REVISION CERTIFICATE EDSD REV. NO.

DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS


THIS INDICATES THAT REV. NO. ____________ VERIFICATION

OF THIS DRAWING IS COVERED, FOR ALL D 04/19/18 BI-10-09003 ISSUED FOR DETAILED DESIGN (B2) FK RXS
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,

farooq.khan2

ravi.seshadri
B 01/07/18 BI-10-09003 ISSUED FOR COMMENT (O2) HGB RXS

AGENCY
PROJECT
ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE
BY DRAWING COMPLETION CERTIFICATE BY: ______________

OPERATIONS
CONSTRUCTION
DATE 19 APR 2018
DATE 19 APR 2018

DATE ___________
DATE ___________
DATE ___________

________________
________________
________________
________________
________________
(DCC)NO. _______________________________ C 04/03/18 BI-10-09003 ISSUED FOR DETAILED DESIGN (B1) FK RXS
DATE _____________

T00-A-DD-842201_REV D
TANAJIB
Saudi Aramco 2616-ENG (03/99)

DETAILED DESIGN

SCOPE OF WORK-TCF

TEMPORARY CONSTRUCTION FACILITIES


DOC
DWG.TYPE

SAUDI ARABIA
BI-10-09003

PLANT .NO
SCOPE OF WORK
DETAILED DESIGN

A
INDEX
SAUDI ARABIAN OIL COMPANY

TANAJIB GAS PLANT (TGP)

JO / EWO: BI-10-09003
DOC CLASS: 4A
DRAWING NO.

DD-842201
MARJAN DEVELOPMENT PROGRAM

74
OF

DSN:
SHT. NO.
TEMPORARY CONSTRUCTION FACILITIES

D
13859
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

REVISION B C D
Signature Signature Signature
CERT

DATE 01/07/18 04/03/18 04/19/18


RXS

RXS

RXS

INT APP. R. Seshadri RXS R. Seshadri RXS R. Seshadri ravi.seshadri


ENGG

HGB

QA REVIEW M. Alasfoar MA M. Alasfoar MA M. Alasfoar


FK

FK

ravi.seshadri

TABLE OF CONTENTS

1. PURPOSE 4
1.1 Definitions 5
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

1.2 Abbreviations 6
BI-10-09003 ISSUED FOR COMMENT (O2)

1.3 WORK EXECUTION 9


2. LOCATION ANALYSIS 11
DESCRIPTION

2.1 Site Location 11


2.2 Site Conditions 11
3. INTERFACES 12
JO/EWO

3.1 Description of Main Interfaces 12


3.2 Vendor Warranties 14
04/19/18

01/07/18

04/03/18
DATE

4. SCOPE SUMMARY 14
REV. NO.

4.1 COMPANY Temporary Construction Facilities 14


D

C
B

DISCIPLINE
ENGINEER 4.2 Non Electrical Utilities Summary 15
________________

DATE 19 APR 2018 4.3 Electrical Utilities Summary 20


PROJECT
ENGINEER 5. STUDY INFORMATION AVAILABLE 21
21
________________

DATE 19 APR 2018


5.1 Environmental Impact Assessment (EIA)
CERTIFIED 5.2 Building Risk Assessment (BRA) 21
________________

DATE ___________ 5.3 Geotechnical Investigation 22

CONSTRUCTION 5.4 Topographical Survey 22


AGENCY

________________ 6. CODES, STANDARDS AND SPECIFICATIONS 22


DATE ___________
6.1 Industry Codes and Standards 22
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
6.2 SEC Standards 23
EDSD

DATE ___________

6.3 Saudi Aramco Standards and Procedures 23


6.4 Saudi Aramco Standard/Library Drawings 25
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

26
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

6.5 Saudi Aramco Material System Specifications


REVISION CERTIFICATE

6.6 Saudi Aramco Best Practices 27

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 2


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

6.7 Saudi Aramco General Instruction 27


CERT

RXS

RXS

RXS

7. DETAILED DESCRIPTION OF THE WORKS 27


ENGG

HGB

27
FK

FK

7.1 General
7.2 Civil/Structural/Architectural 28
7.3 Mechanical 44
7.4 Electrical 47
7.5 Communications 55
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.6 Instrumentation 62
BI-10-09003 ISSUED FOR COMMENT (O2)

7.7 Materials 66
7.8 Satellite TV System 66
DESCRIPTION

7.9 Coating and Painting 67


8. PROJECT RECORDS 74
8.1 Project Record Requirements 74
JO/EWO

8.2 As-Built Drawings: 74


74
04/19/18

01/07/18

04/03/18

8.3 Equipment and Technical Documentation:


DATE
REV. NO.

C
B

DISCIPLINE
ENGINEER

________________

DATE 19 APR 2018

PROJECT
ENGINEER

________________

DATE 19 APR 2018

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 3


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1. PURPOSE
CERT

RXS

RXS

RXS

The purpose of SAPMT camp is to provide facilities and accommodation in order to


allow the SAPMT personnel to reside close by the construction site during the TGP’s
ENGG

HGB
FK

FK

construction and commissioning. The facilities include and are not limited to utilities,
infrastructure for the accommodation, mess, laundry, health, recreation, internal roads,
fuelling, vehicle maintenance and other required facilities.

This Scope of Work describes the WORK activities required to provide, install, construct
and commission the facilities and associated infrastructure at Tanajib Gas Plant (TGP)
for the following:
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

1. Saudi Aramco Project Management Team (SAPMT) camp and Utilities (referred as
BI-10-09003 ISSUED FOR COMMENT (O2)

SAPMT Area).
2. Sewage Treatment Plant, Sewage collection network, Raw Water supply, reject
water collection network and tie-in at EPC Contractor Camps and laydown yards
DESCRIPTION

(referred as EPC Contractor Area).


3. Pioneer Camp, SAPMT Office Buildings (Project Support Buildings), and Tent.
4. Solid Waste Landfill and associated facilities.
JO/EWO

The SAPMT Camp is designed to accommodate 1500 personnel. Accommodation units


for 1300 people are to be provided and installed with a provision for the company to
increase the number of installed accommodation by a futher 200 units. All services
04/19/18

01/07/18

04/03/18
DATE

including but not limited to ground and pad preparations, water & sewage systems,
utilities, power supply, communications, parking, roads, fences, training hall, and all
REV. NO.

service buildings associated with the 1500 capacity are to be constructed.


D

C
B

DISCIPLINE
ENGINEER The SAPMT camp shall be provided with a complete sewage collection network, potable
________________ water and fire water supply network, dedicated Sewage Treatment Plant (STP) and
DATE 19 APR 2018
dedicated Water Treatment Plant (WTP). Raw water shall be supplied from water wells
PROJECT
ENGINEER
drilled by OTHERS.
________________

DATE 19 APR 2018 The SAPMT Camp WTP, STP and the underground water and sewage system shall
CERTIFIED
provision for an additional 500 O&M personnel capacity, as such these systems are
________________
designed for a total of 2000 personnel.
DATE ___________

The SAPMT camp shall be connected to TGP by an access road.


CONSTRUCTION
AGENCY

________________ CONTRACTOR shall note that the COMPANY at its sole option may require an
DATE ___________ Additional Resdiental Camp. The Additional Residential Camp will serve 1500
personnel and shall be located adjacent to the Marjan SAPMT Camp. The services of
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ this Additional Residential Camp shall be standalone, and the design and construct shall
EDSD

DATE ___________ not impact the delivery of the SAPMT Camp. The Alternative Tent for the Additional
Resdiential Camp can potentially be located in the northwest side of the SAPMT Camp.
If the option the alternative tent is exercised, then the utilities and services to the
Alternative Tent are interlinked with the SAMPT Camp.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

The EPC Contractor Camps and laydown yards in the EPC Contractor Area shall be
provided with sewage collection network, raw water supply and reject water collection

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 4


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

network and dedicated STP. The raw water shall be supplied from wells drilled by
CERT

OTHERS. The peak personnel for the EPC Contractor Camp is 30,000 personnel.
RXS

RXS

RXS
ENGG

HGB

A Central Training Facility complete with a training building, shaded car parking, heavy
FK

FK

equipment training yard and training workshop shelters shall be provided in the area
adjacent to the EPC Contractor Area. The treated water shall be trucked in to the
potable water and fire water system.

The fire water and potable water systems for the SAPMT Office Building and Tent, shall
connect into the Central Training Facility water network. The SAPMT office buildings
shall be supplied and installed with all utilities and associated infrastructure. SAPMT
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

office buildings shall be located adjacent to the Pioneer Camp area and Tent. The
sewage shall be trucked out for disposal.
BI-10-09003 ISSUED FOR COMMENT (O2)

The Pioneer Camp is designed to accommodate 48 personnel. This shall include the
following services and not limited to: ground and pad preparations, water, sewage
DESCRIPTION

system connections, utilities, power supply, communications, parking areas, roads,


fences and all service buildings. These shall be designed, supplied and installed by the
CONTRACTOR, as a stand-alone facility. CONTRACTOR shall be responsible for the
operation and maintenance of the pioneer camp and providing catering services.
JO/EWO

CONTRACTOR shall provide the Solid Waste Landfill Facility in accordance with Scope
of Work (T80-A-PP-312857) and Functional Specification (T80-A-PP-312856). This
04/19/18

01/07/18

04/03/18
DATE

shall include but is not limited the following items; all fencing, security, grading,
buildings, communications, instrument and control, access and internal roads. This is a
REV. NO.

standalone facility, complete with all necessary infrastructure.


D

C
B

DISCIPLINE
ENGINEER
Contractor shall note that the Ownership of all equipment, plant, buildings, camps and
________________
all materials provided under this Scope of Work is to be transferred to COMPANY after
DATE 19 APR 2018
commissioning.
PROJECT
ENGINEER

________________

DATE 19 APR 2018 1.1 Definitions


CERTIFIED

________________
“COMPANY” shall mean Saudi Aramco and / or its Representative.
DATE ___________

“CONTRACTOR” shall mean txhe Entity who is awarded the contract to perform the
CONSTRUCTION
AGENCY
WORK set out in this Scope of Work.
________________

DATE ___________ “EPC CONTRACTOR” implies the Engineering Procurement Construction Contractor.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
“EPC CONTRACTOR Area” is the area North of the Tanagib Gas Plant allocated for the
VERIFICATION

________________
EDSD

DATE ___________ EPC Contractor, and the associated drawings also refer to this as the “Contractor”
camp/laydown/facility or area.

“EPC CONTRACTOR CAMP” refers to the associated housing for the EPC
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Contractor(s) within the “EPC Contractor Area”.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 5


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

“SAPMT Camp” is the residential facilites and associated infrastructure to house the
SAPMT personnel, and the drawings may also refer to this as the “SAPMT” camp/facility
CERT

RXS

RXS

RXS

or area.
ENGG

“ADDITIONAL RESIDENTIAL CAMP” refers to the location adjacent to the SAPMT


HGB
FK

FK

Camp to house additional resources as required by Company.

“WORK” shall mean planning, procurement, construction, installation, testing and


commissioning, furbishing of labor, provision of all materials, tools, instruments and
equipment and everything else required to provide complete and functional facilities,
services and infrastructure set out in this Scope of Work and the contract which this
Scope of Work is a part of.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

“DIWANYAH” is a sitting area, and the terminology is interchanged within this document
BI-10-09003 ISSUED FOR COMMENT (O2)

and drawings.

“TENT” is a “GATHERING TENT” located near the SAPMT Offices, and this terminology
DESCRIPTION

is also interchanged within the document and drawings. This location has been
identified in the plot plan as the “Preferred” tent location.

“ALTERNATIVE TENT” is located in the northwest side of the SAPMT Camp and is also
JO/EWO

a “GATHERING TENT” for the Additional Residential Camp.

“CENTRAL TRAINING FACILITY” and “CENTRAL TRAINING CENTER” is a location


04/19/18

01/07/18

04/03/18
DATE

of training located north of the TGP. This terminology has also been interchanged within
this document.
REV. NO.

C
B

DISCIPLINE
“TRAINING CENTER” is also known as the “TRAINING HALL” and is located within the
ENGINEER
SAPMT Camp.
________________

“PIONEER CAMP” is the location allocated for Early Works, and is located east of the
DATE 19 APR 2018

PROJECT
ENGINEER Tanajib Gas Plant (TGP).
________________

DATE 19 APR 2018 “OTHERS” shall mean contracting organizations, or companies, or government bodies
CERTIFIED other than CONTRACTOR who will perform activities associated with the Tanajib Gas
________________ Plant (TGP) and/or Temporary Construction Facilities (TCF).
DATE ___________

1.2 Abbreviations
CONSTRUCTION
AGENCY

________________

DATE ___________ ACI American Concrete Institute


CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
AISC American Institute of Steel Construction
VERIFICATION

________________
EDSD

DATE ___________
ANSI American National Standards Institute

APCS Aramco Painting and Coating System


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

ASCE American Society for Civil Engineers

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 6


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

ASHRAE American Society of Heating Refrigeration & Air Conditioning Engineers


CERT

RXS

RXS

RXS

ASTM American Society for Testing and Materials


ENGG

HGB
FK

FK

ATS Automatic Transfer Switch

ATM Asynchronous Transfer Mode

AWG American Wire Gauge

AWS American Welding Society


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

BICSI Building Industry Consulting Service International


BI-10-09003 ISSUED FOR COMMENT (O2)

CATV Central Antenna Television


DESCRIPTION

CCTV Closed Circuit Television

DB Duct Banks
JO/EWO

DS Duty & Standby

DG Diesel Generator
04/19/18

01/07/18

04/03/18
DATE

EIA Environmental Impact Assessment


REV. NO.

EPC Engineering Procurement Construction


D

C
B

DISCIPLINE
ENGINEER

________________
FAA Federal Aviation Administration
DATE 19 APR 2018
FACP Fire Alarm Control Panel
PROJECT
ENGINEER

________________ FAJB Fire Alarm Junction Box


DATE 19 APR 2018

CERTIFIED FBE Fusion Bonded Epoxy


________________

DATE ___________ FOC Fiber Optic Cable


CONSTRUCTION
AGENCY FRR Fire Resistant Rated
________________

DATE ___________ FW Fire Water


CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ HAZID Hazard Identification Plan


EDSD

DATE ___________

HD High Definition

HDD Horizontal Directional Drilling


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

HVAC Heating, Ventilating and Air Conditioning

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 7


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

IBC International Building Code


CERT

RXS

RXS

RXS

IFC International Fire Code


ENGG

HGB
FK

FK

IDC Insulation Displacement Connection

IP Internet Protocol

IPCE Insulated Power Cable Engineers Association

ISDN Integrated Services Digital Network


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

LAG Line Access Gateway


BI-10-09003 ISSUED FOR COMMENT (O2)

LV Low Voltage
DESCRIPTION

LPD Loss Prevention Department

MBR Membrane Bio Reactor


JO/EWO

MCC Motor Control Center

MFACP Master Fire Alarm Control Panel


04/19/18

01/07/18

04/03/18
DATE

MV Medium Voltage
REV. NO.

NEC National Electrical Code


D

C
B

DISCIPLINE
ENGINEER

________________
NFPA National Fire Protection Association
DATE 19 APR 2018
O&M Operation and Maintenance
PROJECT
ENGINEER

________________ OSP Outside Plant


DATE 19 APR 2018

CERTIFIED P&ID Process and Instrument Diagram


________________

DATE ___________ PTZ Pan, Tilt, Zoom


CONSTRUCTION
AGENCY PVC Polyvinyl Chloride
________________

DATE ___________ RCDD Registered Communications Distribution Design


CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ RMU Ring Main Unit


EDSD

DATE ___________

SABP Saudi Aramco Best Practices

SAEP Saudi Aramco Engineering Procedure


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

SAES Saudi Aramco Engineering Standards

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 8


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SACSM Saudi Aramco Construction Safety Manual


CERT

RXS

RXS

RXS

SACS Saudi Aramco Construction Specifications


ENGG

HGB
FK

FK

SAMSS Saudi Aramco Material System Specifications

SAPMT Saudi Aramco Project Management Team

SASO Saudi Arabian Standard Organization

SBC Session Border Controller


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

SCS Structured Cable System


BI-10-09003 ISSUED FOR COMMENT (O2)

SDMS SEC Distribution Materials Specification


DESCRIPTION

STP Sewage Treatment Plant

SWS Sanitary Waste Sewer


JO/EWO

TER Temporary Communications Shelter

TGB Telecom Ground Bus


04/19/18

01/07/18

04/03/18
DATE

TGP Tanajib Gas Plant


REV. NO.

TIA Telecommunications Industry Association


D

C
B

DISCIPLINE
ENGINEER

________________
TMGB Telecommunication Main Grounding Bus Bar
DATE 19 APR 2018
UL Underwriters Laboratories
PROJECT
ENGINEER

________________ UPC Uniform Plumbing Code


DATE 19 APR 2018

CERTIFIED UMC Uniform Mechanical Code


________________

DATE ___________ UTM Universal Transverse Mercator


CONSTRUCTION
AGENCY VC Video Conferencing
________________

DATE ___________ WTP Water Treatment Pant


CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ WW Water Well


EDSD

DATE ___________

1.3 WORK EXECUTION


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

1.3.1 Performing the WORK


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

1.3.1.1 The WORK shall be executed in full compliance with all aspects of this Scope of Work,
COMPANY Standards, Specifications and relevant International Codes and Standards,
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 9


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Drawings and any project information supplied by COMPANY. This document and
CERT

other related documents are to be read in conjunction with each other and no document
RXS

RXS

RXS

is to be taken in isolation. A list of the standards is included in this Scope of Work.


ENGG

HGB
FK

FK

1.3.1.2 CONTRACTOR shall carry out all WORK logically and in accordance with the
programmed schedules.
1.3.1.3 CONTRACTOR shall be responsible for producing detailed shop drawings necessary
to complete the WORK. All detailed drawings produced are to be provided to
COMPANY for comment and approval.
1.3.1.4 CONTRACTOR shall provide all the necessary equipment, instruments, technicians,
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

supervisory personnel and labor required for the successful completion of the Scope
of Work.
BI-10-09003 ISSUED FOR COMMENT (O2)

1.3.1.5 CONTRACTOR shall render all services and equipment, even if not specifically
mentioned in this Scope of Work, which are necessary and required to complete the
WORK to programmed schedules.
DESCRIPTION

1.3.1.6 The WORK is to be performed in a safe manner. CONTRACTOR shall comply with
COMPANY permitting systems.
1.3.1.7 CONTRACTOR shall obtain all permits, licenses and governmental authorizations,
JO/EWO

which are necessary for the performance of the Work except for those, which must be
obtained by COMPANY.
04/19/18

01/07/18

04/03/18

1.3.1.8 Supervisors and Independent safety advisors are to be employed at the job site to
DATE

ensure safety systems are complied with. Unsafe practices and violations of safety
systems are not tolerated and activities shall be halted until a safe method of
REV. NO.

performing the WORK is put in place.


D

C
B

DISCIPLINE
ENGINEER 1.3.1.9 Permit to Work holders, watchmen and all other personnel who are required to perform
________________ the work safely and functions within the Permit to Work system. All personnel, shall
DATE 19 APR 2018
attend, successfully complete and obtain certification for the associated COMPANY
PROJECT
ENGINEER
approved training, in relation to their job function.
________________
1.3.1.10 All appropriate COMPANY certification for mobile equipment usage, cranes, rigging,
DATE 19 APR 2018
electrical, gas testing, and any other applicable COMPANY certification shall be
CERTIFIED obtained before commencement of WORK. Tasks related Certification shall also be
________________
obtained prior to CONTRACTOR commencing WORK. Attending training and
DATE ___________
complying with certification requirements is at CONTRACTOR cost.
CONSTRUCTION
AGENCY
1.3.1.11 The site including the CONTRACTOR’s own camp and construction facilities shall be
________________ kept neat, tidy and in good sanitary condition at all times. Safe conditions are to be
DATE ___________ maintained across the site of the WORK and any facilities the CONTRACTOR is
utilizing to assist in performing the WORK.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
1.3.1.12 CONTRACTOR shall remove all rubbish and waste material on daily basis from across
EDSD

DATE ___________
the WORK site.
1.3.1.13 Until such time that the site Solid Waste Landfill is made operational CONTRACTOR
shall dispose of waste and rubbish at a government approved disposal site.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

1.3.1.14 Dust control measures shall be performed during construction by spraying water
frequently to minimize dust.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 10


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

2. LOCATION ANALYSIS
CERT

RXS

RXS

RXS

2.1 Site Location


ENGG

HGB
FK

FK

2.1.1 The new Tanajib Gas Plant is installed in an undeveloped area within COMPANY land
reservation in proximity to the shoreline, approximately 25km to the east. The new TGP
is located approximately 100km north-west of the existing Wasit Gas Plant and
approximately 20km east of the existing onshore Tanajib facility.

2.1.2 The SAPMT camp is located south west of TGP, and the EPC Contractor Camps are
located north of TGP as shown on DD-816807. The Pioneer Camp, SAPMT office
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

buildings, and tent are located east of the TGP. The Solid Waste Landfill location is
south of TGP.
BI-10-09003 ISSUED FOR COMMENT (O2)

2.2 Site Conditions

2.2.1 Climate
DESCRIPTION

2.2.1.1 The site climate is desert climate with maximum ambient temperature 120°F and
minimum +32°F. The sand/dust storms are frequent with average frequency as per
table below:
JO/EWO

Average frequency Winter Spring Summer Autumn Annual


Days/year
04/19/18

01/07/18

04/03/18

Dust Haze 10.1 23.3 25.6 8.7 67.8


DATE

Local Dust Events 14.2 26.9 25.1 8.6 74.8


Dust Storms 1.5 4.4 1.9 0.4 8.3
REV. NO.

C
B

DISCIPLINE
2.2.1.2 The following table summarises the climatic data of the Tanajib Gas Plant and
ENGINEER
Temporary Construction Facilities.
________________

DATE 19 APR 2018


Wind
PROJECT
ENGINEER Wind Design Load Reference Code ASCE 7-05
________________

DATE 19 APR 2018 Basic wind speed (3-sec gust, 50 yr) 145 km/hr (90 mph)
CERTIFIED Exposure Category C
________________

DATE ___________
Prevailing wind direction from N

CONSTRUCTION
Ambient Air & Soil Temperature
AGENCY

________________
Maximum ambient temperature 120°F (49°C)
DATE ___________
Minimum ambient temperature 32°F (0°C)
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
Average annual 77°F (25°C)
VERIFICATION

________________
EDSD

DATE ___________
Monthly Normal Max. Soil Temp. (1m below grade) 86°F (30°C)
Precipitation
Rainfall, Average Annual 104 mm (4.1 in)
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Rainfall Maximum in 24 hours 59 mm (2.3 in)


Isokeraunic Levels (days lightning/year) 20

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 11


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Flooding conditions Not applicable


CERT

RXS

RXS

RXS

Seismic data
ENGG

HGB
FK

FK

Site Class D
Short Period Acceleration (Ss) in %g 8.1
1-sec Period Acceleration (S1) in %g 3.0
Peak ground acceleration (bedrock) in %g 6.0

Miscellaneous
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Tropical Environment Yes


BI-10-09003 ISSUED FOR COMMENT (O2)

Temperature inversion present Yes


Sand / dust storms to be considered Yes
DESCRIPTION

2.2.2 Soil conditions

Geotechnical investigation shall be made available to CONTRACTOR.


JO/EWO

3. INTERFACES

The site is a Greenfield site. CONTRACTOR will have interface with the OTHERS who
04/19/18

01/07/18

04/03/18

are awarded contracts, such as the following, but not limited to:
DATE

a. Site preparation works


REV. NO.

C
B

b. Operation and Maintenance


DISCIPLINE
ENGINEER c. WiFi System Service provider.
________________ d. Ministry of Transportation, and OTHERS.
DATE 19 APR 2018

PROJECT CONTRACTOR shall provide appropriate personnel to plan and coordinate its’
ENGINEER
interfaces as well as communicate and coordinate with OTHERS. CONTRACTOR
________________

DATE 19 APR 2018


schedules shall take into account access requirements by OTHERS, and allow
OTHERS time to perform their scopes. If certain WORK activities require OTHERS to
CERTIFIED
complete activities prior to CONTRACTOR commencing, then this shall be taken into
________________

DATE ___________
consideration by CONTRACTOR in WORK scheduling.

CONSTRUCTION
AGENCY

________________
3.1 Description of Main Interfaces
DATE ___________
The following describe the main interfaces in more detail
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
3.1.1 Site Preparation
EDSD

DATE ___________

The site preparation for all areas associated with the permenemt works of TGP and
associated EPC Contractor area is completed by OTHERS. This scope also includes
the access roads to the mainsite. As such CONTRACTOR has interfaces with these
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

organisations.
BY DRAWING COMPLETION CERTIFICATE
REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 12


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

3.1.2 Operation and Maintenance (O&M)


CERT

RXS

RXS

RXS

3.1.2.1 Operation and Maintenance of the SAPMT camp, CENTRAL TRAINING FACILITY,
ENGG

SAPMT OFFICES, TENT, and SWL, and related support facilities shall be performed
HGB
FK

FK

by OTHERS. CONTRACTOR is required to provide access to the camp prior to


mechanical completion such that preparations for operation of the camp can be made.
Note commissioning and testing of all buildings, packages, systems, networks and
infrastructure is the responsibility of CONTRACTOR. Only after mechanical
completion, commissioning and performance testing will any building or piece of plant
or equipment be handed over.
3.1.2.2 CONTRACTOR is required as part of the Sewage Treatment Plants (STPs) to secure
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

a commitment for operational training and support from the STPs vendor and provide
BI-10-09003 ISSUED FOR COMMENT (O2)

a rate for this support.


