1. Front Floor §¾ìÌ ÁÃò¾¢ø §À¡ðÎò ¾ÃôÀÎõ (Rs.2400/-Sq.ft)
2. Windows º¡ø ÁÃò¾¢ø §À¡ðÎò ¾ÃôÀÎõ (Rs.1700/- Sq.ft)
3. ¸¢îºý À¢Ç¡ðÀ¡÷õ Granite (Rs.100/-Per Sq.ft) §À¡ðÎò
¾ÃôÀÎõ.
4. ¸¢îºý À¢Ç¡ðÀ¡÷õ -ìÌ §Áø 4'0" «Ê ¯ÂÃò¾¢üÌ ¸¢Ç¡ŠÎ
¨¼øŠ (Glazed Tiles, Cost of Tiles Rs.25/- per Sq.ft) -For All
Toilet : 7'0" «Ê ¯ÂÃò¾¢üÌ ¸¢Ç¡ŠÎ ¨¼øŠ (Glazed Tiles,
Cost of Tiles Rs.25/- Sq.ft) ´ðÊò ¾ÃôÀÎõ.
5. ¾Çõ (Flooring Work) Flooring Tiles (2x2) - Vertified Tile
Flooring (Cost of Tiles Rs.40/- per Sq.ft).
6. Portico Cement Flooring.
7. ±Äìð¡¢ì¸ø §Å¨Ä - ¨Äð À¡Â¢ýð, À¢Çì À¡Â¢ýð, §Àý À¡Â¢ýð
§À¡ðÎò ¾ÃôÀÎõ.
Branded ŠÅ¢ð͸û ÁüÚõ ´Â÷¸û «¨ÉòÐõ ISI ¸õ¦ÀÉ¢
Kundan Company Material ÀÂýÀÎò¾ôÀÎõ.
8. ¦À¢ñÊí §Å¨Ä - Inner ÁüÚõ Outer Walls One Coat White
Cement, Enamal Paint for Doors and Windows Grills.
9. À¢ÇõÀ¢í §Å¨Ä (Plumbing Work) - (PVC Pipe for all lines
excluding Heater Line) ISI Brand Overhead Tank 750 Ltrs
Capacity & all fittings included.
¯¡¢¨Á¡Ç÷ þýƒ¢É¢Â÷
-3-
Payment Details
«ðÅ¡ýŠ ¦¾¡¨¸ - 20% - Rs. 5,40,000
Ä¢ñ¼ø To G.Floor Roof Level - 20% - Rs. 5,40,000
G.Floor Roof Level - 12.5% - Rs. 3,37,500
ÁÃõ Å¡í̾ø - 5% - Rs. 1,35,000
âîÍ §Å¨Ä ¬ÃõÀ¢ìÌõ ÓýÒ(G.F) - 5% - Rs. 1,35,000
âîÍ §Å¨Ä ¬ÃõÀ¢ìÌõ ÓýÒ(F.F) - 7.5% - Rs. 2,02,500
âîÍ §Å¨Ä ÓÊó¾ À¢ýÒ (G.F & F.F) - 10% - Rs. 2,70,000
Purchasing of Plumbing Material,
Granite Slab for Rooms & Wall Tiles,
Flooring Tiles etc - 10% - Rs. 2,70,000
Purchasing of Electrical Material &
Painting Material etc & Portico Works. - 7.5% - Rs. 2,02,500
Total - Rs.27,00,000