LEARNING CENTRE
AHMADU BELLO UNIVERSITY
ZARIA, NIGERIA
COURSE MATERIAL
COPYRIGHT PAGE
1
© 2016 Distance Learning Centre, ABU Zaria, Nigeria
All rights reserved. No part of this publication may be reproduced in any form or by any
means, electronic, mechanical, photocopying, recording or otherwise without the prior
permission of the Director, Distance Learning Centre, Ahmadu Bello University, Zaria,
Nigeria.
ISBN:
Zaria, Nigeria.
Tel: +234
E-mail:
2
COURSE WRITERS/DEVELOPMENT TEAM
Yusuf Abdullahi (Subject Matter Experts)
Sandra Ekpot
Prof. Abiola Awosika (Subject matter Reviewers)
Halima Shuaibu
Enegoloinu Adakole (Language Editor)
Prof. Adamu Z. Hassan (Formatting Editor)
Nasiru Tanko
Graphics
Ibrahim Otukoya
3
QUOTE
“Open and Distance Learning has the exceptional ability of meeting the challenges of the three
vectors of dilemma in education delivery – Access, Quality and Cost”
4
TABLE OF CONTENT
Title Page
Copyright
Quote
1.0 Course Information
2.0 Course Description
3.0 Course Introduction
4.0 Course Outcome
5.0 Activities to Meet Course Objectives
6.0 Grading Criteria and Scale
7.0 Course Structure and Outline
8.0 Discussion Forum
8.1 Topical Discussions
8.2 Discussion Questions
9.0 Study Modules
9.1 Module 1:
Introduction
9.1.1 Objectives
9.1.3 Study Sessions
9.1.3.1 Study Session 1: Operations management
Discussion Question(s)
9.1.3.2 Study Session 2: Operations strategy
Discussion Question(s)
9.1.3.3 Study Session 3: Process analysis
Discussion Question(s)
9.1.3.4 Study Session 4: Data Protection Policy and Basic Economic Decisions
Discussion Question(s)
9.2 Module 2
Introduction
9.2.1 Objectives
9.2.3 Study Sessions
9.2.3.1 Study Session 5: Plant Location and layout
Discussion Question(s)
9.2.3.2 Study Session 6: Inventory Management
Discussion Question(s)
9.2.3.3 Study Session 7: Forecasting
Discussion Question(s)
9.2.3.4 Study Session 8: Business forecasting
Discussion Question(s)
5
9.3 Module 3
Introduction
9.3.1 Objectives
9.3.3 Study Sessions
9.3.3.1 Study Session 9: Network Analysis
Discussion Question(s)
9.3.3.2 Study Session 10: Critical Path Method (CPM)
Discussion Question(s)
9.3.3.3 Study Session 11: Project Evaluation and Review Technique (PERT)
Discussion Question(s
9.3.3.4 Study Session 12: Linear Programming (LP)
Discussion Question(s)
9.3.3.5 Study Session 13: Developments in Operations Management
Discussion Question(s)
10.0 Further Reading
11.0 Glossary
6
PREAMBLE
Welcome to Operations/Production Management (BUAD 802)! This document is
base on the past practices and current directions of research into current course
design and quality assurance practices. Feel free to compare with other institutions
and contact me for any input into this document.
1.0 COURSE INFORMATION
Course Code: BUAD 802
Course Title: Production and Operations Management
Credit: 3 Credit Units
Semester: Two
Lecturer Information
Instructor: Yusuf Abdullahi
2.0 COURSE DESCRIPTION
This course involves an analysis of the theory and practice of operations
management in organisations. Included are the issues in operations strategy,
process analysis and the use of data and managerial opinion in making effective
propositions to address the questions in the cases. This course introduces you to
problems and analyses related to the enhancement of modern and service
operations. Class sessions involve explaining concepts, working examples, and
discussing cases. A wide range of topics are covered, including: process analysis,
quality management, procurement, and product development. Major economic
decision, problems of production and operations management; aggregate
production and workforce scheduling; multi-plant allocation of product; large scale
7
project control (CPM and PERT); Production and Inventory control; Demand
forecasting, Quality control and short run job – shop scheduling; the interaction of
production. Toward the end of the course, you will work in teams to manage a
virtual factory.
3.0 COURSE INTRODUCTION
Production and operations management is the process, which combines and
transforms various resources used in the production and operations subsystem of
the organisation into value added product/services, in a controlled manner as per
the policies of the organisation. Therefore, it is that part of an organisation, which
is concerned with the transformation of a range of inputs into the required
(products/services) having the requisite quality level.
I. Academic Honesty
It is expected that you behave according to the highest standards of academic
discipline and acknowledge the works of others cited and also be sure that the
8
work submitted for assessment as individuals or as team members is theirs.
Anyone found to engage in any form of academic dishonesty in this course will be
penalised.
II. Participatory Learning
You are advised to have academic firmness at the back of your minds as you play a
part in this course. Please, familiarise yourself with course contents and
assignments.
4.0 COURSE OUTCOME
On successful completion of this course, you should be able to:
1. Explain theories, concepts, and cutting-edge developments in the global
business environments (economic, technological, competitive, operations
and management).
2. Synthesise logistics and transportation of raw materials: the processes of
just-in-time logistics, transportation by rail, shipping, etc.
3. Compare and contrast different production and service operations.
4. Assess the operations, functions and the nature of the operations manager's
job.
5. Utilise the key aspects of operations management in decision making.
5.0 ACTIVITIES TO MEET COURSE OBJECTIVES
This is a theoretical as well as a practical course; there will be a significant amount
of reading, writing and researching, and case analyses involved in acquiring
knowledge. Research will be applied, meaning working jointly with others and
sharing the outcome of your work in short essays. Many of the topics we cover
may provide new ideas for use, both in our organisations and at home.
9
You are expected to work together on team/group assignments. This mimics the
typical team-based nature of operations/production management case analysis.
Please remember the basics of group assignments (Forming, Storming, Norming
and Performing) and try to quickly adjust in your teams, so you can begin to
perform for success. For a comprehensive understanding of the material, keeping
current with the reading is strongly encouraged. Assignments are to be completed
and submitted or posted as the case may be.
The Study Session Activities and Discussion Question(s) are presented under the
appropriate Modules. Group responses to each module assignment are to be
uploaded within the stipulated time indicated in the modules. Indicate clearly
whose post you are responding to and what specific point you are addressing.
Bringing in additional outside resources and knowledge as well as related life
experiences would enhance your response and command additional points. Also,
tutorials will be arranged within the two weeks on campus activities in which
questions will be clarified to enable you understand fully what you’ve learnt.
10
6.0 GRADING CRITERIA AND SCALE
6.1 Grading Criteria
Grades will be based on the following Percentages:
Individual assignments 10%
Group Assignment/Discussion Question(s) 10%
Discussion Topic Participation 10%
Quizzes/Other Assignments 10%
Semester Examination 60%
TOTAL 100%
6.2 Grading Scale
The following is the grading scale as recommended by the Board of Examiners of
the Centre:
A = 70–100
B = 60–69
C = 50-59
F = 0-49
As you work on your research in this course and throughout your
graduate programme, here are some examples of open education
resources that will serve you well.
School Forge and Source Forge are good places to find, create, and publish open software. Source
Forge, for one, has millions of downloads each day.
Open Source Education Foundation and Open Source Initiative, and other organisations like
these, help disseminate knowledge.
11
Creative Commons has a number of open projects from Khan Academy to Curriki where teachers
and parents can find educational materials for children or learn about Creative Commons licenses.
Also, they recently launched the School of Open that offers courses on the meaning, application,
and impact of "openness."
Numerous open or open educational resource databases and search engines exist. Some examples
include:
OEDb: over 10,000 free courses from universities as well as reviews of colleges and rankings of
college degree programmes
Open Tapestry: over 100,000 open licensed online learning resources for an academic and
general audience
OER Commons: over 40,000 open educational resources from elementary school through to
higher education; many of the elementary, middle, and high school resources are aligned to the
Common Core State Standards
Open Content: a blog, definition, and game of open source as well as a friendly search engine
for open educational resources from MIT, Stanford, and other universities with subject and
description listings
Academic Earth: over 1,500 video lectures from MIT, Stanford, Berkeley, Harvard, Princeton,
and Yale
JISC: Joint Information Systems Committee works on behalf of UK higher education and is
involved in many open resources and open projects including digitising British newspapers from
1620-1900!
Universities
The University of Cambridge's guide on Open Educational Resources for Teacher Education
(ORBIT)
Open Learn from Open University in the UK
Global
Unesco's searchable open database is a portal to worldwide courses and research initiatives
African Virtual University (http://oer.avu.org/) has numerous modules on subjects in English,
French, and Portuguese
https://code.google.com/p/course-builder/ is Google's open source software that is designed to
let anyone create online education courses
Global Voices (http://globalvoicesonline.org/) is an international community of bloggers who
report on blogs and citizen media from around the world, including on open source and open
educational resources
12
Individuals (which include OERs)
Librarian Chick: everything from books to quizzes and videos here, includes directories on open
source and open educational resources
K-12 Tech Tools: OERs, from art to special education
Web 2.0: Cool Tools for Schools: audio and video tools
Web 2.0 Guru: animation and various collections of free open source software
Livebinders: search, create, or organise digital information binders by age, grade, or subject
(why re-invent the wheel?)
Legal help
New Media Rights is trying to help digital creators use public domain or open materials legally.
They have guides on how to use free and open software materials in various fields.
13
7.0 COURSE STRUCTURE AND OUTLINE
7.1 Course Structure:
Week 4 Study Session 2: 1.Study the course material of this Demonstrate operations strategy using
Operations session your place of employment?
strategy
2.Watch the video of this study
session
3.Listen to the audio of this study
session
4. Review the posted response to
last week’s Discussion Question(s)
14
Study Session 3: 1.Study the course material of this Using your place of employment/your
Process analysis. session Department, identify and explain the
steps of process analysis.
Week 5 2.Watch the video of this study
session
3.Listen to the audio of this study
session
4. Read chapters one, two & three of
Introduction to Analysis by; Wade
4th Edition: Chegg solutions.
Week 6 Study Session 4: 1.Study the course material of this Explain the key aspects of operations
Data Protection session management decision making.
Policy and Basic
Economic 2.Watch the video of this study
Decisions session
3.Listen to the audio of this study
session.
4.Read chapters one, two & three of
Introduction to Analysis by; Wade
4th Edition: city Chegg solutions.
5 Review the posted response to
last week’s Discussion Question(s)
Study Session 5: 1.Study the course material of this 1. Visit a real-life plant location.
Week 7 Plant Location and session Describe their plant layout and assess
layout the efficiency of the layout.
2.Watch the video of this study
session
3.Listen to the audio of this study
session.
4.Read chapters seven & eight of
MODULE 2 “Production and Operations
Management” by; Norman Gaither
15
2nd Edition: USA; Duxbury press.
WEEK 9 Study Session 7: 1.Study the course material of this Create any question under forecasting
Forecasting session and solve it.
2.Watch the video of this study
session
3.Listen to the audio of this study
session
4.Read chapter three of; Production
and Operations Management by;
Norman Gaither 2nd Edition: USA;
Duxbury Press.
Study Session 8: 1.Study the course material of this
Week 10 Business session
forecasting.
2.Watch the video of this study
16
session
3.Listen to the audio of this study
session
4. Review the posted response to
the week’s Discussion Question(s)
Week 11 M I D S E M E S T E R B R E A K
Study Session 9: 1.Study the course material of this Solve the questions at the end of the
Week 12 Network Analysis session chapters.
2.Watch the video of this study
session
3.Listen to the audio of this study
session
4.Read chapters twenty three,
twenty four & twenty five of;
Quantitative Techniques by T. Lucey
third Edition: ELBS series.
