TANK SCHEME
MONTHWISE WATER REQUIREMENT
S.No. NAME OF CROP PROPOSED IRRIGATION Water Requirement in Hact-mm
IN HECTARES JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

1 KHARIF:
4 4 6 4 18
Paddy 0 0 0 0 0
1 4 1 6
Soyabean 0 0 0 0
2 RABI:
6 6 6 6 24
HYV Wheat 75 11430 11430 11430 11430 45720
3 3 2 2 2 12
Ord. Wheat 565 43053 43053 28702 28702 28702 172212
3 3 6
Gram 184 14021 14021 28042
TOTAL 824 0 0 0 0 68504 68504 40132 40132 28702 245974
Transmission Losses@
35% 0 0 0 0 23976 23976 14046 14046 10046 86091

G.TOTAL (Hact-mm) 0 0 0 0 92480 92480 54178 54178 38748 332064


G.TOTAL (MCM)) 0.0000 0.0000 0.0000 0.0000 0.9248 0.9248 0.5418 0.5418 0.3875 3.3206

Maximum Requirement in any month= 0.9248 MCM Units------> MCM MCf


or 32.65 MCf Total Kharif Water Requirement 0.0000 0
Total Rabi Water Requirement 3.3206 117.22
Assuming canal runs 25 days in a month and 16 hours a day Total Water Requirement 3.3206 117.22
32.65 x1000000 i.e. = 22.67 cusecs
25 x16 x60 x60 or 0.64 cumecs

Canal Duty= Total irrigation in acres/ Total discharge required in cusecs


Canal Duty= 2035.28 i.e. = 89.78 Acres/ Cusec
22.67
or 0.78 Cumecs/ 1000 Hact

Sub-Engineer Sub-Divisional Officer Executive Engineer


WRD WR Division ………………………………