ADDENDUM SPECIFICATION
.- 1. GENERAL
‘\ 3.2 Design of pile caps and associated structural members shall conform
in all respects to BS 8110 : 1985.
- 12 -
LAMPiRAN 'D'(Ccnt'd)
4.1 The following shall apply to the measurement of and payment for the
piling work:
(a) The value of the piling work (and related work if any) shall
be ascertained by remeasurement of the work as it is actually
,executed and valuation of the work with the prices or rates
of the Contractor in the bill of quantities submitted by him
(after the prices or rates therein have been adjusted if
necessary as by the Instructions to Tenderers or Conditions
of Tendering provided).
(5) If the value of the piling work (and related work if any)
ascertained in accordance with Clause 4.1 (a), is greater than
the amount for the same in the bill of quantities submitted
* by the Contractor (after the prices or rates therein have been -
adjusted if necessary as by the Instructions to Tenderers or
Conditions of Tendering provided), the amount to be paid to
the Contractor in respect of the piling work (and related work
if any) shail be the sum of the amount for the same in the bill
of quantities submitted by the Contractor and half of the
difference betdeen the same and the value of the work
ascertained in accordance with Clause 4.1 (a).
(cl If the value of the piling work (and related work if any)
ascertained in accordance with Clause 4.1 (a), is less than
the amount for the same-work in the bill of quantities
submitted by the Contractor (after the prices or rates therein
have been adjusted if necessary as by the Instructions to
Tenderers or Conditions of Tendering provided), the amount to
be paid to the Contractor in respect of the piling work (and
related work if any) shall be the value of the same ascertained
in accordance with Clause 4.1(a).
- 13 -
LAMPIRAN 'D'(Cont'd)
63) If at any time and in the opinion of the S.O., the alternative
piling system fails to meet the criteria for which it is
designed, the piling work (and related work if any) shall be
re-executed in accordance with the JKR design and the
provisions of Clauses 4.1 (a), (b), (c) ,and (d) shall not
apply. The Contractor shall be paid only the total amount for
the piling work (and related work (if any)) in the bill of
quantities submitted by him (after the prices or rates therein
have been adjusted if necessary as by the Instructions to
Tenderers or Conditions of Tendering provided) as a lump sum.
All extra costs incurred shall be borne solely by the
Contractor and no extension of time for time loss shall be
grar;ted .
5. TEST PILES F'
5.1 The-Contractor shall supply, install and load preliminary test piles
in locations to be selected by the S.O.. The number of preliminary
test piles to be supplied, installed and load tested shall be equal
in number to the number of test piles allowed in the basic tender.
The test piles shall afterwards form part of the foundations for the
structure.
5.3 The load test shall be carried out as specified under the section
on "Pile Testing" in the Standard Specifications.
5.6 If the results require a partial re-design of the piles, the S.O.
may direct the Contractor to do the same and in this event no
extension of time shall be granted and all extra costs incurred
shall be borne by the Contractor. Alternatively, the S.O. may treat
the piles as having failed and instruct the Contractor to re-execute _
the piling works based on the JKR specified piling works/system in
which case the provisions of. Clause 4.1 (e) shall also apply.
- 14 -
LAMPIRAN 'D'(Cont'd)
6.1 In the event of there being any discrepancy between any.of the terms,
conditions or other matters contained in the Contractor's
supplementary specifications for the Contractor's alternative piling
system and those contained in the Conditions of Contract and
Specifications, the Government Conditions of Contract and
Specifications shall take precedence.,
7.1 General
7.2 Reinforcement
The lateral reinforcement shall be not less than 0.6% of the gross
volume for a distance of about three times the least lateral
dimension of the pile from each end. In the body of the pile, the
lateral reinforcement shall be not less th2n 0.2% spaced af not more
than half the width of the pile.
The main reinforcing b2rs in piles not exceeding !2m in length shall
be in one continuous length unless otherwise approved by the S.O..
* -
- 15 -
LAMPIRAN ‘D’(Cont’d)
. .
