Vous êtes sur la page 1sur 6

SPE 147903

Developing Oil in Monobore Well Completion Using Permanent Coil Tubing Gas
Lift Application
Ari Taufiq Kramadibrata, SPE, Sumaryanto, SPE, Pahala Panjaitan, SPE; VICO Indonesia

Copyright 2011, Society of Petroleum Engineers

This paper was prepared for presentation at the SPE Asia Pacific Oil and Gas Conference and Exhibition held in Jakarta, Indonesia, 20–22 September 2011.

This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been
reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its
officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to
reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright.

Abstract
VICO Indonesia has operated the Sanga-Sanga PSC in implemented in “MUT-X” well that was not capable to
East Kalimantan, Indonesia, since 1968. More than 750 flow naturally, and then PCTGL was installed to resume
development wells have been drilled to date in the oil production. The well was flowing 600 BOPD initially
complex Mahakam Delta in East Kalimantan. The mature and now is continue flowing at 350 BOPD.
reservoirs are predominantly gas, extremely depleted and
have an average recovery factor of about 70%. To In summary, PCTGL is a proven favorable and simple
optimize the development cost VICO changed the method for artificial lift application in monobore
completion from multi string and multi packers to completion to maximize oil production and recovery.
monobore in 1997 and furthermore to dual monobore in Furthermore, this technique has helped VICO in
2005. VICO has also focus to optimize oil production and synergizing gas and oil development to maximize value of
recovery. The current oil recovery factor is relatively the assets.
modest and needing further detail study and optimization.
Introduction
A multi-disciplinary team was performed to further VICO Indonesia is a Production Sharing Contractor
evaluate oil potential in all VICO fields including review operated in Sanga-sanga Block East Kalimantan since
of historical performance, geology and development 1968 (Fig. 1). Currently, there are 4 fields operated by
opportunities. These reservoirs were also evaluated using VICO: Badak, Semberah, Nilam and Mutiara. Current
material balance to understand the initial volumes in place, overall production is 400 MMscfd and 15000 bbl liquid
the drive mechanism and the opportunity to maximize (oil and condensate).
production and oil recovery through the existing wells.
Two major fields producing oil are Mutiara and Nilam.
One of the challenges in maximizing oil recovery is Mutiara contribute 8500 bopd from 16 active strings while
artificial lift system in monobore completion. VICO has Nilam contributes 1700 bopd from 12 strings.
evaluated and selected gas lift as optimum artificial lift
method. There are two possibilities to gas lift oil wells (1) Mutiara Field is located southern of Sanga-sanga block.
using a side pocket mandrel in the conventional dual string Mutiara covers 125 km2 and several wells are commingled
completion and (2) inject gas lift through coil tubing in the into single trunk line through which the gas or oil flow can
monobore completion. be transported into compressor or oil separator then flow
to nearest gathering area or central plant. As a hilly
The paper describes innovative gas lift system in topography, the field has “fish bone” surface facilities
monobore completion where gas lift mandrels were not type. Geologically, oil deposits are usually found in G, F
pre-installed. This technique has been implemented, by and E Sands at depth approximately 1500 – 6000 feet.
running 1.5" coil tubing into a well through a special Meanwhile, Nilam field covers up 85 km2 area. Due to its
tubing hanger attached to the top of the Christmas tree. swampy terrain and overstretched area, Nilam has 5
This technique allows gas lift to an oil reservoir in Satellites. Each Satellite has test separator and compressor
monobore well completion without requiring rig for to update test and transport gas to Central Plant. Oil
recompletion. This application is known as “Permanent deposits are usually found in D and E Sands at depth
Coil Tubing Gas Lift” or PCTGL. This technique has been approximately 8000 – 11000 feet. Much of oil properties
are light oil with API 32 – 35.
2 SPE 147903

Completion Types diameter 1.5 inch and has a nozzle and a check valve at the
As a solution in completing multi-layer reservoirs and to end of its tail, then hang it above X-mast tree. The gas is
optimize well performance and reserve recovery, VICO injected into the swab valve and produces the string
Indonesia utilizes two major types of completion: through the annulus between tubing and coil inserted, then
conventional well and monobore well. pass the wing valve.

