The document discusses deposits observed on the low pressure turbine of Unit #3 at the BLR SET-44 facility. It recommends taking boiler tube samples from the high heat flux zone during the next annual shutdown to test for deposits. As of January 15, 2018 the sample had been taken and was being processed.
The document discusses deposits observed on the low pressure turbine of Unit #3 at the BLR SET-44 facility. It recommends taking boiler tube samples from the high heat flux zone during the next annual shutdown to test for deposits. As of January 15, 2018 the sample had been taken and was being processed.
The document discusses deposits observed on the low pressure turbine of Unit #3 at the BLR SET-44 facility. It recommends taking boiler tube samples from the high heat flux zone during the next annual shutdown to test for deposits. As of January 15, 2018 the sample had been taken and was being processed.
Lot of deposits capital shutdown, boiler tube 23.08.2017 1 BLR SET-44 observed on Unit#3 LP samples from high heat flux SE (BLR) Turbine. zone to be drawn and tested for deposits. Status as on 15.01.2018