3.1.2.3 The STPs vendor is to provide commissioning and operational personnel for the full
commissioning and early operation of the STPs. The cost of the Vendor provided
DESCRIPTION

commissioning and operation personnel up to the time of hand over of the STPs to the
O&M OTHERS is the responsibility of CONTRACTOR. After handover, the cost of the
operational, supervisory and training personnel provided by the STPs vendor shall be
the responsibility of the O&M OTHERS.
JO/EWO

3.1.2.4 CONTRACTOR is to secure from the STPs Vendor a quotation for the provision of
Operating Personnel to Operate and maintain the STP for a period of up to 12 months
from the time the plant is handed over to COMPANY. The validity of the quotation is to
04/19/18

01/07/18

04/03/18
DATE

be a full 12 months from the time of handover. At least one of the operating personnel
provided by the STPs Vendor shall be competent in the training of OTHERS in the
REV. NO.

operation of the plant.


D

C
B

DISCIPLINE
ENGINEER 3.1.2.5 CONTRACTOR is required as part of the Water Treatment Plant to secure a
________________ commitment for operational training and support from the WTP vendor and provide a
DATE 19 APR 2018 rate for this support.
PROJECT
ENGINEER 3.1.2.6 CONTRACTOR shall provide and provision for any shortfalls of water or raw water as
________________ needed, and provide rate for raw and potable water.
DATE 19 APR 2018
3.1.2.7 The WTP vendor is to provide commissioning and operational personnel for the full
CERTIFIED

________________
commissioning and early operation of the WTP. The cost of the Vendor provided
DATE ___________
commissioning and operation personnel up to the time of hand over of the WTP to the
O&M OTHERS is the responsibility of CONTRACTOR. After handover, the cost of the
CONSTRUCTION
AGENCY
operational, supervisory and training personnel provided by the WTP vendor shall be
________________
the responsibility of the O&M OTHERS.
DATE ___________
3.1.2.8 CONTRACTOR is required to provide as part of its bid package, rates for Vendor
provided training of O&M personnel for any significant equipment packages (e.g. Diesel
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
Generator Packages).
EDSD

DATE ___________
3.1.2.9 Technical Documentation, Operation and Maintenance manuals, Installation manuals,
priced recommended spare parts lists and equipment drawings are Critical for the O&M
OTHERS and COMPANY contractual preparation for the O&M OTHERS. These
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Documents are to be provided by CONTRACTOR to COMPANY as early as possible


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

and not later than 75 days from the time of Contract Award.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 13


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

3.1.3 IT, Communications and other


CERT

RXS

RXS

RXS

3.1.3.1 CONTRACTOR shall be responsible to coordinate and communicate with third party
ENGG

service provider for Telephone System, WiFi, CATV for the requirements of
HGB
FK

FK

Accomodation Type A, B, C and other support structured facilities of SAPMT


Temporary Camp Facilities.

3.1.4 Ministry of Transportation & other agenies

3.1.4.1 CONTRACTOR is responsible to coordinate and get all the required permits and
approvals from the Ministry of Transportation and other agencies to perform thrust
boring at the identified locations shown on the drawings.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

BI-10-09003 ISSUED FOR COMMENT (O2)

3.2 Vendor Warranties

3.2.1 Vendor provided warranties are to be obtained for all Vendor supplied equipment such
as STPs, WTP, Pumps, Diesel Generator Sets, Air Conditioning units, electrical
DESCRIPTION

equipment and appliances, and furniture. CONTRACTOR shall ensure all warranties
are transferrable and that they are transferred to COMPANY.

3.2.2 Major equipment shall have a 2 year warranty from the time of hand over and minor
JO/EWO

equipment shall have a 1 year warranty from the time of handover.

3.2.3 Major Equipment shall include: STPs, WTP, Air Conditioners, Pumps, Motors, Diesel
04/19/18

01/07/18

04/03/18
DATE

Generator Sets, Pre- Fab Buildings including internal electrical and plumbing, Tanks,
Major Electrical equipment.
REV. NO.

C
B

3.2.4 Minor Equipment shall include all Vendor supplied equipment and appliances that are
DISCIPLINE
ENGINEER
not Major Equipment.
________________

DATE 19 APR 2018


3.2.5 The warranty for the STPs and WTP shall include not only mechanical warranty on all
PROJECT
items but the capacity and quality of output shall be warranted for 2 years.
ENGINEER

________________
4. SCOPE SUMMARY
DATE 19 APR 2018

CERTIFIED
4.1 COMPANY Temporary Construction Facilities
________________

DATE ___________ 4.1.1 The SAPMT camp is designed to provide all buildings, facilities, utilities and services
CONSTRUCTION
required to provide accommodation for the SAPMT during the construction of the TGP.
AGENCY

________________ 4.1.2 This section contains a summary of what is to be provided and is not detailed. Further
DATE ___________ details are contained in detailed discipline scopes.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
COMPANY’s facilities including accommodation facilities, office facilities, support
VERIFICATION

________________ 4.1.3
EDSD

DATE ___________ buildings, mess, dinning, laundry, recreation facilities and buildings, clinic and tent
areas for use by COMPANY designated personnel. There is a list of the buildings and
structures provided in the Architectural section of the Detailed Description of WORKs.
See T80-A-DD-816801.001 Rev. E for plot plan of facilities.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

4.1.4 Note: The SAPMT camp is designed and is to be constructed for 1500 people. The
WORK, however only includes installing accommodation rooms for 1300 of the 1500
people. The pads, utilities, roads, parking, landscaping are to be installed for the full
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 14


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1500 accommodation rooms. Utility (water, power, sewage) piping and cabling, fire
CERT

water, fire detection and alarm systems and communication cabling are to be installed
RXS

RXS

RXS

as per design up to the hook up point for each of the pads for buildings. The SAPMT
ENGG

HGB

Camp WTP, STP and the underground water and sewage system shall provision for
FK

FK

an additional 500 O&M personnel capacity, as such these systems are designed for a
total of 2000 personnel. The 20 pads marked C3 and one (1) E1 on T80-A-DD-
816801.001 Rev. E are to be prepared for future C-Type 10-Single Standard
accommodation buildings.

Company may at its sole option require the Contractor to expand the facilities adjacent
to the SAPMT camp by providing additional residential camp for 1500 personnel
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

complete with all utilities. Refer drawing DD-816801 Sht 005.


BI-10-09003 ISSUED FOR COMMENT (O2)

4.1.5 Fuel and vehicle maintenance facilities.

4.1.6 Asphalted roads and parking areas complete with signage, markings and striping and
parking car shades.
DESCRIPTION

4.1.7 Asphalt walkways for SAPMT’s camp and facilities.

4.1.8 Electrical Utilities including power generation by diesel generators, distribution, indoor
JO/EWO

& outdoor lighting, grounding, etc to complete the electrical installation for the entire
camp facility.
04/19/18

01/07/18

04/03/18
DATE

4.1.9 Non Electrical Utilities.

4.1.10 Communications work.


REV. NO.

C
B

DISCIPLINE
ENGINEER
4.1.11 Perimeter and internal fence and gates for the SAPMT camp and related facilities.
________________
Fencing shall be as per the requirement of SAES-M-006 and applicable standard
DATE 19 APR 2018 drawing nos. AB-036677, AA-036678, AB-036679 and AC-036680.
PROJECT
ENGINEER 4.1.12 Landscaping and irrigation system (automatic).
________________

DATE 19 APR 2018 4.1.13 External access roads starting from interface point at existing road to the SAPMT Camp
CERTIFIED
facilities complete with solar power street lighting system, signage, markings and
________________ stripping including cat’s eyes beginning from interface point with existing road up to the
DATE ___________ intended facility.
CONSTRUCTION
AGENCY 4.2 Non Electrical Utilities Summary
________________

DATE ___________ 4.2.1 Non Electrical Utilities to be supplied and constructed by CONTRACTOR under this
scope are detailed in the drawings in the indices and include:
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
a. Potable Water Tanks, Pump Station and Distribution Network.
EDSD

DATE ___________
Potable Water Layout composite drawings DD-453608.001 and DD-453609.001 to
008 shows the Overall Layout of the Potable water system for SAPMT camp. The
requirements for the Potable Water Pump Skids for both SAPMT and EPC
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Contractor Area are contained in Technical Specification, DD-108410 and the


REVISION CERTIFICATE

associated Potable Water Pump Data Sheets, DD-108407 (SAPMT) and DD-
108426 (EPC).
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 15


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

CONTRACTOR shall also construct a raw water supply and reject water collection
CERT

RXS

RXS

RXS
header, with tie-ins for individual EPC Contractor, which are on the north side of the
EPC Contractor Area. See composite drawings DD-453615.001 and DD-
ENGG

HGB
FK

FK

453616.001 for Potable Network Overall Layout.


Potable water is supplied to Central Training Facility with extension to SAPMT
offices and the associated tent.
The SWL is a standalone facility.
If the option the Alternative Tent on the northwest of the SAPMT Camp is exercised,
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

then the potable water system can be connected.


BI-10-09003 ISSUED FOR COMMENT (O2)

Water Treatment Plant (WTP) for the SAPMT Camp area is to be procured and
constructed as part of the WORK. The requirements for the WTP are contained in
Technical Specification for Water Treatment Plant DD-108705. The CONTRACTOR
DESCRIPTION

shall use COMPANY approved Vendor to perform all WORK associated with the
WTP.
Since Raw Water is supplied to the EPC Contractor Camps, for possibly their own
JO/EWO

dedicated WTPs, there is no requirement for a localized Water Treatment Plant in


the EPC Contractor Area. Provisions shall be made for reject water evaporation
pond and reject water collection header and associated tie-ins for the individual EPC
04/19/18

01/07/18

04/03/18
DATE

Contractors. Furthermore, Raw Water from the Water Wells shall be provided
through a common Raw Water Header to the EPC Contractors and associated tie-
REV. NO.

ins.
D

C
B

DISCIPLINE
ENGINEER

________________ Additional demand of water due to lower Raw Water production from Water Wells
DATE 19 APR 2018
and/or resulting additional demand of Potable Water shall be provided by the
PROJECT
ENGINEER CONTRACTOR.
________________

DATE 19 APR 2018 b. Fire Water Tanks, Pumps Station, Distribution Network and Fire Hydrants.
CERTIFIED Overall layout of fire water piping is shown in composite drawings DD-453608.001
________________ and DD-453609.001 to 008 for the SAPMT Camp.
DATE ___________

Fire hydrants, hose reels, and extinguishers, as required by Company standards


CONSTRUCTION
AGENCY throughout all the facilities are part of the WORK. Sprinkler Systems to be installed
________________ in larger buildings including Senior Management PMT office, SAPMT office,
DATE ___________
Musallah and Dinning.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ The requirements for the SAPMT Camp Fire Water Pump Skid are contained in
EDSD

DATE ___________ Technical Specification, DD-108409 and associated Firewater Pump Data Sheets,
DD-108404, DD-108405 & DD-108406. The PW/FW Tank is detailed in Data Sheet,
DD-109201. If the option the Alternative Tent on the northwest of the SAPMT Camp
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

is exercised, then the fire water system can be connected.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Note the SAPMT area Potable Water and Fire Water Systems share the same tanks.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 16


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

The Central Training Facility overall layout of Fire Water piping is shown in
CERT

RXS

RXS

RXS
composite drawings DD-453616.001.
ENGG

The requirements for the Centeral Training Facility Fire Water Pump Skid are
HGB
FK

FK

contained in Technical Specification, DD-108409 and associated Firewater Pump


Data Sheets, DD- 108416, DD- 108417 & DD- 108418. The PW/FW Tank is detailed
in Data Sheet, DD-109206. These water systems serve the Centeral Training
Facility and also the SAPMT Office and Tent, and are NOT intended for the EPC
Contractor Camp and Laydown.
The Centeral Training Facility Potable Water and Fire Water Systems share the
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

same tanks. Potable Water shall be hauled to this tank.


BI-10-09003 ISSUED FOR COMMENT (O2)

The SWL is a standalone facility.


c. Fuelling Tanks and Station, vehicle maintenance workshop and Vehicle Wash
DESCRIPTION

Water Recycling System. See DD-816919.001 and DD-453609.007. The technical


details for these utilities are included in the drawings and individual technical
specifications for each system. The requirements for the Vehicle Wash Water
Treatment & Recycling is detailed in DD-108703; the technical requirements of the
JO/EWO

gasoline storage tanks are detailed in DD-109202 and DD-109211 respectively.

d. Sewage network with lift stations and forced pumping sections


04/19/18

01/07/18

04/03/18
DATE

CONTRACTOR shall construct a sewage network connected to all the buildings


inside the SAPMT camp. CONTRACTOR shall also provide a separate network with
REV. NO.

C
B

tie-in connections (manholes) in the EPC Contractor Area. See composite drawing
DISCIPLINE
ENGINEER DD-453608.001, DD-453609.001 to 008, DD-453615.001 and DD-453616.001 for
________________
Sewage Network Overall Layout. If the option the Alternative Tent on the northwest
DATE 19 APR 2018
of the SAPMT Camp is exercised, then the sewage system can potentially be
PROJECT
ENGINEER
connected.
________________

DATE 19 APR 2018 The requirements for the Lift Stations are contained in Pump Data Sheets, DD-
CERTIFIED 108401 for SAPMT Camp, and DD-108402, DD-108403, DD-108412, DD-108419
________________
and DD-108425 for the EPC Contractor Area. The Odour Control Unit is detailed in
DATE ___________
Technical Specification, DD-108706. The SAPMT office buildings and tent shall
CONSTRUCTION have a sewage network and a sewage collection tank for manual truck-out.
AGENCY

________________
The SWL is a standalone facility and sewage collected shall be trucked out
DATE ___________
manually.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ CONTRACTOR shall submit the layout drawing package showing the exact number
EDSD

DATE ___________
and locations of Fire and Gas detectors throughout the plant for Saudi Aramco Loss
Prevention Department’s review, refer to SAES-J-505.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

e. Sewage Treatment Plants (STPs) are to be procured and constructed as part of


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

the WORK. The requirements for the STPs are contained in Technical Specification,
DD-108704. The CONTRACTOR shall use COMPANY approved Vendor to perform
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 17


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

all WORK associated with the STPs. It is to be designed by the Vendor for both low
CERT

RXS

RXS

RXS
and high population with appropriate surge and low loading under all scenarios. The
STPs Vendor selected by CONTRACTOR is to design the STPs such that should
ENGG

HGB
FK

FK

contamination occur, parts of the package can be isolated such that not the whole
plant is made inoperable due to contamination.

CONTRACTOR shall provide and contruct for emergency evaporation pond, treated
water evaporation ponds.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

A waste characterization study shall be required to address all wastewater quality


parameters. Wastewater treatment standards shall meet intended usage
BI-10-09003 ISSUED FOR COMMENT (O2)

requirements for remote locations where dust control and irrigation are useful
reclaim and reuse objectives. The most stringent standards of the following
DESCRIPTION

organisations shall be met at each Camp STP as appropriate to the locations, and
shall assume treated filling stations and wastewater evaporation ponds are provided
at each site for facilitating reclaiming of as much wastewater as economic and
practical to do so at each respective site, considering the locations remoteness,
JO/EWO

scale and forecast operational life.


SAEHC
04/19/18

01/07/18

04/03/18
DATE

SAES-A-104 (2017)
KSA GAAMEP and
REV. NO.

C
B

KSA MOWE
DISCIPLINE
ENGINEER

________________
For more remote work-front areas where temporary facilities need to be provided,
DATE 19 APR 2018
septage and holding tank flows shall be transported to the main TGP Construction
PROJECT
ENGINEER Camp STP reception for appropriate flow buffering and treatment to and in line with
________________
the above applicable standards.
DATE 19 APR 2018

CERTIFIED

________________ f. Water Wells; COMPANY will drill four, 1100 gpm each Water Wells (Water Wells
DATE ___________
#1, #2, #3, and #6). CONTRACTOR shall provide the pumps, permanent fencing
CONSTRUCTION and filling stations to potentially support the construction activities and Potable
AGENCY

________________
Water demand. CONTRACTOR shall be responsible for the installation and
DATE ___________ operation of the filling stations on the wells including the installation of submersible
pumps. A tanker filling facility shall be provided near two water wells and one water
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ well (either Water Well #4 or #5), shall be dedicated to supply water for the SAPMT
EDSD

DATE ___________
Water Treatment Plant, or act as supplement flow to the EPC CONTACTOR as Site
Prep is Raw Water demands are phased out.
The requirements for the submersible Water Well Pumps are contained in Data
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Sheet DD-108408. The associated Well Water Booster Pumps are contained in Data
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Sheets DD-108414 (SAPMT) and DD-108427 (EPC) with requirements for all Water
Well Booster Pump Skids detailed in technical specification DD-108415.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 18


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

The CONTACTOR shall be provided with Water Well Data once the wells have been
CERT

RXS

RXS

RXS
drilled. Any shortfall of raw water production and/or the potable water, shall be
provided by the CONTRACTOR.
ENGG

HGB
FK

FK

g. Irrigation Water Tanks, Pump Station and Distribution Network.


Composite drawing DD-453609 shows the Overall Layout of the Irrigation Water
system for SAPMT camp. The requirements for the Irrigation Water Pumps are
detailed in Data Sheets DD-108413 and technical specification DD-108411. The
Irrigation Water Tank is detailed in Data Sheet DD-109205.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

BI-10-09003 ISSUED FOR COMMENT (O2)

Irrigation Water for the SAPMT Office and tent landscape shall be trucked in.

h. SAPMT 13.8kV Power Generation.


DESCRIPTION

The SAPMT Camp will be supplied with main power via 4 off diesel engine driven
electrical generators (13.8kV, 2500kW, 60Hz) as detailed in technical specification
DD-108701. Generators will operate with 3 operating and 1 on standby.
JO/EWO

Each diesel generator will be supplied with a 12 hour day tank.


Common bulk diesel storage tanks (API 650 or equivalent) sized for 7 days supply
for 3 diesel generators operating continuously will also be supplied as part of the
04/19/18

01/07/18

04/03/18
DATE

diesel generator Vendor package including all associated interconnecting pipework,


instruments and controls.
REV. NO.

C
B

DISCIPLINE
Supply of DG sets connected to 13.8kV Switchgear alongwith Generator Control &
ENGINEER
Protection, Synchronisation facility and Parallel operation ontrol & interlocks will be
________________

DATE 19 APR 2018


provided by the DG vendor as a single Package. DG Vendor will ensure the safety
PROJECT
operation of DG sets running in parallel.
ENGINEER

________________
For electrical details see “Electrical Utilities Summary” in Section 4.3 below.
DATE 19 APR 2018

CERTIFIED i. Local 480V Power Generation.


________________

DATE ___________
The areas nearby Contractor Camp will be supplied with 480V diesel generator sets
dedicated to supplying power to lift stations 1 to 5, water wells 1-3 & 6, STP, CTC
CONSTRUCTION
AGENCY areas. Each diesel generator set will contain a main and standby unit and each will
________________ include a 12 hour day tank. Each diesel generator set will include bulk diesel storage
DATE ___________
tanks (API 650, UL 142, or equivalent) sized for 7 days supply for 1 diesel generator
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
operating continuously will also be supplied as part of the diesel generator Vendor
VERIFICATION

________________
package including associated interconnecting pipework, instruments and controls.
EDSD

DATE ___________

The 480V diesel generators are detailed in data sheet DD-108702.


For electrical details see Para 4.3 below.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 19


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

4.3 Electrical Utilities Summary


CERT

RXS

RXS

RXS

Power supply to the entire facilities, SAPMT camp area and Water Wells, Lift stations,
ENGG

STP, CTC near CONTRACTOR camp area will be provided through Diesel Generators.
HGB
FK

FK

4.3.1 SAPMT camp area is divided in to two parts from power distribution point of view as
detailed below;

(1) Camp area and

(2) Utility area comprising WTP, STP and Water well-6.


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

4.3.1.1 Power supply to the Camp area will be fed from 13.8kV Diesel Generators (3-Working
+ 1-Stand by) connected to 13.8kV indoor Metal Clad Switchgear installed inside a
BI-10-09003 ISSUED FOR COMMENT (O2)

Substation Building. Power will be distributed further to all buildings and electrical
facilities through Package Substations fed from the 13.8kV loop originating from the
above mentioned 13.8kV Switchgear. Capacity of DG sets indicated in one line
DESCRIPTION

diagram drawing no. DD-704605 Sh.001 is sized considering the future loads for 200
people and additional 10% future growth margin based on SAES-P-100.
The Package Substations will be provided with 13.8kV RMU, 13.8kV-400-230V or
JO/EWO

13.8kV-480-277V transformer and 3Ph, 4W, 60Hz LV 480V or 400V Distribution Panels
with requisite numbers of outgoings for feeding Main Distribution Panels, LV Control
gears/Switch racks, etc. Main Distribution Panels and LV Control gears/Switch racks
04/19/18

01/07/18

04/03/18

will feed the local Panel Boards (power Panels/lighting panels), package/motor loads,
DATE

etc.
REV. NO.

Package Substations shall be installed in strategic locations and will be connected to


D

C
B

DISCIPLINE respective 13.8kV loops fed both from outgoing circuit breakers of Bus Section A & B
ENGINEER

________________
of 13.8kV switchgear and have a closed loop electrical operating scheme. Closed loop
DATE 19 APR 2018
interlock/earthling cross key interlock on the loop-in/loop out line switches of Package
Substation Ring Main Unit (RMU) shall be provided as required for safety purposes.
PROJECT
ENGINEER

________________ Based on the loads and distribution requirements, loads within the SAPMT camp area
DATE 19 APR 2018 are distributed through two 13.8kV loops (Loop-1 & Loop-2).
CERTIFIED

________________
4.3.1.2 Power supply to the Utility area comprising WTP, STP and Water well will be fed from
DATE ___________ 480V Diesel Generators (1-Working + 1-Stand by) connected to 480V Low Voltage
Switchboard installed inside an Electrical Room. Power will be distributed further to
CONSTRUCTION
AGENCY
WTP, STP and Water Well through radial feeders. Capacity of DG sets indicated in
________________ one line diagram drawing no. DD- 704639 Sh.001 is sized considering the present
DATE ___________ estimated load and 10% future growth margin based on SAES-P-100.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
4.3.2 Power distribution point of view near CONTRACTOR camp area is as detailed below;
VERIFICATION

________________
EDSD

DATE ___________
(1) Utility area comprising of the STP and Water Wells 1, 2 & 3,

(2) Lift Station 2, 3, 4 & 5


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4.3.2.1 Power supply to the Utility area comprising STP, Water Wells 1, 2, 3 will be fed from
REVISION CERTIFICATE

dedicated 480V Diesel Generators (1-Working + 1-Stand by) connected to ATS and
respective Switchgears / Control gears installed inside an Electrical Room. Capacity

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 20


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

of DG sets indicated in one line diagram drawing no. DD- 704634 Sh.001 is sized
CERT

considering the present estimated load and 10% future growth margin based on SAES-
RXS

RXS

RXS

P-100.
ENGG

HGB
FK

FK

4.3.2.2 Power supply to the Lift Station 2, 3, 4 & 5 will be fed from dedicated 480V Diesel
Generators (1-Working + 1-Stand by) connected to 480V Low Voltage ATS/MCC
installed inside an Electrical Room. Capacity of DG sets indicated in one-line diagram
drawing no. DD- 704637 Sh.002, 3, 4, 5 is sized considering the present estimated
load and 10% future growth margin based on SAES-P-100.
4.3.2.3 Power supply to the Central Training Centre will be fed from 480V Diesel Generators
(1-Working + 1-Stand by) connected to 480V Low Voltage ATS/Switchboard installed
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

inside an Electrical Room. Power will be distributed further to different loads. Capacity
of DG sets indicated in one-line diagram drawing no. DD- 704636 Sh.007 is sized
BI-10-09003 ISSUED FOR COMMENT (O2)

considering the present estimated load and 10% future growth margin based on SAES-
P-100.
4.3.2.4 Power supply to the SAPMT Office and Gathering tent will be fed from 480V Diesel
DESCRIPTION

Generators (1-Working + 1-Stand by) connected to 480V Low Voltage


ATS/Switchboard installed inside an Electrical Room. Power will be distributed further
to different loads. Capacity of DG sets indicated in one-line diagram drawing no. DD-
JO/EWO

704609 Sh.001&2 is sized considering the present estimated load and 10% future
growth margin based on SAES-P-100.
4.3.2.5 Power supply to the STP, WTP, Water Well #6 will be fed from 13.8kV Generators from
04/19/18

01/07/18

04/03/18
DATE

SAPMT camp area.


