Vous êtes sur la page 1sur 13

The probability for a randomly picked unit to be a defective one is 0.

1, if 20 units are picked,


how many will be defective on average, what will be the satnadard deviation? Additionally what
will be the probability of having more than 5 defectives, less than 5 defectives and between 3
and 7 defectives inclusive?

P 0.1
n 20

# Prob Cum. Prob.


0 0.121577 0.121576655 Mean 2
1 0.27017 0.391746998 SD 1
2 0.28518 0.676926805
3 0.19012 0.867046677 P (X > 5) 0
4 0.089779 0.956825505 P (X< 5) 1
5 0.031921 0.988746866 P (3<=X<=7) 0
6 0.008867 0.997613911
7 0.00197 0.999584365
8 0.000356 0.999940141
9 5.27E-05 0.999992849
10 6.44E-06 0.999999291
11 6.51E-07 0.999999942
12 5.42E-08 1
13 3.71E-09 1
14 2.06E-10 1
15 9.15E-12 1
16 3.18E-13 1
17 8.31E-15 1
18 1.539E-16 1
19 1.8E-18 1
20 1E-20 1
On average there comes 10 customer in a rush hour. Compute the distribution of
customers in rush hour. What will be the mean and standard devaition for this
distriubtion. Find the probability of the following events.
1. Getting more than 2 cusomters
2. Getting less than 7 cusomters.
3. Getting between 5 and 15 customers
4. Getting exactly 8 customers
Avera 10
STD 3.1622776602

X P Cum Prob
0 4.5399929762E-05 4.53999297625E-05 P(C>2)
1 0.0004539993 0.0004993992 P(C<7)
2 0.0022699965 0.0027693957 P(5<=C<=15)
3 0.007566655 0.0103360507 P(C=8)
4 0.0189166374 0.0292526881
5 0.0378332748 0.0670859629
6 0.063055458 0.1301414209
7 0.0900792257 0.2202206466
8 0.1125990321 0.3328196788
9 0.1251100357 0.4579297145
10 0.1251100357 0.5830397502
11 0.1137363961 0.6967761463
12 0.0947803301 0.7915564764
13 0.0729079462 0.8644644226
14 0.0520771044 0.9165415271
15 0.0347180696 0.9512595967
0.9972306043
0.1301414209
0.9220069086
0.1125990321
The salary of newly hired graduates is assumed to be normally
distributed. The mean Salary is Rs. 58,000 with a standard deviation of
Rs. 5000. You are required to do the following.
1 Find the probability of getting more than 50,000
2 Find the probability of getting less than 52,000
3 Find the probabilit yfo getting less than 70,000
4 Find the probability of getting between 55,000 and 65,000.
5 What is the maximum salary of lower 20% of the newly hired graudates
6 What is the minimum salary of upper 20% of the newly hired graduates

Mean 58000 1 P(S>50K) 0.9452007083


STD 5000 2 P(S<52K) 0.1150696702
3 P(S<70K) 0.9918024641
4 P(55K<S<65K) 0.644990223
5 Max of Lower 20% 53.7918938321
6 Min of Upper 20% 62.2081061679
Mean 58
STD 5

Less Than More than


50 0.9452007083
52 0.1150696702
70 0.9918024641
55 65 0.644990223
Develping X-Bar Chart

Sample Average UCL LCL Xm Mean (Xm) 1.70


1 1.92 2.134714 1.270286 1.70 SD 0.144071
2 1.80 2.134714 1.270286 1.70
3 1.51 2.134714 1.270286 1.70 N of SD 3
4 1.95 2.134714 1.270286 1.70 UCL 2.134714
5 1.89 2.134714 1.270286 1.70 LCL 1.270286
6 1.55 2.134714 1.270286 1.70
7 1.82 2.134714 1.270286 1.70
8 1.61 2.134714 1.270286 1.70
9 1.75 2.134714 1.270286 1.70 2.5
10 1.71 2.134714 1.270286 1.70
11 1.82 2.134714 1.270286 1.70 2
12 1.76 2.134714 1.270286 1.70
13 1.58 2.134714 1.270286 1.70
14 1.60 2.134714 1.270286 1.70 1.5
15 1.54 2.134714 1.270286 1.70
16 1.82 2.134714 1.270286 1.70 1
17 1.51 2.134714 1.270286 1.70
18 1.59 2.134714 1.270286 1.70
0.5
19 1.76 2.134714 1.270286 1.70
20 1.56 2.134714 1.270286 1.70
0
0 5 10 15
10 15 20 25
R-Chart

