Vous êtes sur la page 1sur 2

Checklists

DC 9/80 DEC 18 Rev 1


COLD WEATHER OPERATION CHECKLIST
COCKPIT CREW CHECK DE –ANTI-ICING PROCEDURE
De/Anti-Icing Treatment……………AS RQD 1/2 AIR COND SUPPLY Sw(s)………………OFF 1
Oxy Cylinder…………………….CKD OPEN 2 CABIN PRESS Lever…...…MAN/FULL FWD 2
Gear Pins………………………...4 STOWED 1 Airplane Configur ation………...……...UP/RET 2
AHRS Alignment…………….….VERIFIED 1/2 Thrust Levers (If Rqd)…………...…….....IDLE 1
FMS………………….….…...….X-CKD/SET PF/PNF
Parking Brake……………………...…...….SET 1
RVSM Equipment…………..…….VERIFIED 1/2 APU Air Sw…………………..…...…...….OFF 1
Emergency Lts…………………...….ARMED 1
PROCEED WITH SPRAYING
Cabin Signs…………………..……..…….ON 1 Report of Treatment…………….…...OBTAIN 1
Pitot & Static Heaters…………….ON(CAPT) 1 CABIN PRESS Lever……………...…..AUTO 2
WINDSHIELD ANTI-ICE Sw……..…….ON 1 AIR COND SUPPLY Sw(s)…………...AUTO 1
Stall Warning…………………..…...TESTED 2 Flight Cont &Trims …...CKD FULL TRAVEL 1/2
AIR COND SHUTOFF Sw…………...AUTO 1 IF DE/ANTI-ICE TREATMENT IS APPLIED AT
Fire Protection Sys……………..…...TESTED 2 REMOTE FACILITY:
Fuel Quantity………………......…...___ KGS 1/2 Flaps/Slats……...FULL DOWN/SET FOR T.O 2
Altimeters…………………...___/___/X-CKD 1/2 De/Anti-Ice Proc. Checklist Completed
Takeoff Warning…………….….…TESTED 2
FUEL Shutoff Levers……..……………..OFF 1
CABIN PRESS Lever……………...….AUTO 1 TAXIING
Takeoff Data (SSW)…………....COMPUTED 2 Static run-up……………………..…AS RQD 1
Cockpit Crew Checklist Completed APU……..ON/L&R BUS Sws ON (ssw only) 1
If De-Anti-icing Procedure shall be made APU AIR Sw…………………………….OFF 2
at parking gate, refer to De/Anti-Icing TRP/ART……………………...……AS RQD 1/2
Procedure Checklist V Bugs……………………...___/___/___/___ 1/2
Flt Instruments/FGS………………….…CKD 1/2
FMS………………………….……….…CKD PF/PNF
FLAP/SLAT Lever……………...….___/EXT 1/2
T.O. Briefing……………….…COMPLETED PF/PNF
Fuel Heat System………………...….AS RQD 1
Cabin Report………………….…OBTAINED 1
Taxiing Checklist Completed

BEFORE TAKEOFF
BEFORE START T.O. Runway RUNW AY_/ENTRY POINT_ 1/2
EFB/PED……...……………..FLIGHT MODE 1/2 Pretakeoff Check……………..PERFORMED 1
Parking Brake……………………………..SET 1 T.O. Data ……………………..CONFIRMED 1/2
Pneumatic Pressure……………………___ PSI 1 Fuel Balance………………………..…...CKD 1/2
ENG IGN Sel………………..SYS A or SYS B 2 FLAP/SLAT Lever………….….….___°/EXT 1/2
Left/Right/ Fuel Tank Pumps……...……....ON 1 Brake Temperatures……………………..CKD 2
If LMT WING FUEL is performed: Flight Controls &
Center Fuel Pumps ………………….……...ON 1 Trims ………...….CKD FREE MOVEMENT 1/2
Anti Collision Lts………………...………...ON 2 Ail, Rud & Stab Trim.…...ZERO/ZERO/CKD 2
AIR COND SUPPLY Sws………………..OFF 2 ENG IGN……...…..BOTH (OVRD ssw only) 1
Thrust Levers…………………………....IDLE 2 AIR COND SUPPLY Sws………….AS RQD 1
Door Cue Light ………………...…CKD OFF 1/2 EOAP…………………………….…….CKD 1/2
Before Start Checklist Completed Static run-up………………….…..PERFORM PF
Before Takeoff Checklist Completed