Tpk;l
I- * 78.i ? - F%mina? Cover T= A!7 ?einforsement f'iflc!cdinq Licks) T.-d I+a+
--*
DuretSilitv Renuirement (see nctel
- 16 -
. LAMPIRAN 'O'(Cont'd)
7.3 Concrete
- 17 -
LAM?iPAN 'Q'(Cont'd)
r
Conditions Grade Minimum Quantity 28 Cay Chatacterfstic
Cesignation of Cement Cube Strength t
I
Fsr piles driven into coarse grave?, clay with cobbles and ctha;
soils liab'ie to damage the concrete at the tip of the pile, pi?e
shoes shall be provided. Pile shoes shall comply with the following
as relevant:
7 ."= C&tin0
- 18 -
.L
.. LAMPIRAN ’ 0’ (Cont’d)
Piles made
from ordinary Portland cement shall be kept damp for a
period of at
least 10 days after casting. Side forms shall not be
stripped less than 3 days after casting. After 14 days, piles may
be lifted and removed to a suitable stacking area but they shall
not be driven until they are at least 28 days old.
For piles made from rapid ha rdening cement the abcve periods may be
modified as ap.=roved by the S.O..
.AFtar
. w a pi1 e has been czst, the date of casting, reference number,
and the length shail be clearly marked on the top surface and on
the head of the pile. In addition, each pile shall be marked at
intervals of 3OCmm along its length before being driven.
Any face of a pile shall not deviate by more than Smm frcm a straight
edge 3m long laid on the face, and the centroid of any cross-section
of the pile shall not deviate by more than 12mm from the straight
line connecting the centroids of the end faces of the pile.
- 19 -
LAMPIRAN 'D'(Cont'd)
. ..
- 20 -
,-
LAMPIRAV 'D'(Ccnt'd)
- 21 -
.
LSMPIRA?4 '0' (Cont'd)
7.16.7 Prebiinq ..
7.12.5 Jettina
- 22 -
LAb4PiR.M 'D'(Cont'd)
%?en a piYe has been driven to the reqtiired set cr depth, the hez!
of the piYe Shail be cut off to the ieve: specified. The leflgt? cf
reinforc ing bars projecting above this level shall be as spe;'iliad.
- 23 -
,
?,AYPI?GP! ‘C’(Cont’d)
..
(Z *\
‘. 11 I Name of purchaser.
- ‘\
(iii; Name and location r;f job.
- 24 -
h,’ .
.
LAMPiZAN 'O'(Cont'd)
..
a.3 Prestress
(5) The prestress (in Pi/mm') shail not be less than O.C? times
the ratio of the length of the pile to its least laterai
dimension.
Patio of hammer
weight to pile
weight not less th3n : c .3 sea C .7 c.5
M:nimum brastress
fc r r,oy?ei drj;jjcg ?l,fmn' : 2.0 3.5 j*s 5.c
Minimum orestress
c,or easy driving ti/mm' : 3.5 d-0 5.0 6.3
3 .d
Mi:d steel stirrqs of not less than &TIE diameter shal! be placed
at a pitch of not more than the side dimension less SCmm. At the
too and bottom, for a length of three times the side dimension, the
stirrup volume sha?l not be less than 0.6% of the pile volume.
8.5
\ 3.1 Genera.'
- 25 -
ct
*
i
;;
LAMPIPAN 'D'(Cont'd)
..
iC.l General
Manufacturer
Cefinitions
lC.2.4 Gradina
- 27 -
LAWIRAN 'D'(Cont'd;
C-
L&l r Kind of defect V'axlnum permissible lfmits
I
t (r-e f3r
*
is r:sta 7)
iI Ic?
I es,
(a; ?in
borer
and needle (up to
2mm diameter 1500 in 7 sq. metre
II (b> Shot holas~2nm tc 3mm) 2C ;er metre
1 (c) toLarge6mmborer
diameter
holes, 3mm
Nme
j (d) EmnLarge bore
diameter
holes, over
E!one
i
i! WGOtS
(a) Sound Ccc-eight dimensicn of face, 6,~ f
maximum sf 4Cmm diameter per t
I ?,,"Cb
'"::y-.: I
i
1I
f
t
/ Socnd sapwood
I (a) Treated piles
!S> Untreated qiies
Allowed without
Not a! 1 cwed
limit
!
End split and included phloetr
intersecting end.
(See (15) below)
- 28 -
.
P
I 9 Twist (spiral distortion None apparent
15 Included phloem'not
intersecting ends
(see item 7)
- 29 -
tAMPIi7AN 'D'(Cont'd)
..
*
- 30 -
:
_..
LAMPIRAN 'a'(Cont'd)
The Contractor shall notify the S.O. of the delivery of timber piles
to the site, and provide the necessary facilities to enabie the S.O.
to inspect each pile and take randcm sampling for determination of
depth of penetration and the nett dry sa?t retention.
The pile head shall be fitted with toothed metal plates as approved
by the S.O. for protection against "brooming" and splitting during
normal driving.