4.3.2.6 The SWL is a standalone facilty.
REV. NO.

C
B

DISCIPLINE
ENGINEER
5. STUDY INFORMATION AVAILABLE
________________

DATE 19 APR 2018 5.1 Environmental Impact Assessment (EIA)


PROJECT
ENGINEER An Environmental Impact Assessment (EIA) is not part of this Scope of Work but shall
________________
be made available to CONTRACTOR for reference and implementation where its
DATE 19 APR 2018
requirements and recommendations related to WORK performed as part of this Scope
CERTIFIED

________________
of Work.
DATE ___________

5.2 Building Risk Assessment (BRA)


CONSTRUCTION
AGENCY

________________
The Building Risk Assessment (BRA) is not part of this Scope of Work but shall be
DATE ___________ made available to CONTRACTOR for reference and implementation during
construction where its requirements and recommendations related to WORK
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ performed as part of this Scope of Work.


EDSD

DATE ___________

CONTRACTOR shall verify the location of SAPMT Camp, based on BRA


recommendations and measures and shall secure COMPANY approval prior to
construction.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 21


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

5.3 Geotechnical Investigation


CERT

RXS

RXS

RXS

The report shall be made available for use as reference, upon completion of survey (by
ENGG

HGB

OTHERS). Report can be obtained by request to COMPANY. The current design is


FK

FK

based upon an assumed value, generally 200 kPa.

5.4 Topographical Survey

Topographic Surveys has been completed and the Topographical Drawings shall be
made available for use as reference. Drawings can be obtained by request to
COMPANY.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

BI-10-09003 ISSUED FOR COMMENT (O2)

6. CODES, STANDARDS AND SPECIFICATIONS

The latest codes and standards up to and including the December 31, 2017 are to be
used unless noted otherwise.
DESCRIPTION

6.1 Industry Codes and Standards

Unless noted otherwise, all WORK shall conform to the latest COMPANY approved
JO/EWO

edition of the following industry codes and standards including, but not limited to the
following:
04/19/18

01/07/18

04/03/18
DATE

Standard Number Title


REV. NO.

ACI 301 Specifications for Structural Concrete


D

C
B

DISCIPLINE ACI 318 Building Code Requirement for Structural Concrete


ENGINEER
ACI 347 Recommended Practices for Concrete Formwork
________________
AISC, 13th edition American Institute of Steel Construction
DATE 19 APR 2018
ANSI B1.20.1 Pipe Threads, General Purpose
PROJECT
ENGINEER ASCE 7-05 American Society for Civil Engineers
________________ AWS D1.1 American Welding Society, Structural Welding Code
DATE 19 APR 2018 IPCEA Insulated Power Cable Engineers Association
CERTIFIED NEMA National Electric Manufacturers Association
________________ NFPA 10 Portable Fire Extinguisher
DATE ___________ NFPA 13 Installation of Sprinkler System
NFPA 22 Water Tanks for Private Fire Protection
CONSTRUCTION
AGENCY NFPA 24 Private Fire Service
________________ NFPA 25 Inspection, Testing, and Maintenance of Water-Based
DATE ___________
Fire Protection System
NFPA 70 National Electrical Code (NEC)
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ NFPA 70E Standard for Electrical Safety in the Workplace


EDSD

DATE ___________
NFPA 72 National Fire Protection Code
NFPA 101 Life Safety Code (2009 Edition)
SASO Saudi Arabian Standard Organization
ANSI American National Standards Institute
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

REA-PE-90 Specification for Totally Filled Fibre Optic Cable


REVISION CERTIFICATE

IBC-2012 International Building Code (IBC 2012)


IFC-2012 International Fire Code (IFC 2012)

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 22


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

ASHRAE American Society of Refrigeration & Air Conditioning


CERT

UL Underwriters Laboratories, USA


RXS

RXS

RXS

SBC Saudi Building Code Chapter 4


ENGG

HGB
FK

FK

6.2 SEC Standards

Standard Number Title

DPS-01 Distribution Planning Standards Estimation Of


Customer Load Guideline (Connected Load & Demand
Load)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

01-SDMS-01 General Requirements for all Equipment/Materials


31-SDMS-01 Low Voltage Distribution Panel
BI-10-09003 ISSUED FOR COMMENT (O2)

31-SDMS-05 Low Voltage Distribution Panel 400/230


32-SDMS-01 Non Extendable SF6 Insulated Ring Main Unit 17.5kV
37-SDMS-01 Low Voltage Molded Case Circuit Breakers for Service
DESCRIPTION

Connections
37-SDMS-01 Low Voltage Molded Case Circuit Breakers For
Service Connections
37-SDMS-02 Molded Case Circuit Breakers for Low Voltage
JO/EWO

Distribution Panels 400 Amps


51-SDMS-01 Distribution Transformers up to 36 kV
56-SDMS-04 Specifications for 13.8kV package substations
04/19/18

01/07/18

04/03/18
DATE

6.3 Saudi Aramco Standards and Procedures


REV. NO.

C
B

Standard Number Title


DISCIPLINE
ENGINEER

________________ SAEP-13 Project Environmental Impact Assessments


DATE 19 APR 2018
SAEP-35 Valves Handling, Hauling, Receipt Tests, and Storage
PROJECT
ENGINEER
SAEP-122 Project Records
________________
SAEP-302 Instructions for Obtaining a Waiver of a Mandatory
DATE 19 APR 2018
Saudi Aramco Engineers Requirement
CERTIFIED
SAEP-378 Electrical Inspection Requirements
________________
SAEP-380 Equipment Deficiency Report
DATE ___________
SAEP-1151 Inspection Requirements for Contractor Procured
Materials and Equipment
CONSTRUCTION
AGENCY
SAEP-1152 Approval Procedure for Ready-Mixed Concrete Mix
________________
Design
DATE ___________ SAEP-1154 Guidelines for Contractor's Quality Plan
SAES-A-004 General Requirements for Pressure Testing
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Requirements


EDSD

DATE ___________ SAES-A-102 Ambient Air Quality and Source Emission Standards
SAES-A-104 Wastewater Treatment, Reuse and Disposal
SAES-A-111 Borrow Pit Requirements
SAES-A-112 Meteorological and Seismic Design Data
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

SAES-A-113 Onshore Geotechnical Engineering Requirements


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

SAES-A-114 Excavation and Backfill


SAES-B-008 Restrictions to Use of Cellar, Pits and Trenches
SAES-B-017 Fire Water System Design
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 23


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SAES-B-019 Portable, Mobile and Special Fixed Firefighting


CERT

Equipment
RXS

RXS

RXS

SAES-B-054 Access, Egress and Materials Handling for Plant


ENGG

HGB

Facilities
FK

FK

SAES-B-055 Plant Layout


SAES-B-068 Electrical Area Classification
SAES-B-069 Emergency Eyewashes and Showers
SAES-D-100 Design Criteria of Atmospheric and Low-Pressure
Storage Tanks
SAES-G-005 Centrifugal Pumps
SAES-G-007 Submersible Pumps and Motors For Water Well and
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Offshore Service
SAES-H-001 Coating Selection and Application Requirements for
BI-10-09003 ISSUED FOR COMMENT (O2)

Industrial Plants and Equipment


SAES-H-003 Protective Coatings for Industrial Concrete Structures
SAES-H-101V Approved Saudi Aramco Data Sheets – Paints and
DESCRIPTION

Coatings
SAES-H-102 Safety Requirements for Coating Applications
SAES-J-003 Instrumentation and Control Buildings - Basic Design
Criteria
JO/EWO

SAES-J-100 Process Measurement


SAES-J-600 Pressure Relief Devices
SAES-J-902 Electrical System for Instrumentation
04/19/18

01/07/18

04/03/18
DATE

SAES-K-001 Design and Installation of Heating, Ventilating and Air


Conditioning Systems
REV. NO.

SAES-K-002 Air Conditioning Systems for Essential Operation


D

C
B

DISCIPLINE
Facilities
ENGINEER
SAES-K-003 HVAC Systems for Communication Facilities and Data
________________
Centers
DATE 19 APR 2018
SAES-K-100 Saudi Aramco Mechanical (HVAC) Code
PROJECT
ENGINEER SAES-L-105 Piping Line Classes
________________ SAES-L-132 Materials Selection for Pipelines, Piping, and Process
DATE 19 APR 2018 Equipment
CERTIFIED SAES-M-001 Structural Design Criteria for Non-Building Structures
________________ SAES-M-006 Saudi Aramco General Purpose Fencing
DATE ___________ SAES-M-100 Saudi Aramco Building Code
SAES-O-204 Security Lighting
CONSTRUCTION
AGENCY SAES-P-100 Basic Power System Design Criteria
________________ SAES-P-103 UPS and DC System
DATE ___________ SAES-P-104 Wiring Methods and Materials
SAES-P-111 Grounding
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ SAES-P-113 Motors and Generators


EDSD

DATE ___________ SAES-P-114 Power System Protection and Control


SAES-P-116 Switchgear and Control Equipment
SAES-P-121 Transformers and Reactors
SAES-P-123 Lighting
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-Q-001 Criteria for Design Construction of Concrete Structures


REVISION CERTIFICATE

SAES-Q-005 Concrete Foundations


SAES-Q-006 Asphalt and Sulfur Extended Asphalt Concrete Paving

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 24


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SAES-Q-007 Foundations and Supporting Structures for Heavy


CERT

Machinery
RXS

RXS

RXS

SAES-Q-009 Concrete Retaining Walls


ENGG

HGB

SAES-Q-010 Cement Based, Non-Shrink Grout for Structural and


FK

FK

Equipment Grouting
SAES-Q-011 Epoxy Grout for Machinery Support
SAES-R-004 Building Architectural Design and Finishes
Requirements
SAES-S-007 Solid Waste Landfill Requirements
SAES-S-010 Sanitary Sewers
SAES-S-020 Oily Water Drainage Systems
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

SAES-S-030 Storm Water Drainage Systems


SAES-S-040 Saudi Aramco Water Systems
BI-10-09003 ISSUED FOR COMMENT (O2)

SAES-S-050 Sprinkler and Standpipe Systems in Buildings


SAES-S-060 Saudi Aramco Plumbing Code
SAES-S-070 Installation of Utility Piping Systems
DESCRIPTION

SAES-T-018 Telecommunications - Symbols, Abbreviations and


Definitions
SAES-T-624 Telecommunications: Fiber Optic Cables for Outside
Plant (OSP) and Inter/Intra Building Applications
JO/EWO

SAES-T-632 Telecommunications: Splicing Copper Cables, Fiber


Optic Cables and Types of Splice Closure
SAES-T-634 Telecommunications Cable Testing and Acceptance
04/19/18

01/07/18

04/03/18
DATE

SAES-T-911 Telecommunication Conduit System Design


SAES-T-916 Communications Building Cable
REV. NO.

SAES-T-920 Telecommunications Copper Cable Information


D

C
B

DISCIPLINE
SAES-U-101 Regulated Vendors List for Fire Protection Equipment
ENGINEER
SAES-X-060 Cathodic Protection of Plant Facilities
________________
PIP STE03020 Guidelines for Tank Foundation Design
DATE 19 APR 2018
SACSM Saudi Aramco Construction Safety Manual
PROJECT
ENGINEER GN 07-005-2012 Saudi Aramco Management Guide- Application Saudi
________________ Aramco Building Code to Contractor Camp and Project
DATE 19 APR 2018 Support Buildings
CERTIFIED

________________ 6.4 Saudi Aramco Standard/Library Drawings


DATE ___________

The WORK shall conform to the latest revision of the Saudi Aramco Standard Drawings
CONSTRUCTION
AGENCY
listed below and others that may be applicable but not listed herein:
________________

DATE ___________ Standard Drawing Number Title


CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ AA-036322 Sht. 001 Anchor Bolt Details Inch and Metric Sizes
EDSD

DATE ___________ AA-036353 Sht. 001 Water Storage Tanks Impressed Current - Internal
AA-036354 Sht. 001 Water Storage Tanks Interior Galvanic Anode
Install
AA-036678 Sht. 001 Saudi Aramco Security and General Purpose
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Fencing Post and Fabric Details


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

AB-036106 Sht. 002 Assembly and Details of Type “A” stairs for walk-
ways and platforms
AB-036260 Sht. 001 Concrete Sidewalk, Curb and Gutter Details
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 25


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

AB-036273 Sht. 001 Surface Marker Underground Electric Cable


CERT

AB-036677 Sht. 001 An Overview Saudi Aramco Security and General


RXS

RXS

RXS

Purpose Fencing
ENGG

HGB

AB-036679 Sht. 001 Saudi Aramco Security and General Purpose


FK

FK

Fencing Gate Details


AB-036897 Sht. 001 Buried/Underground Cable Route Marker- Post
and Signs.
AD-036874 Sht. 001 Installation- Direct Buried Electric Cable and
Conduit
AE-036254 Sht. 001 Parking Bumpers Precast Concrete Block
AE-036412 Sht. 001 Guard Post and Guardrail Details
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

AE-036083 Sht. 002 Manhole Cover for Sewers


BI-10-09003 ISSUED FOR COMMENT (O2)

Library Drawing Number Title

DD-950022 Sht. 001~012 Ground Connections Details


DESCRIPTION

DD-950025 Sht. 002 Nameplate Details for Instrument Boards


DD-950114 Sht. 001~024 Electrical Protection Schemes
DC-950147 Sht. 001 Slip Base Plate for Breakaway Sign Post
DA-950146 Sht. 001 Windsock Pole
JO/EWO

6.5 Saudi Aramco Material System Specifications


04/19/18

01/07/18

04/03/18
DATE

Standard Number Title


09-SAMSS-075 Caulking Compound (Joint Sealant)
REV. NO.

09-SAMSS-088 Aggregates for Concrete


D

C
B

09-SAMSS-097 Ready-Mixed Concrete


DISCIPLINE
ENGINEER 09-SAMSS-106 Epoxy Coating of Steel Reinforcing Bars
________________ 12-SAMSS-007 Fabrication of Structural and Miscellaneous Steel
DATE 19 APR 2018
12-SAMSS-008 Erection of Structural and Miscellaneous Steel
PROJECT
ENGINEER
12-SAMSS-014 Pre-Engineered Metal Buildings
________________
12-SAMSS-024 Fiber-Reinforced Plastic (FRP) Manhole and Access
DATE 19 APR 2018
Covers with Frame
CERTIFIED
14-SAMSS-536 Pad-Mounted, Three-Phase Distribution Transformers
________________
15-SAMSS-502 Medium Voltage Power Cable 5kV through 35kV
DATE ___________ 16-SAMSS-503 Indoor Control Gear – Low Voltage
16-SAMSS-504 Indoor Metal Clad Switchgear: 1 to 38kV
CONSTRUCTION
AGENCY
16-SAMSS-518 Low Voltage Panelboards
________________ 16-SAMSS-519 Indoor Switchboard - Low Voltage
DATE ___________ 16-SAMSS-521 Indoor Automatic Transfer Switch - Low Voltage
17-SAMSS-503 Severe Duty, Totally Enclosed, Squirrel Cage Induction
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ Motors to 500HP


EDSD

DATE ___________ 17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted


Equipment
17-SAMSS-518 Diesel Generator Set
31-SAMSS-004 Centrifugal Pumps
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

31-SAMSS-010 Submersible Pumps and Motors for Water Well and


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Offshore Service
32-SAMSS-005 Manufacture of Atmospheric Tanks
32-SAMSS-033 Reverse Osmosis Systems
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 26


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

32-SAMSS-038 Shop-Fabricated Skid-Mounted Units


CERT

34-SAMSS-718 Electric Motor Operated Valve Actuators


RXS

RXS

RXS

34-SAMSS-820 Instrument Control Cabinets


ENGG

HGB

34-SAMSS-830 Programmable Logic Controllers


FK

FK

34-SAMSS-831 Instrumentation for Packaged Units


34-SAMSS-913 Instrumentation and Thermocouple Cable

6.6 Saudi Aramco Best Practices

Number Title
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

SABP-Q-001 Anchor Bolt Design and Installation


SABP-Q-002 Spread Footings Design
BI-10-09003 ISSUED FOR COMMENT (O2)

SABP-P-041 Guidelines for Conducting Arc Flash Hazard Analysis

6.7 Saudi Aramco General Instruction


DESCRIPTION

Number Title

G.I 2.100 Work Permits Systems


JO/EWO

G,I 2.709 Gas Testing Using Portable Gas Monitors


G.I 2.710 Mechanical Completion and Performance
Acceptance of Facilities
04/19/18

01/07/18

04/03/18

G.I 2.721 Electrical Arc Flash Hazard Mitigation


DATE

G.I 2.102 Pressure Testing Safely


GI 2.716 Land Use Permit Procedures
REV. NO.

C
B

GI 430.001 Implementing the Saudi Aramco Hazardous Waste


DISCIPLINE
ENGINEER
Code
________________ G.I 1021-000 Street and Road Closure: Excavation, Reinstatement
DATE 19 APR 2018 and Traffic Controls
PROJECT GI 1781.001 Inspection, Testing & Maintenance of Fire Protection
ENGINEER
Equipment
________________

DATE 19 APR 2018

CERTIFIED

________________ 7. DETAILED DESCRIPTION OF THE WORKS


DATE ___________

7.1 General
CONSTRUCTION
AGENCY

________________
7.1.1 This Scope of Work describes the minimum requirements for construction of the
DATE ___________
SAPMT camp, Pioneer camp, SAPMT office buildings, gathering tent, STP, WW, WTP
and other associated facilities. The intent of this document is to generally describe the
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
major components of the WORK. It is not the intent to describe each item or detailed
VERIFICATION

________________
EDSD

DATE ___________
procedure for the construction of the entire WORK. CONTRACTOR shall refer to the
Drawings and reference standards for a more comprehensive description of the
WORK.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

7.1.2 CONTRACTOR shall perform the WORK on the basis of this Scope of Work and project
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

drawings provided in this package. Scope of Work and drawings are contingent and
are not to be used separately. Any items mentioned in Scope of Work and not shown

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 27


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

in drawings or shown in drawings but not mentioned in Scope of Work shall be of like
CERT

effect as if shown or mentioned in both.


RXS

RXS

RXS
ENGG

7.1.3 All materials/equipment in this project shall be CONTRACTOR supplied (unless


HGB
FK

FK

instructed) and comply with the requirements of COMPANY standards and material
specifications. CONTRACTOR shall submit complete lists of material and equipment
with material specifications and samples to COMPANY for approval prior to
construction.

7.1.4 CONTRACTOR shall submit a quality control plan as per SAEP-1154, in order to
ensure the contract specifications are met. CONTRACTOR shall prepare/submit
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Hazard Identification Plan (HAZID) to COMPANY Loss Prevention Department for


review.
BI-10-09003 ISSUED FOR COMMENT (O2)

7.1.5 CONTRACTOR shall plan and execute the WORK as per Saudi Aramco Engineering
Procedures (SAEP), Saudi Aramco Engineering Standards (SAES) and Saudi Aramco
Construction Safety Manual (SACSM). CONTRACTOR shall submit a detailed Project
DESCRIPTION

Execution plan to COMPANY Representative for approval prior to the start of WORK.
The CONTRACTOR shall carry out site surveys to verify actual field conditions, review
all design and Vendor drawings and recommendations.
JO/EWO

7.2 Civil/Structural/Architectural

7.2.1 General
04/19/18

01/07/18

04/03/18
DATE

7.2.1.1 All equipment foundations shall meet the design and construction requirements as per
REV. NO.

COMPANY Standards SAES-Q-005. Concrete mix designs including cement type shall
D

C
B

DISCIPLINE
be based on geotechnical recommendations.
ENGINEER

________________
7.2.1.2 All concrete and pavement shall be in accordance with COMPANY Standards SAES-
DATE 19 APR 2018 Q-001 and SAES-Q-006. Concrete and asphalt shall be supplied only from COMPANY
PROJECT
approved Suppliers.
ENGINEER

________________ 7.2.1.3 Excavation and backfill shall be as per COMPANY Standard SAES-A-114. All borrow
DATE 19 APR 2018 material and its source of supply shall be approved by COMPANY.
CERTIFIED
7.2.1.4 Excavation activities shall be allowed after completing necessary Excavation Permit
________________
complete with drawings showing underground facilities in the area and shall be signed
DATE ___________
and approved by COMPANY. As per COMPANY Construction Safety Manual an
CONSTRUCTION
excavation checklist shall be signed and approved by COMPANY Engineering and
AGENCY
Operations prior to any excavation.
________________

DATE ___________ 7.2.1.5 Fill material shall be placed in lifts not exceeding 200 mm (8 in) in loose depth. 300 mm
(12 in) can be applied pending successful test section on site. Fill materials shall be
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ placed in lifts not exceeding 100 mm (4 in) in loose depth for hand-operated
EDSD

DATE ___________ compaction. Where Rapid Impact Compaction methods are used lift thickness shall
not be more than 4.0m.
7.2.1.6 Sources and test results of all of fill materials and compaction water shall be reviewed
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

and approved by COMPANY prior to beginning fill operations.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

7.2.1.7 Backfill and compaction for utility trenches shall comply with SAES-S-070.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 28


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.2.1.8 CONTRACTOR shall remove and dispose of all excess, scrapped materials and debris
CERT

from site and transport to a Government approved dump facility until such time as the
RXS

RXS

RXS

site solid waste landfill area is completed. If the Solid waste landfill area is completed,
ENGG

HGB

CONTRACTOR may use the landfill to dispose of appropriate waste.


FK

FK

7.2.1.9 CONTRACTOR shall identify and prepare gravel laying areas as shown on
T00-S-DD-816918.001 Rev. D to T00-S-DD-816918.004 Rev. D. No curbstone is
required.
7.2.1.10 SAMPT Camp, Central Training Center area, WTP and STP internal roads and access
roads from interface points shall be constructed by CONTRACTOR.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.2.1.11 Road markings and traffic signage, building and area signage shall be part of the
WORK. Road markings shall be as per COMPANY standard drawing AD-036512.001.
BI-10-09003 ISSUED FOR COMMENT (O2)

All signage and markings are to be included for approval on CONTRACTOR submitted
detailed shop drawings.
7.2.1.12 A Marl Capping Layer, 150mm is to be provided in all unpaved areas & slope
DESCRIPTION

embankment and after the fill placement and compaction of the utility trenches,
concrete foundations and other structures in the SAPMT camp.
7.2.1.13 CONTRACTOR is to reinstate any marl capping that it disturbs in the course of the
JO/EWO

WORKS.
7.2.1.14 Sulfur Extended Asphalt, as per SAES-Q-006, is required for external roads, such as
the access roads between the TGP and SAMPT Camp; and exempts residential roads.
04/19/18

01/07/18

04/03/18
DATE

7.2.1.15 Contractor shall consider the possible presence of rock formation in the area. Where
the rock formation is identified in the area during excavation for utility trenching, rock
REV. NO.

blasting is not allowed.


D

C
B

DISCIPLINE
ENGINEER 7.2.1.16 Contractor shall consider the provision of swales, ditches and concrete channels where
________________ required to divert and avoid storm water ponding in the area.
DATE 19 APR 2018

PROJECT 7.2.2 Civil work


ENGINEER

________________

DATE 19 APR 2018


The Civil WORK shall include but not limited to the following;
CERTIFIED
7.2.2.1 Fence and gates for SAPMT Camp, Fuel Station, Water Wells, STP, WTP, Central
________________
Training Facility area, and Storm Water Evaporation Ponds. Fencing shall be as per
DATE ___________
the requirements of SAES-M-006 and according to Overall Fence Layout drawing
CONSTRUCTION DD-816835.001, Site Development Plan DD-816918.001 to DD-816918.004,
AGENCY

________________
applicable standard drawings AB-036677, AA-036678, AB-036679 and AC-036680.
DATE ___________
Provide a 3.0 meter high Type-V fences around the basketball court and tennis court.
7.2.2.2 Vinyl mesh sheeting (beige colour) on the fence of the SAPMT camp, basketball court
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ and tennis court. The vinyl netting shall be applied to the entire height of the fence.
EDSD

DATE ___________
7.2.2.3 Access roads beginning from interface point up to the facilities and all roads within the
SAPMT camp, SAPMT Offices & Pioneer Camp, Fuel station, Gathering Tent, Central
Training Facility, STPs, WTP and Water Wells, evaporation ponds, and lift stations
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

shown on T00-S-DD-816934.001 Rev C; T00-A-DD-816801.003 Rev. C; T00-S-DD-


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

816991.001 Rev. C and T00-S-DD-816992.001 Rev. C are CONTRACTOR’s


responsibility. Type B asphalt shall be used for all roads, pavements and parking areas
and shall comply with SAES-Q-006. Detail of roads and pavements shall be as shown
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 29


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

on drawing no. T00-S-DD-816939.001 Rev C. In addition, the access road to the Solid
CERT

Waste Landfill shall also be provided.


RXS

RXS

RXS

7.2.2.4 Grubbing, fill, levelling, compaction and finish grade of the SAPMT Camp pad, Fuel
ENGG

HGB
FK

FK

Station, Pioneer Camp, SAPMT Offices, Central Training Facility, Gathering Tent and
other related support Facilities and areas are part of the WORK as shown on T00-S-
DD-816981.001 rev. A to T00-S-DD-816981.008 Rev. A.
7.2.2.5 A Marl Cap Layer, 150 mm is to be provided at the top of the rough grading level over
the extent of the area bounded by the Perimeter Fence Line and extended 6 meters
beyond the fence for SAPMT camp patrol road.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.2.2.6 All foundations, anchors, portals and support for the prefabricated portable type
buildings for SAPMT Offices, Housing Accommodations, Gatehouses and other
BI-10-09003 ISSUED FOR COMMENT (O2)

support buildings (by Vendor’s drawings).


