Vous êtes sur la page 1sur 8

SITE TEST REPORT

POWER TRANSFORMER REINFORCEMENT


PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 1 of 8

P443 OH Line distance protection relay.

1. GENERAL DATA AND INFORMATION:


Sub. Name Designation
Circuit Ref. Serial No.
Panel No. Model No.
Make Aux. Voltage
Dwg & Sh No. Rated Current
Software Ref. Rated Voltage

Test Kit Details:


Test Kit Used Equipment S. No:
Calibration Date:

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


2.1 WITH THE RELAY DE-ENERGISED
Description Checked
Item
1 Inspect for any physical damage or defects.
2 Verify connections as per approved drawings.
3 Check that serial no. of relay matching with serial no. of case.
4 Rating information correct for installation.
5 Case earth installed.

2.2 WITH THE RELAY ENERGISED


Item Description Checked
1 Clock set to local time?
2 Time maintained when auxiliary supply removed?
3 Relay healthy (green) LED working?
4 Alarm (yellow) LED working?
5 Out of service (yellow) LED working?
6 Trip (red) LED working?

2.3 Field supply voltage

Item Description Checked


1 Value measured between terminals M7 & M9
2 Value measured between terminals M8 & M10

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 2 of 8

3. WATCHDOG Contact:-
Supply Off - Terminals N11 & N12 (Closed)
Supply Off - Terminals N13 & N14 (Open)
Supply On - Terminals N11 & N12 (Open)
Supply On - Terminals N13 & N14 (Closed)

4. Opto Inputs:-
Opto No Function Remarks
Opto 1
Opto 2
Opto 3
Opto 4
Opto 5
Opto 6
Opto 7
Opto 8
Opto 9
Opto 10
Opto 11
Opto12
Opto13
Opto14
Opto15
Opto16
Opto17
Opto18
Opto19
Opto20
Opto21
Opto22
Opto23
Opto24

5. Output Relays:-
Relays Function Type Remarks

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 3 of 8

Relay 1
Relay 2
Relay 3
Relay 4
Relay 5
Relay 6
Relay 7
Relay 8
Relay 9
Relay 10
Relay 11
Relay 12
Relay 13
Relay 14
Relay 15
Relay 16
Relay 17
Relay 18
Relay 19
Relay 20
Relay 21
Relay 22
Relay 23
Relay 24
Relay 25
Relay 26
Relay 27
Relay 28
Relay 29
Relay 30
Relay 31
Relay 32

6.0 LED FUNCTION CHECK


LED COLOUR FUNCTION TYPE Remarks
Led 1
Led 2
Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA
Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 4 of 8

Led 3
Led 4
Led 5
Led 6
Led 7
Led 8
Function Led 1
Function Led 2
Function Led 3
Function Led 4
Function Led 5
Function Led 6
Function Led 6
Function Led 7
Function Led 7
Function Led 8
Function Led 9
Function Led 10

7.0 MEASUREMENT ACCURACY CHECKS


Displayed current (Primary / Secondary) Primary
Line CT ratio
E/F CT ratio

Input CT Applied value Displayed value in Displayed In Remarks


secondary primary
Ia
Ib
Ic
IN
Accuracy: - Range (0.05 to 3In) ,Accuracy(+/- 1.0% of reading)

Voltage measurement
Displayed current (Primary / Secondary) Primary
Line VT ratio

Applied voltage:63.5 (Ph-N)


Input VT Applied value Displayed value in Displayed In Remarks
secondary Primary
Van 63.5 V
Vbn 63.5 V
Vcn 63.5 V
Accuracy :- Range (0.05 to 2 Vn ),Accuracy(+/- 1.0% of reading)

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 5 of 8

8.0 Settings checks


Application specific function setting applied?
Application specific PSL applied?

9.0 Distance Protection .: Distance will be active


during CH. Fail only
Line Length
Line Impedance
Line Angle
Setting mode
Phase/Ground Chars.
Zone 1 ph/Gnd Status
Zone 2 ph/Gnd Status
Zone 3 ph/Gnd Status
Zone 4 ph/Gnd Status
Z1ph/Gnd Reach
Z1ph/Gnd Phase Angle
Z2ph/Gnd Reach
Z2ph/Gnd Phase Angle
Z3ph/Gnd Reach
Z3ph/Gnd Phase Angle
Z1Ph-Ph Resistance
Z2Ph-Ph Resistance
Z3Ph-Ph Resistance
Z1Ph-Gnd Resistance
Z2Ph-Gnd Resistance
Z3Ph-Gnd Resistance
Z1 Sensit. Iph>1
Z2 Sensit. Iph>1
Z3 Sensit. Iph>1
Z1 Sensit. Ignd>1
Z2 Sensit. Ignd>1
Z3 Sensit. Ignd>1
kZN1 Res. Comp
kZN1 Res. Angle
kZN2 Res. Comp
kZN2 Res. Angle
kZN3 Res. Comp
kZN3 Res. Angle
tZ1 ph/Gnd Delay
tZ2 ph/Gnd Delay
tZ3 ph/Gnd Delay