MODULE 3 Study Session 10: 1.Study the course material of this
Week 13 Critical Path session
Method (CPM)
2.Watch the video of this study
session
3.Listen to the audio of this study
session
4.Read chapters, twenty three,
twenty four & twenty five of;
Quantitative Techniques by T. Lucey
third Edition: ELBS series.
5.Review the posted response to the
week’s Discussion Question(s)
Study Session 1.Study the course material of this Solve the questions at the end of the
11: Project session chapters
Week 14 Evaluation and
Review Technique 2.Watch the video of this study
17
(PERT) session
3.Listen to the audio of this study
session
4. Read chapters, twenty three,
twenty four & twenty five of,
Quantitative Techniques by T. Lucey
third Edition: ELBS series
Week 15 Study Session 12: 1.Study the course material of this What is a linear equation? Relate it to
Linear session the population census of Nigeria.
Programming (LP)
2.Watch the video of this study
session
3.Listen to the audio of this study
session
4. Read chapters, seventeen &
eighteen of; Quantitative Techniques
by T. Lucey third Edition: ELBS
series
5. Review the posted response to
last week’s Discussion Question(s)
Week 16 Study Session 13: 1.Study the course material of this Review and critique the current efforts
Developments in session of two authors in the area of operations
Operations management.
management 2.Watch the video of this study
session
3.Listen to the audio of this study
session
4. Review the site:
www.jstor.com
Week 17
Week 18 ON CAMPUS ACTIVITIES/TRAINING/PRACTICALS
18
Week 19 REVISION/ TUTORIALS
Week 20
Week 21 SEMESTER EXAMINATION
N.B: Discussion Topics shall be uploaded weekly while Discussion Question(s) is/are presented in the appropriate units.
You are to submit all individual, Topical Discussion or Discussion Question assignments via your programme dashboard on or before the
prescribed date.
19
7.2 Course Outline
MODULE 1: Review of Fundamental Concepts of Operations Management
Study Session 1: Operations management
Study Session 2: Operations strategy
Study Session 3: Process analysis
Study Session 4: Data protection policy and basic economic decisions
21
9.0 STUDY MODULES
9.1.1 Objectives
After completing this session, you should be able to:
a) Demonstrate operations strategy using your place of employment,
b) Identify and explain the steps of process analysis using your place of
employment/your Department,
c) Explain the key aspects of operations management decision making.
22
STUDY SESSIONS
Introduction
Learning Outcome
Introduction
The concept of production as a function in an organisation is concerned with the
transformation of inputs, into the required outputs (products) having the required
quality level. Production is defined by Kumar and Sunesh (2008) as “the step-by-
step conversion of one form of material into another form, through chemical or
mechanical process to create or enhance the utility of the product to the user.” Thus
production is a value addition process. This function focuses on the creation of
23
physical product which can be managed by a set of interrelated management
activities called production management. When this concept is extended to services
management, then the corresponding set of management activities is called
operations management.
Learning Outcome
At the end of this session, you should be able to
a. Define the concept of production and operation management
b. Distinguish between manufacturing and service operations
24
operations management function is carried out will directly affect an organisation’s
competitive position, because it will:
o Establish the level of quality of the goods or services
o Influence the overall cost of production, given that the operations
function is responsible for the largest part of an organisation’s capital
and human expenses.
o Determine whether sufficient products are available to satisfy
consumer demand.
Production management was the acceptable term in the period between 1930 and
1950. In the 1970s emerged a new name ‘operations management’ which was a
shift to the service from manufacturing sectors of the economy. As service sector
became more prominent, the change from ‘production’ to ‘operations’ emphasised
the broadening of the field to service organisations. Production/operations
management is therefore the process, which combines and transforms various
resources used in the production/operations of the organisation into value added
product/services. Operations management uses the organisation’s resources to
create outputs that fulfil defined market requirements. This is the fundamental
activity of any type of enterprise, Slack, Chambers and Johnston (2010).
25
ITQ: What is operations management?
ITA: Operations management is the heart of the success of the organisation. It is the
strategy used to achieve productive or transformational process of an organisation.
With the 1970s emerge two distinct changes in our views. The most obvious of
these, reflected in the new name operations management was a shift in the service
and manufacturing sectors of the economy. As service sector became more
prominent, the change from ‘production’ to ‘operations’ emphasised the
broadening of our field to service organisations. The second, more suitable change
was the beginning of an emphasis on synthesis, rather than just analysis, in
management practices.
27
contact, frequent customer participation in the conversion process, and elementary
methods for measuring conversion activities and resource consumption. Some
services are equipment based, namely; rail-road services, telephone services and
some are people based, namely; tax consultant services, hair styling.
While manufacturing has to do with the physical tangible outputs that consumers
consume, uses more labour and equipment, has little customer contact and has no
customer participation in the production conversion process, service is
characterised by intangible outputs, outputs that consumers consumes immediately,
jobs that use more labour and less equipment and has direct consumer contact.
ITA: While manufacturing has to do with the physical tangible outputs that
consumers consume, Service is characterised by intangible outputs.
Everything you wear, eat, sit on, use, read or knock about on the sports field comes
to you courtesy of the operations managers who organised its production. Every
book you borrow from the library, every treatment you receive at the hospital,
every service you expect in the shops and every lecture you attend at university –
all have been produced.
28
The operations function is the part of the organisation that is responsible for this
activity. Every organisation has an operations function, because every organisation
produces some form of products and/or services. However, not all types of
organisation will necessarily call the operations function by this name. (Note that
we also use the shorter terms ‘the operation’ and ‘operations’ interchangeably with
the ‘operations function’).
Operations managers are the people who have particular responsibility for
managing some, or all, of the resources, which compose the operations function.
Again, in some organisations the operations manager could be called by some
other name. For example, he or she might be called the ‘fleet manager’ in a
distribution company, the ‘administrative manager’ in a hospital, or the ‘store
manager’ in a supermarket, the production manager in a publishing house.
29
Yet operations management is also relevant to organisations whose purpose is not
primarily to earn profits. Managing the operations in an animal welfare charity,
hospital, research organisation or government department is essentially the same as
in commercial organisations. Operations have to take the same decisions – how to
produce products and services, invest in technology, contract out some of their
activities, devise performance measures, and improve their operations performance
and so on.
Organising
These are activities that establish a structure of tasks and authority. Operation
managers establish a structure of roles and the flow of information within the
operations subsystem. They determine the activities required to achieve the goals
and assign authority and responsibility for carrying them out.
30
Controlling
Activities that assure the actual performance in accordance with planned
performance. To ensure that the plans for the operations subsystems are
accomplished, the operations manager must exercise control by measuring actual
outputs and comparing them to planned operations management. Controlling costs,
quality, and schedules are the important functions here.
Behaviour
Operation managers are concerned with how their efforts to plan, organise, and
control affect human behaviour. They also want to know how the behaviour of
subordinates can affect management’s planning, organising, and controlling
actions. Their interest lies in decision-making behaviour.
Models
As operation managers plan, organise, and control the conversion process, they
encounter many problems and must make many decisions. They can simplify their
difficulties using models like aggregate planning models for examining how best to
use existing capacity in short-term, break even analysis to identify break even
volumes, linear programming and computer simulation for capacity utilisation,
decision tree analysis for long-term capacity problem of facility expansion, simple
median model for determining best locations of facilities
31
Summary
In this session, we have discussed about operations management concept
consisting of manufacturing and service operations and their definitions. We have
also distinguish between manufacturing operations comprising of tangible output
which customers consume with less labour, using more equipment with no
customer contact and participation from service operations having intangible
outputs with more labour and less equipment use. We have also discussed the
framework of operations management.
REFERENCES
Ambrose, S. E. (1996) Undaunted Courage: Meriwether Lewis Thomas Jefferson
and the Opening of the American West. New York: Simon & Schuster.
33
9.1.2.2 STUDY SESSION 2:
Operations Strategy
Introduction
Learning Outcome
Marketing
Operations
Finance
Summary
Introduction
Over time, strategies and processes do change with changes in the company’s
industry or in its technology. In particular, the historical evolution of operations
and process management is linked intimately to technological changes and their
role in the development of industrialisation.
Learning Outcome
At the end of this session, you should be able to:
34
a. Narrate the evolution of operations strategy
b. Discuss on operational effectiveness
c. Identify strategy hierarchy
No organisation can plan in detail every aspect of its current or future actions, but
all organisations need some strategic direction and so can benefit from some ideas,
of where they are heading and how they can get there. Once the operations
function has understood its role in the business and after it has articulated its
performance objectives, it needs to formulate a set of general principles which will
guide its decision-making. This is the operations strategy of the company (Slack,
Chambers and Johnston 2010).
The word strategy derives from the Greek military term stratégia - “the general’s
art.” It is the art or science of planning a war, and much of the original
management thinking on strategy, treated business as something of a war and the
35
goal was to win. However, times have changed. Chief executive officers are no
longer generals, and workers are not soldiers. Today, strategy is a plan to achieve
an objective (Hindle, 1994).
Strategic Planning is a Process that brings to life the Mission and Vision of the
Enterprise. A strategic plan, well-crafted and of value, is driven from the top
down; considers the internal and external environment around the business; is the
work of the managers of the business; and is communicated to all the business
stakeholders, both inside and outside of the company.
As a company grows and as the business environment becomes more complex, the
need for strategic planning becomes greater. There is a need for all people in the
corporation to understand the direction and mission of the business. Companies
consistently applying a disciplined approach to strategic planning are better
prepared to evolve as the market changes and as different market segments require
different needs for the products or services of the company.
The benefit of the discipline that develops from the process of strategic planning,
leads to improved communication. It facilitates effective decision-making, better
selection of tactical options and leads to a higher probability of achieving the
owners’ or stakeholders’ goals and objectives.
ITA: Strategic planning is a process that brings to life the mission and vision of the
enterprise
36
The plan specifies precisely what managers must do in order to reach corporate
objectives. Often, the implicit objective of a business strategy is to deliver
sustained superiority, not just average, performance relative to the competition. To
outperform one’s rivals, one must be - and remain - different from and better than
them. This is because similar firms, especially those in the same industry, perform
in much the same way, a sustainable competitive advantage requires some form of
differentiation. Operations Strategy is the total
pattern of decision which shapes long-term
capacities of any type of operation and their
contribution to the overall strategy through the
reconciliation of market requirements with
operation resources.
37
competencies in speed and reliability, not low cost. In practice, gaining and
sustaining a competitive advantage requires that a firm have a good strategic
position and operational effectiveness to support that position.
ITA: Operational effectiveness refers to any number of practices that allow a company to
better utilise its inputs by reducing defects in products or developing products faster”
Since the goal is to differentiate the firm from its competition by establishing
competitive priorities in terms of the four product attributes, business strategy
entails a two-pronged analysis:
Competitive analysis of the industry in which the business unit will
compete.
Critical analysis of the unit’s competitive skills and resources.
38
At the next level, we have functional strategies that define the purpose for
marketing, operations, and finance—the three main functions in most
organisations:
B. Marketing identifies and targets customers that the business unit wants to
serve, the products that it must supply in order to meet customer needs, and
the competition that it will face in the marketplace.
D. Finance acquires and allocates the resources needed to operate all a unit’s
business processes.
39
to compete, operations strategy focuses on the process competencies required to
produce and deliver those product attributes.
If the goal is to provide short response times, processes must include greater
investment in inventories (for manufactured goods) or greater process availability
through excess capacity (for both manufacturing and service operations).
Finally, a strategy that calls for producing and delivering high-quality products
requires high quality processes with precision equipment and highly trained
workers. In every case, process competencies must be aligned with desired product
attributes - operations strategy must be consistent with business strategy.
The introduction to business and strategy simulation will give you a sample of
what the study of business offers without swamping them in details. If they are
40
looking for a taste of the business world, something to excite them, that is what this
simulation will do. It introduces the participant to the basic concepts of business
and strategy, providing them with broad exposure to many concepts, yet keeping
the fine points to a minimum.