7.2.2.7 Car Parking shade shall be in accordance with COMPANY Library drawings: DA-
950182, DA-950183 and DA-950184. Parking layout per library drawing DA-950107
DESCRIPTION

requirement.
7.2.2.8 Recreational facilities such as tennis courts; basketball court; soccer field and jogging
lane as indicated in drawings T00-R-DD-816913.001, T00-R-DD-816913.002 and T00-
JO/EWO

R-DD-816913.003.
7.2.2.9 CONTRACTOR shall excavate for underground utility trenches and backfill the same
after installation of utilities. Backfill shall be as per the requirement of SAES-A-114.
04/19/18

01/07/18

04/03/18
DATE

7.2.2.10 Sewer manholes and associated sewer piping network as shown in composite
drawings no. DD-453609. Installation shall be as per the requirement of SAES-S-060
REV. NO.

and SAES-S-070. At all locations construction of the sewer system shall ensure that
D

C
B

DISCIPLINE
ENGINEER
a slope of greater than or equal to 0.5% is maintained.
________________ 7.2.2.11 Sanitary lift stations are to be located in SAPMT camp, nearby EPC camp/Laydown
DATE 19 APR 2018
area and Central Training Center area. Construction of sanitary lift stations shall be as
PROJECT
ENGINEER
per the requirements of SAES-A-104 and SAES-S-010. Location of lift stations as
________________
shown in drawing no. T00-A-DD-816801.001 Rev. E and T00-A-DD-816802.001 Rev.
DATE 19 APR 2018 D.
CERTIFIED 7.2.2.12 Sewage Treatment Plant (STP) of MBR or MBBR Type package by approved
________________
COMPANY vendor with ability to perform under high and low daily inflow variance
DATE ___________
factors. The treated effluent shall be connected to a Truck Filling Station and treated
CONSTRUCTION
water evaporation pond. CONTRACTOR shall coordinate with STP VENDOR for the
AGENCY
extent of civil WORK required for equipment foundations, tanks foundations and
________________
buildings. Sewage Treatment Plant design requirements, influent design flows,
DATE ___________
characteristics, equipment, instrumentation and controls, electrical, piping, testing,
CONTROL NUMBER

DATE _____________

inspection and dispatch shall be in accordance with technical specifications DD-


BY: ______________

OPERATIONS
VERIFICATION

________________
108704.
EDSD

DATE ___________

7.2.2.13 Valve boxes and associated potable and firewater piping system. Installation shall be
as per the requirement of SAES-S-040 and SAES-S-070. Firewater distribution system
shall be designed and installed in accordance with SAES-M-100, SAES-B-017, and
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

NFPA 24.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

7.2.2.14 Isolation valves between hydrants, hose reels and fire water main shall be buried in
accordance with the requirement of SAES-S-040, and SAES-B-017, Para 12.11.2
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 30


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.2.2.15 Hydrants used in facilities shall be selected from SAES-B-017 Para 7.2.1.
CERT

RXS

RXS

RXS

7.2.2.16 Cross-connection controls to protect potable water system shall be provided in


accordance with the requirements of G.I.0151.006, COMPANY Sanitary Code,
ENGG

HGB
FK

FK

Chapter SACS-S-01 and SAES-S-060, Chapter 6.0.


7.2.2.17 Water storage tank shall be provided and constructed in accordance with SAES-D-100,
SAES-B-017, NFPA-22 and shall comply with all construction and operational
requirements of G.I.-0151.006, and COMPANY Sanitary code, Chapter SACS-S-01.
All water storage steel tanks shall be provided with cathodic protection system for
protecting the tank internals and the underside of bottom as per requirement of SAES-
D-100, SAES-X-500/600, AA-036353 and AA-036354.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.2.2.18 Newly constructed potable water system shall be thoroughly disinfected in accordance
BI-10-09003 ISSUED FOR COMMENT (O2)

with COMPANY Sanitary Code, chapter SACS-S-01 and SAES-S-040 Para 5.9.
7.2.2.19 Neutralization pits and grease traps as shown in composite drawing DD-453609.
7.2.2.20 Vehicle Wash Water Treatment and Recycling System package by approved
DESCRIPTION

COMPANY vendor with design capacity of 50 gpm. System shall be installed in


accordance with vendor’s specification. Contaminated water holding tank and oily
water holding tank shall be provided as per shown in composite drawing. no.
JO/EWO

DD-453609.
7.2.2.21 The requirements for the Vehicle Wash Water Treatment and Recycling System are
contained in Technical Specification DD-108703. Drawing DD-201957 is the process
04/19/18

01/07/18

04/03/18
DATE

flow diagram for the system.


7.2.2.22 Water Wells shall be provided with cathodic protection system for protecting the well
REV. NO.

as per requirement of SAES-X-700.


D

C
B

DISCIPLINE
ENGINEER 7.2.2.23 Excavate and backfill for the tank foundation, and pipe trenches for the WTP, and STP
________________ facility including all relevant pipe supports, pumps and appurtenances. All excavation
DATE 19 APR 2018
and backfill shall be as per the requirement of SAES-A-114.
PROJECT
ENGINEER 7.2.2.24 Excavate and backfill for lighting pole foundations, generator mounting pads, fuel
________________
containment dike and pipe trenches for raw water, fire water and sewer line system
DATE 19 APR 2018
within the SAPMT camp area. All excavation and backfill shall be as per the
CERTIFIED requirement of SAES-A-114
________________

DATE ___________ 7.2.2.25 Provide and construct the required landscaping for the SAPMT camp area and shall
also include the irrigation system. The Contractor shall be responsible for the following
CONSTRUCTION
AGENCY
landscape work items;
________________
a. Irrigation system (automatic) connected to the main utility irrigation water main.
DATE ___________

b. Provide appropriate planting materials and selected plants such as shrubs, trees,
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
palms, ground covers and grass. All plants shall be nursery grown and free from
EDSD

DATE ___________ pests and diseases. Refer to drawing no. DD-816987.001 and DD-816987.002.
7.2.2.26 Access road to the Solid Waste Landfill shall be provided by the CONTRACTOR.
7.2.2.27 CONTRACTOR shall perform excavation, site preparation, and provide liner and
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

fencing for Solid Waste Landfill. See Scope of Work (T80-A-PP-312857) and
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Functional Specification (T80-A-PP-312856).

7.2.3 Structural WORK


DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 31


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.2.3.1 The Structural WORK shall include but not be limited to all the necessary works
CERT

to support and provide complete function of the facilities. The WORK shall be done
RXS

RXS

RXS

in accordance with the latest applicable Saudi Aramco Engineering Standards (SAES)
ENGG

HGB

and American Building Code requirements for Reinforced Concrete (ACI), other
FK

FK

COMPANY Standards & Specifications and relevant Industry Codes & Standards.
7.2.3.2 CONTRACTOR shall excavate, backfill and compact soil for foundations
in accordance with SAES-A-114. CONTRACTOR shall provide and utilize all
equipment required to excavate all soils to the dimensions in depth specified on the
drawings and/or COMPANY Standards. CONTRACTOR shall obtain approval from
COMPANY Representative prior to backfilling excavations.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.2.3.3 Excavation shall be limited to the minimum necessary to perform the WORK.
BI-10-09003 ISSUED FOR COMMENT (O2)

7.2.3.4 CONTRACTOR shall load and haul all fill materials (e.g. sand and marl) required for
the WORK from a source approved by COMPANY.
7.2.3.5 All fill material utilized by CONTRACTOR, around and under foundations shall be
DESCRIPTION

select fill. The type of fill material and fill compaction shall be in accordance with SAES-
A-114. In place density tests shall be performed as directed by the COMPANY
Representative to ensure compliance with the compaction requirements.
JO/EWO

7.2.3.6 Sources and test results of all fill materials and compaction water shall be reviewed
and approved by COMPANY prior to beginning fill operations.
7.2.3.7 Should the CONTRACTOR need to construct temporary access or haul roads, prior to
04/19/18

01/07/18

04/03/18
DATE

construction of such access/haul roads, CONTRACTOR shall obtain COMPANY


written approval of the new routing and type of construction to be used.
REV. NO.

7.2.3.8 CONTRACTOR shall load and transport concrete which shall conform to COMPANY
D

C
B

DISCIPLINE
ENGINEER
Material Specifications 09-SAMSS-097 and from a source approved by COMPANY
________________
Representative (CONTRACTOR to submit list to Company Representative for
DATE 19 APR 2018 approval). All concrete shall conform to SAES-Q-001.
PROJECT
ENGINEER
7.2.3.9 CONTRACTOR shall mix, place and cure structural concrete as per the COMPANY
________________
standard and ACI Manual of concrete practice. A minimum compressive strength of
DATE 19 APR 2018 4000 psi at 28 days shall be obtained. One set of four test cylinders shall be made
CERTIFIED
once for each day of concrete pour, or not less than for each 50 cu. m. of concrete, or
________________
not less than one for each 465 sq.m. of surface area for slabs or walls poured on each
DATE ___________ day. These cylinders shall be tested as per ACI 318 by COMPANY approved third party
(approved List to be secured from the Company). Test results shall be provided to the
CONSTRUCTION
AGENCY
COMPANY Representative within 48 hours of the test date.
________________
7.2.3.10 All concrete reinforcement rebar shall conform to SAES-Q-001 Para 5.6, Reinforcing
DATE ___________
steel bars shall be FBE coated. CONTRACTOR shall cut and cold bend reinforcing
CONTROL NUMBER

DATE _____________

steel to shapes and dimensions specified in the steel bending detail drawings and place
BY: ______________

OPERATIONS
VERIFICATION

________________
as shown and detailed on the drawings. FBE coating to rebar shall be required using
EDSD

DATE ___________
APCS-113 material with COMPANY Stock No. 09-697-833 or equal approved
proprietary FBE rebar patching material. The material is supplied in 0.5 liter two-part
kits which should not be split. The two-part kits and specially designed Nylotron
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Bending mandrills or equal shall be provided by the CONTRACTOR for each different
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

size of reinforcing bar. CONTRACTOR shall review all bending details prior to
fabrication to verify that the required concrete cover and anchor bolt clearances can be
maintained.
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 32


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.2.3.11 Below grade concrete surfaces, except the bottom one, cast in place concrete anchors
CERT

and foundations shall be coated as per SAES-H-003 except for precast footings and
RXS

RXS

RXS

foundations which shall also have the bottom surface coated prior to replacement and
ENGG

HGB

backfilling. Coating of concrete surfaces below final grade. Bottom of concrete shall be
FK

FK

protected by pouring on secure and intact plastic sheets without laps, splices and/or
damage.
7.2.3.12 Anchor bolts in concrete foundations shall be installed as per the COMPANY Standard
drawing no. AA-036322 Sheet 001 and shall not touch the reinforcement rebar steel.
7.2.3.13 Material selection and galvanizing of anchor bolt assemblies shall be as per
12-SAMSS-007.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.2.3.14 All non-galvanized steel supports or anchor bolts which are to be partially embedded
BI-10-09003 ISSUED FOR COMMENT (O2)

in a concrete foundation shall be coated in compliance with SAES-H-001 and


APCS-1C for a minimum distance of 3 inches on either side of the concrete surface.
7.2.3.15 All form works shall be in accordance with SAES-Q-001. All external edges of concrete
DESCRIPTION

above ground shall be chamfered by inserting one inch angle strips in the forms. Prior
to placing concrete into forms, forms and rebar shall be sprayed with Water to prevent
loss of moisture from the concrete. Amount of water used for wetting surfaces shall not
be of such volume as to increase the water content of the concrete.
JO/EWO

7.2.3.16 All non-shrink grout shall be applied under base plates of equipment and supports in
accordance with PIP STS03600, SAES-Q-010 and manufacturer’s recommended
04/19/18

01/07/18

04/03/18

procedures. Grout shall be poured in a high fluidity range and shall be free of voids
DATE

and air pockets. CONTRACTOR shall take measures to follow grout manufacturer’s
recommended procedure precisely.
REV. NO.

C
B

DISCIPLINE
7.2.3.17 All structural steel erection shall comply with the requirements of SAES-M-001,
ENGINEER COMPANY Material Specification 12-SAMSS-008 and the American Institute
________________
Specification for Design, Fabrication and Erection of Structural Steel (AISC).
DATE 19 APR 2018

PROJECT
7.2.3.18 All structural steel welding shall be in accordance with ANSI/AWS D 1.1/D 1.1M – 2010
ENGINEER “Structural Welding Code for Steel.” Skip or stitch welds shall not be made.
________________

DATE 19 APR 2018 7.2.3.19 Backfill for foundations shall be compacted per SAES-A-114. Backfilling shall only be
CERTIFIED
performed after foundations have been approved by COMPANY.
________________
7.2.3.20 Backfilling and reinstatement of surfaces shall be completed immediately after approval
DATE ___________
is given by COMPANY.
CONSTRUCTION
AGENCY
7.2.3.21 CONTRACTOR shall keep the construction site areas, camps, storage areas, and haul
________________ and access roads clean of construction and/or other debris. All waste, debris and/or
DATE ___________ trash shall be picked up and properly disposed of in a manner approved by COMPANY.
CONTROL NUMBER

DATE _____________

7.2.3.22 CONTRACTOR shall restore all existing roads and any other items damaged due to
BY: ______________

OPERATIONS
VERIFICATION

________________
construction of new facilities or by CONTRACTOR vehicles and equipment to their
EDSD

DATE ___________
original conditions.
7.2.3.23 CONTRACTOR shall construct reinforced concrete foundation for storage tanks, and
associated pipe supports where required. All foundations shall be constructed per
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

requirement of SAES-Q-005. Concrete mix designs including cement type shall be


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

based on geotechnical recommendations.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 33


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.2.3.24 CONTRACTOR shall construct (or precast if applicable) reinforced concrete


CERT

foundations and supports for the prefabricated portable type buildings for PMT Offices,
RXS

RXS

RXS

Housing Accommodations, Gatehouses and other support buildings (by Vendor).


ENGG

HGB

Construct concrete stair, landing and ramp per project requirement. All concrete works
FK

FK

shall be as per SAES-Q-005 requirement.


7.2.3.25 CONTRACTOR shall provide and construct reinforced concrete foundations, supports
and frames for parking shades.
7.2.3.26 Above ground concrete surfaces shall be coated with APCS-1B as per SAES-H-003,
para.6.1
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.2.3.27 CONTRACTOR shall construct concrete pads and install anchor bolts (if required) as
per final approved vendor drawings.
BI-10-09003 ISSUED FOR COMMENT (O2)

7.2.3.28 CONTRACTOR shall provide and construct reinforced concrete foundations, for
lighting poles, generator mounting pads and fuel containment dike. All foundations
shall be constructed per requirement of SAES-Q-005.
DESCRIPTION

7.2.3.29 Below ground concrete surfaces shall be coated with APCS-10 as per requirement of
SAES-H-003, para 6.1 and SAES-101V.

7.2.4 Architectural work


JO/EWO

7.2.4.1 General Requirements


04/19/18

01/07/18

04/03/18

a. All the buildings and structures shall be manufactured and furnished by COMPANY
DATE

approved Vendors and shall meet the requirements specified in the performance
specification for buildings DD-966916.
REV. NO.

C
B

DISCIPLINE
HVAC specification and schedule shall follow requirements specified in DD-
ENGINEER
486890.
________________

DATE 19 APR 2018 Plumbing specification & schedule shall follow requirements specified in DD-
PROJECT
486891.
ENGINEER

________________ Note: As with all items in this WORK, The above mentioned buildings shall be
DATE 19 APR 2018 owned by COMPANY.
CERTIFIED
b. CONTRACTOR shall be responsible for field verifying the location of all portable
________________
buildings and facilities and obtain written approval prior to fabrication or procuring
DATE ___________
any material for buildings and shelters. Any discrepancies found in
CONSTRUCTION
drawings/documents shall be notified in writing for COMPANY representative
AGENCY
review and resolution.
________________

DATE ___________ c. For every building and site, CONTRACTOR shall be responsible for providing the
following information: Architectural plans, sections, elevations; Reflected ceiling
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ plan etc. dimensioned; Fire water layout and hydraulic calculations; Fire
EDSD

DATE ___________ alarm/sprinkler plans if applicable; Specifications, Architectural Plans shall show
fire-rated walls; Coordinated construction details for walls, ceilings and floors;
Construction details for fire rated walls shall be tested, listing assembly ; Door and
window schedule information with hardware schedules and panic devices; Interior
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

finish schedule ; Stairway, handrail and guardrail details; Detail drawings of stairs,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

handrails, landings, wall/floor/ceiling assembly, and water heater enclosures; Detail


drawings for the kitchen and service areas reflecting all equipment and accessories

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 34


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

to determine additional fire protection and building Fire Resistant Rated (FRR)
CERT

requirements. All above shall be provided in the Index R drawings. These


RXS

RXS

RXS

comments are applicable to all buildings.


ENGG

HGB
FK

FK

d. Interior walls and ceiling finishing material shall be classified for flame spread and
smoke development and certification of ASTM E84 or UL 723 test. Interior walls
and ceilings shall comply with requirements of the IBC table 803.9. CONTRACTOR
shall provide documentation showing that the wall, flooring and ceiling finishes
meet a minimum Class C - particularly the acoustical ceiling tiles. The entrance/exit
platforms and handrails shall be galvanized steel.
e. FRR walls and ceilings shall comply with IBC 2009 sec. 715, sec. 1018 and sec
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

709.3
BI-10-09003 ISSUED FOR COMMENT (O2)

f. All furniture and fabrics (including gathering tent) shall be in accordance with Code
of Federal Regulation (USA):16 CFR 1633-Standard for the Flammability (open
flame) of Mattress Sets; or, (UK) BS7177: Fire test to mattresses divans and bed
bases; Code of Federal Regulations (USA):16 CFR1634-Standard for the
DESCRIPTION

Flammability of Residential Upholstered Furniture; or, (UK) BS 7176: Ignitability of


upholstered furniture as per COMPANY Directives.
7.2.4.2 Building Types
JO/EWO

CONTRACTOR shall be responsible for the fabrication, provision and installation of


SAPMT office buildings, accommodations buildings and all support buildings.
04/19/18

01/07/18

04/03/18

Associated interface WORK shall be in accordance with project design drawings,


DATE

documents and specifications. Overall Plot Plan drawing shows the types of buildings
and number of buildings required and their location /orientation. Fabrication of these
REV. NO.

buildings shall be in accordance with COMPANY building code guideline document #


D

C
B

DISCIPLINE
ENGINEER
07-005-2012. CONTRACTOR shall be responsible for providing shop drawings of all
________________
portable buildings / shelters to COMPANY for review /approval prior to fabrication.
DATE 19 APR 2018 Buildings shop drawings should include location / installation of all EXIT signs (text in
PROJECT
English/Arabic) battery operated (90min) in all buildings hallways, directing towards
ENGINEER
exit doors. CONTRACTOR is required to submit all building materials / samples and
________________
all buildings furniture and equipment to SAPMT for review and obtain approval prior to
DATE 19 APR 2018
procurement of any material or equipment. All portables/non-portable buildings /
CERTIFIED
shelters / shaded parking and facilities are defined in Index–R showing the size of
________________
building layout. Those Buildings/Facilities are listed as follows:
DATE ___________

CONSTRUCTION • 2 - Man Suite (Type-A)


AGENCY

________________ • 2 - Man Suite (Type-A1)


DATE ___________
• 4 - Man Suite (Type-B)
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ • 4 - Man Suite (Type-B1)


EDSD

DATE ___________
• 10 - Man Single Standard Rooms (Type-C&C1)
• 10 - Man Single Standard Rooms (Type-C2)
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

• Sitting Room
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

• Executive Diwaniyah
• Clinic
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 35


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

• Kitchen & Mess Hall Building


CERT

RXS

RXS

RXS

• Musallah
ENGG

HGB


FK

FK

Recreation & Gym Building


• Guard’s House & Toilet
• Laundry
• Mini Market
• Gathering Tent
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

• Senior Management PMT Office Building



BI-10-09003 ISSUED FOR COMMENT (O2)

SAPMT Office Building


• Kitchen and Toilet Unit (Tent Area)
• Electrical Room
DESCRIPTION

• MV Switchgear Room
• Fire & Potable Water Pump Shelter
JO/EWO

• TER Shelter
• Toilet & Wash Room
04/19/18

01/07/18

04/03/18
DATE

• Sport Equipment Storage Room


• Maintenance Shop & Warehouse
REV. NO.

C
B

DISCIPLINE • Security Office Building


ENGINEER

________________ • Vehicle Maintenance Building


DATE 19 APR 2018
• Fueling Shade & Facility
PROJECT
ENGINEER

________________
• Smoking Shelter
DATE 19 APR 2018
• Satellite Building
CERTIFIED

________________
• Training Hall
DATE ___________
• Central Training Center Building & Yard
CONSTRUCTION
AGENCY • Tennis Court

________________

DATE ___________
Basketball Court
• Soccer Field
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION


________________
Storage Buildings
EDSD

DATE ___________

• Sewage Treatment Plant


• Evaporation Ponds
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Water Treatment Plant


REVISION CERTIFICATE

• Water Wells

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 36


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

RXS

RXS

RXS

7.2.4.3 SAPMT Camp Accommodation:


ENGG

HGB
FK

FK

CONTRACTOR shall provide COMPANY with accommodation facilities, which shall


consist of the following portable buildings:

For furniture and equipment list, refer to document DD-842203.

For Accommodation Facility building list, refer to DD-816801 Sheet 001.

7.2.4.4 2 - Man Suite (Type-A & A1)


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Index-R drawings define the size/details of building and other requirements. 2-Man
BI-10-09003 ISSUED FOR COMMENT (O2)

Suites Building (Type-A&A1) (Ref. DD-816884).

7.2.4.5 4 - Man Suite (Type-B&B1)


DESCRIPTION

Index-R drawings define the size/details of building and the requirements.


4 - Man – Single Standard Rooms (Type-B&B1) (Ref. DD-816885).
JO/EWO

7.2.4.6 10 Man - Single Standard Rooms (Type-C, C1 & C2)


Index-R drawings define the size/details of building and the requirements.
04/19/18

01/07/18

04/03/18
DATE

Single Standard Rooms (Type-C, C1 & C2) (Ref. DD-816886).


REV. NO.

C
B

7.2.4.7 Sitting Room Building (Type-E)


DISCIPLINE
ENGINEER
These typical sitting room buildings are located at various areas adjacent to
________________
accommodation areas. Index-R drawings define the size/details of buildings and other
DATE 19 APR 2018
requirements. Detailed drawings shall be provided by CONTRACTOR prior to
PROJECT
ENGINEER construction.
________________

DATE 19 APR 2018 Sitting Room Building is referenced in drawing number DD-816887.
CERTIFIED

________________
7.2.4.8 Executive Diwaniyah
DATE ___________

This building (Type-F) is in the Type – A accommodation area of COMPANY


CONSTRUCTION
AGENCY managerial personnel. Index-R drawings define the size/details of building and other
________________ requirements. Detailed drawings shall be provided by CONTRACTOR prior to
DATE ___________ construction.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ Executive Diwaniyah is reference in drawing number DD-816888.


EDSD

DATE ___________

7.2.4.9 Clinic Building (Type-G)


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

This building is located next to the Musallah and is to provide preliminary health service
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

(first-aid). Index-R drawings (Ref. DD-816889) define the size/details of building and
other requirements. Detailed drawings shall be provided by CONTRACTOR prior to

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 37


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

construction. All medical tools, furnishings and equipment for this building shall be
CERT

provided and installed by OTHERS.


RXS

RXS

RXS
ENGG

HGB

CONTRACTOR shall provide a 120 dB siren and pole to be installed near the clinic for
FK

FK

emergency alarm. The siren shall be activated from the security building.

7.2.4.10 Kitchen / Mess Hall Building (Type-H)


This building is vital and shall be in service 7 days a week for SA personnel. Index-R
drawings define the size/details of building and other requirements. Detailed drawings
shall be provided by CONTRACTOR prior to construction
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Kitchen/ Mess Hall Building (Type-H) is reference in drawing number DD-816890.


