabel 4.2.3.1. Debit Rencana Untuk Periode Ulang 2 Tahun (Saluran Tersier)
Aliran Permukaan Aliran dalam saluran Curah Hujan
Nama tc Luas (A) Q Q Kumulatif
No Lt St to Ls V td Cs Cr T I
saluran Rencana (m3/det)
(m) menit (m) m/dtk menit menit Thn m/jam m2 (m3/det)
1 A0 - A1 141.421 0.0057 6.541 100 0.40 4.167 10.707 0.837 0.900 2 361.08338 1.00 0.7561 0.7561
2 A1 - B 1 141.421 0.0057 6.541 100 0.40 4.167 10.707 0.837 0.900 2 361.08338 1 0.7561 0.7561
3 C0 - C 1 335.41 0.00530693 13.035 300 0.40 12.500 25.535 0.803 0.900 2 202.29089 4.50 1.8291 1.8291
4 C2 - C 3 223.61 0.00836289 8.007 100 0.40 4.167 12.174 0.854 0.900 2 331.47476 2.00 1.4158 1.4158
5 E0 - E 1 282.84 0.0053033 11.434 200 0.40 8.333 19.768 0.826 0.900 2 239.93480 4.00 1.9829 1.9829
6 G0 - G 1 223.61 0.00469574 9.999 100 0.40 4.167 14.166 0.872 0.900 2 299.61728 2.00 1.3065 1.3065
7 I0 - I1 111.80 0.00447214 5.975 100 0.40 4.167 10.142 0.830 0.900 2 374.39125 0.50 0.3885 0.3885
8 I2 - I3 206.16 0.38320629 1.725 200 0.40 8.333 10.058 0.707 0.900 2 376.45448 1.00 0.6660 0.6660
9 J 0 - J1 223.61 0.00469574 9.999 100 0.40 4.167 14.166 0.872 0.900 2 299.61728 2.00 1.3065 1.8065
10 J2 - J3 250.000 0.0041 11.502 200 0.40 8.333 19.835 0.826 0.900 2 239.38715 3.00 1.4844 1.4844
11 J 4 - J5 111.803 0.0045 5.975 100 0.40 4.167 10.142 0.830 0.900 2 374.39125 0.50 0.3885 0.3885
12 J 6 - J7 206.155 0.0038 10.157 200 0.40 8.333 18.491 0.816 0.900 2 250.85824 1.00 0.5122 0.5122
Tabel 4.2.3.2 Debit Rencana Untuk Periode Ulang 5 Tahun (Saluran Sekunder)
Aliran Permukaan Aliran dalam saluran Curah Hujan
Nama tc Luas (A) Q Q Kumulatif
No Lt St to Ls V td Cs Cr T I Rencana
saluran (m3/det)
(m) menit (m) m/dtk menit menit Thn m/dtk m 2
(m3/det)
1 A2 - A3 180.278 0.0064 7.529 150 0.40 6.250 13.779 0.815 0.900 5 326.91572 1.50 0.9999 2.5121
2 B3 - A 3 180.28 0.0064 7.529 100 0.40 4.167 11.695 0.849 0.900 5 364.66944 1.50 1.1613 14.8706
3 B5 - A 5 141.42 0.0092 5.426 100 0.40 4.167 9.592 0.822 0.900 5 416.19043 1.00 0.8553 4.6114
4 D1 - A7 282.84 0.0052 11.493 200 0.40 8.333 19.827 0.826 0.900 5 256.48959 4.00 2.1208 8.2213
5 F1 - C1 335.41 0.0053 13.035 150 0.40 6.250 19.285 0.861 0.899 5 261.27537 4.50 2.5298 11.8802
6 H1 - C 3 223.61 0.0084 8.007 200 0.40 8.333 16.340 0.797 0.900 5 291.78719 2.00 1.1632 2.3402
7 H3 - E1 282.84 0.0053 11.434 200 0.40 8.333 19.768 0.826 0.900 5 257.00180 4.00 2.1239 4.1176
8 J 1 - G1 223.61 0.0047 9.999 200 0.40 8.333 18.332 0.815 0.900 5 270.24440 2.00 1.1016 2.9081
9 G2 - G 3 250.00 0.0041 11.502 150 0.40 6.250 17.752 0.850 0.900 5 276.10342 3.00 1.7614 5.9760
10 J 3 - G3 250.000 0.0041 11.502 200 0.40 8.333 19.835 0.826 0.900 5 256.41519 3.00 1.5900 3.3744
11 J5 - I1 111.803 0.0045 5.975 50 0.40 2.083 8.058 0.886 0.900 5 467.46129 0.50 0.5178 0.7885
12 J7 - I3 206.155 0.0038 10.157 50 0.40 2.083 12.241 0.922 0.900 5 353.75611 1.00 0.8155 1.3277
Tabel 4.2.3.3 Debit Rencana Untuk Periode Ulang 10 Tahun (Saluran Primer)
Aliran Permukaan Aliran dalam saluran Curah Hujan
Nama tc Luas (A) Q Q Kumulatif
No Lt St to Ls V td Cs Cr T I Rencana
