Vous êtes sur la page 1sur 1
28 29 42 53 Se Replacement of Engineer “The ten of Sub-Ciause 28 is deleted and substitute bythe folowing “ithe Employ intends to replace the Engnaor, the Employer shal not ss than 14 days befora the intanded date of roplacemar, gv natice fo the Contractor, of the rama, aderest and vlovant experince ofthe Fiended replacement Engines. The Employer shal not eplae the Engineer wit a person agans whom the Contactor falses reasonable objection By nate tothe Employ, with supporting parla” Engincer Not Liable Sub-Clause 2.9 i¢ added a flows: “Approval, viens and inspection by the Enginoer of ary ert ofthe Works doesnot relieve the Contactor ffom his s9f respansibity and lably forthe sunoly of ‘remaining materials and equigment fete Works and pars threo! and complete ne femaining erecion works and testing and commissioning in accoraoe wih he ‘Contract and nar the Enginees authonty to act noe any decision made by ti in {ood fh a proved lor under the Contact whothor fo exercise or nat fo excise {uh authorty shal ge rise to any duy or responsibly of the Engineer tothe Contractor any Subcontractor, any of tel representatives or employees oF any father person performng. any of the woras, However the Contactor shai be ‘compensated fay lssldamage's occured due tothe decsion ofthe Engineer” No Contractual Relation between Subcontractor and the Employor Sub Clause 42is added as flows: Nothing contained inthe Contact Documents shal crete any contractual ration ‘baleen any Subeantractor and tne Employer, Priority of Contract Documents ‘Sub-Clause 3s deleted and subettutes by the fotowing: “Unless ottrnise provided i the Contract the pcorty ofthe Contract Oocuments hal be a8 Toons: 1. The Contact Agreemant if completed) 2 The Later of Acceptance 3. The completed Farm of Bid 4 Preamble o Conditions of Contact The Parieular Conon of Contact 8 The General Conds of Contact 7 The priced Sehedule of Prees 8 The completed Schedules to Bid 8. The Specifications 10. The Drawings 1 (Any other document In cate of aorapansios balwoen drauings, those ofarger scale shall gover they ate suporsedea by drawings) ofa later date regarcess of scale. Al 3d specications shal be interpreted in conformity wih the Corract Ag 136

Vous aimerez peut-être aussi