BI-10-09003 ISSUED FOR COMMENT (O2)

7.2.4.11 Musallah Building (Type-I)


The Musallah building is in the accommodation area for COMPANY personnel and it
DESCRIPTION

has an outside shaded area for additional people. Index-R drawings (Ref. DD-816891)
define the size/details of building and other requirements. Detailed drawings shall be
provided by CONTRACTOR prior to construction.
JO/EWO

CONTRACTOR shall provide a complete Audio system in the Musallah building and
at the Minaret outside the building.
04/19/18

01/07/18

04/03/18

7.2.4.12 Recreation & GYM Building (Type-J)


DATE

Those buildings are distributed next to the accommodation area. Index-R drawings
REV. NO.

define the size/details of building and other requirements. Detailed drawings shall be
D

C
B

DISCIPLINE
provided by CONTRACTOR prior to construction.
ENGINEER

________________ Recreation & Gym Buildings (Type-J) is reference in drawing number DD-816892.
DATE 19 APR 2018

PROJECT
ENGINEER
7.2.4.13 Gate House & Guard's Toilet (Type-K)
________________ These buildings shall be for security control located at three entrance gates (Gate No.
DATE 19 APR 2018
1 for accommodation area, Gate No. 2 for SAPMT Office area and Gate No. 3 Service
CERTIFIED Gate). Index-R drawings (Ref. DD-816893) define the size/details of building and other
________________ requirements.
DATE ___________
7.2.4.14 Laundry Building (Type LA & LB)
CONSTRUCTION
AGENCY These buildings are distributed next to accommodation area and shall be in service 7
________________
days a week. Index-R drawings define the size/details of building and other
DATE ___________
requirements. Detailed drawings shall be provided by CONTRACTOR prior to
CONTROL NUMBER

DATE _____________

construction.
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________
Laundry Buildings is reference in drawing number DD-816894.

7.2.4.15 Mini Market (Type-L2)


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

This building is located next to the kitchen / mess hall building and shall be in service
REVISION CERTIFICATE

7 days a week. This building will include a barber shop and Mail Room. Index-R
drawings (Ref. DD-816895) define the size/details of building and other requirements.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 38


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Detailed drawings shall be provided by CONTRACTOR prior to construction. All


CERT

furnishings for this building including chillers/ refrigerators shall be provided and
RXS

RXS

RXS

installed by OTHERS.
ENGG

HGB
FK

FK

7.2.4.16 Gathering Tent (Type-M)


a. This Tent comprises of a high-density heat/fire resistant, insulated fabric roof & steel
structure with insulated pre-cast concrete external walls/columns on all 4 sides and
shall be air-conditioned. Index-R drawings (Ref. DD-816896) define the size/details
of the building and other requirements. Material for the gathering tent/tent fabric shall
have flame spread rating of Class A. Detailed drawings shall be provided by
CONTRACTOR prior to construction to show the gathering tent structure and
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

material finishes from interior and exterior to determine additional requirements from
IBC 2009. CONTRACTOR shall design, fabricate, supply & install this facility and
BI-10-09003 ISSUED FOR COMMENT (O2)

shall include but not be limited to the following.

b. Steel structure shall be painted with primer paint and one coat paint. Steel structure
DESCRIPTION

for walls and cap shall comprise of hollow tubular sections. Top of wall rails shall
have an extended edge or steel projection, leading rain water away from tent walls.

Details of fabric layers shall be as follows:


JO/EWO

I. Outer most layer shall be polyvinylidene fluoride fabric, beige plain, heavy duty,
water proof, solar resistant, UV treated, anti-dust, flame retardant, long life & easily
04/19/18

01/07/18

04/03/18
DATE

cleaned. This layer shall cover all the cap, cap extension and walls. There shall
be a decorative frill of 30 cm depth at the bottom of the steel projection.
REV. NO.

II. Second layer from outside shall be a tarpaulin sheet to provide further protection
D

C
B

DISCIPLINE
from water. This layer shall be applied to the cap only.
ENGINEER

________________
III. A polyethylene thermal insulation layer of 15mm thickness.
DATE 19 APR 2018
IV. Non-woven fabric stitched to chainmail cloth to stop the light penetrating from
PROJECT
ENGINEER outer layers and to take the tension stresses applied on the walls and the cap
________________ fabrics.
DATE 19 APR 2018

CERTIFIED V. The innermost layer shall be chainmail cloth; plain color for cap and printed for
________________ walls. There shall be decorative frill of 30cm from floor level.
DATE ___________

c. The tent installation shall include the following:


CONSTRUCTION
AGENCY

________________ I. Electrical WORK shall include conduits and all necessary wirings, switches and
DATE ___________ sockets, for lights, T.V., A/C units, telephones and panel board cables.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ II. Install lights behind inner decoration frill and spot lights.
EDSD

DATE ___________

III. Aluminum shall be beige or white powder coated with double, clear & tempered
glass (8mm thick glass with 6mm air gap)
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

• Aluminum hinged door.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

• Aluminum sliding window


• Aluminum emergency door.
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 39


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

IV. HVAC shall be split unit,


CERT

RXS

RXS

RXS

V. Provide and install 3 Chandeliers


ENGG

HGB
FK

FK

VI. Fire place from fire resistant block with chimney and marble shelves.

VII. Arabic majiles type seating that match the printed cloth

VIII. Flooring carpet: Broadloom carpets that match the printed cloth on wall

• Average Pile Weight (Tufted or Woven) ASTM D 5848


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

• Tuft Bind ASTM D 1335


BI-10-09003 ISSUED FOR COMMENT (O2)

• Flammability - Small Scale Ignition Test 16 CFR 1630 or ASTM D 2859


• Flammability - Flooring Radiant Panel ASTM E 648
DESCRIPTION

• Smoke Density ASTM E 662


• Colorfastness to Crocking AATCC 165
JO/EWO

• Colorfastness to Light AATCC 16, Option 3


• Indoor Air Quality (CRI Green Label Plus, Green Label)
04/19/18

01/07/18

04/03/18

• Delamination Resistance
DATE

ASTM D 3936
• Electrostatic Propensity AATCC 134
REV. NO.

C
B

DISCIPLINE
• Dimensional Stability ISO 2551
ENGINEER

________________ • Under layer (10) mm.


DATE 19 APR 2018
IX. Custom made SONY OLED TV 120" or approved equal
PROJECT
ENGINEER

________________ X. Concrete foundation: 150mm thickness.


DATE 19 APR 2018
7.2.4.17 Senior Management PMT Office Building (Type-P)
CERTIFIED

________________
This building is being dedicated for (Senior SAPMT) personnel. Index-R drawings
DATE ___________ define the size of building layout.
CONSTRUCTION
AGENCY SAPMT Office Building is reference in drawing number DD-816897.
________________
7.2.4.18 SAPMT Office Building (Type-P1)
DATE ___________

This building shall be dedicated for (SAPMT) personnel. Index-R drawings define the
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ size of building layout.


EDSD

DATE ___________

Senior Management Office Building is reference in drawing number DD-816898.

7.2.4.19 Toilet / Kitchen – Tent Area (Type-R)


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Index-R drawings define the size/details of building and other requirements. See
Drawing no. DD-816899 for the floor plan of this building. This building layout is also

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 40


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

to be used for the Telecom Home Office. Detailed drawings shall be provided by
CERT

CONTRACTOR prior to construction.


RXS

RXS

RXS

The Minaret shall be provided with loudspeakers


ENGG

HGB
FK

FK

Note: For Telecom Home Office (Type-AH), CONTRACTOR to coordinate with the
WIFI service provider to redesign the internal layout based on their requirements and
function.
7.2.4.20 Electrical Room (Type-V)
These typical electrical rooms are located at Kitchen & Mess Hall area. Index-R
drawings (Ref. DD-816900) define the size/details of building and other requirements.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Detailed drawings shall be provided by CONTRACTOR prior to construction.


BI-10-09003 ISSUED FOR COMMENT (O2)

7.2.4.21 HV Switchgear Room (Type-V1)


This switchgear room accommodates 13.8kV HV switchgear & control panels and
located at Diesel Generator area. Index-R drawings (Ref. DD-816901) define the
DESCRIPTION

size/details of building and other requirements. Detailed drawings shall be provided by


CONTRACTOR prior to construction.
7.2.4.22 Fire Water, Potable Water, Irrigation Water Pump Shelter (Type-W1)
JO/EWO

This shelter is to house Fire Water, Potable Water and Irrigation Water equipment
serving the SAPMT camp. Index-R drawings (Ref. DD-816902) define the size/details
of building and other requirements. Detailed drawings shall be provided by
04/19/18

01/07/18

04/03/18
DATE

CONTRACTOR prior to construction.


7.2.4.23 TER Shelter (Type-X)
REV. NO.

C
B

This shelter is to house the vital telecom main equipment located near sport facility
DISCIPLINE
ENGINEER area. Index-R drawings (Ref. DD-816903) define the size/details of building and other
________________ requirements. Detailed drawings shall be provided by CONTRACTOR prior to
DATE 19 APR 2018
construction.
PROJECT
ENGINEER 7.2.4.24 Outdoor Sports and Support Facilities:
________________

DATE 19 APR 2018


a. For the location of all outdoor recreation facilities, refer to overall plot plan. Index-
CERTIFIED
R drawings defines the size/details of all outdoor recreation facilities as follows:
________________
• Toilet & Wash Room (Type-Y), Ref. DD-816904
DATE ___________

• Sports Equipment Storage (Type-Y1), Ref. DD-816905


CONSTRUCTION
AGENCY
• Tennis Court (Type-N), Ref. DD-816913.001
________________

DATE ___________ • Basketball court (Type-O), Ref. DD-816913.002


• Soccer Field with Running Track Lane (Type-Q), Ref. DD-816913.003
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________ • Jogging Track located around accommodation area.


• Shaded/ Un-shaded Car Parking.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

b. All shaded paved parking structures shall be of tubular steel frame with high tensile
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

strength fabric and from SA approved manufacturer/vendor. Index-R defines the


size/details of shaded parking. Locations of shaded parking are adjacent to SAPMT
camp area, PMT Offices and Managers Accommodations as shown in DD-816801.
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 41


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

c. Un-shaded paved parking areas are located at various locations as shown in


RXS

RXS

RXS

Overall Plot Plan Drawing No. DD-816801. Index-R drawings define the size/details
ENGG

HGB

of shaded and un-shaded light vehicle paved parking and other requirements.
FK

FK

d. Outdoor sport facilities shall be constructed, meeting all applicable standards for
each sport facility including complete surfacing system. Surfacing shall be asphalt
paving type-3. The tennis court, basketball courts and jogging tacks around the
field shall have a final coat of dark green latex Synthetic Athletic Rubberized
Surface applied. Installation of complete equipment for each sport facility shall be
from COMPANY approved manufacturers /vendors and in accordance with
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

manufacturer’s standard erection/installation shop drawings.


BI-10-09003 ISSUED FOR COMMENT (O2)

e. The soccer pitch shall be covered with natural grass.


DESCRIPTION

7.2.4.25 Maintenance Shop & Warehouse (Type-Y2)


This building is located next to the outdoor sport facility to house spare parts, supplies
and other stock materials and equipment needed for future use in the SAPMT camp
facilities (including Maintenance shops). Index-R drawings (Ref. DD-816906) define
JO/EWO

the size/details of building and other requirements. Detailed drawings shall be


provided by CONTRACTOR prior to construction.
04/19/18

01/07/18

04/03/18

7.2.4.26 Security Office Building (Type-Z)


DATE

These buildings shall be used by security/safety of entire camp. Index-R drawings


REV. NO.

define the size/details of building and other requirements.


D

C
B

DISCIPLINE
ENGINEER
Security Office Building (Type-Z) is reference in drawing number DD-816907.
________________

DATE 19 APR 2018


7.2.4.27 Vehicle Maintenance Building (Type-AA)
PROJECT
ENGINEER

________________
This building is located next to the fuelling facility and will be operated 7 days
DATE 19 APR 2018
a week for vehicle quick service for COMAPNY personnel. Index-R drawings (Ref. DD-
816908) define the size/details of building and other requirements. Detailed drawings
CERTIFIED

________________
shall be provided by CONTRACTOR prior to construction.
DATE ___________
7.2.4.28 Fuelling Shade (Type-AB)
CONSTRUCTION
AGENCY
This building is located next to vehicle maintenance building and will operate 7 days a
________________
week for COMAPNY personnel. Index-R drawings (Ref. DD-816909) define the
DATE ___________
size/details of building and other requirements. Detailed drawings shall be provided by
CONTRACTOR prior to construction.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ 7.2.4.29 Smoking Shelter (Type-AD)


EDSD

DATE ___________
These typical shelters are located at various areas in SAPMT camp and PMT offices
area. Index-R drawings (Ref. DD-816910) define the size/details of building and other
requirements. Detailed drawings shall be provided by CONTRACTOR prior to
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

construction.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

7.2.4.30 Satellite Building

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 42


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

This building is to house all satellite equipment serving the SAPMT camp. Index-R
CERT

drawings (Ref. DD-816911) define the size/details of building and other requirements.
RXS

RXS

RXS

Detailed drawings shall be provided by CONTRACTOR prior to construction.


ENGG

HGB
FK

FK

7.2.4.31 Training Hall (Type-AM) & Central Training Center (Type-AN)


This building (Type-AM) is located alongside before entering the gatehouse nearby
Senior Management PMT Department and (Type-AN) is located Northwest of the Gas
Plant and dedicated to 50-person capacity Training Hall. Index-R drawings define the
size/details of building and other requirements. Detailed drawings shall be provided by
CONTRACTOR prior to construction.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Training Halls and Central Training Center is reference in drawing number DD-816912.
BI-10-09003 ISSUED FOR COMMENT (O2)

7.2.4.32 Store Room (Electrical) Type-V2


This building is to house electrical tools and spare parts in switchgear area. Index-R
DESCRIPTION

drawings define the size/details of building and other requirements. Floor plan shall be
according to Drawing No. DD-816914. Detailed drawings shall be provided by
CONTRACTOR prior to construction.
JO/EWO

7.2.4.33 Containerized Substation /Electrical Room


Containerized Substation /Electrical Room housed various electrical equipment,
panels, etc. shall be provided as listed below as per Specification T00-P-PP-594659-
04/19/18

01/07/18

04/03/18
DATE

001;
1) WTP/ STP/Water Well-6 in SAPMT camp area – I No
2) WTP/ STP/ Water Wells -1,2&3 in CONTRACTOR camp area – 1 No
REV. NO.

C
B

DISCIPLINE
3) Lift Station 2 in CONTRACTOR camp area – 1 No
ENGINEER 4) Lift Station 3 in CONTRACTOR camp area – 1 No
________________
5) Water Well-4 in CONTRACTOR camp area – 1 No
DATE 19 APR 2018
6) Water Well-5 in CONTRACTOR camp area – 1 No
PROJECT
ENGINEER 7.2.4.34 Early Project Support Accommodation
________________

DATE 19 APR 2018 Early Camp for 48 personnel described as Pioneer Camp in Schedule B attachment I
CERTIFIED and shall be completed within sixty (60) days after receiving notice to proceed.
________________

DATE ___________
CONTRACTOR shall provide all utilities, potable water, fire water network, sewage
network and tank (sewage will be trucked out to approved location) inside the camp
CONSTRUCTION
AGENCY boundary and all other services for these accommodation units.
________________

DATE ___________
Potable water, fire water, communication and power shall be provided by OTHERS up
to the interface points as shown on the drawings.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
Camp Operation, maintenance and catering services shall be provided by
EDSD

DATE ___________
CONTRACTOR.
A twenty-eight (28) days cycle menu shall be prepared by the CONTRACTOR and
THIS INDICATES THAT REV. NO. ____________

furnished to COMPANY thirty (30) days in advance for approval.


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Pioneer Camp location shall be approved by COMPANY prior to construction.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 43


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Upon completion of the SAPMT Camp these Project Support units Type B, C and E
CERT

RXS

RXS

RXS
are to be relocated and installed in the SAPMT camp as directed by COMPANY. The
cost of the Optional Project Support Accommodation is to also include all costs
ENGG

HGB
FK

FK

associated with fully installing and connecting the units to all services in their new
locations.
7.2.4.35 Additional Residential Camp
To provide additional Camp Facility for 1300-1500 personnel identical to Tanajib
SAPMT Camp. However, it will not require common facilities such as Gas station and
Clinic. This shall include for all work associated with the SAPMT Camp.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.3 Mechanical
BI-10-09003 ISSUED FOR COMMENT (O2)

7.3.1 Potable Water Supply System:


DESCRIPTION

All building facilities in SAPMT camp shall be provided with Potable Water supply, such
as Toilets, Kitchens, Tea Rooms, Laundry Rooms and other required rooms and areas
shall be provided with potable water supply. DD-486891 specifies the plumbing
requirements and schedule. Potable water up to the building entrance valve box shall
JO/EWO

be provided by the CONTRACTOR and from the valve box to the building fixtures shall
be by CONTRACTOR’s building vendor. CONTRACTOR shall supply & install the
potable water pumps with distribution network and suction header from the tanks.
04/19/18

01/07/18

04/03/18
DATE

Laundry building water supply shall meet the requirement of laundry equipment, as per
Vendor requirements. Kitchen building hot & cold water service lines shall be as per
REV. NO.

C
B

kitchen Vendor requirements.


DISCIPLINE
ENGINEER

________________ The Battery Room, Emergency Eye Wash & Shower shall be provided with dedicated
DATE 19 APR 2018 potable water supply.
PROJECT
ENGINEER

________________
The building service piping and valve accessories shall meet the requirements of
DATE 19 APR 2018
ASHRAE, UPC, UMC & COMPANY Standard requirements.
CERTIFIED

________________
Further details for portable water supply refer to plumbing specification and schedule
DATE ___________
as shown in T00-S-DD-486891.

CONSTRUCTION 7.3.2 Sanitary Waste Water Drainage System:


AGENCY

________________
Buildings shall be provided with a gravity type Sanitary Waste Sewer (SWS) system.
DATE ___________
The Toilets, Kitchens, Tea Rooms, Laundry Rooms and other area fixtures shall be
CONTROL NUMBER

DATE _____________

connected with a building main pipe and routed to (building battery limit) manhole.
BY: ______________

OPERATIONS
VERIFICATION

________________
Required vent to atmospheric plumbing shall be provided in all SWS building service
EDSD

DATE ___________
locations in accordance with UPC & SAES recommendations. The building service
piping materials and accessories shall meet the requirements of ASHRAE, UPC, UMC
& COMPANY Standard requirements.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Drain lines from manholes are to be routed to the SAPMT camp lift station.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 44


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Further details for sanitary waste & vent refer to plumbing specification and schedule
CERT

as shown in T00-S-DD-486891.
RXS

RXS

RXS
ENGG

7.3.3 Fire Protection System & Wet Chemicals:


HGB
FK

FK

The required fire protection system for all buildings in SAPMT camp shall be provided
as per Building Performance Specification DD-966916 in accordance with NFPA code,
International Building Code, International Fire Code and COMPANY Engineering
Standards.

Fire water pumps including jockey pumps, diesel operated pump and main power
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

operated pump shall be provided to feed the fire water network taking suction from
Combined Fire Water and Potable water tanks. Fire Water/Potable Water tanks shall
BI-10-09003 ISSUED FOR COMMENT (O2)

be provided by the CONTRACTOR. Fire hydrant network with hydrants and hose reel
cabinets shall be provided as shown on the drawings.
DESCRIPTION

Buildings are portable type pre-fabricated buildings. As per the building service and
occupancy classification, the applicable fire extinguishers shall be provided as shown
on the drawings. Kitchen/Mess Hall Building, Senior Management PMT Department
Building and Prayer Hall shall be provided with fire sprinkler systems. Commercial
JO/EWO

kitchen shall be provided with a hood-and-duct suppression system in accordance with


form SAES-M-100, under Section 12.3.3.
04/19/18

01/07/18

04/03/18

Sprinkler and fire alarm system drawings and any associated calculations shall display
DATE

the seal of a registered engineer or chartered engineer, who has at least five years of
experience in sprinkler and/or fire alarm system design. CONTRACTOR shall arrange
REV. NO.

C
B

for certification of all fire protection / fire drawings and calculations by a COMPANY
DISCIPLINE
ENGINEER approved fire protection engineer.
________________

DATE 19 APR 2018 Further details for fire sprinkler and wet checmical refer to Fire Sprinkler and Wet
PROJECT Chemical Specification as shown in T00-B-DD-486893.
ENGINEER

________________

DATE 19 APR 2018


Further details for portable fire extinguishers refer to Fire Extinguisher specification and
schedule as shown in T00-B-DD-486892.
CERTIFIED

________________
7.3.4 HVAC System:
DATE ___________

CONSTRUCTION
Split type HVAC units shall be provided for all buildings by CONTRACTOR as per
AGENCY Building Performance Specification DD-966916 which shall include: Mini Split Air
________________
Conditioning System Units; Exhaust Fans; Fresh Air Intakes; Transfer Fans; Switches,
DATE ___________
each unit shall have two disconnect switches, one Flush Mounted Indoor Disconnect
CONTROL NUMBER

DATE _____________

Switch in dwelling room or office and an External Surface Mounted Disconnect


BY: ______________

OPERATIONS
VERIFICATION

________________
adjacent to Compressor Unit; Temperature Controls; Condensate Drains and all
EDSD

DATE ___________
required accessories to meet the required performance. DD-486890 describes the
HVAC requirements and schedule.
THIS INDICATES THAT REV. NO. ____________

Clinic Building HVAC shall be as per ASHRAE Standard to meet the indoor health
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

requirements.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 45


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

The Toilets, Kitchen / Tea Rooms and Diwanyah smoking area shall be provided with
CERT

exhaust fans. Kitchen Building cooking area shall be provided with airlock doors, air
RXS

RXS

RXS

curtains, insect killers, room exhaust and make-up fresh air system as per industrial
ENGG

HGB

practice. Kitchen hoods shall be with automatic fire suppression system.


FK

FK

Laundry Building shall be provided with normally operating air conditioning and
ventilation systems, as per the service requirements.

The equipment, material and workmanship shall meet the requirements of ASHRAE &
SAES.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Further details for HVAC System refer to HVAC specification and schedule as shown
in T00-K-DD-486890.
BI-10-09003 ISSUED FOR COMMENT (O2)

7.3.5 Laundry Equipment & Mechanical WORK:


DESCRIPTION

The Laundry Equipment shall be supplied and installed by the CONTRACTOR as per
standard industrial practice and COMPANY requirements.

Pipe work and valves shall be in accordance with Uniform Plumbing Code and Uniform
JO/EWO

Mechanical Code requirements.

Required steam piping & water plumbing work shall be CONTRACTOR’s scope as per
04/19/18

01/07/18

04/03/18

equipment vendor’s requirements.


DATE

7.3.6 Kitchen Equipment & Mechanical WORK:


REV. NO.

C
B

DISCIPLINE All equipment provided is to be of high quality and is to be submitted to company for
ENGINEER

________________
approval prior to purchase.
DATE 19 APR 2018
Kitchen Building shall be provided with electrically operated Cooking Ranges and
PROJECT
ENGINEER ovens and other associated kitchen equipment.
________________

DATE 19 APR 2018


The Arabic and Tandoori ovens to be gas operated.
CERTIFIED

________________ All plumbing and valves shall be in accordance with Uniform Plumbing Code and
DATE ___________
Uniform Mechanical Code requirements. All electrical installations shall be carried out
CONSTRUCTION
in accordance with NEC and SAES related Standards.
AGENCY

________________
All kitchen equipment supply, installation and testing and commissioning shall be by
DATE ___________
CONTRACTOR as per standard industry practice.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
Kitchen hood shall be with exhaust air fan. Kitchen hood shall be provided with
EDSD

DATE ___________
integrated automatic fire suppression system as per NFPA Standard Requirements /
Industry Practice and COMPANY standards requirements.

Required piping & plumbing shall be CONTRACTOR’s scope as per equipment


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

vendor’s requirements.
REVISION CERTIFICATE

7.3.7 Fuel Station

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 46


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

A fuel station shall be provided as shown in drawing no DD-516304.001. Fuel station


CERT

shall include two gasoline storage tanks (tanks are above ground), fuel pumps mounted
RXS

RXS

RXS

on top of the tanks, level switches, flame arrestors, piping, each sized at 10,000 US
ENGG

HGB

Gallons strainers, motor operated valves, dispensers, local control panels, level
FK

FK

gauges and all other required accessories for the trouble free and efficient operation of
fuel station. Details of equipment to be purchased for the Fuel Station are to be
submitted to COMPANY for review and approval prior to purchase by CONTRACTOR.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.4 Electrical
BI-10-09003 ISSUED FOR COMMENT (O2)

7.4.1 General

7.4.1.1 The CONTRACTOR shall plan, design & engineering, supply of equipment and
DESCRIPTION

materials, interface and execute the WORK as per the COMPANY Procedures,
Engineering Standards and Saudi Aramco Construction Safety Manual (SACSM).
CONTRACTOR shall submit a detailed project execution plan to COMPANY
representative for approval prior to commencement. The CONTRACTOR shall carry
JO/EWO

out site surveys to verify actual field conditions, review all design and Vendor drawings
and recommendations.
7.4.1.2 CONTRACTOR shall perform all WORK in accordance with the requirements of this
04/19/18

01/07/18

04/03/18
DATE

project. Any deviation must be approved by COMPANY prior to its implementation.