saluran (m3/det)
(m) menit (m) m/dtk menit menit Thn m/dtk m2 (m3/det)
1 A4 - A5 141.42 0.00919239 5.426 100 0.4 4.167 9.592 0.822 0.900 10 428.62648 1.00 0.8809 18.2637
2 A6 - A7 282.843 0.0052 11.493 200 0.40 8.333 19.827 0.826 0.900 10 264.15367 4.00 2.1842 25.0592
1 h 2 h
m
Penampang Ekonomis
b = 1.5 h
Q
A = , dimana : A = (b + m.h).h
v
p = b +2 h . √ 1+ m2
Jari-jari Hidrolik ( R )
A
R =
P
(b + m.h).h
=
b+2 h . √ 1+ m2
Dimana:
Q A
v = ; R =
A p
ket:
Q = debit (m3/dtk)
A = Luas (m2)
p = keliling basah (m)
R = jari-jari hidrolis
S = kemiringan saluran
Q 1 A 2/3 1/2
= . . S
A n p
A = (b + m.h).h , misal m = 1
= ( 1.5h + 1 . h ) .h
= 2.5 h2
p = b+2 h . √ 1+ m2
= 1.5h + 2h.√1 + 12
= 1.5 h + 2h . √2
= 4.328 h
( 2.5.h2 )5 1/3
n. Q
= ; n= 0.02
(4.328.h) 2
S1/2
Q 3
5.21345 h8 = 0.0000080
S1/2
Q 3
h8 = 0.00000153
S1/2
Q 3/8
h = 0.18761 .............................. ( 2 )
S1/2
Tabel Perhitungan Dimensi Saluran Tersier
Dimensi Saluran
Q maks v w V saluran Q saluran T
No. saluran A h b n m P R S
m3/dt m/dt m2 m m m m/dtk m3/dtk m
1 A0 - A 1 0.75611 0.40 0.50906 0.45125 0.67687 0.02 1 1.95299 0.26066 0.00530 0.4128116 1.4853163 0.75611 1.579
2 A 1 - B1 0.7561124831 0.40 0.59477 0.48776 0.73163 0.02 1 2.11101 0.28174 0.0035 0.421939 1.2712794 0.75611 1.707
3 C0 - C1 1.8291253978 0.40 1.00925 0.63537 0.95306 0.02 1 2.74990 0.36701 0.005 0.4588437 1.812356 1.82913 2.224
4 C2 - C3 1.4158132908 0.40 0.90555 0.60185 0.90277 0.02 1 2.60480 0.34765 0.004 0.4504619 1.563482 1.41581 2.106
5 E 0 - E1 1.9828822337 0.40 1.58951 0.79737 1.19606 0.02 1 3.45104 0.46059 0.00175 0.4993436 1.2474765 1.98288 2.791
6 G0 - G 1 1.3064784569 0.40 0.92699 0.60893 0.91340 0.02 1 2.63545 0.35174 0.0032 0.4522328 1.4093721 1.30648 2.131
7 I0 - I1 0.3885115178 0.40 0.57741 0.48059 0.72088 0.02 1 2.07998 0.27760 0.001 0.4201467 0.6728525 0.38851 1.682
8 I2 - I3 0.6659681886 0.40 0.58406 0.48334 0.72502 0.02 1 2.09192 0.27920 0.00285 0.4208362 1.1402474 0.66597 1.692
9 J0 - J1 1.8064784569 0.40 1.24271 0.70504 1.05756 0.02 1 3.05143 0.40726 0.00280 0.4762608 1.453655 1.80648 2.468
10 J2 - J3 1.4844207406 0.40 1.52257 0.78040 1.17060 0.02 1 3.37758 0.45079 0.00110 0.4951005 0.9749456 1.48442 2.731
11 J4 - J5 0.3885115178 0.40 0.38244 0.39112 0.58668 0.02 1 1.69277 0.22593 0.00300 0.3977804 1.0158751 0.38851 1.369
12 J6 - J7 0.5122000441 0.40 0.79134 0.56262 0.84392 0.02 1 2.43500 0.32499 0.00075 0.4406538 0.647257 0.51220 1.969
Tabel Perhitungan Dimensi Saluran Sekunder
Dimensi Saluran
Q maks v w V saluran Q saluran T
No. saluran A h b n m P R S
m3/dt m/dt m2 m m m m/dtk m3/dtk m
1 A2 - A 3 2.51209 0.40 1.20590 0.69452 1.04178 0.02 1 3.00589 0.40118 0.00587 0.4736304 2.0831697 2.51209 2.431
2 B3 - A 3 14.87065 0.40 5.67853 1.50712 2.26068 0.02 1 6.52282 0.87056 0.0033 0.6767801 2.6187503 14.87065 5.275
3 B5 - A 5 4.61141 0.40 1.69296 0.82291 1.23437 0.02 1 3.56157 0.47534 0.008 0.5057283 2.7238684 4.61141 2.880
4 D1 - A7 8.22132 0.40 3.05899 1.10616 1.65924 0.02 1 4.78747 0.63896 0.00525 0.5765405 2.6875958 8.22132 3.872