The introduction to business and strategy game is a short exercise, with just 6
decision rounds, each taking only thirty minutes to one hour to complete. You can
play against your peers or against computer-generated competitors. The "play
against computer" version allows everyone to work at his or her own pace and
there is no need to coordinate the play of all of you.
41
Summary
In this session, we have discussed the operations strategy of operations
management. Its evolution, strategy hierarchy, and operational effectiveness were
also discussed in details.
REFERENCES
43
9.1.2.3 STUDY SESSION 3:
Process Analysis
Introduction
Learning Outcome
Summary
Introduction
The aim of the analysis phase of a business process design project is to understand
how the processes of a business function and interact; the aim of the design phase
is to improve the way that those processes operate and interact.
Learning Outcome
At the end of this session, you should be able to:
a. Identify the aims of process analysis
b. Types of process analysis
c. Identify the steps of process analysis
The results of the analysis phase are then fed into the design phase, whose
purpose is to:
G. Investigate options for achieving improvement by redesigning the
processes currently in operation.
H. Identify and prioritise areas for improvement.
I. Implement process design according to an agreed schedule.
One of the decisions that needs to be made early in the project is, what kind of
analysis is needed – strategic (top down) or tactical (bottom up):
J. A strategic perspective is higher level (i.e. managers) and seeks to
understand the processes that make up the business and deliver its value.
K. A tactical perspective is lower level (i.e. practitioners) and seeks to
understand the activities that support processes. It is driven by the task
requirements for operational efficiency.
ITA: Understand the organisation and its purpose or “mission” and relate this to
the organisation’s current business processes.
45
where to start. This is according to Harris, who recently co-authored the book
‘Analytics at Work: Smarter Decisions, Better Results’.
ITQ: What does 40% of organisations relies on guts mean?
ITA: It means that 40% of organisations depend on their instincts when taking important
business decisions, instead of using proper data analysis.
46
Summary
In this session, the aims of process analysis had been highlighted. Also, the types
of analysis were discussed and the steps for process analysis were also considered.
REFERENCES
Ambrose, S. E. (1996) Undaunted Courage: Meriwether Lewis Thomas Jefferson
and the Opening of the American West. New York: Simon & Schuster.
47
9.1.2.4 Study Session 4:
Data Protection Policy and Basic Economic Decisions
Introduction
Learning outcome
(A) Data Protection
i What is Data?
ii Data
iii Information
iv Knowledge
v Understanding
vi Wisdom:
Introduction
Personal data is defined as any information related to an identifiable person. For
example, a data subject home address, e-mail address, telephone number, or
government-issued identification numbers would constitute Personal Data.
Learning Outcome
At the end of this session, you should be able to:
48
a. Talk about data.
b. Discuss on the data protection policies.
c. Discuss on basic economic decisions.
Data is raw. It simply exists and has no significance beyond its existence (in and
of itself). It can exist in any form, usable or not.
Information... information is data that has been given meaning by way of
relational connection. This "meaning" can be useful, but does not have to be.
49
Knowledge... knowledge is the appropriate collection of information, such that it's
intent is to be useful. Knowledge is a deterministic process. When someone
"memorises" information, then they have amassed knowledge. This knowledge has
useful meaning to them, but it does not provide for, in and of itself, an intergration
such as would infer further knowledge. For example, elementary school children
memorise, or amass knowledge of, the "times table." They can tell you that "2 x 2
= 4" because they have amassed that knowledge (it being included in the times
table). But when asked what is "1267 x 300," they cannot respond correctly
because that entry is not in their times table. To correctly answer such a question
requires a true cognitive and analytical ability that is only encompassed in the next
level... understanding.
Be obtained and processed fairly and lawfully and shall not be processed
unless certain conditions are met.
Be obtained for a specified and lawful purpose and shall not be processed in
any manner incompatible with that purpose.
Be adequate, relevant and not excessive for those purposes.
Be accurate and kept up to date.
Not be kept for longer than is necessary for that purpose.
Be processed in accordance with the data subject's rights.
Be kept safe from unauthorised access, accidental loss or destruction.
Not be transferred to a country outside the European Economic Area, unless
that country has equivalent levels of protection for personal data.
This policy does not form part of the formal contract of employment, but it is a
condition of employment that employees will abide by the rules and policies made
by the organisation from time to time. Any failure to follow the policy can
therefore result in disciplinary proceedings. Any employee, who considers that the
policy has not been followed in respect of personal data about themselves, should
raise the matter with the designated data controller at the initial stage. If the matter
is not resolved, it should be raised as a formal grievance.
51
ITQ: What is data protection act?
ITA: It is the main piece of legislation that governs the protection of personal data within a
country.
Choice is implicit in our definition of decision making. We may not like the
alternatives available to us, but we are seldom left without choices.
Economic decision making, refers to the process of making business decisions
involving money. All economic decisions of any consequence require the use of
some sort of accounting information, often in the form of financial reports. Anyone
using accounting information to make economic decisions must understand the
business and economic environment in which accounting information is generated,
and they must also be willing to devote the necessary time and energy to make
sense of the accounting reports.
ITA: Decision making is the process of identifying alternative course of action and
selecting an appropriate alternative in a given decision situation
52
In any organisation, state or nation, it is expected that for certain decision to be
precise, economic is important for it to remain relevant in its existence. We will
look at the different types of economic decisions and how they are used for
organisational relevance.
ITA: Basic economic decision making is all about maximising value, almost everyone
in the society engage in economic decision making at one point or the other.
Summary
In this session, we have discussed about data. The definition has been given, data
protection policies has been discussed as well as basic economic decisions
discussed.
(D) Discussion Questions
1. How could unfair use of data be detrimental to a company’s bottom-line?
2. Explain the key aspects of operations management decision making.
3. Describe a major decision in your work environment or in Nigeria as a
whole that could benefit from operations management decision making.
REFERENCES
Ambrose, S. E. (1996) Undaunted Courage: Meriwether Lewis Thomas Jefferson
and the Opening of the American West. New York: Simon & Schuster.
53
MODULE TWO;
Plant Location and Layout, Inventory Management and Forecasting
Introduction
In this module, the understanding of major decision making
component in a manufacturing/production process will be
highlighted. Three basic economic decisions that any country
needs to make include: knowing the commodities to
manufacture or produce, second; the process of
manufacturing the best quality and last; the market
availability and the competitive advantage.
9.2.1 Objectives
Upon completion of this module, you should be able to:
a) explain the stages in the location decision,
b) describe the location criteria for retail and service businesses,
c) outline the basic location options for retail and service businesses,
d) explain the site selection process for manufacturers,
e) discuss the benefits of locating a start-up company in a business incubator,
f) describe the criteria used to analyse the layout and design considerations of a
building, including the Americans with Disabilities Act,
g) explain the principles of effective layouts for retailers, service businesses,
and manufacturers,
h) Evaluate the advantages and disadvantages of building, buying, and leasing
a building.
ITQ: What are the three basic economic decisions that any country needs to make?
ITA: They include; knowing the commodities to manufacture or produce, second, the
process of manufacturing the best quality and last, the market available and the
competitive advantage.
54
9.2.2. STUDY SESSIONS
Introduction
Learning Outcome
Summary
Introduction
What is plant location? - A plant location is a location where a plant should be
established, while determining the maximum effectiveness and operating economy.
The place of the plant should offer the lowest cost when the costs of production
and delivering the goods to consumers have been calculated.
Learning Outcome
At the end of this session, you should be able to:
55
a. Discuss the meaning of plant location
b. Discuss ideal location
c. Give the definition of plant layout
d. Identify the layout of physical facilities
ITA: Plant location is needed when a brand new plant is being started or when an old plant
is being expanded.
What is an ideal location? - An ideal location is one where the cost of the product
is kept to minimum, with a large market share, the least risk and the maximum
social gain. It is the place of maximum net advantage or which gives lowest unit
56
cost of production and distribution. For achieving this objective, small-scale
entrepreneur can make use of locational analysis for this purpose (Kumar ND).
(B) Locational Analysis
Locational analysis is a dynamic process where entrepreneur analyses and compare
the appropriateness or otherwise of alternative sites with the aim of selecting the
best site for a given enterprise. It consists the following:
57
II. Selection Criteria
The important considerations for selecting a suitable location are given as
follows:
Natural or climatic conditions.
Availability and nearness to the sources of raw material.
Transport costs-in obtaining raw material and also distribution or marketing
finished products to the ultimate users.
Access to market: small businesses in retail or wholesale or services should
be located within the vicinity of densely populated areas.
Availability of Infrastructural facilities such as developed industrial sheds or
sites, link roads, nearness to railway stations, airports or sea ports,
availability of electricity, water, public utilities, civil amenities and means of
communication are important, especially for small scale businesses.
58
relief, subsidies and liberalisation. Negative incentives are in form of
restrictions for setting up industries in urban areas, for reasons of pollution
control and decentralization of industries.
59
(D) Importance of Plant Layout
Plant layout is an important decision as it represents long-term commitment. An
ideal plant layout should provide the optimum relationship among output, floor
area and manufacturing process. It facilitates the production process, minimises
material handling, time and cost, and allows flexibility of operations, easy
production flow, makes economic use of the building, promotes effective
utilisation of manpower, and provides for employees convenience, safety, comfort
at work, maximum exposure to natural light and ventilation. It is also important
because it affects the flow of material and processes, labour efficiency, supervision
and control, use of space and expansion possibilities etc.
Essentials
An efficient plant layout is one that can be instrumental in achieving the following
objectives:
a. Proper and efficient utilisation of available floor space.
b. To ensure that work proceeds from one point to another point without any
delay.
c. Provide enough production capacity.
d. Reduce material handling costs
e. Reduce hazards to personnel.
f. Utilise labour efficiently.
g. Increase employee morale.
h. Reduce accidents.
i. Provide for volume and product flexibility.
j. Provide ease of supervision and control.
k. Provide for employee safety and health.
l. Allow ease of maintenance.
60
m. Allow high machine or equipment utilisation.
n. Improve productivity.
Various techniques exist, but general areas of concern include the following:
a) Space (adequate area to house each function)
b) Affinity (functions located in proximity to other related functions)
c) Material handling
d) Communications (telephone, data, telemetry and other signal items)
e) Utilities (electricity, gas, water and other utility services)
f) Buildings (structural and architectural forms; site work)
Summary
In this session, we have discussed on plant location. Plant location and layout were
defined, the location analysis was done, selection criteria were specified, plant
layout was discussed, the importance of plants layout were highlighted and the
essentials of a plant layout were listed.
61
(E) Discussion Questions
1. Identify and explain the various factors that determine plant location and
layout.
2. Write an explanatory note on layout of physical facilities.
3. A juice manufacturing company is thinking of where to locate its new
production facility. Using the location factor rating method, decide which of
the three sites has the most location advantage, given the information in the
following table:
5. Determine the best location site using the centre-of-gravity method and the
data in the table below:
A B C D
X 240 120 300 600
Y 240 600 720 360
W 90 126 162 72
6. What are the factors that are to be considered in the location of facilities?
62
7. Elaborate the factors for selecting an appropriate location.
8. Identify a case that you know (preferably in your country of residence)
where good location impact on an organisation. Explain the features of this
location as well as how they impacted on the organisation.
9. Sketch the principles of a good plan layout.
10. Explain the principles of effective layouts for retailers, service businesses,
and manufacturers.
