2 CFL - 8 (3x36W) 960 EL+MCB 1 10 10 4.71 2.5 65.0 1.63 RACK ROOM, ENGG. ROOM 4.18
4 CFL - 8 (3x36W) / CFL - 1 (2x18W) 1000 EL+MCB 1 10 10 4.90 2.5 55.0 1.43 CONSOLE ROOM, UPS ROOM 4.35 01 04
7 FTL - 3 (2X36W) / CFL - 6 (3X36W) 960 EL+MCB 1 10 10 4.71 2.5 60.0 1.5 OFFICE, AHU ROOM 0 07 10 (SPARE)
E N.T
10 SPARE 1000 EL+MCB 1 10 10 0 4.35
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 NOTE : 0
0 BOTTOM 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" MAIN HUB
0 SIZE
CKT NO. 1 2 3 4 5 6 7 8 9
SUB TOTAL [W] 3040 2840 1800
SPARE LOAD PER PHASE [W] 1000 1000 2000 PANEL FEED FROM : BOTTOM 3/4" 3/4" 3/4"
1-1/4"
4040 3840 3800 19.8 MAXIMUM CIRCUIT CURRENT [ A ] LOCATION :
GRAND TOTAL [W] CKT NO. 10 11 12
1 of 12
LIGHTING
PANEL BOARD SCHEDULE PROJECT :
CLIENT :
PANEL NO. : SITE :
MAIN INCOMING CIRCUIT BRK(MCB) SERVICE VOLTAGE 1-1/4"
CIRCUIT LOAD DESCRIPTION CIRCUIT WIRING DIAGRAM
CKT. TPN / 63 AF / 32 AT 240 V, 50Hz, 1 P+N+E, 3WIRE, 10KA
GRAND TOTAL [W] CKT NO. 10 11 12
NO.
11680 19.1 INCOMING CURRENT [ A ] MOUNTING TYPE : WALL MOUNTED (INDOOR, GP.)
2 of 12
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
MAIN HUB
SIZE
1-1/4"
3 of 12
1-1/4"
4 of 12
LIGHTING
PANEL BOARD SCHEDULE PROJECT :
CLIENT :
PANEL NO. : SITE :
MAIN INCOMING CIRCUIT BRK(MCB) SERVICE VOLTAGE
CIRCUIT LOAD DESCRIPTION CIRCUIT WIRING DIAGRAM
2P / 32 AF / 32 AT D.C. 220V, 2WIRE, 10KA
CKT.
NO. LOAD FRAME
TRIP CURRENT CABLE SIZE LOAD VOLTAGE
NO. OF FIXTURES BREAKER POLE SERVICE AREA REMARK
[A] [A] [Sq.mm] CENTRE [M] DROP [%]
[WATT] [A] DC. 220V, 2C - 95 Sq.mm
1 GLS - 10 (1X100W) 1000 DC MCB 2 10 10 4.55 2.5 65.0 1.99
OFFICE, CHIEF MANAGER,
MANAGER MECH.,
4.35 + -
CHIEF MANAGER (PORT OPEN),
2 GLS - 9 (1X100W) 900 DC MCB 2 10 10 4.09 2.5 70.0 1.93 3.92
MANAGER MECH., INST.,MAINT.
UPS ROOM, CONSOLE ROOM, SHIFT
3 GLS - 10 (1X100W) 1000 DC MCB 2 10 10 4.55 2.5 45.0 1.38 0
ENGG., CORRIDOR
ENGG. ROOM, OTS ROOM, RACK
4 GLS - 7 (1X100W) 700 DC MCB 2 10 10 3.18 2.5 60.0 1.29 0
ROOM, SHIFT ENGG, CORIDOR
0 02 05
NOTE : 0
0
CKT NO. 1 2 3 4 5 6
SUB TOTAL [W] 3600
SPARE LOAD [W] 2000 PANEL FEED FROM : DC-301 BOTTOM
LOCATION :
GRAND TOTAL [W] 5600 CKT NO.
25.5 INCOMING CURRENT [ A ] MOUNTING TYPE : WALL MOUNTED (INDOOR, GP.)
5 of 12
AGRAM
(SPARE)
(SPARE)
MAIN HUB
SIZE
1"
6 of 12
LIGHTING
PANEL BOARD SCHEDULE PROJECT :
CLIENT :
PANEL NO. : SITE :
MAIN INCOMING CIRCUIT BRK(MCB) SERVICE VOLTAGE
CIRCUIT LOAD DESCRIPTION CIRCUIT WIRING DIAGRAM
TPN / 63 AF / 48 AT 240 V, 50Hz, 1 P+N+E, 3WIRE, 10KA
CKT.
