VALORIZACION- ARQUITECTURA ( FACTURA)

OBRA : RESIDENCIAL "CONQUISTADORES"


SUPERVISOR : ING. NANCY MARIUSKA ZAMALLOA PUMA
RESIDENTE : ING. CRISTOPRHER CANÑ ARIA
CONTRATISTAS : RUBEN MAMANI BANÑ OS
FECHA : 12/16/2017

METRADO METRADO
DESCRIPCCION UND FECHA PLANOS COSTO TOTAL OBRA M2 C.U.

ASENTADO DE MUROS M2 12/16/2017 3,152.25 S/. 40,979.25 1,619.92 S/. 13.00


MESAS VACIADAS M2 12/16/2017 0.00 S/. - 8.00 S/. 200.00
COLUMNETAS UND 12/16/2017 0.00 S/. - 48.00 S/. 30.00
VIGUETAS ML 12/16/2017 0.00 S/. - 0.00 S/. 10.00
TARRAJEO MUROS M2 12/16/2017 825.00 S/. 10,725.00 1,769.98 S/. 13.00
DERRAMES ML 12/16/2017 294.73 S/. 2,357.84 1,017.34 S/. 8.00
TARRAJEO EN ESCALERAS FONDO M2 12/16/2017 0.00 S/. - 41.35 S/. 15.00
TARRAJEO EN POZOS MUROS M2 12/16/2017 0.00 S/. - 0.00 S/. 20.00
DERRAMES ML 12/16/2017 0.00 S/. - 0.00 S/. 8.00
TARRAJEO EN TANQUE CISTTECHO M2 12/16/2017 0.00 S/. - 0.00 S/. 15.00
MUROS ML 12/16/2017 0.00 S/. - 0.00 S/. 13.00
TARRAJEO EN FACHADA M2 12/16/2017 0.00 S/. - 0.00 S/. 28.76
FORJADO GRUESO MUROS M2 12/16/2017 0.00 S/. - 0.00 S/. 8.00
ESTUCADO CIELORRASOS M2 12/16/2017 0.00 S/. - 198.97 S/. 12.00
FALSO PÍSO PISOS M2 12/16/2017 0.00 S/. - 0.00 S/. 25.00
SOBRECIMIENTOS ML 12/16/2017 0.00 S/. - 29.74 S/. 18.00
RELLENO Y COMPACTACION1ER NIVEL M2 12/16/2017 0.00 S/. - 0.00 S/. 12.00

S/. 54,062.09
COSTO TOTAL DE AVANCE DE PARTIDA DE ARQUIT
ADELANTO ANTERIOR
ADELANTO ASGINADO A LA FECHA
ADELANTO TOTAL HASTA LA FECHA

-------------------------------------------------
ING. MAYKOL A. GOMEZ PADILLA
GERENTE GENERAL ------
ING. NA

-------------------------------------------------
RUBEN MAMANI BAÑOS ING
CONTRATISTA
DNI: 432191897
ON- ARQUITECTURA ( FACTURA)

UMA

DNI: 432191897

C.T. TOTAL

S/. 21,058.96
S/. 1,600.00
S/. 1,440.00
S/. 0.00
S/. 23,009.77
S/. 8,138.74
S/. 620.19
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 2,387.63
S/. 0.00
S/. 535.23
S/. 0.00

S/. 58,790.52
COSTO TOTAL DE AVANCE DE PARTIDA DE ARQUITECTURA S/. 58,790.52
12/30/1899 S/. 24,850.00
12/16/2017 S/. 0.00
12/16/2017 S/. 24,850.00
SALDO S/. 33,940.52

-------------------------------------------------
ING. NANCY MARIUSKA ZAMALLOA PUMA
SUPERVISOR

-------------------------------------------------
ING. AMADOR VILLAVICENCIO VILLAVICENCIO
RESIDENTE DE OBRA
PERSONAL ENCARGADO RUBEN MAMANI BAÑOS
PATIDA : ACABADOS