References
Gor, Ravi Mahendra (2009) “Industrial Statistics and Operational Management”.
http://nsdl.niscair.res.in/jspui/bitstream/123456789/829/1/Chapter-
6%20forecasting%20techniques-%20Formatted.pdf
63
9.2.2.2 STUDY SESSION 6:
Inventory Management
Introduction
Learning Outcome
b) Work in process
Finished goods:
64
Introduction
It is necessary to have physical stock in the system to take care of the anticipated
demand because non-availability of materials when needed will lead to delays in
production or projects or services delivered. However, keeping inventory is not
free because there are opportunity costs of “carrying” or “holding” inventory in the
organisation. Thus, the paradox is that we need inventory, but it is not desirable to
have inventory. It is this paradoxical situation that makes inventory management a
challenging problem area in materials management. It also makes a high inventory
turnover ratio as a desirable performance indicator.
Learning Outcome
At the end of this session, you should be able to:
a. Define inventory.
b. Know types of inventory.
c. Discuss the need for inventory.
d. Describe Economic Order Quantity (EOQ).
e. Discuss Economic Order Quantity with Discounts.
66
A manufacturing inventory consists of three different parts: raw materials, work in
process and finished goods. Using a leather crafting business as my sample craft
company, here are definitions and examples of the three:
Raw materials: Everything the crafter buys to make the product is classified
as raw materials. That includes leather, dyes, snaps and grommets. The raw
material inventory only includes items that have not yet been put into the
production process.
Work in process: This includes all the leather raw materials that are in
various stages of development. For the leather crafting business, it would
include leather pieces cut and in the process of being sewn together and the
leather belts and purse etc., that are partially constructed.
In addition to the raw materials, the work in process inventory includes the
cost of the labour directly doing the work and manufacturing overhead.
Manufacturing overhead is a catchall phrase for any other expenses the
leather crafting business has that indirectly relate to making the products. A
good example is depreciation of leather making fixed assets.
Finished goods: When the leather items are complete and ready to sell at
craft shows or other venues, they are finished goods. The finished goods
inventory also consists of the cost of raw materials, labour and
manufacturing overhead, now for the entire product.
67
will be shortages, production delays, and project delays. Some of the reasons for
having inventories in the production/service system are as follows:
Time lag between placing orders and getting supplies at the point of
consumption – Whenever we place a replenishment order, there is a time lag
between placing the order and getting the materials at the point of use. This
is called “replenishment lead time.” In most cases the lead time is nonzero,
and at times it is quite high. This necessitates holding of inventory to take
care of demand during the lead times.
68
employed as a strategy in aggregate production planning. This strategy
results in inventory in some part of the year.
69
developed by Ford W. Harris in 1913, but R. H. Wilson, a consultant who applied
it extensively, is given credit for his in-depth analysis.
EOQ applies only when demand for a product is constant over the year and each
new order is delivered in full when inventory reaches zero. There is a fixed cost for
each order placed, regardless of the number of units ordered. There is also a cost
for each unit held in storage, commonly known as holding costs, sometimes
expressed as a percentage of the purchase cost of the item. We want to determine
the optimal number of units to order, so that we minimise the total cost associated
with the purchase, delivery and storage of the product.
The required parameters to the solution are the total demand for the year, the
purchase cost for each item, the fixed cost to place the order and the storage cost
for each item per year. Note that the number of times an order is placed will also
affect the total cost, though this number can be determined from the other
parameters.
70
Quality issues: Defective parts and workstation breakdowns.
Working-In-Process (WIP) inventory: Necessary for production.
EOQ is useful for minor stock items of low values with known steady prices,
demands and supply lead times;
71
compare these costs with the costs at each succeeding discount point and so
ascertain the best quantity to order.
ITQ: Does price discount for quantity purchased have any disadvantage?
Summary
In this session, we have studied inventory management. The definition of inventory
management was given to you. We discussed Economic Order Quantity, types of
inventory and the reasons why we need inventory.
72
(E) Discussion Questions
1. Explain in detail what “Inventory Management” is.
2. Identify and explain the different types of Inventories in relation to an
organisation you are familiar with.
3. Explain the types of simulation. Discuss clearly the various costs that are
involved in inventory problems with suitable examples. How are they
interrelated?
4. Contrast between independent and dependent demand.
5. What is single period model? Describe situations in which the single period
model would be appropriate.
6. What is economic run size model? Explain with an appropriate example.
7. Discuss quantity discount model with an example in which it can be
applicable.
8. List and explain four types of inventory cost structures.
9. What are the requirements for effective inventory management?
10. Explain inventory counting system.
References
Gor, Ravi Mahendra (2009) “Industrial Statistics and Operational Management”.
http://nsdl.niscair.res.in/jspui/bitstream/123456789/829/1/Chapter-
%20forecasting%20techniques-%20Formatted.pdf
www.springer.com/cda/content/.../cda.../9788132219699-c2.pdf...
www.du.ac.in /fileadmin/du/academics/course material/ep_07.pd f
73
9.2.2.3 STUDY SESSION 7:
Forecasting
Introduction
Learning Outcome
A. What is Forecasting?
a) Purpose
b) Time
(D)Forecasting Methods/Techniques
iv Time-series Methods
Summary
Introduction
74
Forecasting also provides an important benchmark for firms which have a long-
term perspective of operations.
Learning Outcome
At the end of this session, you should be able to:
a. Understand the meaning of forecasting.
b. Understand pivot forecasting.
c. Discuss the general steps in the forecasting process.
d. Forecasting Methods/Techniques.
B. What is Forecasting?
Forecasting is a process of estimating a future event by casting forward past
data. The past data are systematically combined in a predetermined way, to
obtain the estimate of the future (Gor, 2006). Prediction is a process of
estimating a future event based on subjective considerations
other than just past data; these subjective considerations
need not be combined in a predetermined way. In other
words, forecasting refers to the use of historic data to
determine the direction of future trends. Forecasting is used
by companies to determine how to allocate their budgets for
an upcoming period of time. This is typically based on demand for the goods
and services it offers, compared to the cost of producing them. Business
forecasting generally attempts to predict future customer demand for a firm’s
goods or services, while macroeconomic forecasting attempts to predict future
behaviour of the economy and identify business cycle turning points.
75
There are two basic reasons for the need for forecast in any field:
Purpose – Any action devised in the present to take care of some
contingency accruing out of a situation, or set of conditions set in the
future. These future conditions offer a purpose / target to be achieved so
as to take advantage of or to minimise the impact of (if the foreseen
conditions are adverse in nature) these future conditions.
76
b. Select the period (Time Horizon) of forecast.
c. Select forecast model to be used: For this, knowledge of various forecasting
models, in which situations these are applicable, how reliable each one of
them is; what type of data is required. On these considerations; one or more
models can be selected.
d. Data Collection: With reference to various indicators identified-collect data
from various appropriate sources-data which is compatible with the model(s)
selected in step (3). Data should also go back that much in past, which meets
the requirements of the model.
e. Prepare forecast: Apply the model using the data collected and calculate the
value of the forecast.
f. Evaluate: The forecast obtained through any of the model should not be
used, as it is, blindly. It should be evaluated in terms of ‘confidence interval’
– usually all good forecast models have methods of calculating upper value
and the lower value within, which the given forecast is expected to remain
with certain specified level of probability. It can also be evaluated from
logical point of view, whether the value obtained is logically feasible? It can
also be evaluated against some related variable or phenomenon. Thus, it is
possible, sometimes advisable to modify the statistically forecasted’ value
based on evaluation.
78
Time-series Methods
Time-series methods are used only with historical data to predict future
performance. For example, if N6 million in sales were made over the last year, a
time-series method might predict that N6 million in sales could be achievable this
year, with a slight increase allowed for additional business. If a website was hit
340 times on Sunday last week, a time-series method might predict a similar influx
on a future Sunday.
A time series refers to the past recorded values of the variables under
consideration. The values of the variables under consideration in a time-series are
measured at specified intervals of time. These intervals may be minutes, hours,
days, weeks, months, etc. In the analysis of a time series the following four time-
related factors are important.
79
Summary
In this unit, we have discussed about furcating. The definition of forecasting was
given. Reasons of furcating were given to include purpose and time. The steps to
take in forecasting were also enlisted as well as the methods highlighted and
discussed.
i. Develop a three month moving for average for the data and use it to
forecast sales for Jan., 2014.
ii. Assume that the forecast for the current period is given to be 200 and
alpha = 0.36. Develop an exponential smoothing indices needed to
forecast sales for Jan., 2014.
iii. Discuss the forecast accuracy under (a) and (b), and determine which
one is the best.
3. What do you understand by business forecasting? Discuss a classic case in
your organisation or any organisation you have studied.
4. Describe four qualitative forecasting techniques.
5. Discuss the advantages and limitations of the four forecasting techniques
you know.
6. Compare and contrast qualitative and quantitative approaches to forecasting.
7. Discuss your understanding of time horizon in forecasting.
80
8. What is the importance of forecasting in productions and operations
management?
9. Choose an appropriate forecasting technique of any problem of your choice.
10. Identify the five basic demand patterns that combine to produce some series.
References
Gor, Ravi Mahendra (2009) “Industrial Statistics and Operational Management”.
http://nsdl.niscair.res.in/jspui/bitstream/123456789/829/1/Chapter-
6%20forecasting%20techniques-%20Formatted.pdf
www.springer.com/cda/content/.../cda.../9788132219699-c2.pdf...
www.du.ac.in /fileadmin/du/academics/course material/ep_07.pdf
81
9.2.2.4 STUDY SESSION 8:
Business Forecasting
Introduction
Learning Outcome
- Grass Roots
- Market Research:
- Panel Consensus:
- Historical Analogy:
- Delphi Method:
Summary
Discussion Questions
82
Introduction
In general, when business people speak of forecasts, they usually mean some
combination of both forecasting and prediction. Forecasts are often classified
according to time period and use. In general, short-term (up to one year) forecasts
guide current operations. Medium-term (one to three years) and long-term (over
five years) forecasts support strategic and competitive decisions.
Learning Outcome
At the end of this session, you should be able to know:
a. Forecasting.
b. Business forecasting.
c. Application of forecasting.
d. General steps in forecasting process.
e. Qualitative techniques in forecasting.
83
required for next week’s TV assembly schedule. But suppose a manufacturer
offers a new refrigerator or a new car, he cannot depend on past data. He
cannot forecast, but has to predict. For prediction, good subjective estimates
can be based on the manager’s skill experience, and judgment. One has to
remember that a forecasting technique requires statistical and management
science techniques.
Bear in mind that a perfect forecast is usually impossible. Too many factors in the
business environment cannot be predicted with certainty. Therefore, rather than search
for the perfect forecast, it is far more important to establish the practice of continual
review of forecasts and to learn to live with inaccurate forecasts. This is not to say
that we should not try to improve the forecasting model or methodology, but that we
should try to find and use the best forecasting method available, within reason.
Because forecasts deal with past data, our forecasts will be less reliable the further
into the future we predict. That means forecast accuracy decreases as time horizon
increases. The accuracy of the forecast and its costs are interrelated. In general, the
higher the need for accuracy translates to higher costs of developing forecasting
models.
So, how much money and manpower is budgeted for forecasting? What possible
benefits are accrued from accrued from accurate forecasting? What are the possible
costs of inaccurate forecasting? The best forecasts are not necessarily the most
accurate or the least costly. Factors as purpose and data availability play important
role in determining the desired accuracy of forecast.
ITA: Too many factors in the business environment cannot be predicted with certainty.
Therefore, rather than search for the perfect forecast, it is far more important to establish
the practice of continual review of forecasts and to learn to live with inaccurate
forecasts. 84
When forecasting, a good strategy is to use two or three methods and look at them
for the commonsense view. Will expected changes in the general economy affect
the forecast? Are there changes in industrial and private consumer behaviors? Will
there be a shortage of essential complementary items? Continual review and
updating in light of new data are basic to successful forecasting. In this chapter we
look at qualitative and quantitative forecasting and concentrate primarily on
several quantitative time series techniques.