'in the c&a of 'nard driving, unless otherwise approved by the S.O.,
a meta! helmet shall be fitted on the top of the piie. The top of
the pile shall first be trimme d to fit cioseiy into the recess of
the underside of the helmet. A hard wood dolly and if necessary, a
packing piece shall be used above the heimet.
-31- .
.
.
‘When ,a gile has been driven to the req:::'red set or de&h, the head
5.F the piie shaTi be cut off square to sound wood and given two
fiocd coats of 10% m/v solution of the preservative as specified fn
accordance with MS 733:196i, allowing each application to thcroughly
penetrate into the cut surface. When the preservative soluticn has
dried, t'ne pile head shall be heavily ccated with a bitumfnous
ccmpound which,conforms to SS 34!'6:!975 - Black Gituminous Coating
Solution fur Coid Application, for the whole depth that the pile is
tc be encased in the p'le cap.
37 ! ba?alJ pile<
y.' - shaf 1 hgu-r *we
!.- frcm
I rnt--, ?u;lgal 0" Test ~cc,~l+, p':6
of3er defects. The piles shall be reasonably straight and circular
in cross-section with all branch joints trimmed cff t.c the generz!
,Tlifl'
U.-e. IQP of the p!'.les but ieavirg the bar4 intact on the p!!es.
'here possible bakau oSJes sha?? be provided ir: ore single length
:3f Tct ?ess than 6m each. The average dfameter of piles .shali not
be 13SS than 10Cmm. The maximum aliowabJe Ioad shall not be mere
thEf7 i0 'i.?t psr pile.
- 32 -
LAMPIRAN 'D'(Cont'd)
li.5.2 Pitchinc
- 33 -
LAMPIRAN 'D'(Cont'd)
- 34 -
LAMFIRAN 'D'(Cont'd)
..
il.7 Freoaration of Pile Yeads after Drivina
*When the piles have been driven to the required depth, the top of
the piles shall be cut-off to a uniform level. The cut-off leve!
shall be below the lowest dry season ground water level as shcwn in
the drawings or as approved by the S.O..
12.1 General
All steel pipe piles shall comply with BS 1775 with regards to
sectional dimensions and the steel shall comp?ywith the requirements
Of ss 4350.
Each pile shall be clearly marked with white paint at the flanged
head showing its r eference number and overall length. In addition,
each pile shall be marked at intervals of 300mm along its length
before being driven.
‘\ 12.6
- 35 -
'Hitler: a piie has Seen drive? tc the required se', cr dezth and bef~rs
encas,ins in concrete, the piles shall be cut tc within 2Cmm of the
1eve: s shtytin in t5e Ccntractcr's drawings, and Qrctective caatlngs
if an:/ shall be removed from the surfaces cf the pile heads dcw~ ts
a levei 75Cmrn aSove the scffit cf the concrete. Pile heads s5ali be
ccnstructed to 'he detajls as specified.
T:he aleraze compressive stress under working lcad shal'l net exceed
A
L c-,
3 :& .z 7* the specified works cube strength at 25 <ays,
I
is.3 XcrkaSi7itv OF Concrete
- 36 -
LAMPIRAN 'D'(Cont'd)
S?ump
Ty;sical conditions of use
Range
* (mm) (in)
13.4 Reinforcement
The diameter of the borehole shall be not less than the speci.fied
or designed di aeter
m at any level of throughout its length.
- 37 -
.
LAMPIPXN 'B'(Cont'd)
'
,.
Stabilitv of Borehole
When the use of a drilling fluid is approved fcr this purpose, the
? eve? cf the fluid fr: the excavation shall be maintained so that
t:he internal fluid pressnure always exceeds the axterns? srzund water
press re.
- 38 -
.
‘_
LAMPIP,A?4 'C'(Cont'd)
. ..
Concrete shall be cast not less than C.3m above the cut-off level
or C.3m abcve the ground water'table level if the ground water table
.. is higher than the cut-off 1evel.
Bcrinc sha?? net be j;erz,ittai near recently cast piles wh,Sch ccnta'n
workable or nunset concrete.
- 39 -
_---
. . .
. Lampiran E
-;.a?
(a) Piling $
(0) Pile caps $
(c) Other work $ $
-------__------ ---------------
. S
AA!
-1
Wcrr? based on alternatif pi!irg system
: $
--------------- --------------” f
\
(Ri7c=Ft:,..............
-+ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..~....
cp,+l’-_................*.............. Gate:..............................