The project developed in this dissertation is a study of a work of
art, defined as an overpass, The objective of this project is to create a connection for transferring for the large amount of traffic of the CW78 which connects the city of Sidi bel abbés to Saida . The Bridge consists of two spans of 33.4m and beams spaced made of prestressed concrete .