Conventional Wells Fig. 2 shows the Bottom Hole Assembly of PCTGL


As former completion method in VICO Indonesia, the well application. It consists of nozzle, centralizer, check valves,
is completed as a single or a single selective; dual or dual nipple, and Coil Tubing (CT) connector. The nozzle has
selective completion. This conventional well typically total area 0.5 in2. The check valve is required to prevent
utilizes production tubing of diameter 2-3/8”, 2-7/8” or 3- back flow from annulus into coil tubing. A nipple is placed
1/2”. Within one casing, two production tubing systems above check valves where a special tool called Dart (Fig.
may be installed, namely the Upper (Short String) and the 3) can be inserted to pull PCTGL in case we want to
Lower (Long String). retrieve it later.
The system has flexibility to obtain production from
potential zones. Also, if in fact the zone turns out to The surface configuration of PCTGL is shown in Fig. 4.
contain oil, a Side Pocket Mandrel (SPM) can be placed to
inject gas lift that would assist in raising hydrocarbon The estimated cost of a full PCTGL installation ranges
liquids within the well when flow to the surface cannot be from USD 45,000 to USD 60,000 depending on the length
maintained anymore using its own natural pressure. The of coil tubing required (i.e depth for injection). This
work-over rig might be required to access the other includes the cost of the coil tubing, the BHA and the coil
potential zone or to repair tubing if any leaks or tubing hanger. Additonal cost of USD 25,000 is required
obstruction. for installing surface gas lift skid and USD 15,000 for the
well intervention to permanently install the PCTGL. This
Monobore Wells compares very favourably with any workover operation
A Monobore well is most common well completion type option required to install a gas lift completion., which in
recently, that uses a single or dual production casing or the case of VICO could range between USD 1,000,000 to
tubing cemented up to surface. Most applications use a USD 1,500,000.
production casing with a diameter of 3-1/2” and 4-1/2”.
The philosophy of Monobore well is to obtain an extreme
under balanced condition during the initial perforation; VICO’s Case History
easy and simple to access other potential zones without NLM-X is a dual monobore completion, one string
using rig (or called rigless operation) and also has produced gas and other produced oil. The oil zone flowed
flexibility to balance between reserves recovery from low naturally, then it was ceased to flow. The well is an ideal
rate permeability reservoir and optimize rate from shallow PCTGL candidate because of its distinctive rate history
depth if the well is completed as dual – monobore and completion. The Long String was initially 3900 bopd,
completion. In other side, this completion type is not best 0 bwpd, and 4 MMscfd associated gas from Reservoir-A.
fit for oil development as no mandrel to house the gas lift Water-cut has increased up to 17% within 5 days
valve in monobore well. Thus, it is impossible to inject gas production before it died. A static gradient survey shows
lift gas. column of oil from depth 0 to 12000 feet. Considering the
reserves of Reservoir-A, well completion type and
availability of the artificial lift technology, it is concluded
Permanent Coil Tubing Gas Lift (PCTGL) that installing a permanent coil tubing gas lift (PCTGL) is
A multi-disciplinary team was performed to further a good option and economical solution. Coil tubing was
evaluate oil potential in all VICO fields including review run into depth at 5600 feet and injection gas lift pressure
of historical performance, geology and development at 1800 psig. The well completion is shown on Fig. 5. Gas
opportunities. These reservoirs were also evaluated using lift line is installed to swab valve as depicted in Fig. 6.
material balance to understand the initial volumes in place,
the drive mechanism and the opportunity to maximize NLM-X was successfully reactivated by PCTGL and
production and oil recovery through the existing wells. initial test was 800 bopd, 1610 bwpd, 0.3 MMscfd of
associated gas by injecting 0.9 MMscfd gas lift gas.
One of challenging in performing gas lift in monobore is
that there is no gas lift valve or side pocket mandrel Success story in Nilam field inspires the same technique
available which we can introduce gas lift gas into the for Mutiara field. MUT-X is also 3.5” dual bore well.
production tubing. Monobore has no annulus to transport Short String is accessing Reservoir-E1 and Reservoir E-2.
gas downwards. Utilizing coil tubing inserted into Initially, the string produced 1500 bopd and 0% WC. After
monobore well (called PTGL) is applied to deliver gas lift 2 years, water cut had increased 50% and the production
into the bottom hole. PCTGL is a coil tubing with halted. Then, PCTGL is applied with injection point at
1500 feet and injection pressure at 450 psig, the well was
resumed flowing at rate of 400-600 bopd.
3 SPE 147903