7.4.1.3 CONTRACTOR shall co-ordinate with the package Vendors for proper interfacing and
REV. NO.

C
B

power supply to all electrical equipment /system coming under various packages.
DISCIPLINE
ENGINEER

________________
7.4.2 Scope of Work
DATE 19 APR 2018
CONTRACTOR shall supply and install electrical distribution system for the facilities
PROJECT
ENGINEER and associated WORK covered by this Scope of WORK. This includes, but not limited
________________ to the following:
DATE 19 APR 2018
7.4.2.1 Design, Engineering, Supply, Inspection & Testing at works, delivery and Supervision
CERTIFIED
of installation, testing & commissioning of 4 nos. Diesel Generator (DG) 13.8kV, 3Ph,
________________
3W, 60Hz as a prime power supplier based on one line diagram drawing nos. DD-
DATE ___________
704605 & DD-704608 complete in all respect as a complete package. The package
CONSTRUCTION scope includes but not limited to the following:
AGENCY

________________ a. Diesel engine complete with lube oil system, fuel oil system with day tank, storage
DATE ___________ tank with transfer pumps with controls, interconnecting pipes, etc. (Transfer pump
control includes motor control gear panel to be located inside the 13.8kV switchgear
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ building where Client will provide 480V, 3Ph, 4W, 60Hz power supply at one point
EDSD

DATE ___________ to control gear)

b. 13.8kV alternator with individual control panels located in the respective skid with all
accessories.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

c. 13.8kV Neutral Grounding Resistors (NGRs)

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 47


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

d. 13.8kV Switchgear with all control and synchronization facilities of DG’s to be


CERT

located inside the 13.8kV switchgear building


RXS

RXS

RXS
ENGG

HGB

e. Interconnecting LV power & control cables and cabling materials, etc. except for
FK

FK

13.8kV cables, to be provided by CONTRACTOR, from Generator to 13.8kV


Switchgear and NGRs
Note: Installation, site testing and commissioning of package equipment shall be
done by CONTRACTOR.
7.4.2.2 Design, Engineering, Supply, Inspection & Testing at works, delivery and supervision
of installation, testing & commissioning of prefabricated containerised 13.8kV
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Substation Building complete with 13.8kV Switchgear and all other auxiliaries as
a complete package. The package scope includes but not limited to the following;
BI-10-09003 ISSUED FOR COMMENT (O2)

a. 13.8kV Switchgear 3Ph, 3W, 60Hz based on one line diagram drawing nos.
DD-704605 & DD-704608.
DESCRIPTION

b. 480V Switchgear 3Ph, 3W, 60Hz based on one line diagram drawing nos.
DD-704641
JO/EWO

c. 125V Battery charger with required capacity Lead Acid battery banks, 125V DC
distribution panels, battery disconnecting switches.
04/19/18

01/07/18

04/03/18

d. 480V, 3Ph, 4W, 60Hz power panel for power supply to all auxiliary power supplies
DATE

e.g. 125V battery charger, control gear for diesel transfer pumps, annunciation
panel, lighting & power panels, HVAC system, Fire System, etc.
REV. NO.

C
B

DISCIPLINE
ENGINEER
e. Small power and lighting system for the prefabricated substation building, outdoor
________________ lighting in DG set area with necessary 480V- 400V dry type transformers, 400-230V
DATE 19 APR 2018 Lighting & Power Panel Boards as required for the same.
PROJECT
ENGINEER
f. Space for locating DG Set Package Vendor supplied equipment e.g. Diesel transfer
________________
pump control gear panel, synchronization panels, etc.
DATE 19 APR 2018

CERTIFIED
g. All ancillary system for the building including HVAC, FDA & Portable Fire
________________
Extinguishers, Lighting & Small Power, Grounding, eye wash in battery room, etc.
DATE ___________

CONSTRUCTION h. Interconnecting LV power & control cables and cabling materials, etc. with the
AGENCY
package substation except for 13.8kV cables, to be provided by CONTRACTOR,
________________

DATE ___________
from Generator to 13.8kV Switchgear and NGRs
Note: Installation, site testing and commissioning of package equipment shall be
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ done by CONTRACTOR.


EDSD

DATE ___________
7.4.2.3 Design, Engineering, Supply, Inspection & Testing at works, delivery and supervision
of installation, testing & commissioning of Low Voltage Diesel Generator (DG) Sets (as
per list below) 480V, 3Ph, 3W, 60Hz as a prime power supplier based on one line
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

diagram drawing nos. DD-7046634 Sh.001, DD-7046636 Sh.002, 003, 004, 005, 006
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DD-7046638 Sh.004&005, DD-704639 Sh. 001 complete in all respect as a complete


package.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 48


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

List of 480V Diesel Generator Sets


CERT

RXS

RXS

RXS

Nos and DG Set


Facilities and Area Tag of DG Sets
Rating (Prime Power)
ENGG

HGB
FK

FK

STP near CONTRACTOR Camp area (refer 2Nos. 480V, 750kW, 3Ph, T00-P-2051A,
Drg. No. DD-724635 Sh. 002) 3W, 60Hz
T00-P-2051B
(1 Duty + 1 Stand by)

Water Well 1, CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2100A,
(refer Drg. No. DD-724639 Sh. 001) 3W, 60Hz
T00-P-2100B
(1 Duty + 1 Stand by)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Water Well 2, CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2200A,
BI-10-09003 ISSUED FOR COMMENT (O2)

(refer Drg. No. DD-724639 Sh. 002) 3W, 60Hz


T00-P-2200B
(1 Duty + 1 Stand by)

Water Well 3, CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2300A,
DESCRIPTION

(refer Drg. No. DD-724639 Sh. 003) 3W, 60Hz


T00-P-2300B
(1 Duty + 1 Stand by)

Water well 6, Lift station-1, STP, WTP at 4Nos. 13.8kV, 2250kW, T00-EDG-301,
JO/EWO

SAPMT Camp 3Ph, 3W, 60Hz


T00-EDG-302,
(refer Drg. No. DD-704606 (3 Duty + 1 Stand by)
T00-EDG-303
04/19/18

01/07/18

04/03/18
DATE

T00-EDG-304
REV. NO.

Lift Station 2 in CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2251A,
D

C
B

(refer Drg. No. DD-724637 Sh.002) 3W, 60Hz


DISCIPLINE T00-P-2251B
ENGINEER
(1 Duty + 1 Stand by)
________________

DATE 19 APR 2018


Lift Station 3 in CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2351A,
PROJECT (refer Drg. No. DD-724637 Sh.003) 3W, 60Hz
ENGINEER T00-P-2351B
________________ (1 Duty + 1 Stand by)
DATE 19 APR 2018
Lift Station 4 in CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2401A,
CERTIFIED
(refer Drg. No. DD-724637 Sh.006) 3W, 60Hz
________________ T00-P-2401B
DATE ___________ (1 Duty + 1 Stand by)

CONSTRUCTION Lift Station 5 in CONTRACTOR Camp area 2Nos. 480V, 750kW, 3Ph, T00-P-2501A,
AGENCY
(refer Drg. No. DD-724637 Sh.007) 3W, 60Hz
________________ T00-P-2501B
DATE ___________ (1 Duty + 1 Stand by)
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

Central Training Centre in CONTRACTOR 2Nos. 480V, 680kW, 3Ph, T00-P-2052A,


________________
Camp area (refer Drg. No. DD-724637 3W, 60Hz
EDSD

DATE ___________
Sh.001) T00-P-2052B
(1 Duty + 1 Stand by)

SAPMT office & Gathering tent facility 2Nos. 480V, 750kW, T00-P-2053A,
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

area (refer Drg. No. DD-774644 ) 3Ph, 3W, 60Hz


T00-P-2053B
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

(1 Duty + 1 Stand by)

The package scope includes but not limited to the following:


DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 49


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

a. Diesel engine complete with lube oil system, fuel oil system with day tank, storage
CERT

tank with transfer pumps with controls, interconnecting pipes, etc. (transfer pump
RXS

RXS

RXS

control includes motor control gear panel where Client will provide 480V, 3Ph, 4W,
ENGG

HGB

60Hz power supply at one point to control gear)


FK

FK

b. 480V alternator with individual control panel located in the respective skid with all
accessories.

c. Necessary inputs from GCP to synchronization system as a part of ATS panels to


be located inside the respective Electrical Rooms.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

d. Interconnecting LV power & control cables, cabling materials, earthing materials etc.
within DG set skid except for 480kV cables, to be provided by CONTRACTOR, from
BI-10-09003 ISSUED FOR COMMENT (O2)

Generator to 480V Switchboard/Control gear.


Note: Installation, site testing and commissioning of package equipment shall be
DESCRIPTION

done by CONTRACTOR.
7.4.2.4 Design, Engineering, Supply, Inspection & Testing at works, delivery and Supervision
of installation, testing & commissioning of prefabricated containerised Electrical Room
complete with 480V Switchboard/Control gear (MCC) and all other auxiliaries as a
JO/EWO

complete package. The package scope includes but not limited to the following as
detailed in table below;
04/19/18

01/07/18

04/03/18

Designation of Switchboard/ Other Ancillary


DATE

DC System
Electrical Room Controlgear Equipment System
Electrical Room WW6 - 480V ATS Panel, NA 480-400V Dry HVAC, FDA &
REV. NO.

SAPMT Camp Type Transformer, Portable Fire


B

480V Switchgear Aux.Panel Extinguisher,


DISCIPLINE
ENGINEER (See Drg. Nos. DD- Boards, etc. Lighting & Small
724640 Sh.001) 480V MCC
________________ Power,
DATE 19 APR 2018 Grounding, etc.
PROJECT
ENGINEER
Electrical Room WTP - 480V MCC 480-400V Dry HVAC, FDA &
________________ SAPMT Camp Type Transformer, Portable Fire
DATE 19 APR 2018 Aux.Panel Extinguisher,
(See Drg. Nos. DD- Boards, etc. Lighting & Small
CERTIFIED 724643 Sh.002) Power,
________________
Grounding, etc.
DATE ___________

CONSTRUCTION
Electrical Room - 480V ATS Panel, NA Aux.Panel HVAC, FDA &
AGENCY Kitchen Boards, etc. Portable Fire
480V Switchboards Extinguisher,
________________
(See Drg. Nos. DD- Lighting & Small
DATE ___________
724637 Sh.002) Power,
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
Grounding, etc.
VERIFICATION

________________
EDSD

DATE ___________
Electrical Room WTP - 480V MCC NA 480-400V Dry HVAC, FDA &
SAPMT Camp Type Transformer, Portable Fire
Aux.Panel Extinguisher,
(See Drg. Nos. DD- Boards, etc. Lighting & Small
THIS INDICATES THAT REV. NO. ____________

724643 Sh.002)
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Power,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Grounding, etc.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 50


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Designation of Switchboard/ Other Ancillary


DC System
Electrical Room Controlgear Equipment System
CERT

RXS

RXS

RXS

Electrical Room STP - 480V MCC NA 480-400V Dry HVAC, FDA &
ENGG

HGB

SAPMT Camp Type Transformer, Portable Fire


FK

FK

Aux.Panel Extinguisher,
(See Drg. Nos. DD- Boards, etc. Lighting & Small
724643 Sh.001) Power,
Grounding, etc.

Electrical Room -LS 2 480V ATS Panel, NA Aux.Panel HVAC, FDA &
Boards, etc. Portable Fire
(See Drg. Nos. DD- 480V MCC Extinguisher,
724637 Sh.002)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Lighting & Small


Power,
BI-10-09003 ISSUED FOR COMMENT (O2)

Grounding, etc.

Electrical Room -LS 3 480V ATS Panel, NA Aux.Panel HVAC, FDA &
Boards, etc. Portable Fire
(See Drg. Nos. DD- 480V MCC
DESCRIPTION

Extinguisher,
724637 Sh.003) Lighting & Small
Power,
Grounding, etc.
JO/EWO

Electrical Room -LS 4 480V ATS Panel, NA Aux.Panel HVAC, FDA &
Boards, etc. Portable Fire
(See Drg. Nos. DD- 480V MCC Extinguisher,
724637 Sh.006) Lighting & Small
04/19/18

01/07/18

04/03/18
DATE

Power,
Grounding, etc.
REV. NO.

C
B

Electrical Room -LS 5 480V ATS Panel, NA Aux.Panel HVAC, FDA &
DISCIPLINE
ENGINEER
Boards, etc. Portable Fire
(See Drg. Nos. DD- 480V MCC Extinguisher,
________________ 724637 Sh.007) Lighting & Small
DATE 19 APR 2018
Power,
PROJECT Grounding, etc.
ENGINEER

________________
Electrical Room -WW 1 480V ATS Panel, NA Aux.Panel HVAC, FDA &
DATE 19 APR 2018
Boards, etc. Portable Fire
CERTIFIED
(See Drg. Nos. DD- 480V MCC Extinguisher,
724639 Sh.001) Lighting & Small
________________

DATE ___________ Power,


Grounding, etc
CONSTRUCTION
AGENCY
Electrical Room -WW 2 480V ATS Panel, NA Aux.Panel HVAC, FDA &
________________
Boards, etc. Portable Fire
DATE ___________ (See Drg. Nos. DD- 480V MCC Extinguisher,
724639 Sh.002) Lighting & Small
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
Power,
EDSD

DATE ___________
Grounding, etc

Electrical Room -WW 3 480V ATS Panel, NA Aux.Panel HVAC, FDA &
Boards, etc. Portable Fire
(See Drg. Nos. DD- 480V MCC Extinguisher,
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

724639 Sh.003)
OF THIS DRAWING IS COVERED, FOR ALL

Lighting & Small


BY DRAWING COMPLETION CERTIFICATE
REVISION CERTIFICATE

Power,
Grounding, etc

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 51


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Designation of Switchboard/ Other Ancillary


DC System
Electrical Room Controlgear Equipment System
CERT

RXS

RXS

RXS

Electrical Room – STP 480V ATS Panel, NA Aux.Panel HVAC, FDA &
ENGG

HGB

Contractor Camp Boards, etc Portable Fire


FK

FK

480V MCC Extinguisher,


(See Drg. Nos. DD- Lighting & Small
724635 Sh.002) Power,
Grounding, etc

Electrical Room – 480V ATS Panel, NA Aux.Panel HVAC, FDA &


SAPMT Office Boards, etc Portable Fire
Extinguisher,
(See Drg. Nos. DD-
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Lighting & Small


7246XX Sh.002) Power,
BI-10-09003 ISSUED FOR COMMENT (O2)

Grounding, etc

Electrical Room – 480V ATS Panel, NA Aux.Panel HVAC, FDA &


Central Training Centre Boards, etc Portable Fire
480V Switchgear
DESCRIPTION

Extinguisher,
(See Drg. Nos. DD- Lighting & Small
724637 Sh.004) Power,
Grounding, etc
JO/EWO

Notes: 30% emergency lighting shall be provided with same type Light fixtures having
built-in battery back-up for 1.5Hrs.
04/19/18

01/07/18

04/03/18

7.4.2.5 Supply, installation, testing and commissioning of the Package Substations


DATE

(13.8kV-400/230V, 3Ph, 4W, 60Hz) consisting of outdoor type, SF6 Ring Main Unit
(RMU), Oil Immersed Pad Mounted Transformer and Low Voltage Distribution Panel,
REV. NO.

including power and control cables interconnection complete with all required
D

C
B

DISCIPLINE
ENGINEER
accessories as per SEC Standard, 56-SDMS-04 and one line diagram drawing no. DD-
________________
704607.
DATE 19 APR 2018
7.4.2.6 Supply, installation, testing and commissioning of the Package Substations
PROJECT
ENGINEER
(13.8kV-480/277V, 3Ph, 3W, 60Hz) consisting of outdoor type, SF6 Ring Main Unit
________________
(RMU), Oil Immersed Pad Mounted Transformer and Low Voltage Distribution Panel,
DATE 19 APR 2018 including power and control cables interconnection complete with all required
CERTIFIED
accessories as per SEC Standard and one line diagram drawing no. DD-704607.
________________
7.4.2.7 Supply, laying, termination, testing and commissioning of two nos. 13.8kV cable loop
DATE ___________
to the outgoing circuit breakers of indoor, metal clad switchgear, complete with indoor
CONSTRUCTION
type-high voltage termination kits complete with all required accessories based on one
AGENCY
line diagram drawing no. DD-704605 and 704606.
________________

DATE ___________ 7.4.2.8 Supply, termination, testing and commissioning of 13.8kV loop cables to the respective
SF6 Ring Main Units (RMU) loop-in and loop-out line switches with outdoor type
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ termination/splicing kit complete with all required accessories based on one line
EDSD

DATE ___________ diagram drawing nos. DD-704611 and 704612 .


7.4.2.9 Supply, installation, testing and commissioning of outdoor type 480V main distribution
panels having 480V, 400A, 3Ph, 4W Busbar with requisite nos. of outgoing 3 Pole
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

MCCBs complete with all required accessories based one line diagram drawing no.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DD-704611 and 704612.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 52


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.4.2.10 Excavation of cable trench, sand bedding, laying of power and control cables, back
CERT

filling, and compaction complete with required cable tiles, warning tapes, route markers
RXS

RXS

RXS

complete with all required accessories.


ENGG

HGB
FK

FK

7.4.2.11 Supply, termination including jointing/splicing, testing and commissioning of low


voltage power and control cables to the outdoor/indoor electrical equipment complete
with terminal lug, termination/splicing kit, cable gland, cable shroud/support complete
with all required accessories.
7.4.2.12 Supply, laying, terminations, testing and commissioning of LV power & control cables
include but not limited to following;
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

a. Cables from Diesel Generators to ATS Panels and to LV switchgear / MCC.


b. Cables from LV switchboards / ATS panels to various transformers, panels boards,
BI-10-09003 ISSUED FOR COMMENT (O2)

controlgears, etc. and controlgears to various transformers, panels boards, etc.


c. Cables from Package substations (13.8kV-480V or 400V, 3Ph, 4W, 60Hz) to
outdoor Main Distribution Panels located near respective Package substations.
DESCRIPTION

d. Cables from the outdoor main distribution panel boards to outdoor panel boards / to
the indoor panel boards inside the pre-fabricated buildings which distributes power
to lighting, small power receptacles and HVAC / kitchen or other equipment inside
JO/EWO

the buildings complete with all required accessories.


e. Cables from the outdoor main distribution panel boards to outdoor panel boards to
04/19/18

01/07/18

04/03/18

Street light fixtures and flood light fixtures.


DATE

f. Cables from Package Substations / Switchgear Panels to Outdoor type switchrack


REV. NO.

with motor controller inside the package for Fire Water Main FW pump and Jockey
D

C
B

DISCIPLINE
pump motors and cables from switchrack to different consumers like Potable water,
ENGINEER Irrigation water motors.
________________

DATE 19 APR 2018


g. Cables from Package Substations / Switchgear Panels to Outdoor type switchrack
PROJECT
with motor controller inside the package for Sewage Lift Stations and cables from
ENGINEER switchracks to different consumers/ motors.
________________

DATE 19 APR 2018 h. Cables from Package Substations / Switchgear Panels to Outdoor type switchrack
CERTIFIED
with motor controller inside the package of STP for sewage pumps, odor control
________________
system and cables from switchrack to different consumers/ motors.
DATE ___________
i. Cables from Package Substations / Switchgear Panels to Outdoor type switchrack
CONSTRUCTION
with motor controller inside the package of WTP for various consumers / pump
AGENCY
motors and cables from switchrack to different consumers/ motors.
________________

DATE ___________ j. Cables from Package Substations / outdoor Main Distribution Panels to Outdoor
type switchrack with motor controller inside the package of Water Wells for various
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
pump motors and cables from switchrack to different consumers/ motors.
EDSD

DATE ___________
Notes:
1. The package Vendors shall provide all the required Switchracks with motor
starters/feeders as required for providing power supply to various motors/
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

consumers.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 53


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

2. The package Vendors shall size and supply all required interconnecting power
CERT

and control cables between the equipment in scope (between


RXS

RXS

RXS

switchboards/controlgears/switchracks to various motors/ consumers.


ENGG

HGB
FK

FK

7.4.2.13 Supply, laying, testing and commissioning of complete grounding network and
grounding equipment & structures based on SAES-P-111 & library drawing no.
DD-950022 and project grounding drawings nos. DD-774643 & DD-724626.
7.4.2.14 All electrical utilities like lighting, power, grounding, fire alarm system along with the
panel boards inside the building shall be provided by the building vendor complete with
all required accessories.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.4.2.15 CONTRACTOR shall submit the Building shop drawings for all electrical utilities like
lighting with LED type fixtures, power/receptacles, grounding, fire alarm system along
BI-10-09003 ISSUED FOR COMMENT (O2)

with the Distribution Panels inside the building for prior approval before starting
manufacturing.
Regarding number of light fittings, receptacles, etc refer load schedules, Doc. No.
DESCRIPTION

DD-834600 for guidelines. Number of lighting fittings shall be selected to achieve


minimum lux levels as mentioned in SAES-P-123 and in Functional specification for
portable building, document no. DD-966916.
JO/EWO

Building Vendor scope shall include complete electrical power distribution system
including power supply to HVAC system starting from Distribution Panels (MDP or
Panels Boards) including supply and installation of Distribution Panels, cabling/wiring
04/19/18

01/07/18

04/03/18

including cabling/wiring materials, Grounding including grounding materials, etc as


DATE

complete package. CONTRACTOR will provide power supply to the incoming


Distribution Panels of the buildings.
REV. NO.

C
B

DISCIPLINE
Clinic Building shall have a Common Siren in case of emergency inside the SAPMT
ENGINEER Camp. The Siren shall be initiated by a Push Button Station located inside the Main
________________
Guard House.
DATE 19 APR 2018

PROJECT
7.4.2.16 Exits and exit access shall be marked by an approved exit sign readily visible from any
ENGINEER direction of egress travel. Exit sign placement shall be such that no point in an exit
________________
access or exit passageway is more than 30m away or the listed viewing distance
DATE 19 APR 2018
(whichever is less) from the nearest visible exit sign.
CERTIFIED

________________
7.4.2.17 Emergency lights shall be provided and comply with IBC2009 section 1006. The means
DATE ___________ of egress illumination level shall not be less than 11 lux at the walking surface.

CONSTRUCTION
7.4.2.18 Supply, installation, testing and commissioning of street and area lighting in SAPMT
AGENCY
camp area complete with 10M lighting poles with power supply loop-in loop out boxes
________________
including fuses, 230V LED light fixtures with lamps with all required accessories based
DATE ___________
on DD-744625 and typical installation details drawing no. DD-774643.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ Street light fixtures and flood light fixtures shall be controlled from a Contactor located
EDSD

DATE ___________ inside the Street Lighting Distribution Panel or in other panels as required with
photoelectric switches so that they are switched on only when ambient illumination
level is low, complete with all required accessories.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

7.4.2.19 Supply, installation, testing and commissioning of Solar system street lights for external
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

access roads complete with 10M Street Poles, 24V LED light fixtures with lamps,
individual solar PV modules with battery, with all required accessories to complete the
solar system street lighting.
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 54


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.4.2.20 Provide Lighting Control Panel, complete with lighting contactor, photocell, selector
CERT

switches, wiring and wiring accessories including Local Control Station in NEMA-4X
RXS

RXS

RXS

enclosure for flood lighting of Soccer Field, Basketball Court & Tennis Court complete
ENGG

HGB

with all required accessories.


FK

FK

7.4.2.21 Perform an arc flash hazard analysis for all electrical equipment.

7.4.3 Pre-Commissioning and Testing

COMPANY has a series of Pre-Commissioning Test Forms which are available to


CONTRACTOR’s Vendors and Third Party Test Agencies. The above Forms shall be
utilized for all pre-commissioning activities and shall be supplemented as required by
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

specific Vendor or Third Party Test Agency documentation.


BI-10-09003 ISSUED FOR COMMENT (O2)

COMPANY Pre-Com Form P-000; provides a basic guideline for general pre-
commissioning requirements on all projects.
Full Pre-Commissioning requirements shall be stipulated by COMPANY Pre-
DESCRIPTION

Commissioning Forms, COMPANY Engineering Standards, Manufacturer, Vendor


Operation & Maintenance Manual Requirements and/or other valid
recommendations/requirements.
JO/EWO

7.5 Communications

The WORK described in this section includes the installation of communication


04/19/18

01/07/18

04/03/18
DATE

transport infrastructure for voice and data network for the new TGP temporary
construction facilities.
REV. NO.

C
B

For backbone connectivity, the CONTRACTOR shall provide approximately 23.0 km of


DISCIPLINE
ENGINEER 96-strand single mode fiber optic cable from the existing communication building at
________________ Tanajib Oil Plant to new splice point no.4 and extend approximately 15 km of 24-strand
DATE 19 APR 2018
single mode to the new Tanajib temporary camp facilities.
PROJECT
ENGINEER

________________
The communications facilities and services to be provided for the new TGP temporary
DATE 19 APR 2018 construction facilities are as follows:
CERTIFIED

________________
• OSP Facilities and Inter-Building Cables.
DATE ___________
• Telecommunication Equipment Room (TER) Shelter
CONSTRUCTION
AGENCY • Structured Cabling System
________________
• Data Network System
DATE ___________

• Telephone System
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________ 7.5.1 Data Network Facilities

7.5.1.1 CONTRACTOR shall provide data services for the temporary construction site offices
of the new Tanajib Gas Plant. Data access switches shall be provided to serve the new
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

SAPMT office, Senior Management PMT Office, SAPMT site offices, clinic, training
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

hall, and central training center and connect to the new distribution switch at the TER
shelter under this project. The TCF data network shall be connected to existing PE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 55


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

routers at Tanajib Oil Plant and Tanajib DCO on a 10GB link via the new FOC and
CERT

existing FOC between Tanajib DCO and Tanajib Oil Plant.