85
Industrial Process Control: forecasts of the quality characteristics of a
production process
Demography: forecast of population; of demographic events (deaths, births,
migration); useful for policy planning
Although effective sales forecasting is a key for virtually any company, some
organisations must rely on other types of forecasts as well. A prime example
86
involves forecasts of the need for raw materials and spare parts. Some companies
need to maintain an inventory of spare parts to enable them to quickly repair either
own equipment or their products sold or leased to customers.
With the possible exception of sales forecasting, the most extensive forecasting effort
is devoted to forecasting economic trends on a regional, national, or even international
level.
-Forecasting Staffing Needs
Goods are being produced outside the country (where labor is chapter) and then
imported. At the same time, an increasing number of business firms are
specialising in providing a service of some kind (e.g., travel, tourism,
entertainment, legal aid, health services, financial, educational, design,
maintenance, etc.). For such a company forecasting “sales” becomes forecasting
the demand for services, which then translates into forecasting staffing needs to
provide those services.
87
-Forecasting in education environment
A good education institute typically plans its activities and areas concentration for the
coming years based on the forecasted demand for its different activities. The institute
may come out with a forecast that the future requirements of its students who graduate
may be more in particular sector. This may call for the reorientation of the syllabus
and faculty, development of suitable teaching materials/cases, recruitment of new
faculty with specific sector-oriented background, experience and teaching skills.
Alternatively, the management may decide that the future is more secure with the
conventional areas of operation and it may continue with the original syllabus, etc.
88
c. Select Forecast Model to be used: For this, knowledge of various
forecasting models, in which situations these are applicable, how reliable
each one of them is; what type of data is required. On these
considerations; one or more models can be selected.
e. Prepare forecast: Apply the model using the data collected and calculate
the value of the forecast.
f. Evaluate: The forecast obtained through any of the model should not be
used, as it is, blindly. It should be evaluated in terms of ‘confidence
interval’ – usually all good forecast models have methods of calculating
upper value and the lower value within which the given forecast is
expected to remain with certain specified level of probability. It can also
be evaluated from logical point of view whether the value obtained is
logically feasible? It can also be evaluated against some related variable
or phenomenon. Thus, it is possible, sometimes advisable to modify the
statistically forecasted’ value based on evaluation.
89
product knows its future needs best. Though this is not always true, in many
instances it is a valid assumption, and it is the basis for this method.
Forecasts at this bottom level are summed and given to the next higher level. This
is usually a district warehouse, which then adds in safely stocks and any effects of
ordering quantity sizes. This amount is then fed to the next level, which may be a
regional warehouse. The procedure repeat until it becomes an input at the top level,
which, in the case of a manufacturing firm, would be the input to the production
system.
Market Research:
Firms often hire outside companies that specialise in market research to conduct
this type of forecasting. You may have been involved in market surveys through a
marketing class. Certainly you have not escaped telephone calls asking you about
product preferences, your income, habits, and so on.
Market research is used mostly for product research in the sense of looking for new
product ideas, likes and dislikes about existing products, which competitive
products within a particular class are preferred, and so on. Again, the data
collection methods are primarily surveys and interviews.
Panel Consensus:
In a panel consensus, the idea that two heads are better than one is extrapolated to
the idea that a panel of people from a variety of positions can develop a more
reliable forecast than a narrower group. Panel forecasts are developed through
open meetings with free exchange of ideas form all levels of management and
individuals. The difficulty with this open style is that lower employee levels are
intimidated by higher levels of management. For example, a salesperson in a
particular product line may have a good estimate of future product demand but
90
may not speak up to refute a much different estimate given by the vice president of
marketing.
The Delphi technique (which we discuss shortly) was developed to try to correct
this impairment to free exchange. When decisions in forecasting are at a broader,
higher level (as when introducing a new product line or concerning strategic
product decisions such as new marketing areas) the term executive judgment is
generally used. The term is self-explanatory: a higher level of management is
involved.
Historical Analogy:
The historical analogy method is used for forecasting the demand for a product or
service under the circumstances that no past demand data are available. This may
specially be true if the product happens to be new for the organisation. However,
the organisation may have marketed product(s) earlier which may be similar in
some features to the new product. In such circumstances, the marketing personnel
use the historical analogy between the two products and derive the demand for the
new product using the historical data of the earlier product. The limitations of this
method are quite apparent. They include the questionable assumption of the
similarity of demand behaviors, the changed marketing conditions, and the impact
of the substitutability factor on the demand.
Delphi Method:
As we mentioned under panel consensus, a statement or opinion of a higher-level
person will likely be weighted more than that of a lower-level person. The worst
case is where lower level people feel threatened and do not contribute their true
beliefs. To prevent this problem, the Delphi method conceals the identity of the
91
individuals participating in the study. Everyone has the same weight. A moderator
creates a questionnaire and distributes it to participants. Their responses are
summed and given back to the entire group along with a new set of questions.
The Delphi method was developed by the Rand Corporation in the 1950s. The
step-by-step procedures are;
a. Choose the experts to participate. There should be a variety of
knowledgeable people in different areas.
b. Through a questionnaire (or e-mail), obtain forecasts (and any premises
or qualification captions for the forecasts) from all participants.
c. Summarise the results and redistribute them to the participants along with
appropriate new questions.
d. Summarise again, refining forecasts and conditions, and again develop
new questions.
e. Repeat Step 4 if necessary. Distribute the final results to all participants.
The Delphi technique can usually achieve satisfactory results in three rounds. The
time required is a function of the number of participants, how much work is
involved for them to develop their forecasts, and their speed in responding.
ITA: Grass roots, Market research, Panel consensus, Historical Analogy, Delphi
Method.
Summary
In this session, the definition of business forecasting has been given. Different
forecasting areas in the organisation were identified to include sales, raw materials,
92
staffing needs, forecasting in education environment, and in the rural settings.
Steps in forecasting were given as well as the qualitative techniques in forecasting.
Discussion Questions
1. Define and explain the different types of forecasting methods/techniques.
2. How do forecasting and planning affect a business operation?
3. What is sales forecast?
4. Explain the importance of sales forecast.
5. What do you understand by sales forecasting methods?
6. Discuss user’s expectations. Its advantages and disadvantages.
7. Explain sales force composite. List the merits and demerits.
8. Write on “jury of executive opinion method” and highlight the advantages
and disadvantages.
9. What is “Delphi Technique”? Enumerate its merits and demerits.
10. What is “Market Test”? Point out its advantages and disadvantages.
References
Gor, Ravi Mahendra (2009) “Industrial Statistics and Operational Management”.
http://nsdl.niscair.res.in/jspui/bitstream/123456789/829/1/Chapter-
6%20forecasting%20techniques-%20Formatted.pdf
www.springer.com/cda/content/.../cda.../9788132219699-c2.pdf...
www. Kumar, Abhu (ND) “Plant Location And Layout.”
http://www.iqsoft.co.in/iem/LayoutLesson_7.pdf
93
9.3 MODULE 3
Evaluation and Review Techniques
Introduction
The central technique available to Project Managers for planning and controlling
their projects is Network Analysis. This short guide will provide you with a basic
understanding of networking principles before applying them. The critical path
method-CPM, which is a network based method, is useful in practice and control
of complex projects. The CPM introduces you to the concept of precedence which
reflects the partial ordering that exists among activities of a project, due to
technical or other reasons.
The critical path analysis is based on the computation of latest starting times of
activities from the knowledge of the earliest ending time of the project. The
activity durations in the CPM are deterministic and known, although precise
information about the durations of activities is seldom available. To deal
quantitatively with imprecise durations, the Programme Evaluation and Review
Technique-PERT based on the probability theory can be employed. The originators
of PERT modeled each activity’s duration as a stochastic variable with an
appropriated beta distribution and proposed an approximate method to calculate
the expectation and the variance of the make - span of the project.
9.3.1 Objectives
Upon completion of this module, you will be able to:
1. Appreciate what tasks are, nods, activity time, project completion time, etc.
2. Identify critical path and know which activity to delay without affecting the
project completion time.
94
40
t=1mo D F t=3mo
10
t = 2 mo 30
t = 3mo 50
A D
t= 4mo
B C
20
t=3mo
PERT network chart is for a seven-month project with five milestones (10 through
50) and six activities (A through F).
95
Conventions
A PERT chart is a tool that facilitates decision making: The first draft of a PERT
chart will number its events sequentially in 10s (10, 20, 30, etc.) to allow the later
insertion of additional events.
Two consecutive events in a PERT chart are linked by activities, which are
conventionally represented as arrows (see the diagram above).
The events are presented in a logical sequence and no activity can
commence until its immediately preceding event is completed.
The planner decides which milestones should be PERT events and also
decides their ―proper sequence.
A PERT chart may have multiple pages with many sub-tasks.
Terminology
A PERT event: is a point that marks the start or completion of one or more
tasks. It consumes no time, and uses no resources. It marks the completion
of one or more tasks, and is not ―reached until all of the activities leading
to that event have been completed.
A predecessor event: an event (or events) that immediately precedes some
other event without any other events intervening. It may be the consequence
of more than one activity.
A successor event: an event (or events) that immediately follows some other
event without any other events intervening. It may be the consequence of
more than one activity.
96
A PERT activity: is the actual performance of a task. It consumes time, it
requires resources (such as labour, materials, space, machinery), and it can
be understood as representing the time, effort, and resources required to
move from one event to another. A PERT activity cannot be completed until
the event preceding it has occurred.
Most likely time (M): the best estimate of the time required to accomplish a
task, assuming everything proceeds as normal.
Expected time (TE): the best estimate of the time required to accomplish a
task, assuming everything proceeds as normal (the implication being that the
expected time is the average time the task would require if the task were
repeated on a number of occasions over an extended period of time).
TE = (O + 4M + P) ÷ 6
Float or Slack is the amount of time that a task in a project network can be
delayed without causing a delay - Subsequent tasks – (free float) or Project
Completion – (total float).
Critical Path: the longest possible continuous pathway taken from the initial
event to the terminal event. It determines the total calendar time required for
97
the project; and, therefore, any time delay along the critical path will delay
the reaching of the terminal event by at least the same amount.
Critical Activity: An activity that has total float equal to zero. Activity with
zero float does not mean it is on the critical path.
Lag time: the earliest time by which a successor event can follow a specific
PERT event.
Slack: the slack of an event is a measure of the excess time and resources
available in achieving this event. Positive slack would indicate ahead of
schedule; negative slack would indicate behind schedule; and zero slack
would indicate on schedule.
Implementation
The first step to scheduling the project is to determine the tasks that the project
requires and the order in which they must be completed. The order may be easy to
record for some tasks (e.g. When building a house, the land must be graded before
the foundation can be laid) while difficult for others (there are two areas that need
98
to be graded, but there are only enough bulldozers to do one). Additionally, the
time estimates usually reflect the normal, non-rushed time. Many a time, the time
required to execute the task can be reduced for an additional cost or a reduction in
the quality.
In the following example there are seven tasks, labeled A through G. Some tasks
can be done concurrently (A and B) while others cannot be done until their
predecessor task is complete (C cannot begin until A is complete). Additionally,
each task has three time estimates: the optimistic time estimate (O), the most likely
or normal time estimate (M), and the pessimistic time estimate (P). The expected
time (TE) is computed using the formula (O + 4M + P) ÷ 6.
99
9.3.2 STUDY SESSIONS
Introduction
Learning Outcome
Summary
Introduction
Learning Outcome
At the end of this session, you should be able to:
a. Understand the meaning of Network analysis.
b. Appreciate processes in network analysis.
100
(A) Network Analysis
Step 1
Step 2
101
Design purchase cut machine assemble test finish
We put the tasks into rectangles and join them with arrows to show the
sequence or precedence: the logical relationships between them.
Suppose that once we have bought the materials, some need cutting to
size and others need turning on a lathe. The tasks of machining and
cutting could run in parallel rather than consecutively, assuming we have
the appropriate resources. But let's add a bit more.
Time Analysis
Duration
Having completed the network, we can begin the analysis. First, we need
to know the duration of each task and write it into the network. For
convenience, we can write the durations in days.