AFTER START AFTER TAKEOFF


ENG IGN Sel………………………..….OFF 2 Brake Temperatures……………………..CKD PNF
ENG Anti-Ice Sws………………….……ON 1 Landing Gear……………..……UP/LTS OUT PNF
AIR FOIL Anti-Ice Sw(s)………….AS RQD 1 AIR COND SUPPLY Sws…………….AUTO PNF
AIR COND SUPPLY Sws………..….AUTO 2 FLAP/SLAT Lever…………………..UP/RET PNF
Hyd Sys……………………...…CKD & SET 2 FLAP T.O.SEL…….………………STOWED PNF
APU…………………………...…AS RQD 1 ENG IGN Sel……………………..…AS RQD PNF
IF DE/ANTI-ICE TREATMENT IS APPLIED AT
PARKING GATE:
APU…….. OFF/ L/R BUS Sws OFF(ssw only) PNF
Flaps/Slats….FULL DOWN/SET FOR T.O 2 Center Fuel Tank Pumps……………AS RQD 1
AIR COND SHUTOFF Sw…………...OVRD PNF
After Start Checklist Complete
Altimeters……………………1013/1013/1013 1/2
After Takeoff Checklist Completed
Checklists
DC 9/80 DEC 18 Rev 1
COLD WEATHER OPERATION CHECKLIST

DESCENT AFTER LANDING


Landing Data (SSW)………....COMPUTED 2 FLAP/SLAT Lever………………......15/EXT
MSA…………………………………..CKD PF/PNF SPEEDBRAKE Lever…………………...RET
APPR & LND Briefing…..…PERFORMED PF/PNF ENG IGN Sel…………………………….OFF
MDF …………………...…______/X-CKD PF/PNF Pitot & Static Heaters……………………OFF
Landing Data……………..…CONFIRMED 1/2 AIR FOIL Anti-Ice Sw(s)………...……...OFF
VBugs…….……………………………SET PF/PNF WINDSHIELD ANTI-FOG Sw…………OFF
Radio Altimeters…………………....….SET PF/PNF WINDSHIELD ANTI-ICE Sw…......AS RQD
Hyd Sys……………………….SET & CKD 2 APU (If Rqd)………………………..ON BUS
Pressurization……………………CKD/SET PNF Radar……………………………………..OFF
AIRFOIL & ENG Anti-Ice Sws…..AS RQD PNF ENG Run-Up…………………….….AS RQD
Descent Checklist Completed After Landing Checklist Completed

APPROACH PARKING
Cabin Signs……………………..……..….ON PNF Flaps/Slats………………...………...AS RQD 2
Fuel Sys……………………………...…..SET PNF FUEL TANK PUMP Sws…………..AS RQD 2
APU…....ON/ L/&R BUS Sws ON (ssw only) PNF ENG Anti-Ice Sws…………………….....OFF 1
Altimeters……………...___/___/___/X-CKD 1/2 Aux & Trans Hyd Pumps………………..OFF 2
Fuel Heat System…………………....AS RQD 1 Parking Brake (Chocks must be
Approach Checklist Completed In Place)…………………………RELEASED 1
Parking Checklist Completed

FINAL LEAVING THE AIRPLANE


NAV/RAD Sw (If Rqd)…………………RAD PF
Land Gear/Lts………….....DOWN/3 GREEN 1/2 Emergency Lts……………………...……OFF 2
AIR COND SHUTOFF Sw………...…AUTO PNF APU…………………………………AS RQD 2
FLAP/SLAT Lever……………...….___/EXT PNF BATT Sw……………………...……AS RQD 2
SPEEDBRAKE Lever………………….ARM PNF Leaving The Airplane Checklist Completed
ENG IGN Sel……...BOTH (OVRD ssw only) 1
EOAP……………………………………CKD PNF
Final Checklist Completed

Vous aimerez peut-être aussi