Site Situation: Defects, as of 18th October, 2018.

Section 1: Right Hand Side 2. Gagali retaining wall – poles not cut to
design level
1. Scouring on Ap40 due to lack of
stormwater management behind Gagali
Ret. Wall

3. Incomplete sump pits at Gagali Access


Rd
4. Incomplete stormwater manholes cast 6. Railing not completed at Timber Ret.
iron lid not haunched Wall 2

7. Poor existing road condition at the


junction of Gagali Rd due to poor road
5. Silt on basecourse at Gagali access road maintenance
due to the lack of sediment and erosion
control
8. Damaging of subgrade due to poor 9. Damage to road subgrade due to
stormwater management from CH: 270 ponding and trucks during in wet
to CH: 325 causing ponding condition. Tyre marks evident from CH:
380-410
10. Poor existing road condition in Section
1 due to lack of maintenance

11. Contaminated sub-base from CH: 730-


570, covered with silt
12. Rubbish all over construction area in Section 1: Left Hand Side
Section 1
1. Damaging of road sub-base LHS from
CH: 220 to CH: 265 – ponding due to
poor storm water control

13. No proper maintenance done to the 2. Poor existing road condition in Section
LDS ret. Wall 2 due to lack of maintenance
3. Poor maintenance of pedestrian
walkway and fence in Section 1
4. Contaminated sub-base covered with
silt from CH: 510-570, CH: 502-488 and
CH: 481-430

6. All stormwater manholes constructed in


Section 1 is incomplete. Cast iron lid is
not haunched.
Eg.

5. Lack of maintenance of temporary bus


bay at CH: 590-650
7. Settlement of water trench CH: 820 – Section 2: Right Hand Side
850
1. Damage to sub-base at CH: 1030

8. No erosion control on slope at CH: 990,


close to the existing highway
2. Ponding at bus bay at CH: 1080 4. Contaminted basecourse due to
lack of stormwater control and silt
movement CH: 1220-1390

3. Ponding on stabilized area at CH:


1170
6. Manhole lid not installed at CH:
1550

5. EFL pole abandoned along median


at CH: 1501
7. Lack of stormwater control
resulting in continuous water flow
on subgrade
Section 3: Right Hand Side

1. Lack of protection to subgrade and sub-


base RHS at CH 1685 – to FNU access
road

2.

Section 2: Left Hand Side

1. Settlement of water main


trench CH: 1600
3. Lack of control on vegetation RHS 5. Erosion on batter from CH: 2245 due to
CH1680-CH 1900. lack of sediment and erosion control

4. Damaged subgrade at RHS CH 1600


Section 3: Left Hand Side 3. Ret. Wall infront of M.O.A – poles not
cut to design level
1. Stormwater manhole is incomplete
(Cast Iron lid) and not haunched at CH:
1680

4. Erosion of Slope infront of M.O.A CH:


2070 -2120. Lack of erosion and
sediment control

2. Pot holes at busbay opposite mosque


due to lack of maintenance
5. AC pipe not removed and have not
disposed. Lack fo safety control 7. Back of ker b not haunched with
concrete (towards median) from CH:
2245

6. Kerb alignment not acceptable towards


footpath from CH: 2245-2270
8. Erosion on batter from CH: 2245 due to
lack of sediment and erosion control
9. Contaminated sub-base from CH: 2393-
2400

Section 4: Right Hand Side

1. Contaminated sub-base/weed and 2. Contaminated sub-base from CH:


silt on sub-base from CH: 2570 2793 (opposite Metromix)
4. Settlement of stormwater trench at
CH: 3530

3. EFL pole not disposed at Bus bay


(Opposite Koronivia feeder rd) and
at CH: 2727
5. Stormwater manhole with no lid at 7. Poding on channel at CH: 2480 –
CH: 3527 3410

6. Erosion on slope at CH: 3490 8. Ponding on stabilized surface at CH:


3250
9. Ponding on bus-bay dish channel at
CH: 3400

10. Washing awayof metal under kerb


base from CH: 3280 – 3040
11. Poor alignment of footpath prior to
bus bay at CH: 3400