0 10 10 10 21 31
DESIGN PURCHASE
102
For the purchasing task, we thus say the Earliest Start Time (EST) is
10 and the Earliest Finish Time (EFT) is 31
So far we have calculated the Earliest Start Time (EST) and the Earliest
Finish Time (EFT) for each task. The next step in calculating the critical
path is to re-time the network starting at the end and calculate the Latest
Start Time (LST) and Latest Finish Time (LFT) for each task.
Summary
In this session, we have discussed the Network Analysis. The definitions were
given to you. The steps were also given to include design-purchase-cut-machine-
assemble-test-finish.
103
References
Baker, Samuel L. (2009) “Linear Programming I: Maximisation.”
http://hspm.sph.sc.edu/Courses/J716/pdf/71610%20Linear%20Programmin
g%20I.pdf
Lowe, C. W. (1966) Critical path analysis by bar chart: the new role of job
Progress Charts. London: Business Publications.
Mind Tools (2004) Critical Path Analysis & PERT Charts. Accessed on August 21
2004 from: http://www.mindtools.com/pages/article/newPPM_04.htm
Moder, J. J and Phillips, C. R (1964) Project management with CPM and PERT.
New York: Reinhold Pub. Corp,.
Newbold, R. C. (1998) Project management in the fast lane: applying the theory
of constraints. Boca Raton: Fla. St. Lucie Press.
104
9.3.2.2 STUDY SESSION 10:
Critical Path Method (CPM)
Introduction
Learning Outcome
Introduction
CPM as a management methodology has been used from the mid 50s. The main
objective of the CPM implementation was to determine how best to reduce the
time required to perform routine and repetitive tasks that are needed to support an
organisation. Initially, this methodology was identified to conduct routine tasks
such as plant overhaul, maintenance and construction (Moder and Phillips, 1964).
Newbold (1998) defines CPM a technique for analysing projects by
determining the longest sequence of tasks (or the sequence of task with the
least slack) through a project network.”
105
Learning Outcomes
At the end of this study session, you should be able to:
1. Define critical path method
2. Explain the advantages and disadvantages of critical path method
3. Understand the key rules of a critical path method
4. Know what a business should do when a project is delayed.
According to C. W. Lowe (1966), for any project there is a sequence of events that
have to be undertaken. Some tasks might be dependent on the completion of the
previous tasks while others might be independent of the tasks ahead and can be
undertaken at any given time. Job durations and completion times also differ
significantly. CP analysis helps decision makers and project execution members to
identify the best estimates (based on accurate information) of the time that is
needed to complete the project.
106
an important tool for effective project management, Commonly used with all forms
of projects, including construction, software development, research projects,
product development, engineering, and plant maintenance, among others. Any
project with interdependent activities can apply this method of scheduling.
ITQ: What does a CP analysis helps decision makers and project execution members to do?
ITA: It helps them to identify the best estimates (based on accurate information) of the
time that is needed to complete the project.
The essential technique for using CPM is to construct a model of the project that
includes the following:
A list of all activities required to complete the project (also known as Work
Breakdown Structure).
The time (duration) that each activity
will take to completion.
The dependencies between the
activities.
107
Then the CPM is drawn up based on dependencies such as:
a) The availability of labour and other resources.
b) Lead times for delivery of materials and other services.
c) Seasonal factors – such as dry weather required in a building project.
Once the CPM is drawn up, it is possible to see the CRITICAL PATH itself – this
is a route through the CPM, which has no spare time (called ‘FLOAT’ or ‘slack’)
in any of the activities.
In other words, if there is any delay to any of the activities on the critical path, the
whole project will be delayed, unless the firm makes other changes to bring the
project back on track. The total time along this critical path is also the minimum
time in which the whole project can be completed. Some branches on the CPM
may have FLOAT, which means that there is some spare time available for these
activities.
ITA: The critical path method (CPM) is a step-by-step project management technique for
process planning that defines critical and non-critical tasks with the goal of preventing
time-frame problems and process bottlenecks.
108
(B) Advantages of Using the Critical Path Method
In the age where tools available to management are constantly changing, and
improving the ability of CPM to still command respect among the project teams
and managers, is testimony to the fact that this tools have proven very valuable and
beneficial. The following are some of the major reasons CPM is still being used in
organisations today, as presented by Peter Stelth and Guy Le Roy (2009):
The network diagram also offers a prediction of the completion time of the
project, and can help in the planning and scheduling of the activities needed
for the completion of the project.
Identifying the critical path for the project is the next stage of the analysis of
the network diagram. In doing this, the management of the project has a
reasonable estimate of the potential problems that might occur and the
activities at which these problems might occur. In many cases the critical
path also determines the allocation of resources.
109
A SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis of
the organisation is also an important task to be undertaken at this point. In an
organisation, SWOT analysis should be undertaken at the corporate level
and at the department level. Carrying out an analysis using the SWOT
framework will reveal changes that can be accomplished; as opposed to
those changes that appear to be optimal solutions initially but would not be
as effective in the long run.
Based on the time-cost variables, the project can be tweaked to best satisfy
the goals and aims of the organisation. For example, if a project team is able
to identify that they need more time, if the project has to be within a certain
budget or vice versa this fact is clear right from the start of the project.
While it is presumptuous to aver that every factor affecting activities can be
identified at the initial stages, a large portion of the factors and variables can
be understood and the risks and uncertainties associated with each are
known prior to starting of the project.
Tracking the CPM is also helpful. Managers can identify areas where
attention needs to be focused. Critical paths do not remain static for the life
of the project; rather, there is a very high chance that the CP might changes
due to internal and external factors affecting the organisation. The
insurgency attacks in the North East, for example, shutdown several routes
110
and organisation. CP that estimated for example seven days for delivery of
raw material from out of the area had to change their critical paths. In some
cases, the internal factors such as union issues and sudden equipment failure
might also impact the critical path.
Scheduling of activities is possible. The CPM identifies the entire chain of
activities. Often, during the initials stages of the project the number of
activities and the cost requirements might be high; but as the project
progresses the activities might sort themselves out into routine or critical.
Project managers, instead of tracking the entire issue, can focus their
attention to groups of activities that are immediate and have the ability to
impact the next downstream activity.
The CPM also identifies slack and floats time in the project. Thus, project
managers can identify when resources can be reallocated to different
activities and the shifting and moving of activities to best optimise the
utilisation of the resources.
In many large projects, there can be more than one critical path in the
network diagram mapped out. When such a situation arises, CPM can help
managers identify suitable plan of actions to handle these multiple critical
paths.
111
(C) Disadvantages of Critical Path Method
Many disadvantages are as a result of the technical and conceptual factors involved
in the CP analysis (CPA) process:
The CPA process can become complicated as the scope and extent of the
project increases. Too many interconnecting activities can result in the
network diagram becoming very complicated.
The task of understanding the needs of the critical path get more
complicated when there is more than one critical path in the project. In many
situations, these paths might be parallel and feed into a common node in the
network diagram. It becomes difficult in these situations to identify the best
utilisation of technology and resources for the critical paths.
112
In many cases, as the project progresses, the critical paths might change and
evolve and past critical paths may no longer be valid and new CP have to be
identified, for the project at regular intervals. This implies that the project
manager and project members have to constantly review the network
diagram initially created and identify the shifting and movement of the
critical path over time.
As critical paths and floats change, the scheduling of personnel also changes.
Reallocation of personnel is often very tricky as the individual might be
working on more than one project at a time, and if the services of the
individual are required on more than one critical path, the identification and
distribution of the labour time can cause overloading of the personnel -
creating a stressed out worker.
Very often, critical paths are not easy to identify, especially if the project is
unique and has never been undertaken by the organisation in the past. The
ability to provide estimates of time and cost for every activity in a traditional
CPM process depends on historical data maintained by the company. In the
absence of this data, decision makers are forced to speculate and assume
time and cost requirements for the projects.
113
Traditionally, any good CPA requires that the process is understood and
evaluated using the forward and the backward pass to determine slack or
float times. In reality, however, the time constraints often result in decision
makers using only one method, to find the time and cost requirements. As a
safety measure, however, these individuals often ‘crash’ the project during
the planning stage and determine the maximum cost that would be needed to
complete a project.
Although the CPM method is very valuable in the extent of details that it
provides, modifying the system constantly can be cumbersome especially if
it involves reallocation of resources and time.
114
There must be no crossing activities in the CPM.
Each activity is labelled with its name e.g. ‘print brochure’, or it may be
given a label, such as ‘D’, below.
The activities on the critical path are usually marked with a ‘//’.
In this example, there is a clear sequence of events that have to happen in the right
order. If any of the events on the critical path is delayed, then the bread will not be
ready soon. However, tasks D (prepare tins) and E (heat the oven) can be started at
any time as long as they are done by the latest finish time in the following node.
So, we can see that the oven could be switched on as early as time 0, but we can
work out that it could be switched on at any time before 71 – any time later than
this; it won’t be hot enough when the dough is ready for cooking. There is some
‘float’ available for tasks D and E as neither is on the critical path. This is a fairly
simple example, and we can see the LST and LFT are the same in each node.
In a more complex CPM, this will not necessarily be the case, and if so, will
indicate that there is some ‘float’ in at least one activity leading to the node.
However, nodes on the critical path will always have the same EST and LFT.
116
(E) What can a business do if a project is delayed?
First, the CPM is helpful because it shows the likely impact on the whole
project if no action were taken.
Second, if there is float elsewhere, it might be possible to switch staff from
another activity to help catch up on the delayed activity.
As a rule, most projects can be brought back on track by using extra labour –
either by hiring additional people or overtime. Note that there will usually be
an extra cost. Alternative suppliers can usually be found – but again, it might
cost more to get urgent help.
117
References
Baker, Samuel L. (2009). “Linear Programming I: Maximisation.”
http://hspm.sph.sc.edu/Courses/J716/pdf/71610%20Linear%20Programmin
g%20I.pdf
Lowe, C. W. (1966) Critical path analysis by bar chart: the new role of job
progress charts. London: Business Publications.
MindTools (2004) Critical Path Analysis & PERT Charts. Accessed on August 21
2004 from: http://www.mindtools.com/pages/article/newPPM_04.htm
Moder, J. J. and Phillips, C. R. (1964) Project management with CPM and PERT,
Reinhold Pub. Corp., New York.
Newbold, R. C. (1998) Project management in the fast lane : applying the theory
of constraints, St. Lucie Press, Boca Raton, Fla.
Stelth, Peter and Guy Le Roy “Projects’ Analysis through CPM (Critical Path
Method) School of Doctoral Studies, European Union Journal, 1; ( July, 2009).
118
9.3.2.3 STUDY SESSION 11:
Project Evaluation and Review Technique (PERT)
Introduction
Learning Outcome
(A) What is a project?
(B) Project Evaluation and Review Technique
(i) Objective
(ii)Field Application
(iii) Description
C) Discussion Questions
Introduction
Programme (Project) Evaluation and Review Technique (PERT) is a project
management tool used to schedule, organise, and coordinate tasks within a project.
Learning Objectives
At the end of this session, you should be able to:
a. Define PERT.
119
b. State the objectives of PERT.
c. Discuss the field application of PERT.
d. Describe PERT.
e. Know how to get started in PERT.
ITA: A project is a set of activities with a defined start point and a defined end state,
which pursues a defined goal and uses a defined set of resources.
120
To a greater or lesser extent, all the projects listed above have some elements in
common. They all have an objective, a definable end result or output that is
typically defined in terms of cost, quality and timing. They are all unique.
There are some points of commonality in project success and failure, which allow
us to identify some general points which seem to minimise the chances of a project
failing to meet its objectives. The following factors are particularly important:
● clearly defined goals: including the general project philosophy or general
mission of the project, and a commitment to those goals on the part of the project
team members.