NO. LOAD [WATT] FRAME
TRIP CURRENT CABLE SIZE LOAD VOLTAGE
NO. OF FIXTURES BREAKER POLE SERVICE AREA REMARK
L1 L2 L3 [A] [A] [Sq.mm] CENTRE [M] DROP [%]
[A] 415V, 3.5C - 50 Sq.mm
1 CFL- 7 (3X36W) / CFL - 1 (2X11W) 872 EL+MCB 2 10 10 4.27 2.5 60.0 1.36 RACK ROOM. 3.8 L1 L2 L3 N
2 CFL- 8 (3X36W) 960 EL+MCB 2 10 10 4.71 2.5 60.0 1.5 RACK ROOM. 4.18
3 CFL- 7 (3X36W) 840 EL+MCB 2 10 10 4.12 2.5 60.0 1.31 RACK ROOM. #REF!
4 CFL- 7 (3X36W) 840 EL+MCB 2 10 10 4.12 2.5 60.0 1.31 RACK ROOM. 3.66
5 CFL- 7 (3X36W) 840 EL+MCB 2 10 10 4.12 2.5 65.0 1.42 RACK ROOM. 3.66 01 02
6 CFL-11(2X18W)/ CFL-7(2X36W) 1000 EL+MCB 2 10 10 4.90 2.5 55.0 1.43 CHIEF MANAGER (PORT OPEN), LOBBY. 4.35
7 CFL- 9 (3X36W) 1080 EL+MCB 2 10 10 5.29 2.5 50.0 1.41 CONSOLE ROOM, OTS ROOM 4.7 03 04
8 CFL- 5 (3X36W) 600 EL+MCB 2 10 10 2.94 2.5 50.0 0.78 CONSOLE ROOM. 2.61
9 CFL- 5 (3X36W) / CFL- 2 (2X18W) 680 EL+MCB 2 10 10 3.33 2.5 50.0 0.89 UPS ROOM,LOBBY. 2.96 05 06
CFL - 16 (2X18W) / CFL- 3 (2X36W)/
10 CFL- 2 944 EL+MCB 2 10 10 4.63 2.5 50.0 1.23 ENTRY GATE, TOILET,LOBBY. 4.11
(2X11W)
TECHNICAL ROOM, CLEAN AGENT ROOM,
11 FTL - 9 (2X36W) / CFL - 1 (2X11W) 752 EL+MCB 2 10 10 3.69 2.5 65.0 1.27 3.27 07 08
BATTERY ROOM.
12 CFL - 10 (2X36W) 800 EL+MCB 2 10 10 3.92 2.5 65.0 1.36 MANAGER MECH. 3.48
13 CFL - 8 (2X36W)/ FTL - 1 (2X36W) 720 EL+MCB 2 10 10 3.92 2.5 60.0 1.25 MANAGER HSE & MAINT. #REF! 09 10
14 CFL - 6 (3X36W) 720 EL+MCB 2 10 10 3.53 2.5 45.0 0.85 CHIEF MANAGER, AC PLANT ROOM 3.14
CFL - 7 (2X36W)/ FTL - 6 (2X36W) /
15 1080 EL+MCB 2 10 10 3.53 2.5 60.0 1.13 MANAGER INST., CHIEF MANAGER 3.14 11 12
CFL - 1 (2X18W)
16 CFL - 12 (2X36W) 960 EL+MCB 2 10 10 5.29 2.5 70.0 1.97 CHIEF MANAGER 4.7
17 CFL - 10 (2X36W) 800 EL+MCB 2 10 10 4.71 2.5 45.0 1.13 SHIFT ENGINEER 4.18 13 14
18 CFL - 21 (2X18W) / CFL - 2 (2X11W) 904 EL+MCB 2 10 10 3.92 2.5 60.0 1.25 ENT. LOBBY 3.48
19 CFL - 7 (3X36W) 840 EL+MCB 2 10 10 4.43 2.5 60.0 1.41 ENGINEERING ROOM 3.94 15 16
0 (SPARE) 21 22 (SPARE)
0 (SPARE) 23 24 (SPARE)
0 E N.T
NOTE : 0
7 of 12
M
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
(SPARE) ###
###
###
###
###
###
###
MAIN HUB
1-1/2"
8 of 12
POWER
PANEL BOARD SCHEDULE PROJECT :
CLIENT :
PANEL NO. : SITE :
MAIN INCOMING CIRCUIT BRK(MCCB) SERVICE VOLTAGE
CIRCUIT LOAD DESCRIPTION CIRCUIT WIRING DIAGRAM
TPN / 125AF / 125 AT 240 V, 50Hz, 1 P+N+E, 3WIRE, 10KA
CKT.