ADELANTO COSTO FECHA OBSERVICIOS


ADELANTO 1 S/. 2,500.00 11/18/2017
ADELANTO 2 S/. 5,000.00 11/25/2017
ADELANTO 3 S/. 5,000.00 12/2/2017
ADELANTO 4 S/. 6,550.00 12/9/2017
ADELANTO 5 S/. 5,800.00 12/16/2017
ADELANTO 6
ADELANTO 7
ADELANTO 8
ADELANTO 9
ADELANTO 10
ADELANTO 11
ADELANTO 12
ADELANTO 13
ADELANTO 14
ADELANTO 15
ADELANTO 16
ADELANTO 17
ADELANTO 18
ADELANTO 19
ADELANTO 20
ADELANTO 21
ADELANTO 22

TOTAL DE ADELANTOS S/. 24,850.00 12/16/2017


ASENTADO DE MUROS
% DE METRADO
UBICACIOÓ N DESCRIPCION FECHA
AVANCE PLANOS

R. TORRE DEL ANGEL ASENTADO DE MUROS


PRIMER NIVEL 0.00
ASENTADO DE MUROS 0%
ASENTADO DE MUROS 0%
ASENTADO DE MUROS 0%
ASENTADO DE MUROS 0%
ASENTADO DE MUROS 0%
ASENTADO DE MUROS 0%

SEGUNDA NIVEL 616.09


ASENTADO DE MUROS 100% 12/2/2017
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%

TERCERA NIVEL 521.15


ASENTADO DE MUROS 100% 12/9/2017
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%
ASENTADO DE MUROS 100%

CUARTO NIVEL 516.31


ASENTADO DE MUROS 100% 12/16/2017
ASENTADO DE MUROS 100%

QUINTO NIVEL 466.50


ASENTADO DE MUROS 100%
ASENTADO DE MUROS 0%

SEXTO NIVEL 515.89


ASENTADO DE MUROS 100%
ASENTADO DE MUROS 0%

SEPTIMO NIVEL 516.31


ASENTADO DE MUROS 100%
ASENTADO DE MUROS 0%

LAVANDERIAS 0.00
ASENTADO DE MUROS 0%
ASENTADO DE MUROS 0%

3,152.25

ADE
DO DE MUROS
METRADO C.U./M2 C.T. SALDO TOTAL
OBRA M2

S/. 13.00 S/. -


0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. -
S/. 13.00 S/. 8,009.17
503.87 S/. 13.00 S/. 6,550.31
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
503.87 S/. 6,550.31
S/. 13.00 S/. 6,774.95
454.54 S/. 13.00 S/. 5,909.02
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
454.54 5909.02
S/. 13.00 S/. 6,712.03
437.21 S/. 13.00 S/. 5,683.73
0.00 S/. 13.00 S/. -
437.21 5683.73
S/. 13.00 S/. 6,064.50
224.30 S/. 13.00 S/. 2,915.90
S/. 13.00 S/. -
224.30 2915.90
S/. 13.00 S/. 6,706.57
0.00 S/. 13.00 S/. -
S/. 13.00 S/. -
0.00 0.00
S/. 13.00 S/. 6,712.03
0.00 S/. 13.00 S/. -
S/. 13.00 S/. -
0.00 0.00
S/. 13.00 S/. -
0.00 S/. 13.00 S/. -
S/. 13.00 S/. -
0.00 0.00
1,619.92 S/. 21,058.96 S/. 40,979.25

METRADO ACUMULADO 1619.92


COSTO TOTAL DE METRADO AVANZADO S/. 21,058.96
ADELANTO ACUMULADO ANTERIOR: 3/18/2017 S/. 4,000.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 1,000.00
ADELANTO TOTAL 12/16/2017 S/. 5,000.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. 16,058.96
COLUMNETAS
METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE FECHA PLANOS

