5. Education :
9. Languages :
Main project features: Design of a suitable Effluent Treatment Plant ( ETP) for treatment
and disposal of 1000 kld wastewater from 60 tph fresh mango fruit pulping and
concentration.This ETP there was following tanks for various purpose which are Bar screen
chamber, TPI Chamber, settling tank, equalization tank, anaerobic digester tank, aeration
tank, clarifier tank and with a two storied LAB room. Equalization tank was about 5m of
depth form EGL. Anaerobic digester tank was about 7m height from EGL. There was
walking platform for maintenance.
Main project features: Single Storied STEEL Structure with RCC pedestal footing
foundation & with Mezzanine at Ground floor. The shed have two part. 12 TPH capacity
Boiler part area eave height about 50 feet high. And other part ground floor dedicated for
storing coal & husk and about 22 feet height. Mezzanine floor dedicated for boiler & related
equipment installation. Also there have an 80 feet height chimney structure as for smoke
exhaust. The gross built-up area 23,000 sft (approximately).
Activities performed: Fixing the layout plan as per site condition and available land,
structural design and drawing of RCC structural members, erection drawing of steel prefab
and connection details, Roof and wall sheeting work detailed sectional drawing. Regular
interaction with project manager, clients and visit the site at regular basis.
05. Name of assignment or project: 4- storied New warehouse cum production Building
Year: 2018- ongoing
Location: Danga Industrial Park, Danga, Polash, Norsinghdi, Bangladesh.
Client: Chorka Textiles Limited
Main project features: 4 Storied RCC Moment frame Structure with footing foundation. Ground
floor is dedicated for warehouse and have a mezzanine flor which is dedicated for office
purpose. The warehouse part area floor height about 24 feet high. 1st to 3rd floor are dedicated
for textile related production. There are 4 nos stair case and two lift serves ground to roof floors.
Roof as open roof with a Helipad. Overhead roof using as a Chilekotha, Machine room &
Overhead water reservoir, etc. The gross built-up area 2,00,000 sft (approximately).
08. Name of assignment or project: 6-storied factory building including a 6(six) storied
Annex building
Year: 2016- 2017
Location: Chittagong Export Processing Zones Authority, South Halishahar, Chittagong
Client: MERIMCO LTD.
Main project features: 6-storied RCC frame structure building for garments industry and 1-
storied partial RCC canteen and partial steel structure canteen over roof including a 6(six)
storied Annex building with Pile Foundation. The gross built-up area is 60024 sft
approximately. RCC Part is a combination of Beam & Column frame with two way solid
slab.
Positions held: Structural Engineer
Activities performed: Details Engineering Assessment (DEA), Structural stability and
serviceability check, retrofit analysis with retrofitting design drawing preparation for
ACCORD, Submitting all documents to ACCORD and continuous interaction with ACCORD
to get safety certificate, Continuous monitoring the retrofit work as per final retrofit drawing
and to send pictorial evidence to ACCORD after DEA approval.