RXS

RXS

RXS
ENGG

HGB
FK

FK

7.5.1.2 CONTRACTOR shall be responsible for the complete system installation, termination,
testing and commissioning to ensure full functionality of the data network system.
7.5.1.3 CONTRACTOR shall perform the work required to build a viable and reliable data
network for Tanajib temporary construction facility.
7.5.1.4 All interfacing/integration by this project to the existing and operational COMPANY data
network facility shall be done by CONTRACTOR under the supervision of the
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

concerned COMPANY Engineering, Operations and Service groups.


7.5.1.5 All equipment that shall be provided by CONTRACTOR shall be wired according to
BI-10-09003 ISSUED FOR COMMENT (O2)

COMPANY standards and as shown in design drawings.


7.5.1.6 CONTRACTOR shall install all data network equipment and provide network
connections from the TER, to all communication rooms or cabinets in the office areas.
DESCRIPTION

7.5.2 Backbone Distribution Switch

The CONTRACTOR shall provide and install one (1) Juniper MX-480 at the TER to be
JO/EWO

used as distribution switch for the Tanajib construction temporary facilities.


04/19/18

01/07/18

04/03/18
DATE

7.5.3 IPS Equipment


REV. NO.

CONTRACTOR shall provide and install CISCO firepower 4100 series unit (subject for
D

C
B

DISCIPLINE
approval of Saudi Aramco IT) following SA requirement in providing IPS equipment to
ENGINEER
temporary facilities that shall be directly connected to SA corporate data network.
________________

DATE 19 APR 2018

PROJECT
ENGINEER 7.5.4 Ethernet Access Switches
________________

DATE 19 APR 2018 7.5.4.1 CONTRACTOR shall provide and install new access switches with the following
CERTIFIED provisions:
________________

DATE ___________ a. One (1) 1000Base-LX SFP single mode uplink to be connected to Juniper MX-480
distribution switch located at the TER shelter.
CONSTRUCTION
AGENCY

________________ b. 10/100/1000 Ethernet RJ-45 PoE ports.


DATE ___________

Refer to table 1-1 for access switches distribution


CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________ Building Name Switch Type/Model


TER Shelter HP Aruba 3810M-24G PoE
Senior Management Office TR-1 HP aruba 5412R zl2 – 96 port PoE
Senior Management Office TR-2 HP aruba 5412R zl2 – 96 port PoE
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

HP aruba 5412R zl2 – 96 port PoE


BY DRAWING COMPLETION CERTIFICATE

PMT Office Building TR-1


REVISION CERTIFICATE

PMT Office Building TR-2 HP aruba 5412R zl2 – 96 port PoE


Clinic HP Aruba 3810M-24G PoE
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 56


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Security Office HP Aruba 3810M-24G PoE


CERT

RXS

RXS

RXS
Training Hall HP Aruba 3810M-24G PoE
Central Training Center HP Aruba 3810M-48G PoE
ENGG

HGB
FK

FK

Table-1: Access Switches Distribution Table


7.5.4.2 Access switches shall be mounted on a standard 19” rack if the building has
a dedicated communication room. Whereas, in buildings that don’t have
communication rooms, the access switches shall be mounted on cube-IT cabinet.
7.5.4.3 The switch shall have redundant power supply, powered from two different power
circuits.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.5.5 Power Over Ethernet


BI-10-09003 ISSUED FOR COMMENT (O2)

All access switches shall have the Power over Ethernet capability that shall comply
with the 802.3af specifications. Power over Ethernet capability shall provide adequate
power to all access switch ports with the assumption that all switches at some point be
DESCRIPTION

fully populated.

7.5.6 Network Equipment IP Addresses

All network equipment shall be assigned static IP addresses to uniquely identify each
JO/EWO

device in the network.

7.5.7 TER Shelter


04/19/18

01/07/18

04/03/18
DATE

CONTRACTOR shall provide and install a pre-fabricated TER and shall be equipped
REV. NO.

with all the required civil/electrical/fire alarm system /mechanical (HVAC) facilities as
D

C
B

DISCIPLINE
stipulated in SAES-T-916.
ENGINEER

________________ 7.5.8 Telephone System


DATE 19 APR 2018

PROJECT
7.5.8.1 CONTRACTOR shall provide a VoIP telephone system for temporary construction
ENGINEER
facilities only for SAPMT offices.The new telephone system shall have the capacity to
________________
support 500 VoIP lines to serve the TCF SAPMT office’s telephone requirements.
DATE 19 APR 2018
These offices also include the Clinic, Security Office, Training Hall and Central Training
CERTIFIED
Center. The telephone system shall be connected to the existing SA corporate VoIP
________________
network where additional licenses shall be provided to support the new user
DATE ___________
requirements.
CONSTRUCTION
AGENCY 7.5.8.2 The CONTRACTOR shall be responsible for the complete system installation,
________________ termination, testing and commissioning to ensure full functionality of the new telephone
DATE ___________ system.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
7.5.8.3 The CONTRACTOR shall perform the work required to build a viable and reliable
VERIFICATION

________________
telephone system for Tanajib temporary construction facility.
EDSD

DATE ___________

7.5.8.4 All interfacing by this project to the existing and operational COMPANY telephone
system shall be done by the CONTRACTOR under the supervision of the concerned
COMPANY Engineering, Operations and Service groups.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

7.5.8.5 The telephone system structure for the temporary facilities consists of but not limited
to the following:

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 57


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

a. One (1) Huawei e space U1981 IPBX (LAG).


CERT

RXS

RXS

RXS

b. Five Hundred IP Phones


ENGG

HGB
FK

FK

c. All the necessary software and licenses to support at least 500 VoIP lines in line
with BI-246 requirements.

7.5.8.6 The telephone LAG shall be connected to the SBC in Dhahran as per IT requirements.

7.5.8.7 CONTRACTOR shall coordinate or communicate with third party service provider for
Analog Telephone requirements for accomodations type A, B, C and other structured
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

support facilities of Temporary Construction Facilities.


BI-10-09003 ISSUED FOR COMMENT (O2)
DESCRIPTION

7.5.9 Equipment Licenses

Licenses for 500 VoIP users shall be purchased by CONTRACTOR and get activated
at Dhahran and Abqaiq telephone switches to be used at Temporary Construction
Facilities.
JO/EWO

7.5.10 Video Conferencing


04/19/18

01/07/18

04/03/18
DATE

7.5.10.1 CONTRACTOR shall provide a stand-alone Video Conferencing (VC) system that will
deliver high performance-High Definition (HD) video conferencing services to the users
REV. NO.

in the Senior Management PMT Office building over IP-based network.


D

C
B

DISCIPLINE
ENGINEER
7.5.10.2 The VC system shall utilize the provided data network system for Tanajib temporary
________________ construction facilities.
DATE 19 APR 2018
7.5.10.3 The system shall be equipped with at least one (1) 10/100/1000 Base-T interface port
PROJECT
ENGINEER
for the connection to the Tanajib temporary facilities data network system.
________________
7.5.10.4 CONTRACTOR shall provide install test and commission a viable video conferencing
DATE 19 APR 2018
system to fit in the designated conference room inside the senior management building
CERTIFIED
of Tanajib temporary construction facilities.
________________

DATE ___________ 7.5.10.5 The Video Conferencing (VC) system structure for the Tanajib temporary facilities shall
consist of but not limited to the following:
CONSTRUCTION
AGENCY
a. Video CODEC supporting IP and ISDN network – preferably Cisco SX80
________________

DATE ___________ or higher.


CONTROL NUMBER

DATE _____________

b. HD LCD Screen
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________ c. PTZ Cameras


d. Audio Speakers
e. Table-top microphones
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

f. Amplifier
g. Digital signal Processor

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 58


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

h. HDMI Matrix Switcher


CERT

RXS

RXS

RXS

7.5.11 Closed Circuit Television System (CCTV)


ENGG

HGB
FK

FK

CONTRACTOR shall provide, install, test and commission a CCTV system to provide
surveillance and video monitoring on Senior Management PMT Office, SAPMT Office,
Central Training Center, 2-man Suite accommodation and 4-man Suite
accommodation buildings, Executive Dawaniyah, Sitting Room Type A & B, parking
area at Type A, B & C accommodations and all entrance/exit gates.
The CCTV System shall be monitored in Security Office Building, Central Training
Center and Senior Management office.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.5.11.1 The CCTV system of the Tanajib temporary facilities shall consist of but not limited to
BI-10-09003 ISSUED FOR COMMENT (O2)

the following:
a. Access Switch
b. FHD 65” LED Monitor (eight) at CCTV Room, Security Office & Camp Admin Bldg
DESCRIPTION

c. FHD 45” LED Monitor (two) at PMT Depatrment Manager Office


d. FHD 65” LED Monitor (one) at Central Training Center
e. Server/NVR
f. Outdoor Cameras with housing (NEMA 4) and power supply
JO/EWO

g. Wall mount Cabinets and Racks


h. Work Stations
i. Fiber Patch panel
04/19/18

01/07/18

04/03/18
DATE

j. Power cable and outdoor/indoor UTP Cat 6 cable


REV. NO.

7.5.12 WIFI Access Systems


D

C
B

DISCIPLINE
ENGINEER 7.5.12.1 WiFi Service provider will provide a WiFi service for persons who reside in the
________________ completed SAPMT Camp. CONTRACTOR will have interface with WiFi service
DATE 19 APR 2018 provider.
PROJECT
ENGINEER 7.5.12.2 CONTRACTOR shall provide all trenching and conduit laying for the WIFI system. The
________________ pulling of the associated cable, supply and installation of WiFi receiving and
DATE 19 APR 2018 transmitting equipment is NOT part of the WORK and shall be performed by the WiFi
CERTIFIED Service provider.
________________

DATE ___________ 7.5.13 Audio System for Musallah


CONSTRUCTION
AGENCY
CONTRACTOR shall provide a complete Audio System in Musallah. CONTRACTOR
________________
shall provide indoor speaker system inside musallah and outdoor speaker at Minaret.
DATE ___________
7.5.14 Description of Communication WORK
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
7.5.14.1 Outside Plant Network
EDSD

DATE ___________

a. Duct Bank Facilities


• A new 100mm dia. PVC concrete encased conduit system shall be constructed in
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

all crossing facilities. One (1) of the new PVC installed shall be equipped with
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

4-1” diameter color coded sub-ducts.


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 59


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

• CONTRACTOR shall install surface and/or post markers as required. Warning


CERT

signs shall indicate “Underground Communication Cable”.


RXS

RXS

RXS

• Install new pedestals, type UPC-1000.


ENGG

HGB
FK

FK

• CONTRACTOR shall install Optiped splice closures to house the fiber optic cable
joint.
• CONTRACTOR shall install Horizontal Directional Drilling (HDD) in Main Hi-way
and all asphalted busy road.
• A new 8-4” diameter PVC concrete encased entrance conduit facility system shall
be installed in the TER Shelter.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

• All PVC conduits shall be 4” diameter I.D. NEMA TC-8 Type D.B. conduit bends,
BI-10-09003 ISSUED FOR COMMENT (O2)

coupling and fitting shall conform to the specification requirements of NEMA


TC-9.
• The new conduit structure shall be encased in concrete as per COMPANY
DESCRIPTION

Engineering Standard, SAES-T-911 and SAES-T-903.


b. Temporary Construction Facilities
• CONTRACTOR shall provide and install surface and/or post markers as required.
JO/EWO

Warning signs shall indicate “Underground Communication Cable”.


• CONTRACTOR shall provide and install 4-1” color coded sub-ducts inside 4’
04/19/18

01/07/18

04/03/18
DATE

diameter PVC conduits with fiber optic cable.


• CONTRACTOR shall provide and install new pedestals, type UPC-1000.
REV. NO.

C
B

DISCIPLINE
c. Cable Facilities
ENGINEER

________________
• Fiber Optic Cable
DATE 19 APR 2018
o Backbone connectivity
PROJECT
ENGINEER ▪ A new ITU-G-655, 96 - strand singlemode, Fiber Optic Cable shall be installed
________________
from existing Tanajib Oil Plant communication building up to new Optiped
DATE 19 APR 2018
splice closure along fiber route. The Fiber core strand number 49-72 shall be
CERTIFIED intercepted from optiped splice closure and extend up to TGP Temporary
________________
construction facilities TER shelter.
DATE ___________

▪ The remaining strands from Optiped splice closure shall be cleared and
CONSTRUCTION
AGENCY
capped inside Optiped splice closure for future use in new Tanajib Gas Plant.
________________
▪ The fiber cable shall be installed continuous and without joints.
DATE ___________

o SAPMT Camp
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
▪ A new ITU-T-G.652, 48 and new ITU-T-G.655, 144 strands single mode fiber
EDSD

DATE ___________
optic cable shall be installed from Telecommunication Equipment Room
Shelter distributed to all building that required Fiber Optic Cable connectivity.
Refer to Table below:
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Building No. of Strand

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 60


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Senior Management PMT office 12 strand


CERT

RXS

RXS

RXS

SAPMT Office 12 strand


ENGG

HGB
FK

FK

SAPMT Offices at EPC 1-9 6 strand each

Clinic 6 strand

Training Hall 6 strand

Central Training Center 6 strand


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Security Office 6 strands


BI-10-09003 ISSUED FOR COMMENT (O2)

▪ CONTRACTOR shall provide 50.0 meter Fiber Optic Cable loop in each
demarcation pedestal point for future distribution intended to SAPMT Office
EPC 1-9. Fiber cable shall be capped at one end.
DESCRIPTION

▪ All fiber optic cables shall be terminated in the respective communication


building, termination points in accordance with SAES-T-916 and other
applicable COMPANY standards.
JO/EWO

▪ Perform cable testing before and after cable splicing and terminations and
prepare test documents in accordance with SAES-T-634.
04/19/18

01/07/18

04/03/18

▪ Tagging and Marking of cables. Cable Marking shall conform to SAES-T-916


DATE

Par. 4.6.6.3 and SAES-T-018.


REV. NO.

7.5.14.2 Detailed Description of Outside Plant Facilities - CCTV System


D

C
B

DISCIPLINE
ENGINEER a. Duct Bank Facilities
• A new 100mm dia. PVC concrete encased conduit system shall be constructed in
________________

DATE 19 APR 2018


all crossing facilities. One (1) of the new PVC installed are equipped with 4-1” color
PROJECT
ENGINEER coded sub-ducts.
• The CCTV system shall share with IT cable trenching and duct bank facilities.
________________

DATE 19 APR 2018

CERTIFIED • CONTRACTOR shall install surface and/or post markers as required. Warning
________________ signs shall indicate “Underground Communication Cable”.
DATE ___________
b. Fiber Optic Cable
• CONTRACTOR shall provide and install a new ITU-G-652D, 144 strand
CONSTRUCTION
AGENCY

________________
singlemode, fiber optic cable from Telecommunication Room at Security Office
DATE ___________
Building branch spliced and distributed to the CCTV cameras in Senior
CONTROL NUMBER

Management PMT Office, SAPMT Office Building, Central Training Center, 2-Man
DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
Suite (Type-A) Accommodations, 4-Man Suite (Type-B) Accommodations,
EDSD

DATE ___________
Executive Diwaniyah, Sitting rooms for Type A & B, parking area for Type A, B &
C accommodation and all entrance/exit gates.
• Outside plant fiber optic cables shall be wrapped with fire retardant tape between
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

the cable entry point up to the termination point inside buildings where splice
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

closures are not provided in accordance with SAES-T-916 and other applicable
COMPANY standards.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 61


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

• Perform cable testing before and after cable splicing and terminations and prepare
CERT

RXS

RXS

RXS
test documents in accordance with SAES-T-634.
• Tagging and Marking of cables. Cable Marking shall conform to SAES-T-916 Par.
ENGG

HGB
FK

FK

4.6.6.3 and SAES-T-018.


7.5.14.3 Inside Plant Facilities
a. TER Shelter
The CONTRACTOR shall be responsible to the following SCS scope of work:
• Supply and installation of riser (intra-backbone), horizontal copper and fiber optic
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

cables which also include pulling of cables, cross connect terminations, modular
patch panels, terminal block requirements, testing and commissioning.
BI-10-09003 ISSUED FOR COMMENT (O2)

• Supply and installation of cable ladders, cable runways and pathways.


• Supply and installation of UTP Cat-6 horizontal cabling inside the buildings.
DESCRIPTION

• Supply and installation of equipment racks to support the fiber patch panels, data
network switches, patch cord organizers and power distribution units.
• Supply and installation of Telecommunications Main Grounding Busbar (TMGB)
JO/EWO

inside the TER Shelter to provide the standard grounding requirement. This also
includes the supply and installation of necessary ground wire from the TMGB to
all facilities inside TER Shelter which requires proper grounding and allotting the
04/19/18

01/07/18

04/03/18
DATE

required TMGB terminal for main building ground wire and cableway infrastructure
ground wire.
REV. NO.

b. SCS Inside Buildings


D

C
B

DISCIPLINE
ENGINEER For SCS inside buildings refer to Building Performance Specification DD-966916.
________________

DATE 19 APR 2018


7.5.14.4 Testing, Commissioning and Acceptance
PROJECT a. The CONTRACTOR shall prepare and submit detailed Commissioning and test
ENGINEER
procedure document to the COMPANY for review prior to the start of any
________________

DATE 19 APR 2018


Commissioning or Testing activities.
CERTIFIED b. The Commissioning and test procedure documents shall provide details of all tests
________________ and adjustments to be carried out with descriptions of the methods to be employed.
DATE ___________ The CONTRACTOR shall provide all necessary calibrated test equipment required
to carry out the Commissioning and acceptance testing.
CONSTRUCTION
AGENCY

________________
c. The Commissioning and Test Procedures shall include, but not limited to:
DATE ___________
• Factory Acceptance Test
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
• Site Acceptance Test
VERIFICATION

________________
EDSD

DATE ___________
• Performance Acceptance Test

7.6 Instrumentation
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Instrumentation and control systems WORK shall be carried out in accordance with
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Piping and Instrumentation Diagrams (P&IDs), project specifications, instrument

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 62


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

drawings and documents. All of the instrument WORK shall meet relevant COMPANY
CERT

Standards.
RXS

RXS

RXS
ENGG

7.6.1 General Requirements for instrumentation


HGB
FK

FK

7.6.1.1 All instrument selection, design, application, documentation of instrumentation and


control systems shall comply with COMPANY Standard “SAES-J-003 - Instrumentation
Basic Design Criteria” and relevant instrumentation standards.
7.6.1.2 Instrument cables and conduits, Junction boxes, termination shall comply with
requirements of COMPANY standard “SAES-J-902 - Electrical Systems for
Instrumentation”.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.6.1.3 In general, cables from field instruments to Juncion Boxes are routed through PVC
BI-10-09003 ISSUED FOR COMMENT (O2)

coated Rigid Steel Conduits and home run cables are routed through conduits, direct
buried or through duct bank as required.
7.6.1.4 All instrumentation cables shall meet requirements of Saudi Aramco Material
DESCRIPTION

Specification System 34-SAMSS-913. In general all analog cables shall be individually


& overall shielded, whereas digital signal cables (24 V DC) shall be overall shielded.
All homerun cables shall be suitable for direct burial.
JO/EWO

7.6.1.5 Cabling for Package Equipment shall comply with requirements of Saudi Aramco
Material Specification System 34-SAMSS-831 Instrumentation for Packaged Units.
7.6.1.6 Wherever Instrument cable glands are used, shall be Nickel plated brass as minimum
04/19/18

01/07/18

04/03/18
DATE

and SS316 when exposed to severe weather conditions.


7.6.1.7 Glands connected to instruments in hazardous areas requiring sealing as per NEC
REV. NO.

C
B

shall be Exd (Explosion proof) with barrier compound seal.


DISCIPLINE
ENGINEER
7.6.1.8 All fasteners for cable tray assemblies shall be of PVC coated SS 316 material. All
________________
cable trays shall be grounded as per SAES-P-111 Grounding.
DATE 19 APR 2018

PROJECT
7.6.1.9 Power and control cables shall be segregated from instrument, signal and
ENGINEER
communication cables as per requirements of SAES-J-902 Electrical Systems For
________________
Instrumentation.
DATE 19 APR 2018

CERTIFIED
7.6.1.10 Instrumentation for packaged equipment shall comply with 34-SAMSS-831
________________ Instrumentation for Packaged Units.
DATE ___________
7.6.1.11 CONTRACTOR shall prepare and submit junction box interconnection drawings and
CONSTRUCTION
instrument loop diagrams for all signals to Local Conrol Panels for COMPANY
AGENCY
approval.
________________

DATE ___________ 7.6.1.12 CONTRACTOR shall prepare and submit instrument and junction box support
drawings for approval.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
7.6.1.13 CONTRACTOR shall provide sun-shade for all electronic instruments as per
EDSD

DATE ___________
COMPANY standards.
7.6.1.14 All instruments, Junction Boxes and panels shall be provided with nameplate as per
COMPANY library drawing DD-950025
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

7.6.1.15 CONTRACTOR shall supply all erection accessories and consumables such as cable
markers / route markers, tag plates / name plates, earthing cables, clamps, nuts and
bolts, fasteners, cable ties / wraps, ferrule markers etc.
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 63


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.6.1.16 CONTRACTOR shall carry out testing, calibration, pre-commissioning, loop checking
CERT

and commissioning of all instruments and packages.


RXS

RXS

RXS

7.6.1.17 Suppliers shall provide standard documentation for supplied equipment / instrument
ENGG

HGB
FK

FK

include but not limited to list of instruments, Instrument specification Sheets, hook-up
and installation drawings, cable block diagrams, schedules, termination diagrams, loop
drawings etc as required by COMPANY standards & procedures for review and
Approval.

7.6.2 DETAILS OF INSTRUMENTATION WORK

7.6.2.1 WORK involving instrumentation is required throughout the SAPMT Camp, Utility
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Water system, WTP, STP and Sewage System. The systems which have significant
amounts of instrumentation include: STP, Fire Water Storage and Pump Stations,
BI-10-09003 ISSUED FOR COMMENT (O2)

Potable Water Stations, Irrigation Water System, Water Wells, Diesel/Gasoline storage
and Fueling Station and Vehicle Maintenance Area.
DESCRIPTION

7.6.2.2 Instrument Data Sheets, block diagrams, Cable & Conduit Plan, instrument installation
schedules, Local Panel Specifications are provided in Index J drawings and
documents. Instrument Cable & conduit Schedule is in P index and P&ID’s are provided
in index A drawings and documents. Individual equipment package specifications also
JO/EWO

contain any additional requirements for instrumentation related to a specific package.


7.6.2.3 CONTRACTOR is responsible to provide any additional Instrumentation required for
the reliable and safe operation of systems and equipment provided as part of the
04/19/18

01/07/18

04/03/18
DATE

WORK.
7.6.2.4 CONTRACTOR shall provide the necessary cable route marker posts/surface markers
REV. NO.

C
B

and standard signs spaced as per SAES-P-104 for underground electric cable as per
DISCIPLINE
ENGINEER
COMPANY Standard drawings: AB-036273 and AB-036326
________________
7.6.2.5 Package equipment vendors shall provide all necessary instrumentation for proper and
DATE 19 APR 2018
safe operation of the equipment within a package. Additional instrumentation that is
PROJECT
ENGINEER required as part of vendor provided packages is to have all relevant Instrumentation
________________ Specification Sheets, Block Diagrams and Schedules submitted to COMPANY for
DATE 19 APR 2018 review and approval.
CERTIFIED
7.6.2.6 Fire Water Storage systems (both SAPMT and Contractor Area) and irrigation water
________________
system shall be provided with PLC based control system as per P&IDs DD-251952-
DATE ___________
54.001, DD-251972&73.001, DD-251961.001 and as per Functional Specification DD-
CONSTRUCTION 595901
AGENCY

________________ 7.6.2.7 Fuel station shall be provided with Relay based Local Control Station and
DATE ___________ instrumentation as per P&IDs DD-251955 and as per Functional Specification DD-
595902.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
7.6.2.8 Each Sanitary Lift Station shall have its own PLC based control system with Control &
EDSD

DATE ___________
Interlock as shown on P&IDs DD-251969.001, 002, 003, 004 and as per Functional
Specification DD- 595903.
7.6.2.9 CONTRACTOR shall carry out interface of RTU at Water Well #6 with PLC system of
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Water Treatment Plant (WTP) for SAPMT camp facilities. The RTU and WTP PLC shall
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

be linked by Fiber Optic cable. Refer to Functional Specification DD- 595904.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 64


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.6.2.10 Water Well#1, Well#2, Well#3 shall have its own Pump controller and all control and
CERT

interlock shall be as shown on P&IDs DD-251963.001, 002, 003.