Sample Range UCL LCL Rm


1 0.22 0.39272 0.049283 0.221 n 10
0.45
2 0.19 0.39272 0.049283 0.221 Mean Range 0.221
3 0.21 0.39272 0.049283 0.221 0.4
4 0.2 0.39272 0.049283 0.221 Table Values 0.35
5 0.26 0.39272 0.049283 0.221 D3 0.223
6 0.19 0.39272 0.049283 0.221 D4 1.777 0.3
7 0.29 0.39272 0.049283 0.221 LCL 0.049283 0.25
8 0.24 0.39272 0.049283 0.221 UCL 0.392717
0.2
9 0.32 0.39272 0.049283 0.221
10 0.11 0.39272 0.049283 0.221 0.15
11 0.18 0.39272 0.049283 0.221 0.1
12 0.33 0.39272 0.049283 0.221
0.05
13 0.33 0.39272 0.049283 0.221
14 0.12 0.39272 0.049283 0.221 0
15 0.12 0.39272 0.049283 0.221 0 5
16 0.21 0.39272 0.049283 0.221
17 0.26 0.39272 0.049283 0.221
18 0.12 0.39272 0.049283 0.221
19 0.19 0.39272 0.049283 0.221
20 0.33 0.39272 0.049283 0.221
0.45

0.4

0.35

0.3

0.25 Range
UCL
0.2 LCL
0.15 Rm

0.1

0.05

0
0 5 10 15 20 25
C-Chart

Break
Week Down UCL LCL C(M)
1 3 11.32 1.28 6.30 C(M) 6.3
2 6 11.32 1.28 6.30 Sigma ( C ) 2.50998
3 10 11.32 1.28 6.30 Sigma Level 2
4 10 11.32 1.28 6.30
5 7 11.32 1.28 6.30 12
6 3 11.32 1.28 6.30
7 6 11.32 1.28 6.30 10
8 7 11.32 1.28 6.30
9 5 11.32 1.28 6.30 8
10 6 11.32 1.28 6.30
6

0
0 2 4 6 8 10 12
Break Down
UCL
LCL
C(M)

8 10 12
P-Chart

Day Production Deficiencies Day P UCL LCL P(M)


1 1181 37 1 0.031329382 0.053894 0.020001 0.036947
2 1003 38 2 0.037886341 0.053894 0.020001 0.036947
3 1010 34 3 0.033663366 0.053894 0.020001 0.036947
4 1207 40 4 0.033140017 0.053894 0.020001 0.036947
5 1208 31 5 0.025662252 0.053894 0.020001 0.036947
6 1157 42 6 0.036300778 0.053894 0.020001 0.036947
7 1096 37 7 0.033759124 0.053894 0.020001 0.036947
8 1210 43 8 0.03553719 0.053894 0.020001 0.036947
9 1196 40 9 0.033444816 0.053894 0.020001 0.036947
10 1072 37 10 0.034514925 0.053894 0.020001 0.036947
11 1165 43 11 0.036909871 0.053894 0.020001 0.036947
12 995 52 12 0.052261307 0.053894 0.020001 0.036947
13 1050 34 13 0.032380952 0.053894 0.020001 0.036947
14 1192 32 14 0.026845638 0.053894 0.020001 0.036947
15 1080 49 15 0.04537037 0.053894 0.020001 0.036947
16 1053 53 16 0.050332384 0.053894 0.020001 0.036947
17 1108 53 17 0.047833935 0.053894 0.020001 0.036947
18 1029 38 18 0.036929057 0.053894 0.020001 0.036947
19 1180 48 19 0.040677966 0.053894 0.020001 0.036947
20 1110 43 20 0.038738739 0.053894 0.020001 0.036947
Defective Percentage Mean 0.036947359
Sample Average 1115.1
SD Defective Percentage 0.005648847
UCL 0.0538939
LCL 0.020000818

0.06

0.05

0.04
P
0.03 UCL
LCL
0.02 P(M)

0.01

0
0 5 10 15 20 25