Vous êtes sur la page 1sur 1

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 170 180 190 200 millimetres

Public Works and Government Services Canada


Travaux publics et Services gouvernementaux Canada

CRANE
LIFT
Heritage Canals and Engineering Works
Ontario Region

C LIFTING BEAM,
STOP LOG &
SPILLWAY PU
TO LL
A RD RE LANY
NY IN LE
C PIVOT POINT & L LA SE P AS ARD
L A E P TO C LIFTING HOOK
LIFTING PIN PU RELE IN
C PIVOT POINT &
C LIFTING HOOK LIFTING PIN
1950 1950

1800 LIFTING LIFTING 1800


CABLE OR CABLE OR
OPEN LINK OPEN LINK
CHAIN CHAIN

LIFTING LIFTING
FILLING, DRAIN LIFTING
HOOK HOOK
AND AIR HOLES BEAM NOTES :
AS REQUIRED
1. CONTRACTOR TO SUBMIT DESIGN AND SHOP
DRAWINGS OF PROPOSED LIFTING BEAM BASED
ON PROVIDED CONCEPTUAL DRAWINGS PRIOR
TO FABRICATION. REFER TO SPECIFICATIONS
FOR FURTHER DETAILS.

2. ALL STEEL COMPONENTS TO BE HOT DIP


GALVANIZED, REFER TO SPECIFICATIONS.

3. LIFTING HOOK TO BE SELF CLOSING / LATCHING


BY GRAVITY AND RELEASED BY LANYARD.

4. TOTAL WEIGHT OF EACH SERVICE LOG IS


APPROXIMATELY:
a) 7 kN (DRY WEIGHT)
b) 6 kN (SUBMERGED)
c) 13.6 kN (WHEN FULL OF WATER)

5. APPROXIMATE HOISTING LOAD FOR SERVICE


LOGS: 70kN
a) INCLUDES CONSIDERATIONS FOR
SELF-WEIGHT OF LOGS, FRICTION, CONFINED
WATER, AND INITIAL BREAKAWAY FORCES.
STOP LOG
5. PROVIDE FILLING, DRAIN AND AIR HOLES AS
REQUIRED TO FILL THE LIFTING BEAM WITH
ELEVATION WATER IN 10 - 15 SECONDS.

1:10 6. LIFTING BEAM MUST BE TESTED TO ENSURE


PROPER FIT AND TOLERANCES.

7. TOTAL DISTANCE BETWEEN GAINS = 7870mm.


CONTRACTOR TO VERIFY IN FIELD PRIOR TO
LIFTING CABLE FABRICATION.
ANCHOR POINT
8. LIFTING BEAM TO BE STAMPED WITH MAXIMUM
C PIVOT POINT & ALLOWABLE LOADING.
LIFTING PIN
C LIFTING HOOK
1800 150

RELEASE

HOOK & HSS


ARM

LIFTING
B
LIFTING BEAM
FILLING, DRAIN 102
AND AIR HOLES
LIFTING BEAM

GUIDE WHEELS AS REQUIRED


STOP LOG &

(SEE SPECS. -
TYP.)
1 ISSUED FOR TENDER DMR 28-10-2013
Dwn.By
No. Description Des.Par
Date
LIFTING BEAM

Do not scale drawings.


Verify all dimensions and conditions on site and immediately notify the
Departmental Representative of all discrepancies.
GUSSET PL 12
LIFTING CABLE (TYP.)
ANCHOR POINT STOP LOG
(SEE DWG.
NO. 101) LIFTING HOOK
A Detail number
A
12

A
15

102 B Location dwg. number


EDGE OF B
CONCRETE
DECK ABOVE PART PLAN
1:5

RD
N YA
L A IN
U LL ASE P
P LE
35 270 RE
TC TY

PROVIDE EQUAL SPACES BETWEEN = = = =


LA AVI
H

LIFTING HOOK AND LIFTING PIN


C PIVOT POINT & G
GR

TIN ASSEMBLY TO COMPENSATE FOR


LIFTING PIN LIF BLE LATERAL MOVEMENT OF STOP LOG
CA
B AND LIFTING BEAM
GUIDE WHEEL LIFTING BEAM
102
(2 EACH END), SEE
SPECIFICATIONS FOR
SECTION B
DETAILS (TYP.) 1:5 102
Project title / Titre du projet

FILLING, DRAIN
AND AIR HOLES
AS REQUIRED

FRENCH RIVER DAMS


SERVICE LOGS 2014
RELEASE ARM TO BE
BALANCED TO CREATE A
GRAVITY INDUCED LATCHING
ACTION (ADD PLATES AS
REQUIRED)
Drawing title / Titre du dessin

LIFTING BEAM
CONCEPTUAL
LIFTING PIN

ANGLE OF LIFTING HOOK


TO BE SUFFICIENT TO DAVID ROWAN CHRIS UCHWAT
ALLOW SMOOTH ACTION Drawing Date / Date du dessin
FOR LATCHING
JAN. 2014
Project manager / Administrateur de projet

DANIEL SEGURA
SECTION A STOP LOG
(SEE DWG. NO. 101) Drawing Number/
1:5 102 SAMPLE LIFTING BEAM
OG FRD 13/R18
(FOR PROOF OF CONCEPT ONLY)
102
Sheet of
R.012222.023 Feuille 2 du 2
ISO-B1 PLOTTED BY: ROWAND DATE PLOTTED: Feb 27, 2014 FILE NAME: Little Chaudiere Dam Stop Logs 2014 - 102 - Lifting Beam.dwg LAYOUT NAME: 102