R. CONQUISTADORES COLUMNETAS
PRIMERA NIVEL 0.00
MESAS 0%

SEGUNDO NIVEL 0.00


MESAS 100%

TERCER NIVEL 0.00


MESAS 100%

CUARTO NIVEL 0.00


MESAS 100%

QUINTO NIVEL 0.00


MESAS 0%

SEXTO NIVEL 0.00


MESAS 0%

SEPTIMO NIVEL 0.00


MESAS 0%

OTROS 0.00
MESAS 0%

0.00

ADEL
MNETAS
METRADO C.U./UND C.T. SALDO TOTAL
OBRA M2

S/. 200.00 S/. -


0.00 S/. 200.00 S/. - S/. -

S/. 200.00 S/. -


3.00 S/. 200.00 S/. 600.00 S/. -600.00

S/. 200.00 S/. -


5.00 S/. 200.00 S/. 1,000.00 S/. -1,000.00

S/. 200.00 S/. -


0.00 S/. 200.00 S/. - S/. -

S/. 200.00 S/. -


0.00 S/. 200.00 S/. - S/. -

S/. 200.00 S/. -


0.00 S/. 200.00 S/. - S/. -

S/. 200.00 S/. -


0.00 S/. 200.00 S/. - S/. -

S/. 200.00 S/. -


S/. 200.00 S/. - S/. -

8.00 S/. 1,600.00 S/. -1,600.00 S/. -

METRADO ACUMULADO 8.00


COSTO TOTAL DE METRADO AVANZADO S/. 1,600.00
ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 700.00
ADELANTO TOTAL 12/16/2017 S/. 700.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. 900.00
COLUMNETAS
METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE FECHA PLANOS

R. CONQUISTADORES COLUMNETAS
PRIMERA LOSA 0.00
COLUMNETAS 0%

SEGUNDA LOSA 0.00


COLUMNETAS 100%

TERCERA LOSA 0.00


COLUMNETAS 100%

CUARTA LOSA 0.00


COLUMNETAS 100%

QUINTA LOSA 0.00


COLUMNETAS 0%

SEXTA LOSA 0.00


COLUMNETAS 0%

SEPTIMA LOSA 0.00


COLUMNETAS 0%

OTROS 0.00
COLUMNETAS 0%

0.00

ADEL
MNETAS
METRADO C.U./UND C.T. SALDO TOTAL
OBRA M2

S/. 30.00 S/. -


0.00 S/. 30.00 S/. - S/. -

S/. 30.00 S/. -


20.00 S/. 30.00 S/. 600.00 S/. -600.00

S/. 30.00 S/. -


18.00 S/. 30.00 S/. 540.00 S/. -540.00

S/. 30.00 S/. -


10.00 S/. 30.00 S/. 300.00 S/. -300.00

S/. 30.00 S/. -


0.00 S/. 30.00 S/. - S/. -

S/. 30.00 S/. -


0.00 S/. 30.00 S/. - S/. -

S/. 30.00 S/. -


0.00 S/. 30.00 S/. - S/. -

S/. 30.00 S/. -


0.00 S/. 30.00 S/. - S/. -

48.00 S/. 1,440.00 S/. -1,440.00 S/. -

METRADO ACUMULADO 48.00


COSTO TOTAL DE METRADO AVANZADO S/. 1,440.00
ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 700.00
ADELANTO TOTAL 12/16/2017 S/. 700.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. 740.00
COLUMNETAS
METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE FECHA PLANOS