5 F1 - C1 11.88024 0.40 3.80333 1.23342 1.85013 0.02 1 5.33825 0.71247 0.00613333 0.6083557 3.1236431 11.88024 4.317
6 H1 - C3 2.34025 0.40 1.00625 0.63443 0.95165 0.02 1 2.74581 0.36647 0.00825 0.4586075 2.3257052 2.34025 2.221
7 H 3 - E1 4.11763 0.40 1.77174 0.84184 1.26276 0.02 1 3.64348 0.48628 0.00565 0.5104599 2.3240689 4.11763 2.946
8 J1 - G1 2.90810 0.40 1.57612 0.79401 1.19101 0.02 1 3.43647 0.45865 0.00385 0.4985022 1.8450962 2.90810 2.779
9 G2 - G 3 5.97602 0.40 3.16487 1.12514 1.68771 0.02 1 4.86962 0.64992 0.00253 0.5812857 1.8882367 5.97602 3.938
10 J3 - G3 3.37443 0.40 1.73704 0.83356 1.25033 0.02 1 3.60763 0.48149 0.004 0.5083889 1.9426364 3.37443 2.917
11 J5 - I1 0.78851 0.40 0.58380 0.48324 0.72486 0.02 1 2.09146 0.27914 0.00400 0.4208098 1.3506518 0.78851 1.691
12 J7 - I3 1.32774 0.40 0.55791 0.47240 0.70860 0.02 1 2.04455 0.27287 0.01280 0.4181003 2.3798564 1.32774 1.653
Perhitungan Gorong-gorong A1 - A2
Data-data sbb:
Bangunan pelintas gorong-gorong bentuk Segi empat
Qsaluran = 1.512 m3/s
v1 = kecepatan di hulu saluran = 0.40 m/s
v2 = kecepatan didalam gorong-gorong = 1.5 m/s
v3 = kecepatan di hilir saluran = 0.4 m/s
g = perc. Gravitasi = 9.81 m/s2
n = Koefisien kekasaran Manning = 0.020
Keliling Basah
P = b + 2d
= 1.1327400281 + 2. 1.13
= 3.3982200844 m
2. Akibat gesekan
Nilai koefisien kekasaran Strickler (k) untuk beton 70
Cf . v22 1 1/6 1 1/6
hf = Cf = R = 0.297 = 0.012 m
2.g k 70
0.0116666876 x 1.5 2
= = 0.0013 m
2x 9.81
3. Akibat pengeluaran
(v2 - v3) 2
ho = 0.11
2.g
( 1.5 - 0.40 ) 2
= 0.11 = 0.0068 m
2 x 9.81
4. Htotal = hc + hf + ho
= 0.0308 + 0.0013 + 0.0068
= 0.0390 m
d = 1.13 m
Tabel Perhitungan Dimensi Gorong-gorong (Bulat)
SKETSA PENAMPANG GORONG-GORONG
h(m)
b(m)
Definisi Inlet : Lubang-lubang di sisi jalan yang berfungsi untuk menampung dan menyalurkan
limpasan air hujan yang berada di sepanjang jalan menuju ke dalam saluran.
280
D = x S £ 50 m
w
Q
= 0,36 x g x d3/2
L
dimana :
Q = kapasitas inlet (m3/det)
L = lebar bahan inlet (m)
g = kecepatan grafitasi m/det2
d = kedalaman air (m)
280
D = x S £ 50 m
w
280
x 2 £ 50
22
Luas 1 inlet
A= 1/2 x w x D
A= 0.5 x 22 x 18
A= 0.0198
Data-data :
A = 0.02 Ha st = 2.0 %
Lt = 10.752 m C = 0.9
Ls = 200
Perhitungan:
Lt 1
to = 0.0197 ( )
( st ) 0.5
10.752149785 1
= 0.0197 ( ) = 0.5531 menit
( 2.000 ) 0.5
tc = to + td
= 0.553122 + 3.704 = 4.26 menit
2 . tc 2 x 4.257
Cs = = = 0.70
2 . tc + td ( 2 x 4.257 ) + 3.70
dimana tinggi genangan maksimum yang diijinkan untuk jalur jalan yang lurus = 6.5 mm
Q = 0.36 g. d3/2. L
Sketsa Inlet :
d = 0.10 m
L
0.20 m
Tabel Inlet Pada Trotoar
Q 33.28
A = =
v 0.40
= 83.2013742396 m²
A = 2.5 h2 ; diasumsikan b = 2h
83.2013742 = 2.5 h2
h = 5.7689 m
b = 11.538 m
T = b + 2.m.h
= 11.538 + 2. 1.00 . 6
= 23.0757187349
Jari-jari hidrolis ( R )
A 2.5 h2
R = =
p 4.328 h
83.20137
=
24.96793
R = 3.33233 m
Tinggi jagaan ( fb )
1.5 . Q .h 0.5
fb =
60
= 2.19085 m
33.28055
=
0.8 . 83.201 . 19.62
z = 0.02548 m
SKETSA SALURAN
23.0757187349
T
Fb 2.19
7.96
m
h 5.77
11.54 m
B
SKETSA PENAMPANG
2.19085 m
5.76893 m
11.53786 m