PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Roof Truss details 20-10-2016 & 21-10-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2117 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 20/10/2016 20/10/2016 21/10/2016 21/10/2016 ACC
10.00 AM 03.50
*** Refer attached annexure for 11.35
PM 9.30 AM AM
DFT readings ***
41,42 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2117 Roof Truss details


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

41,42 66 65 61 62 62 63.2 170 170 171 172 174 171.4 54 52 56 52 51 53

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: DETIAL OF GRIDS 20-10-2016 & 21-10-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2102 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 20/10/2016 20/10/2016 21/10/2016 21/10/2016 ACC
11.00 AM 04.30 PM 10.30 AM 12.35 PM ***
19,21,23,24,26,29,30,3 SA 2 1/2 *** Refer attached annexure for DFT readings
1 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2102 DETIAL OF GRIDS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
19,21,23,24,26,
29,30,31 62 66 62 61 60 62.2 174 170 171 172 175 172.4 51 53 52 52 54 52.4

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Assembly & Details of Grid 1 & 3 18-11-2016 & 19-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2102 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 18/11/2016 18/11/2016 19/11/2016 19/11/2016 ACC
10.00 AM 03.00 PM 09.30 AM 11.55 AM ***
01,02,13,14,18,20,28,3 SA 2 1/2 *** Refer attached annexure for DFT readings
4, 35 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2102 Assembly & Details of Grid 1 & 3


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01,02,13,14,18,
20,28,34, 35 60 63 65 64 65 63.4 174 174 170 173 178 173.8 53 52 53 52 55 53

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Roof Truss details 18-11-2016 & 19-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2117 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 18/11/2016 18/11/2016 19/11/2016 19/11/2016 ACC
10.00 AM 03.00
*** Refer attached annexure for 11.55
PM 09.30 AM AM
DFT readings ***
01,02,15 to 24 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2117 Roof Truss details


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

01,02,15 to 24 66 60 65 65 65 64.2 175 175 171 173 174 173.6 55 52 53 50 54 52.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Beam at EL +8.000 M 20-11-2016 & 21-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2111 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 20/11/2016 20/11/2016 21/11/2016 21/11/2016 ACC
11.00 AM 01.00
*** Refer attached annexure for 01.30
PM 11.30 AM PM
DFT readings ***
CT8-1A-07 to 11 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2111 Floor Beam at EL +8.000 M


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
CT8-1A-07 to
11 62 62 65 65 60 62.8 174 178 174 175 170 174.2 56 52 52 53 54 53.4

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Beam at EL +8.000 M 20-11-2016 & 21-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2111 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 20/11/2016 20/11/2016 21/11/2016 21/11/2016 ACC
11.00 AM 01.00
*** Refer attached annexure for 01.30
PM 11.30 AM PM
DFT readings ***
CT8-1A-11A to 14 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2111 Floor Beam at EL +8.000 M


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
CT8-1A-11A to
14 60 63 64 65 61 62.6 171 174 171 174 171 172.2 52 52 52 53 54 52.6

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Monorail floor (EL +15.7 M)details 23-11-2016 & 24-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2120 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 23/11/2016 23/11/2016 24/11/2016 24/11/2016 ACC
11.00 AM 01.00
*** Refer attached annexure for 01.30
PM 11.30 AM PM
DFT readings ***
16 TO 23 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2120 Monorail floor (EL +15.7 M)details


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

16 TO 23 65 64 62 63 61 63 174 178 174 175 174 175 55 58 54 52 50 53.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Details @ EL+10.800 M LVL 25-11-2016 & 26-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2132 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 25/11/2016 25/11/2016 26/11/2016 24/11/2016 ACC
09.00 AM 02.30 PM 09.30 AM 03.00 PM ***
CT8-2A- SA 2 1/2 *** Refer attached annexure for DFT readings
27,38,30,34,36, 31 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2132 Floor Details @ EL+10.800 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
CT8-2A-
27,38,30,34,36,
31 66 63 65 64 63 64.2 173 175 174 174 178 174.8 52 54 58 52 51 53.4

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Details @ EL+10.800 M LVL 25-11-2016 & 26-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2132 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 25/11/2016 25/11/2016 26/11/2016 24/11/2016 ACC
09.00 AM 02.30 PM 09.30 AM 03.00 PM ***
CT8-2A- SA 2 1/2 *** Refer attached annexure for DFT readings
21,22,22A,23,24, 24A ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2132 Floor Details @ EL+10.800 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
CT8-2A-
21,22,22A,23,2
4, 24A
63 63 65 60 60 62.2 174 178 179 174 170 175 54 52 53 56 55 54

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Details @ EL+10.800 M LVL 25-11-2016 & 26-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2132 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 25/11/2016 25/11/2016 26/11/2016 24/11/2016 ACC
10.00 AM 04.30 PM 11.30 AM 04.40 PM ***
CT8-2A-33,35,32,28, SA 2 1/2 *** Refer attached annexure for DFT readings
29,37,39,41 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2132 Floor Details @ EL+10.800 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