R. CONQUISTADORES VIGUETAS
PRIMERA LOSA 0.00
VIGUETAS 0%

SEGUNDA LOSA 0.00


VIGUETAS 100%

TERCERA LOSA 0.00


VIGUETAS 100%

CUARTA LOSA 0.00


VIGUETAS 100%

QUINTA LOSA 0.00


VIGUETAS 0%

SEXTA LOSA 0.00


VIGUETAS 0%

SEPTIMA LOSA 0.00


VIGUETAS 0%

OTROS 0.00
VIGUETAS 0%

0.00

ADEL
MNETAS
METRADO C.U./UND C.T. SALDO TOTAL
OBRA M2

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 15.00 S/. - S/. -

S/. 15.00 S/. -


0.00 S/. 10.00 S/. - S/. -

0.00 S/. - S/. - S/. -

METRADO ACUMULADO 0.00


COSTO TOTAL DE METRADO AVANZADO S/. 0.00
ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 700.00
ADELANTO TOTAL 12/16/2017 S/. 700.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. -700.00
VALORIZACION- ARQUITECTURA ( F
OBRA : RESIDENCIAL "CONQUISTADORES"
SUPERVISOR : ING. NANCY MARIUSKA ZAMALLOA PUMA
RESIDENTE : ING. AMADOR VILLAVICENCIO VILLAVICENCIO
CONTRATISTAS : RUBEN MAMANI DNI: 432191897
FECHA : BANÑ OS
12/16/2017
TARRAJEO DE MUROS
METRADO METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE PLANOS M2 PLANOS ML OBRA M2

R. CONQUISTADORES TARRAJEO DE MUROS


TARRAJEO DE MUROS
PRIMERA LOSA M2 0.00 0.00
ML 0.00
SEGUNDA LOSA M2 95% 825.00 1,240.17
ML 294.73
TERCERA LOSA M2 95% 0.00 428.12
ML 0.00
CUARTA LOSA M2 55% 0.00 95.05
ML 0.00
QUINTA LOSA M2 0.00 0.00
ML 0.00
SEXTA LOSA M2 0.00 0.00
ML 0.00
SEPTIMA LOSA M2 0.00 0.00
ML 0.00
TARRAJEOS EN MESADAS M2 0.00 0.00
ML 0.00
TARRAJEO PLACA ESCAL M2 0.00 6.65
0.00
825.00 294.73 1,769.98

-------------------------------------------------
ING. MAYKOL A. GOMEZ PADILLA ---------------------------------
GERENTE GENERAL ING. NANCY MARIUSKA ZAM
SUPERVISOR

-----------------------------------------------
--
RUBEN MAMANI BAÑOS
CONTRATISTA
DNI: 432191897
TURA ( FACTURA)

ROS
METRADO C.U.M2 C.U.ML COSTO TOTAL
OBRA ML

S/. 13.00 S/ - S/. -


0.00 S/. 8.00 S/ -
S/. 13.00 S/ 16,122.21 S/. 13,082.84
630.39 S/. 8.00 S/ 5,043.14
S/. 13.00 S/ 5,565.50 S/. -
323.26 S/. 8.00 S/ 2,586.08
S/. 13.00 S/ 1,235.61 S/. -
63.69 S/. 8.00 S/ 509.52
S/. 13.00 S/ - S/. -
0.00 S/. 8.00 S/ -
S/. 13.00 S/ - S/. -
0.00 S/. 8.00 S/ -
S/. 13.00 S/ - S/. -
0.00 S/. 8.00 S/ -
S/. 13.00 S/ - S/. -
0.00 S/. 8.00 S/ -
S/. 13.00 S/ 86.45 S/. -
0.00 S/. 8.00 S/ -
1,017.34 S/. 31,148.51 S/. 13,082.84

COSTO TOTAL DE METRADO AVANZADO S/. 31,148.51


ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 2,000.00
ADELANTO TOTAL 12/16/2017 S/. 2,000.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. 29,148.51

--------------------------------- -------------------------------------------------
ARIUSKA ZAMALLOA PUMA ING. AMADOR VILLAVICENCIO
SUPERVISOR VILLAVICENCIO
RESIDENTE DE OBRA
VALORIZACION- ARQUITECTURA ( F
OBRA : RESIDENCIAL "CONQUISTADORES"
SUPERVISOR : ING. NANCY MARIUSKA ZAMALLOA PUMA
RESIDENTE : ING. AMADOR VILLAVICENCIO VILLAVICENCIO
CONTRATISTAS : RUBEN MAMANI DNI: 432191897
FECHA : BANÑ OS
12/16/2017
TARRAJEO DE MUROS
METRADO METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE PLANOS M2 PLANOS ML OBRA M2

