03.00 CONCRETOS
03.01 CONCRETO F'C=175 Kg/cm2 P/REVESTIDO DE CANAL
Hoja de metrado de caja canal y concreto 1.00 700.21
07.00 VARIOS
07.01 BARANDA DE FIERRO GALVANIZADO
de la hoja de resumen metrados de obras de arte 1.00 798.20
HOJA DE METRADOS
1.00 Und
1.00
2.00 Glb
2.00
16,237.50 m
16,237.50
3,359.59 m2
3,359.59
3,725.18 m2
3,725.18
59,218.97 m2
59,218.97
5,850.00 m
900.00
550.00
400.00
4,000.00
11,650.00 m
900.00
750.00
1,000.00
4,000.00
5,000.00
976.80 m3
976.80
6,415.71 m3
6,415.71
700.21 m3
0.00
700.21
5
HOJA DE METRADOS
115.92 m3
115.92
7,207.23 m3
7,207.23
235.51 m3
235.51
0.00 m3
0.00
710.00 m3
710.00
9,691.02 m3
9,691.02
5,641.41 m3
160.40
5245.39
235.62
700.21 m3
700.21
0.00 m3
0.00
63.65 m3
63.65
82.86 m3
82.86
16.73 m3
16.73
94.32 m3
94.32
0.00 m2
0.00
591.48 m2
591.48
0.00 Kg
4,560.42
3,811.75 m
3,739.72
6
HOJA DE METRADOS
9.80 m
9.80
145.60 m
145.60
3.00 Und
3.00
177.00 Und
122.94
53.99
1,895.00 Und
1,812.00
83.00
300.00 Tn
300.00
7
PLANILLA DE METRADOS
PLANILLA DE METRADOS
ANCHO DE ANCHO DE
LONGITUD AREA PARCIAL
L. JUNTA BERMA BERMA
PARCIAL DE BERMA
IZQUIERDA DERECHA
3,739.72 710.00
11
Mamposterisa de Piedra
C°C° f'c=175+30%PM
C°C° f'c=140+30%PM
Encofrado Ydesencof.
Trazos y replanteo de
Elim. Mat.Excedente
Limpieza y desbroce
Comp.P/Estructuras
Excavaciòn Manual
(piedra asentada y
C°f'c=210 kg/cm2
C°f'c=175 kg/cm2
Estructuras (m3)
superficies m2
Demolición de
Nº PROGRESIVA OBRA DE ARTE
Revestido de
Enrrocado de
obras de arte
proteccion
P/Estruc.
Relleno
kg/cm2
kg/cm2
eboq.)
1 0+085.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.88 3.50 5.67 27.57
2 0+200.00 ALIVIADERO 71.50 71.5 18.65 18.65 1.05 10.25 4.53
3 0+263.00 PUENTE VEHICULAR 5.30 14.84 24.84 39.04 17.07 17.97 8.37 7.47 80.82
4 0+450.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.88 3.50 5.67 27.57
5 0+495.00 SALVAVIDAS 12.25 12.25 1.93 0.77 1.16 1.88 3.52
6 0+500.00 TOMA LATERAL M.D 29.09 29.091 9.29 1.11 9.81 0.36 5.35 9.12
7 0+550.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.88 3.50 5.67 27.57
8 0+595.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
9 0+625.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.88 3.50 5.67 27.57
10 0+700.00 SALVAVIDAS 12.25 12.25 1.93 0.77 1.16 1.88 3.52
11 0+715.00 PUENTE VEHICULAR 5.30 14.84 23.74 36.28 17.07 17.23 8.37 7.47 78.70
12 0+751.00 PASE PEATONAL 3.3 5.28 0.94 10.98344 10.63 1.881 3.50 5.67 27.57
13 0+793.00 PASE PEATONAL 3.3 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
14 0+950.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
15 0+985.00 TOMA LATERAL M.D 29.09 29.09 9.29 1.11 9.81 0.36 5.35 9.12
16 1+000.00 SALVAVIDAS 12.25 12.25 1.93 0.77 1.16 1.88 3.52
17 1+040.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
18 1+080.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.88 3.50 5.67 27.57
19 1+123.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
20 1+150.00 TOMA LATERAL M.D 29.09 29.09 9.29 1.11 9.81 0.3550143 5.35 9.12
21 1+178.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.88 3.50 5.67 27.57
22 1+206.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
23 1+250.00 SALVAVIDAS 12.25 12.25 1.93 0.77 1.16 1.88 3.52
24 1+261.00 PASE PEATONAL 3.30 5.28 0.94 10.98 10.63 1.881 3.50 5.67 27.57
Demolision de Estructuras (Ver O.M. Demol.) 100.18
0 264.57
TOTAL METRADO DE OBRAS DE ARTE 100.18 3359.59 311.37 0.00 115.92 235.51 235.62 0.00 63.65 82.86 16.73 94.32 0.00 591.48
12
Baranda metalica
J.Asfaltica
0.20x0.20
J.W.stop
193.51 9.10
312.95 8.00
547.13 9.10
193.51 9.10
10.72
148.00 0.60 9.72 1
193.51 9.10
193.51 9.1
193.51 9.10
10.72
547.13 9.10
193.51 9.1
193.51 9.10
193.51 9.1
148.00 0.60 9.72 1
10.72
193.51 9.1
193.51 9.10
193.51 9.1
148.00 0.6 9.7195959 1
193.51 9.10
193.51 9.1
10.719596
193.51 9.1
TOTAL
14
E HOJA DE METRADOS
1.32 m3
1.32
1.65 m3
1.65
3.58 m3
3.58
59.90 m3