Académique Documents
Professionnel Documents
Culture Documents
[30'-0"]
PF3 1200x1200x350 T16-200 T16-200 T16-200 T16-200 Double Reinforcement [8'-10"] [6'-0"] [14'-5"]
0m x
m
50 30
0m x
0m x
m
m
50 30
50 30
2
2
2
1
C1 B1 C1 B1 C1
PF3
PF3 PF3
[18'-2"]
5535
B1
OUTSIDE INSIDE
300 PF3
0m x
m
50 30
0m x
0m x
m
m
50 30
50 30
2
RC COLUMN STARTER BARS SAME NUMBER. B1 C1 B1 C1
2
2
TYPE, SIZE AND ARRANGEMENT AS 4T16
FOR COLUMN BARS UNLESS NOTED
OTHERWISE IN COLUMN SCHEDULE
2
T10-200 LINKS C1
400
LAP
[7'-0 1/2"]
2145
SSL
FFL
150
B1 3
2 SETS OF T10 TIES FOR
GROUND BEAM
SUPPORT OF STARTER BAR
B2 LAYER
TYPICAL PLINTH
AS SCHEDULE
B1 LAYER LEVEL BEAM
[7'-10 1/2"]
2405
FOR PAD FOUNDATION
FOR SIZE REFER TO SCHEDULE
0m x
0m x
0m x
m
m
230
50 30
50 30
50 30
B1
2
FOR WATER PROOFING DETAIL
REFER TO STANDARD DETAIL 4
C2 C1
230 PF1 PF3
PF2
500
SECTION A
[75'-5 1/2"]
23000
250
[11'-7"]
3525
C1 C2
LENGTH
5
C230x500 C230x250
[4'-6"]
1375
6T16 4T16
0m x
0m x
m
m
50 30
50 3 0
0m x
m
B1
2
50 3 0
T10-200 LINKS T10-200 LINKS
2
6
C1 B1 C1 B1 C1
WIDTH
PF1
B2
PF3 PF3
NOTE:-
[16'-9"]
5100
1. FOR REINFORCEMENT, DIMENSION ETC. SEE COLUMN AND
FOOTING SCHEDULE.
2. OVERBREAK BELOW FOOTING TO BE FILLED TO UNDERSIDE OF
FOOTING WITH GRADE C15 CONCRETE.
3. OVERBREAK AROUND FOOTINGS TO BE FILLED WITH CONCRETE
SAME GRADE AS FOOTINGS OR CEMENT STABILISED SAND (7%
CEMENT BY VOLUMNE)
TYPICAL FOOTING REINFORCEMENT DETAIL 4. DETAILS ABOVE APPLY UNLESS SHOWN OTHERWISE ON THE DRAWING 1000
[3'-3 1/2"]
PF3
0m x
0m x
0m x
m
m
50 30
50 30
50 30
B1
2
7
[3'-11"]
1200
C1 C1 C1
PF3 PF1
[5'-6"]
1675
B1
0m x
0m x
0m x
m
m
25 30
25 30
25 30
B1 920
2
[3'-0"]
8
C2 C2 C2
[3'-8 1/2"]
1125
PF2 PF2 PF2