R. CONQUISTADORES TARRAJEO DE TANQUE


TARRAJEO DE MUROS
TANQUE M2 0.00 0.00
0.00 0.00 0.00

-------------------------------------------------
ING. MAYKOL A. GOMEZ PADILLA ----------------------------------
GERENTE GENERAL ING. NANCY MARIUSKA ZAM
SUPERVISOR

-----------------------------------------------
--
RUBEN MAMANI BAÑOS
CONTRATISTA
DNI: 432191897
TURA ( FACTURA)

ROS
METRADO C.U.M2 C.U.ML COSTO TOTAL
OBRA ML

S/. 13.00 0.00 S/. -


S/. - S/. -

COSTO TOTAL DE METRADO AVANZADO S/. -


ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 2,000.00
ADELANTO TOTAL 12/16/2017 S/. 2,000.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. -2,000.00

--------------------------------- -------------------------------------------------
ARIUSKA ZAMALLOA PUMA ING. AMADOR VILLAVICENCIO
SUPERVISOR VILLAVICENCIO
RESIDENTE DE OBRA
VALORIZACION- ARQUITECTURA ( F
OBRA : RESIDENCIAL "CONQUISTADORES"
SUPERVISOR : ING. NANCY MARIUSKA ZAMALLOA PUMA
RESIDENTE : ING. AMADOR VILLAVICENCIO VILLAVICENCIO
CONTRATISTAS : RUBEN MAMANI DNI: 432191897
FECHA : BANÑ OS
12/16/2017
TARRAJEO DE MUROS
METRADO METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE PLANOS M2 PLANOS ML OBRA M2

R. CONQUISTADORES TARRAJEO DE TANQUE


TARRAJEO DE MUROS
TANQUE M2 0.00 0.00
0.00 0.00 0.00

-------------------------------------------------
ING. MAYKOL A. GOMEZ PADILLA ----------------------------------
GERENTE GENERAL ING. NANCY MARIUSKA ZAM
SUPERVISOR

-----------------------------------------------
--
RUBEN MAMANI BAÑOS
CONTRATISTA
DNI: 432191897
TURA ( FACTURA)

ROS
METRADO C.U.M2 C.U.ML COSTO TOTAL
OBRA ML

S/. 15.00 0.00 S/. -


S/. - S/. -

COSTO TOTAL DE METRADO AVANZADO S/. -


ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 2,000.00
ADELANTO TOTAL 12/16/2017 S/. 2,000.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. -2,000.00

--------------------------------- -------------------------------------------------
ARIUSKA ZAMALLOA PUMA ING. AMADOR VILLAVICENCIO
SUPERVISOR VILLAVICENCIO
RESIDENTE DE OBRA
VALORIZACION- ARQUITECTURA ( F
OBRA : RESIDENCIAL "CONQUISTADORES"
SUPERVISOR : ING. NANCY MARIUSKA ZAMALLOA PUMA
RESIDENTE : ING. AMADOR VILLAVICENCIO VILLAVICENCIO
CONTRATISTAS : RUBEN MAMANI DNI: 432191897
FECHA : BANÑ OS
12/16/2017
TARRAJEO DE MUROS
METRADO METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE PLANOS M2 PLANOS ML OBRA M2

R. CONQUISTADORES TARRAJEO DE MUROS


TARRAJEO DE MUROS 2.81
ESCALERAS M2 0.00 41.35
0.00 0.00 41.35

-------------------------------------------------
ING. MAYKOL A. GOMEZ PADILLA ----------------------------------
GERENTE GENERAL ING. NANCY MARIUSKA ZAM
SUPERVISOR

-----------------------------------------------
--
RUBEN MAMANI BAÑOS
CONTRATISTA
DNI: 432191897
TURA ( FACTURA)

