RESERVOIR – EXPLORATION & EXPLOITATION

PERTAMINA GEOTHERMAL ENERGY


Outline

• Introduction
• Well Stimulation
– Initiating Discharge
– Permeability Enhancement
Introduction

• What is Well Stimulation?


Well stimulation is a well intervention performed on an oil or gas well
to increase production by improving the flow of hydrocarbons from
the drainage area into the well bore. (Wikipedia)

• What if Well cannot be discharged?


Wellbore condition (P&T) stimulated so that well can be discharged
Initiating Discharge

Well discharge simulated using AF/AC


method (Sta. Ana, 1985)
• Af/AC < 0.70  little chance
• Af/Ac > 0.85  Excellent chance of
successful discharge
• Af/Ac = 0.70 – 0.85  Uncertain
chances
Initiating Discharge

• What if Well cannot be discharged?


Wellbore condition (P&T) stimulated so that
well can be discharged
• Stimulation Method
• Air Compression
• Well to well stimulation
• Huff and Puff
Initiating Discharge

• Air Compression
Pipa Lip

Top Valve
Wing Valve

Master Valve
Manometer
Top Side Valve
Tekanan Ke Silencer
Jalur Bleeding Gas

Manifold Bottom Side Valve


Kompressor

Kepala Sumur
Air Compression
Well Discharge Prediction

• Air Compression
Well Tested = LHD
Calculate Condensation area = 40585.75

KOP (mku) =

Elevation (mdpl) =
Show Graph Flashing Area = 0
Inclination ( o ) =

Input Data Output Data - Initial Effect of P hydro


Depth Temperature Pressure 0.7 Depth Temperature Pressure BPD Depth WL - BPD
*) AF/AC Qualification
(°C ) ( Ksc ) 0.85 (mkt) (°C ) ( Bar ) (°C ) (mkt) (°C )
0.0 25.73 0.31 0.00 25.73 0.3038 107.67 197.00 0.00
200.0 32.52 8.56 SUCCESSFUL DISCHARGE 200.00 32.52 8.3888 177.91 197.00 100.04
400.0 41.42 28.86 0 LITTLE CHANCE 400.00 41.42 28.2828 233.67 200.00 107.46
599.7 62.77 49.08 599.66 62.77 48.0984 264.12 400.00 215.62
697.5 67.29 58.99 Delete Content 697.47 67.29 57.8102 275.64 599.66 252.30
790.6 128.17 68 790.64 128.17 66.64 284.89 697.47 265.32
875.0 254.38 75.76 875.03 254.38 74.2448 292.14 790.64 276.04
958.7 261.02 82.79 958.74 261.02 81.1342 298.23 875.03 284.70
1041.7 261.09 89.2 1041.73 261.09 87.416 303.46 958.74 292.51
1083.0 260.79 92.39 1082.99 260.79 90.5422 305.95 1041.73 299.64
1125.1 260.56 95.57 1125.14 260.56 93.6586 308.37 1082.99 302.98
1167.5 260.49 98.93 1167.53 260.49 96.9514 310.86 1125.14 306.27
1210.1 260.41 102.29 1210.12 260.41 100.2442 313.28 1167.53 309.47
1252.9 259.96 105.57 1252.94 259.96 103.4586 315.59 1210.12 312.58
1295.7 259.43 108.93 1295.73 259.43 106.7514 317.90 1252.94 315.61
1338.3 259.06 112.16 1338.29 259.06 109.9168 320.07 1295.73 318.54
1380.8 229.18 115.11 1380.85 229.18 112.8078 322.01 1338.29 321.37
1422.9 224.73 118.3 1422.94 224.73 115.934 324.07 1380.845947 324.1241023
1464.4 219.6 121.61 1464.38 219.6 119.1778 326.16 1422.938843 326.7707576
1505.8 209.57 124.84 1505.82 209.57 122.3432 328.15 1464.377319 329.3088164
1547.1 209.49 128.29 1547.15 209.49 125.7242 330.24 1505.815796 331.7837585
1567.7 208.59 130.09 1567.69 208.59 127.4882 331.32 1547.147217 334.1928757
1567.6875 335.3690306
Air Compression
Well Discharge Prediction

• Air Compression
Well Tested = LHD
Calculate Condensation area = 40585.75
Compression Pressure
= 70 bar
KOP (mku) = (Desired)