9.1 Reach test:


(OMICRON test result enclosed)
9.2 Operating time:

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 6 of 8

(OMICRON test result enclosed


9.3 SOTF Function:
Inject Z2 fault while Opto Input (CB manual Close command) energised:
Fault Type Actual Trip Time
Normal trip time in msec.
Z2 in msec.

L1-E

L2-E

L3-E

L1-L2-L3

9.4 Power Swing Blocking:


Simulated Power Swing
Relay Detects Simulated Power Swing
Blocking Checks
Zone 1 blocked for power swing
Zone 2 blocked for power swing
Zone 3 blocked for power swing
PSB alarm Contact Operates

9.5 Teleprotection scheme:


Scheme : PUR (AIDED 1 scheme)
Inject Z2 fault while Opto Input (DIST. Carrier receive) energised:

Fault Measured trip time with opto


Measured trip time with energized (m sec )
Type Measured Carrier send time (m sec)
opto de energized (m sec )
Z2

L1-E

L2-E

L3-E
L1-L2-
L3

10.0 DEF
Scheme : (AIDED 2 DEF)
Inject forward fault
Measured Aided 2 DEF sending time =
Inject forward fault + DEF carrier receive opto energize
Measured trip time =
Inject reverse fault
Check no carrier send =

11.0 Earth Fault


RCA angle = Trip time = 1 sec DT

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 7 of 8

PH FORWARD
CURRENT & TORQUE
RE LAG LEAD
VOLTAGE APPLIED ANGLE
F. P/U D/O P/U D/O
E/F IR & V Y -B

11.0 VT Supervision:
Apply 3 phase voltage 63.5 V with 0.15 A 3ph current.

Vabc
Va Vb Vb Vc Vc Drop
Va pickup Vabc pickup
drop off pickup drop off Pickup Drop off off

Function Checked
Blocking of distance protection by VT Fail(1ph fail,2ph fail and 3ph
fail)
Blocking of distance protection by VT MCB Trip

VT Inhibit Settings (A) Measured (A)

VTS I> 2.0

VTS I2> 0.05

11.0 Over current


OPERATING TIME AT MULTIPLES OF PICKUP CURRENT (sec)
Phase
I> At SI curve TMS =1
Setting Pick up 10*Is
Refer
(Is) current 2*Is 5*Is
ence
(Amps)
Calculated Measured Calculated Measured Calculated Measured
R 10.029 4.279 2.970
Y 10.029 4.279 2.970
B 10.029 4.279 2.970

12.0 Earth fault

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature:
SITE TEST REPORT
POWER TRANSFORMER REINFORCEMENT
PROJECT
Client: National Grid SA Contract No: 11031064 / 00
Site : Drawing No:
Equipment : MiCOM P443 – Line Dist. Protection Relay Panel ID : Page : 8 of 8

OPERATING TIME AT MULTIPLES OF PICKUP CURRENT (sec)


Phase
Ie> At SI curve TMS =1
Setting Pick up 10*Is
Refer
(Is) current 2*Is 5*Is
ence
(Amps)
Calculated Measured Calculated Measured Calculated Measured
e/f 10.029 4.279 2.970

13.0 Three Pole Trip A/R Timers:

Timer Setting Time (ms) Measured Time (ms)


Dead Time

Reclaim Time

Close Pulse Time

A/R blocked by IN/OUT

A/R blocked by exceeding No. of shoots

14.0 Events and Fault Recorder Checks:


Function Checked
Events
Fault recorder

15.0 Communication interface Check:


Checked
Front Port communication by using MICOM S1 Studio

16.0 Remarks:

Tested by : ALSTOM GRID Witnessed by : CONSULTANT Witnessed by: National Grid SA


Date: Date: Date:
Name & Signature: Name & Signature: Name & Signature: