Vous êtes sur la page 1sur 12

PROJECT: DEEP ROCK PETROLEUM PRODUCT TERMINAL

CUSTOMER: DEEP ROCK TANKS, LLC


JOB: 2211-3704 BY: JPH
DATE: 7/13/2010 CHK. BY:
SECTION: BURIED PIPE DESIGN-FIREWATER REVISION: 0
SHT: 1

BURIED PIPE DESIGN-FIREWATER


DEEP ROCK PETROLEUM PRODUCT TERMINAL
DEEP ROCK TANKS, LLC
2211-3704
PROJECT: DEEP ROCK PETROLEUM PRODUCT TERMINAL
CUSTOMER: DEEP ROCK TANKS, LLC
JOB: 2211-3704 BY: JPH
DATE: 7/13/2010 CHK. BY: 0
SECTION: BURIED PIPE DESIGN-FIREWATER REVISION: 0
SHT: 2
INDEX

PAGE NUMBER REVISION PAGE NUMBER REVISION


1 of 6 0
2 of 6 0
3 of 6 0
4 of 6 0
5 of 6 0
6 of 6 0
PROJECT: DEEP ROCK PETROLEUM PRODUCT TERMINAL
CUSTOMER: DEEP ROCK TANKS, LLC
JOB: 2211-3704 BY: JPH
DATE: 7/13/2010 CHK. BY: 0
SECTION: BURIED PIPE DESIGN-FIREWATER REVISION: 0
SHT: 3
BURIED PIPE DESIGN-FIREWATER
REF: DESIGN OF PE PIPING SYSTEMS - PPI (INSTALLATION CATEGORY 1, SOLID WALL)
GUIDELINES FOR THE DESIGN OF BURIED STEEL PIPE - ASCE JULY 2001
WEIGHT OF SOIL, γS = 110 PCF
BURIED PIPE DEPTH, C = 3.500 FT = 42.000 IN
SOIL PRESSURE TRANSMITTED TO PIPE, PV = 2.67 PSI (DEAD LOAD)

DESIGN SURFACE LOAD, PS (SLAB + SUPPORTED LOAD)


CONCRETE WEIGHT, WC = PCF
SLAB SIZE = FT (length) FT (width)
SLAB WEIGHT, SWT = 0 LBS = 0 CF
SUPPORTED LOAD, SL = LBS
MAXIMUM DESIGN SURFACE LOAD = 0 LBS = 0 PSF
PRESSURE TRANSMITTED TO PIPE, Ps = 0.00 PSI (DEAD LOA

INCLUDE TRUCK/RAILWAY LOADS : 1 (YES=1, NO=0)


LIVE LOAD TRANSFERRED TO PIPE : 1 (TRUCK LOAD=1, RAILWAY=2)
PRESSURE TRANSMITTED TO PIPE, PP1 = 3.48 PSI

MAXIMUM DESIGN SURFACE LOAD, PS1 = 0 LBS


dOFF = 0.000 FT = 0.000 IN
PRESSURE TRANSMITTED TO PIPE, PP21 = 0.00 PSI = 3*PS/(2*π*C2*[1+(dOFF/C)2]2.5)

IMPACT FACTOR, IF = 1.00 2.0 for unimproved road


TOTAL LIVE PRESSURE = PL = IF*(PP21 + PP22) = 3.48 PSI
TOTAL DEAD PRESSURE, PD = Pv + Ps = 2.67 PSI

DIAMETER RATIO, DR = 9.00


PIPE DIAMETER, DP = 20.000 IN Ф = 1.667 FT Ф (no impact on calc)
PIPE THICKNESS, TP = 2.222 IN
PIPE MODULUS, E = 27,000 PSI PE 3408, 100 Years

RING DEFLECTION, ΔX/DM = K*(DL*PD+PL) / { 2/3*E*[(1/(DR - 1)]^3 + 0.061*FS*E' }


DEFLECTION LAG FACTOR, DL= 1.50 (≈ 1.00 TO 1.50, 1.50 Conservative))
BEDDING CONSTANT, K = 0.10 (≈ 0.10)
MODULUS OF SOIL REACTION, E' = 500 PSI (MEDIUM CLAYS)
SOIL SUPPORT FACTOR, FS = 0.15 0.15 min (conservative)
ΔX/DM = 1.88% 7.5% Max Allowable, Non-Pressurized Pipe

COMPRESSIVE RING THRUST, S = (PD + PL)*DR / 2


σBW = 28 PSI 1000 PSI Allowable for PE 3408

CRITICAL RING BUCKLING PRESSURE, PWC = 5.65 / N * SQRT[32 * R * B' * E' * E / 12 / (DR - 1)^3]
N= 2.00 2.0 TYP for thermoplastic pipe
BUOANCY REDUCTION FACTOR, R = 1.00 - 0.33*(hGW/C) HGW = 3.500 FT
R= 0.67
EMPIRICAL COEFFICIENT OF ELASTIC SUPPORT, B' = 1/(1 + 4 e^(-0.065*C))
B' = 0.793
CRITICAL RING BUCKLING PRESSURE, PWC = 96.53 PSI Acceptable
OF 6
0
OF 6
0
OF 6

FT (height)

(DEAD LOAD)

(LIVE LOAD)

(LIVE LOAD)

(no impact on calc)

7.5% Max Allowable, Non-Pressurized Pipe


PROJECT: DEEP ROCK PETROLEUM PRODUCT TERMINAL
CUSTOMER: DEEP ROCK TANKS, LLC
JOB: 2211-3704 BY: JPH
DATE: 7/13/2010 CHK. BY: 0
SECTION: BURIED PIPE DESIGN-FIREWATER REVISION: 0
SHT: 4
BURIED PIPE DESIGN-FIREWATER
PROJECT: DEEP ROCK PETROLEUM PRODUCT TERMINAL
CUSTOMER: DEEP ROCK TANKS, LLC
JOB: 2211-3704 BY: JPH
DATE: 7/13/2010 CHK. BY: 0
SECTION: BURIED PIPE DESIGN-FIREWATER REVISION: 0
SHT: 5
BURIED PIPE DESIGN-FIREWATER REF: API 1102
PROJECT: DEEP ROCK PETROLEUM PRODUCT TERMINAL
CUSTOMER: DEEP ROCK TANKS, LLC
JOB: 2211-3704 BY: #REF!
DATE: 7/13/2010 CHK. BY: #REF!
SECTION: BURIED PIPE DESIGN-FIREWATER REVISION: 0
SHT: 6
BURIED PIPE DESIGN-FIREWATER REF: API 1102
0
OF 6
0
OF 6
0
OF 6

Vous aimerez peut-être aussi