CT8-2A-
33,35,32,28,
29,37,39,41 63 61 60 61 64 61.8 172 175 174 171 176 173.6 55 56 53 54 55 54.6
Ardee Engineering TUV-SUD KPCL
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Details @ EL+10.800 M LVL 27-11-2016 & 28-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2132 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 27/11/2016 27/11/2016 28/11/2016 28/11/2016 ACC
10.00 AM 03.00 PM 10.00 AM 03.00 PM ***
CT8-2A-15, SA 2 1/2 *** Refer attached annexure for DFT readings
16,,17,20,44 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2132 Floor Details @ EL+10.800 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
CT8-2A-15,
16,,17,20,44
62 63 61 62 65 62.6 174 175 174 171 175 173.8 54 52 54 58 51 53.8

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Details @ EL+10.800 M LVL 27-11-2016 & 28-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2132 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 27/11/2016 27/11/2016 28/11/2016 28/11/2016 ACC
10.00 AM 03.00 PM 10.00 AM 03.00 PM ***

CT8-2A-
45,45A,46,47,48,49,51 SA 2 1/2 *** Refer attached annexure for DFT readings
,52,19 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2132 Floor Details @ EL+10.800 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

CT8-2A-
45,45A,46,47,
48,49,51,52,19 60 63 62 60 60 61 170 174 176 176 174 174 58 54 57 52 50 54.2
Ardee Engineering TUV-SUD KPCL
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Monorail floor (EL +15.7 M)details 23-11-2016 & 24-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2120 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 23/11/2016 23/11/2016 24/11/2016 24/11/2016 ACC
11.00 AM 01.00
*** Refer attached annexure for 01.30
PM 11.30 AM PM
DFT readings ***
01 TO 09 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2120 Monorail floor (EL +15.7 M)details


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

01 TO 09 60 59 58 62 60 59.8 174 178 178 176 176 176.4 54 55 51 53 54 53.4

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Monorail floor (EL +15.7 M)details 24-11-2016 & 25-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2120 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 24/11/2016 24/11/2016 25/11/2016 25/11/2016 ACC
12.00 AM 04.00
*** Refer attached annexure for 04.30
PM 11.30 AM PM
DFT readings ***
10 TO 15 ,24,25 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2120 Monorail floor (EL +15.7 M)details


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

10 TO 15 ,24,25 63 66 62 60 67 63.6 174 174 176 176 174 174.8 58 58 52 52 50 54

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: Floor Details @ EL+10.800 M LVL 28-11-2016 & 29-11-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2132 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 28/11/2016 28/11/2016 29/11/2016 29/11/2016 ACC
09.00 AM 04.30 PM 11.00 AM 04.30 PM ***

CT8– 2A –
07,12,13,14, 42, 26,50, SA 2 1/2 *** Refer attached annexure for DFT readings
53 TO 69, ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2132 Floor Details @ EL+10.800 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

CT8– 2A –
07,12,13,14,
42, 26,50, 53
TO 69, 60 63 62 60 60 61 170 174 176 176 174 174 58 54 57 52 50 54.2
Ardee Engineering TUV-SUD KPCL
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: FLOOR BEAM @ EL+8.000 M LVL 01-12-2016 & 03-12-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2111 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 01/12/2016 01/12/2016 03/12/2016 03/12/2016 ACC
10.20 AM 03.10 PM 10.00 AM 02.30 PM ***
CT8– 1A –
01,02,04,05,06,45 TO SA 2 1/2
51 *** Refer attached annexure for DFT readings
***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2111 FLOOR BEAM @ EL+8.000 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
CT8– 1A –
01,02,04,05,06,
45 TO 51

63 62 61 60 66 62.4 174 175 174 172 172 173.4 55 54 58 54 52 54.6


Ardee Engineering TUV-SUD KPCL
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: DETAIL OF CLADDING 02-12-2016 & 03-12-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2124 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 02/12/2016 02/12/2016 03/12/2016 03/12/2016 ACC
10.20 AM 03.10
*** Refer attached annexure for 02.30
PM 10.00 AM PM
DFT readings ***
SA 1 TO SA 5 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2124 DETAIL OF CLADDING


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
SA 1 TO SA 5
63 61 60 65 66 63 179 178 175 174 175 176.2 54 55 52 58 54 54.6

Ardee Engineering TUV-SUD KPCL


PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No : AEC/PIR/
Inspection
Item Description: FLOOR BEAM @ EL+8.000 M LVL 02-12-2016 & 03-12-2016
Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CT8-2117 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 02/12/2016 02/12/2016 03/12/2016 03/12/2016 ACC
10.20 AM 04.00
*** Refer attached annexure for 02.30
PM 11.00 AM PM
DFT readings ***
CT8– 03 & 03X SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME
Mr.K.SIVA KUMAR P. JAGADEESH KUMAR
SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CT8-2117 FLOOR BEAM @ EL+8.000 M LVL


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.

CT8– 03 & 03X 63 60 62 65 64 62.8 170 171 171 176 175 172.6 48 49 49 55 54 51

Ardee Engineering TUV-SUD KPCL