RXS

RXS

RXS
ENGG

7.6.3 Fire Alarm and Detection System


HGB
FK

FK

7.6.3.1 A listed UL 864, 9TH Edition compliant, addressable fire alarm control panel and
components shall be installed. Class A wiring shall be installed for both signal line
circuits and notification appliance circuits. · UL 268 listed projected beam smoke
detectors, UL 268A listed duct smoke detectors, UL 521 heat detectors and UL 38
listed manually activated pull stations are required. · Projected beam smoke detectors
shall be mounted between 12 inches (0.3 m) and 18 inches (0.46 m) below the ceiling
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

level, or as required by the manufacturer’s installation requirements. · Fire alarm


notification (horn/strobes) is required to meet UL 464 audible and ANSI/UL 1971 (not
BI-10-09003 ISSUED FOR COMMENT (O2)

UL 1638) visual notification standards. Specify Public Mode (horn/strobe) notification


devices that comply with 2010 NFPA 72, Sections 18.4.3 and 18.5. Strobe device shall
be synchronized to flash at the same time within each area. Show this as a typical
DESCRIPTION

detail. All interior horns or horn/strobes shall comply with 2010 NFPA 72, Section
18.4.2 and Figure 18.4.2.1 with a temporal-three audible warning signal. Do not use
continuous bells or horns that do not provide a temporal-three pattern audible warning
signal. · Wall-mounted, fire alarm horn/strobe appliances shall be mounted such that
JO/EWO

the entire lens is not less than 80 in. (2.03 m) and not greater than 96 in. (2.44 m)
above the finished floor. Show candela (cd) ratings on strobe or horn/strobe devices.
Locate manually activated fire alarm boxes so they are within 1,524 mm (5 feet) of
04/19/18

01/07/18

04/03/18

grade-level exterior exit door openings. Fire alarm boxes shall be red in color and
DATE

mounted on a background of contrasting color. The operable lever of the fire alarm box
shall be between 1,067 mm (42 inches) and 1,219 mm (48 inches) above the finished
REV. NO.

C
B

floor surface.
DISCIPLINE
ENGINEER
7.6.3.2 The Fire Alarm System Shall Comply with SAES-B-014 and other applicable
________________
COMPANY standards SAES-B-017, SAES-B-019. SAES-B-070 and SAES-M-100.
DATE 19 APR 2018
Shall meet the requirements of ‘T80-A-PP-060601 - F&G detection & Philosophy’ and
PROJECT
ENGINEER ‘T80-J-PP-595025 – Fire Detection and Alarm System Specification’.
________________

DATE 19 APR 2018


7.6.3.3 CONTRACTOR shall utilize Fire Alarm System Vendor to conduct actual design of Fire
Alarm System; shop drawings shall be provided and certified by approved certified
CERTIFIED
Engineer before to submit to COMPANY for review and approval.
________________

DATE ___________ 7.6.3.4 Fire Alarm System shop drawings shall be submitted by Fire Alarm System Vendor to
be reviewed and approved by COMPANY LPD prior to installation.
CONSTRUCTION
AGENCY
7.6.3.5 CONTRACTOR shall prepare and submit Fire Alarm system layout drawings for all
________________

DATE ___________
buildings / facilities as identfied in drawing no. DD- 645904.001 for COMPANY review
and approval.
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ 7.6.3.6 CONTRACTOR shall provide Fire detection and alarm devices in all living room &
EDSD

DATE ___________ accommodation room and associated sitting Room, recreation and Laundary room etc
and shall be wired to respective Local Fire Alarm and Control Panel at each Camp
area.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

7.6.3.7 CONTRACTOR shall prepare and submit Cause & Effect chart for Fire Alarm system
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

for COMPANY review and approval.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 65


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

7.6.3.8 All the buildings shall be provided with an Addressable Analog Fire Alarm System listed
CERT

per the most current edition of Underwriters Laboratory (UL) and installed in
RXS

RXS

RXS

compliance with NFA 72 requirements complete with all required accessories. Refer to
ENGG

HGB

Building Performance specification DD-966916.


FK

FK

7.6.3.9 CONTRACTOR shall provide Fire Alarm Junction Box (FAJB) for all buildings required.
Provide Fire Alarm System where Fire Alarm Control Panel (FACP) is located in remote
buildings complete with all required accessories.
7.6.3.10 CONTRACTOR shall provide Master Fire Alarm Control Panel (MFACP) to be installed
at Security Building complete with required patch panel complete with all required
accessories. Reference drawing no. DD- 645904.001.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7.6.3.11 CONTRACTOR shall provide UL Listed, Addressable type, local Fire Alarm Control
BI-10-09003 ISSUED FOR COMMENT (O2)

Panel (FACP) to be strategically located and distributed at SAPMT camp site, refer to
drawing no. DD- 645904.001.
7.6.3.12 CONTRACTOR shall provide Fiber Optic Cable (FOC) for Communication
DESCRIPTION

requirements between Master Fire Alarm Control Panel (MFACP) and local Fire Alarm
Control Panel (FACP) complete with patch panels complete with all required
accessories. Reference drawing no. DD- 645904.001.
JO/EWO

7.6.3.13 CONTRACTOR shall provide 1 pair copper cable from (FACP) to (FAJB) each for
initiating and notification devices. Loop wiring complete with conduit and supports,
fittings complete with all required accessories.
04/19/18

01/07/18

04/03/18
DATE

7.6.3.14 CONTRACTOR shall obtain the proper work permits in accordance with COMPANY
Construction Safety Manual.
REV. NO.

C
B

DISCIPLINE
7.7 Materials
ENGINEER

________________ All materials and equipment in this project shall be CONTRACTOR supplied and
DATE 19 APR 2018
comply with the requirements of COMPANY standards and material specifications.
PROJECT
ENGINEER
CONTRACTOR shall submit complete lists of material and equipment with material
________________
specifications and samples to COMPANY representative for review and approval.
DATE 19 APR 2018 CONTRACTOR shall submit a quality control plan as per SAES-1154. CONTRACTOR
CERTIFIED
shall prepare and submit Hazard Identification Plan (HAZID) to COMPANY Loss
________________
Prevention Department for review.
DATE ___________
7.8 Satellite TV System
CONSTRUCTION
AGENCY

________________
7.8.1 Contractor shall provide, install, test & commission a complete satellite TV system
DATE ___________
(MATV with central tuning system) with all accessories for all accommodation rooms,
Diwanyahs, gathering tent, setting rooms and recreational facility rooms within the
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
SAPMT camp. The system shall provide satellite TV reception and distribution.
VERIFICATION

________________
EDSD

DATE ___________
7.8.2 CONTRACTOR shall be responsible for system design, supply, installation,
commissioning & testing of the system. CONTRACTOR WORK shall include the
trenching, cable and conduit laying underground above ground and inside buildings as
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

required for distribution.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

7.8.3 CONTRACTOR shall provide a minimum of one hundred (100) digital channels for
each television set within the SAPMT accommodation (additional optional 200 C1 type

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 66


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

rooms to have cable terminate at building hook up point), Sitting Rooms, Diwanyah
CERT

and Tent Area; fifty (50) free to air from NILESAT and ARABSAT; thirty (30) decoded
RXS

RXS

RXS

channels from Orbit Showtime Network (OSN) or equivalent; twenty (20) decoded
ENGG

HGB

channels from Bein Sport or equivalent; ten (10) decoded channels from Adsport or
FK

FK

equivalent; six (6) decoded channels from Pehla or equivalent; three (3) decoded
Filipino channels; and three (3) decoded Indian channels COMPANY representative
shall determine channel list and numbers of channels at a time agreed by both parties

7.8.4 The MATV system shall consist of a Central Antenna System for the entire facility with
the necessary equipment, such as dishes, LNBs, receivers, decoders, and other
associated equipment and accessories required for reception and distribution. Head
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

end station should be compact type with built-in receiver twin type. The equipment shall
be housed in the Satellite Building and the satellite dishes shall be installed on the
BI-10-09003 ISSUED FOR COMMENT (O2)

ground outside near the satellite building.

7.8.5 All equipment supplied installed and commissioned shall have one year warranty and
DESCRIPTION

come complete with a 1 year service agreement from the vendor. The service
agreement is to include a minimum of a monthly site visit and inspection by the Vendors
service technician. Operation of the system shall be by OTHERS and is not the
responsibility of CONTRACTOR.
JO/EWO

7.8.6 CONTRACTOR shall provide the following:

7.8.6.1 Design and shop drawings of the satellite TV system, conduit and cable layout.
04/19/18

01/07/18

04/03/18
DATE

7.8.6.2 Necessary foundations to install the dishes (civil related).


REV. NO.

7.8.6.3 Air-conditioned room for digital TV decoders, dishes, receivers, modulators,


D

C
B

DISCIPLINE attenuators, etc.


ENGINEER

________________ 7.8.6.4 220 volts electric power shall locally power the amplifiers, modulators, and 19” rack.
DATE 19 APR 2018
7.8.6.5 Conduits, cables, amplifiers, amplifier boxes, splitter, splitter boxes, equalizers and all
PROJECT
ENGINEER other necessary equipment for proper functioning of the satellite TV network.
________________

DATE 19 APR 2018 7.9 Coating and Painting


CERTIFIED

________________
7.9.1 General Requirement
DATE ___________
7.9.1.1 CONTRACTOR shall include all Painting and Coating necessary to provide a
CONSTRUCTION
AGENCY
complete, functional facility in accordance with the Codes, Standards and
________________
Specifications as detailed in Section 7.0 of this Scope of Work.
DATE ___________
7.9.1.2 CONTRACTOR’s painting and coating WORK includes but is not limited to the
following:
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________
a. Cleaning, blast cleaning, priming and painting of structural and miscellaneous steel
including such items as standard electrical and instrumentation supports and any
other items fabricated.
b. Finish-painting of items already applied with prime coat, including repair to prime
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

coat.
REVISION CERTIFICATE

c. Touch-up and/or finish coat of items supplied finish-painted or galvanized in order


to ensure uniformity of all finish coatings.
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 67


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

d. Painting of road markings, barriers, signs and miscellaneous piping and structures.
CERT

RXS

RXS

RXS

e. Coating of concrete surfaces below final grade (bottom of concrete shall be


protected by pouring on secure and intact plastic sheets without laps, splices and/or
ENGG

HGB
FK

FK

damage).
f. Aboveground concrete surfaces shall be coated with APCS-1B and below ground
concrete surfaces shall be coated with APCS-10, as per SAES-H-003, Para 6.1 and
SAES-H-101V.
g. All new above ground structures and building wall surfaces shall be prepared and
painted as per SAES-H-001 and SAES-H-003 unless otherwise indicated in the
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

drawings in this Scope of Work. All coating layers shall be inspected and approved
by a qualified coating inspector prior to applying successive layers.
BI-10-09003 ISSUED FOR COMMENT (O2)

7.9.2 Painting Schedules

7.9.2.1 The “PAINTING SCHEDULES” at the end of this section prescribe the surfaces to be
DESCRIPTION

painted and the number and types of coats of paint required.


7.9.2.2 Shop-Painted Items: Surfaces of items finish-painted by the manufacturer or specified
to be finish-painted under other sections of the specifications are exempted from the
JO/EWO

requirements for surface preparation and painting. Shop-primed items shall receive
surface preparation and finish painting as required by this section.
7.9.2.3 Other surface applications:
04/19/18

01/07/18

04/03/18
DATE

a. Interior and exterior concrete masonry (where shown) units/plastered surfaces to


receive a smooth finish: The substrate shall be prepared to receive priming. Fill
REV. NO.

C
B

minor blowholes and/or minor cracks using block filler (Hempel Water-based
DISCIPLINE
ENGINEER
Blockfiller 380-SA or equivalent) after spot priming such areas using primer sealer
________________ (Hempel Tropaline Primer Sealer 2663 or equivalent). Apply topcoats total dft 2 mils
DATE 19 APR 2018 minimum of acrylic emulsion (Tropaline Emulsion 5872 or equivalent).
PROJECT
ENGINEER
b. External concrete masonry units (where shown) are to receive a coarse finish: The
________________ substrate shall be firm, clean, and dry. Apply primer sealer (Hempel Tropaline
DATE 19 APR 2018 Primer Sealer 2663 or equivalent) and solvent based coarse texture top coats of
CERTIFIED
total dft 6 mils (Hempel Texture S.B. 562-SA or equivalent).
________________
c. Gypsum board to receive a smooth finish: The surface shall be free from dirt, duct
DATE ___________
or other contaminants, clean, and dry. Apply white color primer (Hempel Tropaline
CONSTRUCTION Primer Sealer 2883 or equivalent). Apply intermediate and top coat of acrylic
AGENCY
emulsion total dft 2 mils minimum (Hempel Tropaline Emulsion 5872 or equivalent).
________________

DATE ___________ d. Wood surfaces to receive stain and varnish: Prior to application of coating, all
treatment such as drilling, detailing, etc. shall be completed. Remove wood resins
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ with the use of suitable thinner (Hempel Thinner 0811 or equivalent). Filling shall
EDSD

DATE ___________ be done using a suitable filler (Hempel Filler 332-SA or equivalent) and mixing with
the wood stain (Hempel Wood stain 103-SA or equivalent) to receive the color
desired. Varnish finish shall be with semi-gloss urethane alkyd varnish (Hempel
Varnish 0225 or equivalent) with total dft of 3 mils minimum.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

e. Other than specified above, following paint listed below or equivalent may be used
where applicable

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 68


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

f. APCS Primer Middle coat Top coat 1B Hempel HB Primer 17300 zinc phosphate -
CERT

Hempadur Mastic 45881 epoxy 1C Hempadur Zinc 17360 zinc rich epoxy primer-
RXS

RXS

RXS

Hempadur Mastic 45881 epoxy 1D Galvosil 8571 / 15780 Inorganic Zinc Primer
ENGG

HGB

Hempadur Mastic 45881 epoxy Hempathane 5521 acrylic polyurethane 3 CTE


FK

FK

Mastic 35670 (356-SA)-- 4 ZP Alkyd Primer 12090-Silvium 51570 6 ZP Alkyd Primer


12090-Hempaline 5214 9 Hempatex 46330-- 10 Hempinol Hi-Build 10270 (102-SA)-
- 12 Hempel HB Primer 17300-Hempadur Mastic 45881 epoxy 26 Hempadur Mastic
45881 (4515)-Hempathane 5521. Above listed coating or its equivalent shall be
applied per SAES-H-001 requirement.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

BI-10-09003 ISSUED FOR COMMENT (O2)


DESCRIPTION

PAINTING SCHEDULE - A
JO/EWO

APCS Type of coating Requirements

APCS - 1B Epoxy Coating System for Epoxy primer one coat 2-4 mils, minimum-maximum; top
04/19/18

01/07/18

04/03/18
DATE

Atmospheric Service coats two or more coats 6 mils maximum per coat, color
as selected
REV. NO.

APCS-1C Epoxy Coating System for Zinc-rich epoxy primer one coat, minimum-maximum
D

C
B

DISCIPLINE
Atmospheric Service 1.5-3 mils; top coat two or more coats 6 mils maximum
ENGINEER per coat; color as selected
________________

DATE 19 APR 2018 APCS-1D Epoxy/Polyurethane Coating Inorganic Zinc primer solvent or water based, one coat
System for Atmospheric Service 2.5-4 mils minimum-maximum; intermediate coat one or
PROJECT
ENGINEER more coats 4-6 mils minimum-maximum; top coat one
________________ coat 2 mils optimum
DATE 19 APR 2018
APCS-3 Coal Tar Epoxy Coating System Self priming, two or more coats, 12 mils maximum per
CERTIFIED
coat, color red or black
________________

DATE ___________
APCS-4 Pigmented Alkyd Coating System Primer two or more coats 3 mils maximum per coat, top
Aluminum coat one or more coats 1.5 mils maximum per coat.
CONSTRUCTION
AGENCY APCS-6 High Gloss Alkyd Enamel System Primer two or more coats, 3 mils maximum per coat, top
________________
for Structural Steel, Machinery, and coat one or more coats 2 mils maximum per coat, color
DATE ___________
Equipment in marine and industrial as specified or as selected for different applications
requirements
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________ APCS-9 Chlorinated Rubber Coating System Primer one or more coats 2-3 mils minimum-maximum,
EDSD

DATE ___________ on metallic and concrete surfaces top coat(s) one or more coats 2-4 mils minimum-
maximum, color as selected

APCS-10 Bituminous Paint of buried and Self priming


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

immersion services
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

APCS-12 Nonskid Epoxy Coating System for Primer one or more coats 2-4 mils minimum-maximum;
floors and decks top coats two or more coats 6 mils maximum per coat,
color as selected
DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 69


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

APCS-26T Epoxy Mastic/Polyurethane Coating Primer one or more coats 5-8 mils minimum-maximum;
CERT

RXS

RXS

RXS

System for use outdoors top coat one coat 1-2.5 mils minimum-maximum, color
as selected
ENGG

HGB
FK

FK

APCS-26 Epoxy Mastic/Polyurethane Coating In accordance with 09-SAMMS-089.


System for use on above ground
melallic piping.
APCS-104C System for use on underground In accordance with 09-SAMMS-089.
metallic piping. Underground piping will further require Cathodic
Protection in accordance with SAES-X-600.
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

BI-10-09003 ISSUED FOR COMMENT (O2)


DESCRIPTION

PAINTING SCHEDULE – B
JO/EWO

Contractor shall use the Paint System from the table below or the equivalent of it.
04/19/18

01/07/18

04/03/18
DATE

Subject Paint System


REV. NO.

1. Hollow metal window frames. I-PRIMER


D

C
B

Hollow metal doors and frames.


DISCIPLINE
ENGINEER One (1) coat HEMPEL, HEMPADUR
________________ PRIMER 1530
DATE 19 APR 2018 Note: Omit primer except to touch up
PROJECT abraded surfaces on factory primed items. MDF: 2 mils (50 microns)
ENGINEER

________________
II-TOP COATS
DATE 19 APR 2018

CERTIFIED
Two (2) coats HEMPEL, HEMPADUR ENAMEL
________________
5534
DATE ___________

CONSTRUCTION
MDF: 2 mils (50 microns) per coat
AGENCY

________________

DATE ___________
2. All buildings Steel stairs /handrails and door I-PRIMER
CONTROL NUMBER

DATE _____________

landing platforms etc.


BY: ______________

OPERATIONS
VERIFICATION

________________ Steel cover plates and framing. One (1) coat HEMPEL's PRIMER 1530
EDSD

DATE ___________
MDF: 1.2 mils (30 microns)
Note: Omit primer on factory primed items
Stairs/handrails shall have SAFETY color paint
combination.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

II-TOP COATS

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 70


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

Subject Paint System


RXS

RXS

RXS
ENGG

HGB

Two (2) coats HEMPEL, HEMPADUR Hi-Build 4523


FK

FK

3. Structural steel members (columns, beams, I-PRIMER


purlins, supporting frames and structures,
etc.) (See Item 8 for intumescent coatings) HEMPEL’S, Zinc Chromate Primer
122SA or Hemalin Red Lead Q.D. 1237

Follow APCS-6 II-UNDERCOAT


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

One (1) coat Zinc Chromate Primer 122SA or


BI-10-09003 ISSUED FOR COMMENT (O2)

Hempadur

III-TOP COATS
DESCRIPTION

Two (2) coats HEMPEL, HEMPALIN


ENAMEL 5214
JO/EWO

MDF: 1.6 mils coats (40 microns) per coat

4. Miscellaneous Metal I-PRIMER


Follow APCS-6
04/19/18

01/07/18

04/03/18
DATE

One (1) coat HEMPEL's PRIMER 122SA


REV. NO.

C
B

DISCIPLINE
ENGINEER
MDF: 2 to 3 mils (75 to 100 microns)
________________
Note:
DATE 19 APR 2018
a) Omit primer on factory primed items. II-UNDERCOAT
PROJECT
ENGINEER

________________
b) Omit top coats on permanently One (1) coat HEMPEL, HEMPELS Primer 122SA
DATE 19 APR 2018 concealed items.
CERTIFIED
III-TOP COATS
________________

DATE ___________
Two (2) coats HEMPEL, HEMPALIN ENAMEL 5214
MDF: 1.6 mils (40 microns) per coat
CONSTRUCTION
AGENCY

________________
5. Galvanized steel (except underside of I-PRIMER
DATE ___________
exposed metal deck), handrails, steel
members, lighting poles, etc. Mechanical One (1) coat HEMPEL’s
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
and electrical equipment and enclosure. HEMPADUR 4515
VERIFICATION

________________
EDSD

Galvanized metal downspouts.


DATE ___________
MDF: 5 to 8 mils (125 to 200 microns)

Notes: II-TOP COATS


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

a) Omit Primer on Factory Primer items. Two (2) coats HEMPEL HEMPALINE
b) Omit top coats on permanently ENAMEL 5214
concealed items.

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 71


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

Subject Paint System


RXS

RXS

RXS
ENGG

HGB

MDF: 1.6 mil (40 microns) per coat


FK

FK

Under side galvanized metal deck

6. Woodwork Four (4) coats HEMPEL, HEMPEL’s GLOSS


MARINE VARNISH 0222
(Thin 1st coat 25% as primer)

MDF: 1 mil (25 microns) per coat


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

7. Gypsum Board TYPE 1


BI-10-09003 ISSUED FOR COMMENT (O2)

I-PRIMER

One (1) coat HEMPEL’s TROPALINE


DESCRIPTION

PRIMER/SEALER 2663

MDF: 1 mil (25 microns)


JO/EWO

II-TOP COATS

Two (2) coats HEMPEL, TROPALINE


04/19/18

01/07/18

04/03/18
DATE

EMULSION 5871
REV. NO.

MDF: 1.2 mils (30 microns)


D

C
B

DISCIPLINE
ENGINEER

________________
8. Steel Pipes I-PRIMER
DATE 19 APR 2018
Follow APCS-06
PROJECT One (1) coat HEMPEL's ZINC CHROMATE
ENGINEER
PRIMER 122-SA
________________

DATE 19 APR 2018


MDF: 1.6 mils (40 microns)
CERTIFIED

________________

DATE ___________
II-SECOND COAT
CONSTRUCTION
AGENCY
One (1) coat HEMPEL's ZINC CHROMATE
________________
PRIMER 122-SA
DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
MDF: 1.6 mils (40 microns)
VERIFICATION

________________
III-TOP COAT
EDSD

DATE ___________

One (1) coat HEMPEL's HEMPALIN ENAMEL 5214


THIS INDICATES THAT REV. NO. ____________

MDF: 1.6 mils (40 microns)


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

9. CMU Wall Surface I-PRIMER


REVISION CERTIFICATE

HEMPEL Black Filler 361-SA

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 72


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

Subject Paint System


RXS

RXS

RXS
ENGG

HGB

II-TOP COATS
FK

FK

Two (2) coats HEMPEL ENAMEL 5214


10. Concrete Surface Below Grade Level. I-PRIMER

HEMPINOL HB 102-SA
II-TOP COAT
BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

Two (2) coats HEMPINOL HB 102-SA


11. Fire retardant paint (walls inside I-PRIMER
BI-10-09003 ISSUED FOR COMMENT (O2)

telecommunication room) (Per ASTM D 2697 One (1) coat Hempel’s Hempalin primer 4246
and 09-AMSS-060) MDF: 1 mil (25 microns)
DESCRIPTION

II-TOP COAT
Two (2) coats Hempel’s Hempalin cabin flat 5226
MDF: 1.2 mils (30 microns)
JO/EWO

04/19/18

01/07/18

04/03/18
DATE
REV. NO.

C
B

DISCIPLINE
ENGINEER

________________

DATE 19 APR 2018

PROJECT
ENGINEER

________________

DATE 19 APR 2018

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 73


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859
Saudi Aramco 2616-ENG (03/99)
OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

8. PROJECT RECORDS
CERT

RXS

RXS

RXS

8.1 Project Record Requirements


ENGG

HGB
FK

FK

CONTRACTOR shall adhere to the provisions of SAEP-122 in establishing the project


records under the direction of COMPANY who are responsible for determining the
applicability of each document for Project Records.

8.2 As-Built Drawings:

CONTRACTOR shall maintain a set of marked-up drawings during performance of the


BI-10-09003 ISSUED FOR DETAILED DESIGN (B1)
BI-10-09003 ISSUED FOR DETAILED DESIGN (B2)

WORK to record all As-Built changes that occur during construction of the WORK. The
marked up drawings shall be readily available for periodic inspection by COMPANY.
BI-10-09003 ISSUED FOR COMMENT (O2)

Any changes to drawings require COMPANY approval. CONTRACTOR shall furnish


three (3) paper sets and one (1) soft copy of the As-Built drawings. The soft copy of
the As Built drawings shall be in Microstation format. All As Built drawings shall be
DESCRIPTION

submitted to COMPANY for acceptance prior to submission of CONTRACTOR’s final


invoice.

8.3 Equipment and Technical Documentation:


JO/EWO

CONTRACTOR shall provide to COMPANY Vendors’ reproducible drawings and


specification sheets for the purchased equipment, welding procedures and test reports,
04/19/18

01/07/18

04/03/18
DATE

performance curves, priced spare parts lists, installation manuals, operation and
maintenance manuals and all other documents necessary to operate and maintain the
REV. NO.

purchased equipment. This Equipment and technical documentation is to be provided


D

C
B

within 75 days of the award of the contract of which this Scope of Work is a part.
DISCIPLINE
ENGINEER

________________

DATE 19 APR 2018

PROJECT END OF SCOPE


ENGINEER

________________

DATE 19 APR 2018

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________

OPERATIONS
VERIFICATION

________________
EDSD

DATE ___________
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

DETAILED DESIGN DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

SCOPE OF WORK-TCF DOC 74


A DD-842201
TEMPORARY CONSTRUCTION FACILITIES OF D
TANAJIB SAUDI ARABIA JO / EWO: BI-10-09003 74
T00-A-DD-842201_REV D DOC CLASS: 4A DSN: 13859