ROS
METRADO C.U.M2 C.U.ML COSTO TOTAL
OBRA ML

S/. 15.00 620.19 S/. -


S/. 620.19 S/. -

COSTO TOTAL DE METRADO AVANZADO S/. 620.19


ADELANTO ACUMULADO ANTERIOR: 4/1/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 2,000.00
ADELANTO TOTAL 12/16/2017 S/. 2,000.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. -1,379.81

--------------------------------- -------------------------------------------------
ARIUSKA ZAMALLOA PUMA ING. AMADOR VILLAVICENCIO
SUPERVISOR VILLAVICENCIO
RESIDENTE DE OBRA
TARRAJEO DE MUROS
METRADO METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE PLANOS M2 PLANOS ML OBRA M2

R. CONQUISTADORES TARRAJEO DE MUROS


TARRAJEO DE MUROS
|PRIMER NIVEL M2 0.00 0.00
ML 0.00
SEGUNDO NIVEL M2 95% 0.00 0.00
ML 0.00
TERCER NIVEL M2 95% 0.00 0.00
ML 0.00
CUARTA LOSA M2 55% 0.00 0.00
ML 0.00
QUINTA LOSA M2 0.00 0.00
ML 0.00
SEXTA LOSA M2 0.00 0.00
ML 0.00
SEPTIMA LOSA M2 0.00 0.00
ML 0.00
0.00 0.00 0.00
ROS
METRADO C.U.M2 C.U.ML COSTO TOTAL
OBRA ML

S/. 20.00 0.00 S/. -


0.00 S/. 8.00 0.00
S/. 20.00 0.00 S/. -
0.00 S/. 8.00 0.00
S/. 20.00 0.00 S/. -
0.00 S/. 8.00 0.00
S/. 20.00 0.00 S/. -
0.00 S/. 8.00 0.00
S/. 20.00 0.00 S/. -
0.00 S/. 8.00 0.00
S/. 20.00 0.00 S/. -
0.00 S/. 8.00 0.00
S/. 20.00 0.00 S/. -
0.00 S/. 8.00 0.00
0.00 S/. - S/. -

COSTO TOTAL DE METRADO AVANZADO S/. -


ADELANTO ACUMULADO ANTERIOR: 12/30/1899 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 0.00
ADELANTO TOTAL 12/16/2017 S/. 0.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. 0.00
TARRAJEO DE MUROS
METRADO METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE PLANOS M2 PLANOS ML OBRA M2

R. CONQUISTADORES TARRAJEO DE MUROS


TARRAJEO DE MUROS
METRADO DE FACHADA M2 0.00 0.00
0.00 0.00 0.00

C
ADELANTO AC
ADELA

SALDO T
C.U.M2 C.U.ML COSTO TOTAL

S/. 28.76 0.00 S/. -


S/. - S/. -

COSTO TOTAL DE METRADO AVANZADO S/. -


DELANTO ACUMULADO ANTERIOR: 12/30/1899 S/. 0.00
ADELANTO ASIGNADO FECHA: 12/16/2017 S/. 0.00
ADELANTO TOTAL 12/16/2017 S/. 0.00
SALDO TOTAL HASTA LA FECHA 12/16/2017 S/. 0.00
FORJADO GRUESO DE MUROS
METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE C.U.M2
PLANOS M2 OBRA M2

R. CONQUISTADORES TARRAJEO DE MUROS


TARRAJEO DE MUROS
PRIMER NIVEL M2 95% 0.00 0.00 S/. 8.00
SEGUNDO NIVEL M2 95% 0.00 0.00 S/. 8.00
SEPTIMO NIVEL M2 95% 0.00 0.00 S/. 8.00
0.00 0.00

COSTO TOTAL DE METRADO AV


ADELANTO ACUMULADO ANTERIOR:
ADELANTO ASIGNADO FECHA:
ADELANTO TOTAL
SALDO TOTAL HASTA LA FECHA
COSTO TOTAL

0.00 S/. -
0.00 S/. -
0.00 S/. -
S/. - S/. -

METRADO AVANZADO S/. -


12/30/1899 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00
ESTUCADO DE CIELORAZOS
METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE C.U.M2
PLANOS M2 OBRA M2