The more detailed reservoir properties of NLM-X and VICO plans to continue expand this application by
MUT-X can be seen on Table 1. installing 20 PCTGL this year, both in 3.5” and 4.5”
monobore completion.
The reactivation step to resume the well back on
production was very simple. Once the PCGTL installed Acknowledgements
and connected to 2” gas lift line, the reactivation was We would like thank Pak Bambang Ismanto, Mr. Bill
performed as follows: Turnbull and Mr. Eder Lizcano from VICO Indonesia for
1. Keep open wing valve and open well to burn pit. encouraging us presenting this paper.
2. Inject PCTGL with designed gas lift pressure or kick-
off and lifting the well using nitrogen if not enough References
gas lift pressure. 1. Arianto, MA; Susatyo Y; Srisantoso; Sumaryanto.
3. Clean-up the well and put on production system. 2006. New Completion Solution for Multi Layer Gas
4. Test the well and optimize well performance by Field: A Case History. SPE 100991, Asia-Pasific Oil
adjusting gas injection pressure. and Gas Conference and Exhibition.
2. Beggs, Dale. 1991. Optimization using Nodal
Summary Analysis. OGCI and Petroskills Publications.
PCTGL is a proven favorable and simple method for 3. Brown, Kermit E. 1984. The Technology of Artificial
artificial lift application in monobore well completion. It Lift Method, Vol. 4. Petroleum Publishing Co
helps to solve and optimize oil development in monobore 4. Brown, K. E., and Lea. F. 1985. Nodal System
completion, in order to maximize oil reserve recovery and Analysis of Oil and Gas Wells. JPT 1751.
enhance the asset value.
4 SPE 147903

TABLE 1-RESERVOIR PROPERTIES AND WELL DATA


NLM-X MUT-X
Completion Type 3.5 inch monobore
Reservoir Properties
Reservoir Pressure (psi) 2900 1041
Zone Depth (feet) 9100 2652
Porosity (fraction) 0.21 0.28
Permeability (md) 294 880
Water Cut (%) 88 60
Average Skin Factor 8 10
Coil Tubing Gas Lift
Injection Depth (feet) 5600 1500
Outer Diametre (inch) 1.5 1.5
Injection Pressure (psig) 1700 470
Initial Rate (bopd) 800 600
FTHP (psig) 180 90

Fig. 1-VICO Indonesia (Sanga-Sanga PSC)


5 SPE 147903

Coil Tubing
Connector

Nipple

Check
Valve

Centralizer

Nozzle

Fig. 2-Typical BHA of PCTGL Fig. 3-Dart to be landed inside nipple to pull PCTGL

Fig. 4-Surface Configuration of PCTGL. Solid Block Tree supports Tee-Spool (A) and CT hanger (B). The coil tubing
is gripped by Donut (C) and CT Slip (D).
6 SPE 147903

(a) (b)
Fig. 5-NLM-X (a) and MUT-X (b) Completion Diagram

Fig. 6- NLM-X Wellhead Picture

Vous aimerez peut-être aussi