Vous êtes sur la page 1sur 19

Page:

PRIORITY TO TO HMU TO TANK


SPOOL TANK
STEERING PRIORITY
VALVE
VI-23

SIGNAL
PRESSURE
LIMITER
FROM
PREVIOUS
VALVE

FLOW TO IMPLEMENTS
SPRING
TO
IMPLEMENTS FROM PUMP
TO HMU
RESOLVER

CHAPTER : Steering & Loader


TO PUMP TO HMU

BACKHOE LOADERS
FROM
PREVIOUS
FLOW TO HMU VALVE

TO
IMPLEMENTS FROM PUMP

TO HMU

TO PUMP
BACKHOE LOADERS
CHAPTER : Steering & Loader
HMU
STEERING CIRCUIT
LEFT TURN
MAKEUP
VALVE
CHECK
VALVE
Page: VI-24
BACKHOE LOADERS
CHAPTER : Steering & Loader

Implement Control Valve Components Checklist


Directions: Fill in the blanks with the correct response. Use this sheet to take notes during the pre-
sentation.
FROM CLOSED CENTER CONTROL VALVE
PREVIOUS HOLD
VALVE

HEAD ROD
B END END
E

A
TO TANK
TO TANK

D
FROM
C PUMP

TO NEXT
VALVE

Page: VI-25
Page:

CLOSED CENTER CONTROL VALVE


VI-26

FROM HOLD
PREVIOUS
VALVE

PRIMARY HEAD ROD COMBINATION


RESOLVER END END LINE RELIEF
AND MAKEUP
SECONDARY VALVE
RESOLVER

TO TANK
TO TANK

CHAPTER : Steering & Loader


BACKHOE LOADERS
MAIN CONTROL
SPOOL

FLOW CONTROL FROM


TO NEXT VALVE PUMP
VALVE
Page:

CLOSED CENTER CONTROL VALVE


VI-27

FROM METERED
PREVIOUS
VALVE
COMBINATION
PRIMARY HEAD LINE RELIEF
ROD
RESOLVER END AND MAKEUP
END
VALVE
SECONDARY
RESOLVER

CHAPTER : Steering & Loader


BACKHOE LOADERS
SIGNAL RETURN
PASSAGE TO TANK
SIGNAL
RETURN PASSAGE
TO TANK
SIGNAL
FROM
TO NEXT CAVITY
PUMP
VALVE
Page:

CLOSED CENTER CONTROL VALVE


VI-28

FROM HIGH PRESSURE STANDBY


PREVIOUS
VALVE
COMBINATION
LINE RELIEF
HEAD ROD AND MAKEUP
END END VALVE

CHAPTER : Steering & Loader


BACKHOE LOADERS
MAIN CONTROL
SPOOL

ADVANCE SIGNAL
PASSAGE
FROM
FLOW CONTROL
TO NEXT PUMP
VALVE
VALVE
Page:

CLOSED CENTERED CONTROL VALVE


HOLD
VI-29

FROM
PREVIOUS
VALVE
COMBINATION
ROD HEAD LINE RELIEF
END END AND MAKEUP
VALVE

CHAPTER : Steering & Loader


BACKHOE LOADERS
LOAD
TO NEXT ADVANCE CHECK VALVE
VALVE SIGNAL FROM
PASSAGE PUMP
Page:

CLOSED CENTERED CONTROL VALVE


VI-30

FROM
METERED
PREVIOUS
VALVE COMBINATION
LINE RELIEF
ROD HEAD AND MAKEUP
END END VALVE

CHAPTER : Steering & Loader


BACKHOE LOADERS
LOAD
TO NEXT ADVANCE CHECK VALVE
VALVE SIGNAL FROM
PASSAGE PUMP
Page:

CLOSED CENTERED CONTROL VALVE


VI-31

STALL OR INADEQUATE FLOW


FROM
PREVIOUS
VALVE
COMBINATION
LINE RELIEF
ROD HEAD AND MAKEUP
END END VALVE

CHAPTER : Steering & Loader


BACKHOE LOADERS
LOAD
ADVANCE CHECK VALVE
TO NEXT SIGNAL FROM
VALVE PASSAGE PUMP
Page:

BHL C Series
LOADER LIFT CONTROL VALVE
HOLD
VI-32

FROM
PREVIOUS
VALVE

HEAD ROD
END END PLUG

ADVANCE
SIGNAL
BALL PASSAGE
DETENT

CHAPTER : Steering & Loader


BACKHOE LOADERS
FLOW CONTROL
VALVE
FROM
PUMP
TO TILT
VALVE
Page:

BHL 'B' SERIES


LOADER LIFT CONTROL VALVE
HOLD
VI-33

FROM
PREVIOUS
VALVE

MAKEUP
HEAD ROD VALVE
ADVANCE END END
SIGNAL
PASSAGE

BALL
DETENT

CHAPTER : Steering & Loader


BACKHOE LOADERS
FLOW CONTROL
VALVE
FROM
PUMP
TO TILT
VALVE
Page:

BHL C Series
LOADER TILT CONTROL VALVE
HOLD
VI-34

FROM
PREVIOUS
VALVE

HEAD ROD LINE RELIEF AND


END END MAKEUP VALVE

CHAPTER : Steering & Loader


BACKHOE LOADERS
SOLENOID
DETENT
FLOW CONTROL
ADVANCE VALVE
FROM
SIGNAL PUMP
PASSAGE
TO NEXT
VALVE
Page:

BHL 'B' SERIES


LOADER TILT CONTROL VALVE
HOLD
VI-35

FROM
PREVIOUS
VALVE
COMBINATION
LINE RELIEF AND
HEAD ROD
MAKEUP VALVE
END END

CHAPTER : Steering & Loader


BACKHOE LOADERS
TILT
SOLENOID
FLOW CONTROL
ADVANCE VALVE
FROM
SIGNAL PUMP
PASSAGE
TO STEERING
VALVE
Page:

BHL C Series
AUXILIARY CONTROL VALVE FOR PARALLEL LIFT
HOLD
VI-36

FROM
PREVIOUS
VALVE

PORT PORT LINE RELIEF AND


A B MAKEUP VALVE

CHAPTER : Steering & Loader


BACKHOE LOADERS
SOLENOID
DETENT
FLOW CONTROL
FROM VALVE
PUMP

TO NEXT
VALVE
BACKHOE LOADERS
CHAPTER : Steering & Loader

MultiPurpose Bucket

Broom Motor

Broom Angle
I
Q
T
U
Quick Coupler I
A
C
T
K
T
A
C &
C
O
H
U
M
P
E
L
N
E
T
R
S

To disengage Aux 2

Aux 1 - Detented

To engage Aux 1

Page: VI-37
BACKHOE LOADERS
CHAPTER : Steering & Loader

QUICK COUPLER

Operation of front coupler

This switch is to the right of the steer wheel and has a red cen-
ter.

NOTE ! The red button in the center of this switch is a safety


device to prevent the switch being accidentally operated. The
switch will not unlock unless the red center is pressed.

To Disconnect :

1. Place attachment on the ground and switch off machine.

2. Release all pressure in loader & multi-purpose levers.

3. Disconnect front attachment hoses and cap ends.

4. Start machine.

5. Press forwards the RED center of the front coupler switch.

6. Unlock attachment by moving multi-purpose levers forwards.

7. Lower coupler and reverse machine.

To Connect :

1. Engage attachment on coupler.

2. Lock attachment by raising & tilting coupler backwards, then


move multi-purpose lever backwards.

3. Press the front coupler switch to lock position.

4. Place attachment on ground and switch off machine.

5. Release all pressure in both levers as before.

6. Connect hoses to coupler.

Page: VI-38
BACKHOE LOADERS
CHAPTER : Steering & Loader

QUICK COUPLER

Operation of front attachment switch.

This switch is to the right of the front coupler switch.

It is a 3 position switch which operates with the multi-purpose


lever.

- press switch to rear position, this is the auxiliary 1 circuit.

- the mid position is auxiliary 1 circuit, with a detent.

- press switch to forward position, this gives flow to auxiliary 2


circuit.

Page: VI-39
BACKHOE LOADERS
CHAPTER : Steering & Loader
Page: VI-40
BACKHOE LOADERS
CHAPTER : Steering & Loader

Auxiliary Tilt Lift

Cylinder Port
AWS Supply

HMU
Supply

L/S Signal In

Priority
Inlet

Tank

Page: VI-41

Vous aimerez peut-être aussi