R. CONQUISTADORES TARRAJEO DE MUROS


TARRAJEO DE MUROS
PRIMERA LOSA M2 95% 0.00 0.00 S/. 12.00
SEGUNDA LOSA M2 95% 0.00 198.97 S/. 12.00
TERCERA LOSA M2 95% 0.00 0.00 S/. 12.00
CUARTA LOSA M2 95% 0.00 0.00 S/. 12.00
QUINTA LOSA M2 95% 0.00 0.00 S/. 12.00
SEXTA LOSA M2 95% 0.00 0.00 S/. 12.00
0.00 198.97

COSTO TOTAL DE METRADO AV


ADELANTO ACUMULADO ANTERIOR:
ADELANTO ASIGNADO FECHA:
ADELANTO TOTAL
SALDO TOTAL HASTA LA FECHA
COSTO TOTAL

0.00 S/. -
2387.63 S/. -
0.00 S/. -
0.00 S/. -
0.00 S/. -
0.00 S/. -
S/. 2,387.63 S/. -

METRADO AVANZADO S/. 2,387.63


12/30/1899 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 2,387.63
VACIADO DE FALSO PISO
METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE C.U.M2
PLANOS M2 OBRA M2

R. CONQUISTADORES FALSO PISO


FALSO PISO
PRIMER NIVEL M2 100% 0.00 0.00 S/. 25.00
VEREDA M2 100% 0.00 0.00 S/. 25.00
0.00 0.00

COSTO TOTAL DE METRADO AV


ADELANTO ACUMULADO ANTERIOR:
ADELANTO ASIGNADO FECHA:
ADELANTO TOTAL
SALDO TOTAL HASTA LA FECHA
COSTO TOTAL

0.00 S/. -
0.00 S/. -
S/. - S/. -

METRADO AVANZADO S/. -


12/30/1899 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00
SOBRECIMIENTOS
UBICACIOÓ N DESCRIPCION % DE AVANCE FECHA METRADO
PLANOS

R. CONQUISTADORES SOBRECIMEINTOS
PRIMERA LOSA 0.00
SOBRECIMIENTOS 100% 3/28/2017
SOBRECIMIENTOS
SOBRECIMIENTOS
0.00

ADELA

S
ENTOS
METRADO C.U./ML C.T. SALDO TOTAL
OBRA ML

S/. 18.00 S/. -


29.74 S/. 18.00 S/. 535.23
S/. 18.00 S/. -
S/. 18.00 S/. -
29.74 S/. 535.23

METRADO ACUMULADO 29.74


COSTO TOTAL DE METRADO AVANZADO S/. 535.23
ADELANTO ACUMULADO ANTERIOR: 3/28/2017 S/. 0.00
ADELANTO ASIGNADO FECHA: 4/1/2017 S/. 0.00
ADELANTO TOTAL 4/1/2017 S/. 0.00
SALDO TOTAL HASTA LA FECHA 4/1/2017 S/. 535.23
RELLENO Y COMPACTACION
METRADO METRADO
UBICACIOÓ N DESCRIPCION % DE AVANCE C.U.M2
PLANOS M2 OBRA M2

R. CONQUISTADORES RELLENO Y COMPACTACION


RELLENO Y COMPACTACION
PRIMERA LOSA M2 95% 0.00 0.00 S/. 12.00
133.00 0.00

COSTO TOTAL DE METRADO AV


ADELANTO ACUMULADO ANTERIOR:
ADELANTO ASIGNADO FECHA:
ADELANTO TOTAL
SALDO TOTAL HASTA LA FECHA
COSTO TOTAL

0.00 S/. -
S/. - S/. -

METRADO AVANZADO S/. -


12/30/1899 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00
12/16/2017 S/. 0.00