Vous êtes sur la page 1sur 1

Slip and cut

After hanging block mark 10 lines and last line

Slack the line and cut on the mark 10 lines

Set the torque wreck for 210 ft lbs

Loosen dead man anchor bolts

Loosen the line on dead man anchor and rolling the draworks till old mark

Preparation for drilling BHA

Prepare bit breaker

Check bit nozzles and BHA sizes

For ps2 slip

Open the cover and remove the pin

Connect the proper hoses

Vous aimerez peut-être aussi