NO. LOAD [WATT] TRIP
CURRENT CABLE SIZE LOAD CENTRE VOLTAGE DROP
NO. OF RECEPTACLES BREAKER POLE FRAME [A]
[A] [Sq.mm] [M] [%]
SERVICE AREA REMARK 415V, 3.5C - 120 Sq.mm
L1 L2 L3 [A] SQmm
1 RECEP. -6 (180VA) 960 EL+MCB 1 16 16 4.71 2.5 20.0 0.5 ELECT ROOM, MANAGER HSE 4.18 L1 L2 L3 N
2 RECEP.- 7 (180VA) 1120 EL+MCB 1 16 16 5.49 2.5 30.0 0.88 SHIFT ENGINEER 4.87
3 RECEP. - 3 (180VA) / HAND DRIER 1880 EL+MCB 1 20 20 9.22 2.5 40.0 1.96 LADIES TOILET, TEA ROOM 8.18
4 RECEP. - 9 (180VA) 1440 EL+MCB 1 16 16 7.06 2.5 60.0 2.25 CONSOLE ROOM 6.27
5 RECEP. - 8 (180VA) 1280 EL+MCB 1 16 16 6.27 2.5 65.0 2.17 RACK ROOM 5.57 01 04
6 RECEP. - 9 (180VA) 1440 EL+MCB 1 16 16 7.06 2.5 55.0 2.06 CONSOLE ROOM 6.27
7 RECEP. - 2 (180VA) / HAND DRIER 1720 EL+MCB 1 20 20 8.43 2.5 60.0 2.69 GENTS TOILET/ URINAL 7.48 02 05
8 RECEP. - 6 (180VA) 960 EL+MCB 1 16 16 4.71 2.5 50.0 1.25 MANAGER'S ROOM 4.18
9 RECEP. - 7 (180VA) 1120 EL+MCB 1 16 16 5.49 2.5 30.0 0.88 CHIEF MANAGER 4.87 03 06
10 RECEP. - 7 (180VA) 1160 EL+MCB 1 16 16 5.69 2.5 45.0 1.36 CHIEF MANAGER (MAIN.)/ ROLLING UP DOOR 0
11 RECEP. - 7 (180VA) 1120 EL+MCB 1 16 16 5.49 2.5 50.0 1.46 OFFICE 4.87 07 10
12 RECEP. - 1 (180VA) / HAND DRIER 1560 EL+MCB 1 20 20 7.65 2.5 35.0 1.42 GENTS TOILET/ URINAL 6.79
13 RECEP. - 1 (180VA) / HAND DRIER 1560 EL+MCB 1 20 20 7.65 2.5 55.0 2.23 LADIES TOILET/ URINAL 0 08 11
15 ELECTRIC WATER HEATER 3000 EL+MCB 1 20 20 14.71 4.0 45.0 2.36 TOILET 13.05 09 12
16 ELECTRIC WATER HEATER 3000 EL+MCB 1 20 20 14.71 4.0 45.0 2.36 TOILET 0
17 ELECTRIC WATER HEATER 3000 EL+MCB 1 20 20 14.71 4.0 45.0 2.36 TOILET 0 13 16
18 ELECTRIC WATER HEATER 3000 EL+MCB 1 20 20 14.71 4.0 45.0 2.36 TOILET 13.05
0 (SPARE) 20 23 (SPARE)
(SPARE) 21 24 (SPARE)
E N.T
NOTE :
1. SENSITIVITY OF EL+MCB SHOULD BE 30 mA.
BOTTOM 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" MAIN HUB
SIZE
CKT NO. 1 2 3 4 5 6 7 8 9
0 BOTTOM 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
0
CKT NO. 10 11 12 13 14 15 16 17 18
SUB TOTAL [W] 20840 11480 12000 2"
SPARE LOAD PER PHASE [W] 1000 2000 2000 PANEL FEED FROM : BOTTOM 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
9 of 12
M
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
MAIN HUB
SIZE
2"
10 of 12
POWER
PANEL BOARD SCHEDULE PROJECT :
CLIENT :
PANEL NO. : SITE :
MAIN INCOMING CIRCUIT BRK(MCB) SERVICE VOLTAGE
CIRCUIT LOAD DESCRIPTION CIRCUIT WIRING DIAGRAM
CKT. TPN / 63AF / 32 AT 415/240 V, 50Hz, 3 PHASE, 4WIRE, 10KA
NO. LOAD [WATT] LOAD CENTRE
FRAME TRIP CURRENT CABLE SIZE VOLTAGE
NO. OF FIXTURES AND RECEPTACLES BREAKER POLE SERVICE AREA REMARK
L1 L2 L3 [A] [A] [A] [Sq.mm] DROP [%] 415V, 4C - 4 Sq.mm
[M]
1 FIRE ALARM SYSTEM 1000 EL+MCB 1 16 16 4.9 2.5 75 1.84 CONSOLE ROOM 0 L1 L2 L3 N
2 COMMUNICATION SYSTEM 1000 EL+MCB 1 16 16 4.9 2.5 75 1.84 CONSOLE ROOM 4.35
NOTE : 01
E N.T
11 of 12
AGRAM
MAIN HUB
SIZE
1"
12 of 12