Elevation (mdpl) = 790


Show Graph Flashing Area = 22634.76
Inclination ( o ) = Delete Output Data

Re-Input Data Output Data - Initial Effect of P hydro


Depth Temperature Pressure 0.7 Depth Temperature Pressure BPD Depth WL - BPD
*) AF/AC Qualification
(°C ) ( Ksc ) 0.85 (mkt) (°C ) ( Bar ) (°C ) (mkt) (°C )
0.0 25.73 0.31 0.00 25.73 0.3038 105.60 897.00 0.00
200.0 32.52 8.56 SUCCESSFUL DISCHARGE 200.00 32.52 8.3888 177.50 897.00 97.43
400.0 41.42 28.86 0.557702199 LITTLE CHANCE 400.00 41.42 28.2828 233.50 958.74 165.41
599.7 62.77 49.08 599.66 62.77 48.0984 264.01 1041.73 199.49
697.5 67.29 58.99 Delete Content 697.47 67.29 57.8102 275.54 1082.99 211.15
790.6 128.17 68 790.64 128.17 66.64 284.80 1125.14 221.23
875.0 254.38 75.76 875.03 254.38 74.2448 292.06 1167.53 230.05
958.7 261.02 82.79 958.74 261.02 81.1342 298.16 1210.12 237.93
1041.7 261.09 89.2 1041.73 261.09 87.416 303.38 1252.94 245.07
1083.0 260.79 92.39 1082.99 260.79 90.5422 305.88 1295.73 251.59
1125.1 260.56 95.57 1125.14 260.56 93.6586 308.30 1338.29 257.58
1167.5 260.49 98.93 1167.53 260.49 96.9514 310.79 1380.85 263.14
1210.1 260.41 102.29 1210.12 260.41 100.2442 313.22 1422.94 268.29
1252.9 259.96 105.57 1252.94 259.96 103.4586 315.53 1464.38 273.06
1295.7 259.43 108.93 1295.73 259.43 106.7514 317.84 1505.82 277.57
1338.3 259.06 112.16 1338.29 259.06 109.9168 320.01 1547.15 281.84
1380.8 229.18 115.11 1380.85 229.18 112.8078 321.96 1567.69 283.89
1422.9 224.73 118.3 1422.94 224.73 115.934 324.01
1464.4 219.6 121.61 1464.38 219.6 119.1778 326.10
1505.8 209.57 124.84 1505.82 209.57 122.3432 328.10
1547.1 209.49 128.29 1547.15 209.49 125.7242 330.19
1567.7 208.59 130.09 1567.69 208.59 127.4882 331.26
Air Compression

Problems:
• Casing production too shallow
• Leakage on production casing/well head
• Compressor capability
Initiating Discharge

• Well to well stimulation


Well to well stimulation
Well to Well Stimulation

Problems:
• Must have discharged well
nearby
• Surface facility
Initiating Discharge

• Huff and Puff


– to breathe loudly, usually after physical exercise
(dictionary.cambridge.org)
– Slang term for a cyclic process in which a well is injected with a
recovery enhancement fluid and, after a soak period, the well is put
back on production (glossary.oilfield.slb.com)
Huff and Puff

Well History
• Heating up temperature 221°C (53 days)
• Discharge data:
– 5 March 2013
– 20 March 2013
– 27 March 2013
– 18 April 2013
– 22 April 2013
– 31 May 2013
• Well failed to discharge, carrying mud to
surface
Huff and Puff
Well History
• Successful discharge on 30 July 2013
• Start production test on 27 August 2013
Huff and Puff

Production Test
Well Intervention

• Method of Well Stimulation


– Well Washing
– Acidizing
Well Washing

Well History
• Juli 2009  Well completed
• 2009 – 2012  Air compression, failed to discharge

Tanggal Lama P kompresi


No Discharge/tidak
Pelaksanaan Kompresi (barg)
1 Desember-2010 3 hari 35 tidak
2 Januari-2011 3 hari 40 tidak
3 Maret-20011 4 hari 45 tidak
4 Mei-2011 3 hari 47 tidak
5 Juli-2011 2 hari 50 tidak
6 Oktober-2011 3 hari 52 tidak
7 Desember-2011 4 hari 54 tidak
8 Februari-2012 3 hari 57 tidak
9 Apr-12 4 hari 56 tidak
10 Mei-2012 5 hari 58 tidak
Well Washing
Well History
• October 2012  Start hot brine injection from separator

• June 2013  Pressure build up at well head


Well Washing

Potensi
Flow Steam
Tanggal TKS SSC Sumur
(ton/jam)
(MW)
22-Jun-14 10.5 81.63 8 10.20375
29-Jun-14 12.5 67.87 8 8.48375
01-Jul-14 15 61.39 8 7.67375
Acidizing
Acidizing

• Preparation:
– Run go devil, size : 3.5” & 5.5”
– P&T Measurement
– Laboratory test
Acidizing – Solubility Test
% Solibility % Solubility % Total
No Test Procedure
in BJ S3 Acid in BJ SSA Solubility
1 BJ S3 Acid and System #2, 1 hour 20.48 45.13 66.61
2 BJ S3 Acid and System #2, 3 hour 20.93 49.30 70.23
3 BJ S3 Acid and System #3, 1 hour 20.48 0 20.48
4 BJ S3 Acid and System #3, 3 hour 20.93 0 20.93
Acidizing

• Pre-Acidizing
– Quenching
– PTS injection
• Acidizing
– Acid Mixing
– Pre-flush
– Main flush
– Post flush
• Post-Acidizing
– PTS injection
– Heat up survey
Acidizing
Acidizing

• v