● competent project manager: a skilled project leader who has the necessary
interpersonal, technical and administrative skills.
● Top-management support: top-management commitment for the project that has
been communicated to all concerned parties.
● competent project team members: the selection and training of project team
members, who between them have the skills necessary to support the project.
● sufficient resource allocation: resources, in the form of money, personnel,
logistics, etc. which are available for the project in the required quantity.
● adequate communications channels: sufficient information is available on project
objectives, status, changes, organisational conditions and client’s needs.
● control mechanisms: the mechanisms which are in place to monitor actual events
and recognise deviations from plan.
● feedback capabilities: all parties concerned with the project are able to review
the project’s status and make suggestions and corrections.
● responsiveness to clients: all potential users of the project are concerned with
and are kept up to date on the project’s status.
121
● project staff continuity: the continued involvement of key project personnel
through its life. Frequent turnover of staff can dissipate the team’s acquired
learning.
(i) Objective -The main objective of PERT is to facilitate decision making and
to reduce both the time and cost required to complete a project.
(ii) Field Application - PERT is intended for very large-scale, one-time, non-
routine, complex projects with a high degree of inter-task dependency, projects
which require a series of activities, some of which must be performed sequentially
and others that can be performed in parallel with other activities.
(iii) Description - PERT planning involves the following steps which are
described below:
I. Identify the specific activities and milestones. The activities are the tasks
required to complete a project. The milestones are the events marking the
beginning and the end of one or more activities. It is helpful to list the tasks
in a table that in later steps can be expanded to include information on
sequence and duration.
122
II. Determine the proper sequence of the activities. This step may be
combined with the activity identification step, since the activity sequence is
evident for some tasks. Other tasks may require more analysis to determine
the exact order in which they must be performed.
IV. Estimate the time required for each activity. Weeks are a commonly used
unit of time for activity completion, but any consistent unit of time can be
used. A distinguishing feature of PERT is its ability to deal with uncertainty
in activity completion time. For each activity, the model usually includes
three time estimates:
Optimistic time – generally the shortest time in which the activity can
be completed. It is common practice to specify optimistic time to be
three standards deviations from the mean so that there is an
approximately a 1% chance that the activity will be completed within
the optimistic time.
Most likely time – the completion time having the highest probability.
Note that this time is different from the expected time.
Pessimistic time – the longest time that an activity might require.
Three standard deviations from the mean are commonly used for the
pessimistic time.
123
PERT assumes a beta probability distribution for the time estimates. For a
beta distribution, the expected time for each activity can be approximated using the
following weighted average:
Expected time = ( Optimistic + 4 x Most likely + Pessimistic ) / 6
To calculate the variance for each activity completion time, if three standard
deviation times were selected for the optimistic and pessimistic times, then
there are six standard deviations between them, so the variance is given by:
124
A PERT chart presents a graphic illustration of a project as a network
diagram, consisting of numbered nodes (either circles or rectangles)
representing events, or milestones in the project linked by
labeled vectors (directional lines), representing tasks in the project. The
direction of the arrows on the lines indicates the sequence of tasks. In the diagram,
for example, the tasks between nodes 1, 2, 4, 8, and 10 must be completed in
sequence. These are called dependent or serial tasks. The tasks between nodes 1
and 2 and nodes 1 and 3 are not dependent on the completion of one to start the
other and can be undertaken simultaneously.
These tasks are called parallel or concurrent tasks. Tasks that must be
completed in sequence but that do not require resources or completion time are
considered to have event dependency. These are represented by dotted lines with
arrows and are called dummy activities. For example, the dashed arrow linking
nodes 6 and 9 indicates that the system files must be converted before the user test
can take place, but that the resources and time required to prepare for the user test
(writing the user manual and user training) are on another path. Numbers on the
opposite sides of the vectors indicate the time allotted for the task.
125
Determine the proper sequence of the activities.
The PERT chart is sometimes preferred over the Gantt Charts. While another
popular project management charting method clearly illustrates task dependencies,
on the other hand, the PERT chart can be much more difficult to interpret,
especially on complex projects. Frequently, project managers use both techniques.
126
Project Management tools and strategy
The Gantt chart and the PERT chart are probably the two best known charts in
project management. Each of these can be used for scheduling, but because Gantt
charts do not illustrate task dependencies and PERT charts can be confusing, PMs
often use both.
Project management charts; Beyond Gantt: Gantt charts are good for certain
purposes, explains project management expert David Christiansen, but there are
other charts PMs have at their disposal.
Source: www.ask.com/net
Summary
In this unit, we have discussed about the project evaluation and review technique.
The objectives were stated, the field application was made, a description of how to
evaluate a project
ITQ: What was
is project made and
evaluation and how totechnique?
review get started with PERT chart was illustrated.
ITA: The project evaluation and review technique commonly abbreviated as PERT, is a
statistical tool used in project management which was designed to analyse and represent
the tasks involved in completing given project. It was a methodology developed by the US
navy in the 1950's to manage the polarised submarine missile programme.
C) Discussion Questions
1. Consider the following information; the following relates to the construction
of an ultra-modern lecture theatre for the Department of Business
127
Administration. All the preliminary studies have been conducted and the
following activities, their times (weeks) and order of precedence have been
identified:
Optimistic time Normal time Pessimistic time
A - 2 3 6
B A 2 4 6
C A 1 2 3
D A 5 6 8
E C 1 2 4
F B 3 5 8
G D 3 4 6
H D 1 2 3
I F,H 1 2 5
J E,G,I 1 2 4
K J 2 3 6
2. Find the expected time for each activity and set up the PERT network for the
project.
3. Identify the critical path.
4. What is the expected completion time?
5. What is the probability of completing this project 4 weeks ahead of
schedule?
6. What is the probability of completing this project 3 weeks behind schedule?
7. What is the probability of completing this project in 25 weeks?
8. a. write the difference between CPM and PERT.
b. let the value of the money be assumed to be 10% per year and supposed
that machine A is replaced after 3 years whereas, machine B is replaced
after six years.
128
9. A project has the following activities with the time as shown.
Activity Immediate Predecessor Duration (days)
Most likely Optimistic Pessimistic
A - 3 1 7
B A 6 2 14
C A 3 3 3
D B,C 10 4 22
E B 7 3 15
F D,E 5 2 14
G D 4 4 4
d. Draw the network, find the critical path, the expected project
completion time.
e. What project duration will have 95% confidence of completion?
10 The following table gives data on normal time, and cost of crash time and cost
of a project.
Activity Normal Crash
Time (weeks) Cost (Rs) Time (weeks) Cost (Rs)
1-2 3 300 2 400
2-3 3 30 3 30
2-4 7 420 5 580
2-5 9 720 7 810
3-5 5 250 4 300
4-5 0 0 0 0
5-6 6 320 4 410
6-7 4 400 3 470
6-8 13 780 10 900
7-8 10 1000 9 1200
Indirect cost is Rs per week
a. Draw the network diagram and identify the critical path.
b. What are the normal project duration and associated cost?
Determine which machine should be purchased.
129
References
Baker, Samuel L. (2009). “Linear Programming I: Maximisation.”
http://hspm.sph.sc.edu/Courses/J716/pdf/71610%20Linear%20Programmin
g%20I.pdf
Lowe, C. W. (1966) Critical path analysis by bar chart: the new role of job
progress charts. London: Business Publications.
MindTools (2004) Critical Path Analysis & PERT Charts. Accessed on August 21
2004 from: http://www.mindtools.com/pages/article/newPPM_04.htm
Moder, J. J. and Phillips, C. R. (1964) Project management with CPM and PERT,
Reinhold Pub. Corp., New York.
Newbold, R. C. (1998) Project management in the fast lane: applying the theory of
constraints, Boca Raton, Fla. St. Lucie Press.
Stelth, Peter and Guy Le Roy. “Projects’ Analysis through CPM (Critical Path
Method) School of Doctoral Studies, European Union Journal, 1: ( July, 2009).
130
9.3.2.4 STUDY SESSION 12 :
Linear Programming (LP)
Introduction
Learning Outcome
Summary
Introduction
“Linear programming is constrained optimisation, where the constraints and the
objective function are all linear. It is called "programming" because the goal of the
calculations help you choose a "programme" of action” (Baker, 2009). Linear
programming is the process of taking various linear inequalities relating to some
situation, and finding the "best" value obtainable under those conditions.
Learning outcome
At the end of this session, you should be able to:
a. Define the linear programming.
b. Make a classic application of linear programming.
c. Identify the constraint of linear programming.
d. List the functions of linear programming.
e. Make a graphical method of solutions to linear programming problems.
131
(D) Linear Programming
The methods of Linear Programming were originally developed by American
mathematicians, to solve problems arising in industry and economic planning.
Some of such problem involves constraint on the size of workforce, the quantity of
raw material available, the number of working machines, etc. Today, it is a
standard tool that saves millions of dollars for many companies, or even moderate
sizes in many industrialised countries.
What is the nature of this tool and what type of problems would it be useful in
providing solution for? The most common type of application involves those of
allocating limited resources among competing activities, in a best possible and
optimal way. Precisely, this problem involves selecting the level of certain
activities that compete for scares resources that are necessary to perform such
activities.
A typical example of its use would be taking the limitations of materials and
labour, and then determining the "best" production levels for maximal profits under
those conditions. In "real life", linear programming is part of a very important area
of mathematics called "optimisation techniques." This field of study (or at least the
132
applied results of it) is used every day in the organisation and allocation of
resources.
133
Several customers to whom shipments must be made
Minimise cost of serving customers
Scheduling
Many possible personnel shifts
Staffing requirements at various times
Restrictions on shift timing and length
Minimise cost of meeting staffing requirements
Finance
Several types of financial instruments available
Cash flow requirements over time
Minimise cost
The linear programming model, for a manufacturing problem, involves: processes
or activities that can be done with different amounts.
The constraints say that you cannot use more of each resource than you have of
that resource.
134
Objective function - to be maximised or minimised
A linear objective function means that you can sell all you want of your
outputs without affecting the price. You have elastic demand, in economics
jargon.
These "real life" systems can have dozens or hundreds of variables, or more. In
algebra, though, you will only work with the simple (and graph table) two-variable
linear case.
The general process for solving linear programming exercises is to graph the
inequalities (called the "constraints") to form a walled-off area on the x, y-plane
(called the "feasibility region"). Then you figure out the coordinates of the corners
of this feasibility region (that is, you find the intersection points of the various
pairs of lines), and test these corner points in the formula (called the "optimisation
equation") for which you are trying to find the highest or lowest value.
135
(Source: Baker, 2009)
Here, the feasible region is below the 2.5x+y=20, 3x+3y=30, and x+2y=16 lines –
those are the # constraints. It’s above the y=0
line (the x-axis), and to the right of the x=0
line (the y-axis) – those are the $ constraints
136
(Source: Baker, 2009)
As a first try, in the diagram to the right, I drew an isoprofit line for a profit of 45.
The equation for the line is 3x+4y=45. That is because we make $3 for each desk
and $4 for each table. 3x+4y=45 is a line containing all the points that have a profit
of exactly 45.
That 45 is profit line happened to be higher than the feasible region in the lower
left corner, bounded by the constraints (Baker, 2009).
Find the highest value isoprofit line that touches the feasible region. Imagine
moving that 3x+4y=45 line, parallel to itself, down and to the left.
137
Move it down a little bit and you might have the line 3x+4y=44. Move it some
more and you might have the line 3x+4y=43. Keep going until your line just
touches a corner of the feasible area. Stop there, and you have the line 3x+4y=36,
which is shown in the diagram.
All isoprofit lines have the same slope. They differ only in how high they are. The
slope of an isoprofit line depends on the ratio of the x good’s profit-per-unit to y
good’s profit-per-unit. The profit amount for the isoprofit line that just touches the
feasible area is the most profit you can make. The X and Y coordinates of the point
where the isoprofit line touches tells you how much of x and y to make.
Why do you stop with the isoprofit line that just touches the feasible area? Higher
isoprofit lines have no feasible points on them. We cannot use those. Lower
isoprofit lines that touch more of the feasible area, have less profit than the one that
just touches a corner. We want the most profit that is feasible, so we want the line
that just touches a corner. The solution is x = 4, y = 6, and the profit is 36.
ITQ: What is the difference between a linear constraint and an objective function?
ITA: A linear constraint means no diminishing or increasing returns. Adding more input
gives the same effect on output regardless of how much you are already making. While
A linear objective function means that you can sell all you want of your outputs without
affecting the price.
138
However, it can involve a lot of calculation. To understand the enumeration
method, we start with the graph method.
The feasible region in the diagram above is convex with straight edges. This is
always true in linear programming problems. This implies the extreme point
theorem: If a feasible region exists, the optimal point will be a corner of the
feasible region. When the isoprofit line just touches the feasible region, it
will be touching at a corner. (It is possible for the isoprofit line to touch a whole
edge, if one of the constraint lines is parallel to the isoprofit lines. That whole edge
will include two corners, so the general theorem about corners still applies.)
The corners of the feasible region are points where constraints intersect. If we can
find all of the intersections of the constraints, we know that one of those
intersections must be an optimal point. Some jargon: Each point where the
constraints intersect is called a basic solution.
A basic solution for a 2-product problem like ours is where any two of the
constraint lines intersect.
(If our problem had three products, each basic solution would be where three of the
constraint planes intersect. For a problem with n products, where n is more than 3,
each basic solution would be where n of the constraint hyperplanes intersect.)
139
A basic feasible solution is a basic solution that satisfies all the constraints. In
other words, a basic feasible solution is a corner of the feasible area. In Example 1
there are 5 basic feasible solutions, and the five corners of the feasible region.
The extreme point theorem implies that one of the basic feasible solutions is the
optimal point. To get the solution to this linear programming problem, we just have
to test all of the basic solutions to see which are feasible and which are not. Once
we have the basic feasible solution, we calculate the profit for each one and pick
the highest.
Summary
In this unit, we discussed about linear programming. The definition was given, the
applications were listed, the constraints were identified as well as graphical
solutions made of the problems.
B) Discussion Questions
1. What is a linear equation? Relate it to the population census of Nigeria.
2. Define linear programming. What are its applications and limitations?
140
3. Explain the characteristics and assumption of linear programming model.
4. Discuss the meaning of sensitivity analysis on the objective function co-
efficient and right hand side parameters.
5. What is sensitivity analysis in linear programming?
6. Perform graphic analysis of two-variable problems and find the algebraic
solution for the corner point found to be optimal.
7. What are the components of a linear programming model?
8. What is a simplex method in linear programming?
9. What is a “Dual”?
10. What are the procedures of “Dual” in linear programming?
References
Baker, Samuel L. (2009) “Linear Programming I: Maximisation.”
http://hspm.sph.sc.edu/Courses/J716/pdf/71610%20Linear%20Programming%20
I.pdf
Lowe, C. W. (1966) Critical path analysis by bar chart: the new role of job
progress chart. London: Business Publications.
Mind Tools (2004) Critical Path Analysis & PERT Charts. Accessed on August
21 2004 from: http://www.mindtools.com/pages/article/newPPM_04.htm
Moder, J. J. and Phillips, C. R. (1964) Project management with CPM and PERT.
New York: Reinhold Pub. Corp,.
Newbold, R. C. (1998) Project management in the fast lane: applying the theory
of constraints. Boca Raton, Fla. St. Lucie Press.
142
9.3.2.5 STUDY SESSION 13:
Developments in Operations Management
Introduction
Learning Outcome
Summary
Discussion Questions
143
Introduction
This area will dwell heavily on the recent or current work in progress, in the area
of operation and production management. Quality is the only one important fact in
‘operations performance criteria’. There are two reasons for this. First, in some
organisations a separate function is devoted exclusively to the management of
quality. Second, quality is a key concern of almost all organisations. High-quality
goods and services can give an organisation a considerable competitive edge. Good
quality reduces the costs of rework, waste, complaints and returns and, most
importantly, generates satisfied customers. Some operations managers believe that,
in the long run, quality is the most important single factor affecting an
organisation’s performance relative to its competitors.
Learning Outcome
At the end of this session, you should be able to
a. Define quality.
b. Know how to diagnose a quality problem.
c. Identify and discuss steps towards conformance to specification.
d. Define and discuss total quality management.
A. Developments in Operations Management
There are several benefits that organisations stand to gain from high quality. This
will explain why quality is seen as being so important by most operations. The
various ways in which quality improvements can affect other aspects of operations
performance are given below.
1. Revenues can be increased by better sales and enhanced prices in the
market.
2. At the same time, costs can be brought down by improved
efficiencies.
144
3. Productivity and
4. The use of capital.
So, a key task of the operations function must be to ensure that it provides quality
goods and services, to both its internal and external customers. If the perceived
quality gap is such that customers’ perceptions of the product or service fail to
match their expectations, then the reasons lie in other gaps elsewhere as follows.
Gap 1: The customer’s specification–operation’s specification gap: Perceived
quality could be poor because there may be a mismatch between the organisation’s
own internal quality specification and the specification which is expected by the
customer.
ITA: QUALITY. There are several benefits that organisations stand to gain from high
quality.
145
B. Conformance to Specification
After having diagnosed the quality problem, there is need to have conformance to
specification. Conformance to specification means producing a product or
providing a service to its design specification. It is usually seen as the most
important contribution that operations management can make to the customer’s
perception of quality. We shall examine how it can be achieved by describing
quality management as six sequential steps. They are:
Step 1: Define the quality characteristics of the product or service.
Step 2: Decide how to measure each quality characteristic.
Step 3: Set quality standards for each quality characteristic.
Step 4: Control quality against those standards.
Step 5: Find and correct causes of poor quality.
Step 6: Continue to make improvements.
146
characteristic such as ‘appearance’ and breaking it down, as far as one can, into its
constituent elements. ‘Appearance’ is difficult to measure as such, but ‘colour
match’, ‘surface finish’ and ‘number of visible scratches’ are all capable of being
described in a more objective manner. They may even be quantifiable. Other
quality characteristics pose more difficulty. The ‘courtesy’ of airline staff, for
example, has no objective quantified measure.
147
Step 4 – Control quality against those standards
After setting up appropriate standards the operation will then need to check that the
products or services conform to those standards: doing things right, first time,
every time. This involves three decisions:
1 Where in the operation should they check that it is conforming to standards?
2 Should they check every product or service or take a sample?
3 How should the checks be performed?
148
● Checking everything can be time-consuming and costly. It may not be feasible to
check all output from a high-volume machine or to check the feelings of every bus
commuter every day. Also, 100 per cent checking may not guarantee that all
defects will be identified. Sometimes it is intrinsically difficult. For example,
although a physician may undertake the correct testing procedure, he or she may
not necessarily diagnose a (real) disease.
TQM can be viewed today as a logical extension of the way in which quality-
related practice has progressed. Originally, quality was achieved by inspection –
screening out defects before they were noticed by customers. The quality control
(QC) concept developed a more systematic approach to not only detecting, but also
treating quality problems. Quality assurance (QA) widened the responsibility for
quality to include functions other than direct operations. It also made increasing
use of more sophisticated statistical quality techniques. TQM included much of
what went before but developed its own distinctive themes. We will use some of
these themes to describe how TQM represents a clear shift from traditional
approaches to quality.
149
D. What is TQM?
TQM is ‘an effective system for integrating the quality development, quality
maintenance and quality improvement efforts of the various groups in an
organisation so as to enable production and service at the most economical levels
which allow for full customer satisfaction’. However, it was the Japanese who first
made the concept work on a wide scale and subsequently popularised the approach
and the term ‘TQM’. It was then developed further by several, so-called, ‘quality
gurus’. Each ‘guru’ stressed a different set of issues, from which emerged the
TQM approach.
ITA: TQM is ‘an effective system for integrating the quality development, quality
maintenance and quality improvement efforts of the various groups in an organisation
so as to enable production and service at the most economical levels which allow for
full customer satisfaction’
150
E. TQM means meeting the needs and expectations of customers
In TQM this customer perspective is particularly important. It may be referred to
as ‘customer-centricity’ or the ‘voice of the customer’. However it is called,
TQM stresses the importance of starting with an insight into customer needs,
wants, perceptions and preferences. This can then be translated into quality
objectives and used to drive quality improvement.
ITA: There have been a number of innovative developments in operations management that
have sought to organise resources in a significantly new manner in order to make a big
chance in performance.
G. Service-level agreements
Some organisations bring a degree of formality to the internal customer concept by
encouraging (or requiring) different parts of the operation to agree service-level
151
agreements (SLAs with each other). SLAs are formal definitions of the
dimensions of service and the relationship between two parts of an
organisation. The type of issues which would be covered by such an agreement
could include response times, the range of services, dependability of service
supply, and so on. Boundaries of responsibility and appropriate performance
measures could also be agreed. For example, an SLA between an information
systems support unit and a research unit in the laboratories of a large company
could define such performance measures as:
● The minimum ‘up-time’, i.e. the proportion of time the system will be available
at different periods of the day;
● The maximum response time and average response time to get the system fully
operational should it fail;
Summary
In this session, quality development in operations management has been
discussed. The definition of quality has been given, stressing on the “total” in the
new operations management. How quality can be diagnosed, what steps leads
152
towards conformity and total quality management were all discussed in this
session.
Discussion Questions
6. Total quality marketing means meeting the needs and the expectations
of the customers. Do you agree? discuss
153
REFERENCES
Baker, Samuel L. (2009). “Linear Programming I: Maximisation.”
http://hspm.sph.sc.edu/Courses/J716/pdf/71610%20Linear%20Programmin
g%20I.pdf
Lowe, C. W. (1966) Critical path analysis by bar chart: the new role of job
progress charts. London: Business Publications.
Mind Tools (2004) Critical Path Analysis & PERT Charts. Accessed on August 21
2004 from: http://www.mindtools.com/pages/article/newPPM_04.htm
Moder, J. J. and Phillips, C. R. (1964) Project management with CPM and PERT.
New York: Reinhold Pub. Corp,.
Newbold, R. C. (1998) Project management in the fast lane: applying the theory of
constraint., Boca Raton: Fla. St. Lucie Press.
Stelth, Peter and Guy Le Roy “Projects’ Analysis through CPM (Critical Path
Method) School of Doctoral Studies, European Union Journal, 1: ( July, 2009).
154
10.0 FURTHER READING
Hindle, T. (1994) Field Guide to Strategy, Cambridge Mass: Harvard Business School
Press.
Lucey T. (1989). Quantitative Techniques: An Instructional Manual. Third Edition:
United Kingdom; Guermey Press vale.
Operations Management (2007) By Nigel Slack, Stuart Chambers, Robert Johnston
Prentice Hall/Financial Times.
Operations Management for Competitive Advantage (2002) By Richard B. Chase,
Nicholas J. Aquiliano F. Robert Jacobs McGraw-Hill Irwin.
Operation Management (2007) Contemporary Concepts and Cases Roger G. Schroeder
McGraw-Hill College.
Operations Management(2002) By William J. Stevenson McGraw-Hill Irwin
Operation and Supply Management (2009) By Robert Jacobs, Richard B. Chase,
Nicholas J. Aquilano F. McGraw-Hill.
Operations management (2007) By Nigel Slack, Stuart Chambers, Robert Johnston
Prentice Hall/Financial Times.
www.jstor.com.
www.ask.com/net.
11.0 GLOSSARY
Production: According to Elwood Butta “production is a process by which goods or services are
created”.
Safety Stock: Remaining inventory between the times that an order is placed and when new
stock is received.
155