Vous êtes sur la page 1sur 24

ENOC PROCESSING COMPANY L.L.C.

, DUBAI, UAE

PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES


(ESR-00550)

Doc. No:ESR00550-24-A-CAL-1004

PUMP HEAD CALCULATION FOR HEAVY NAPHTHA


SHIPPING PUMPS 24G-103 A/B

SANDEEP Digitally signed by


SANDEEP VEDAGIRI Nithyan Digitally signed
by Nithyanandam Mee
Digitally signed by:
Meena
DN: CN = Meena C =
SG O = REL OU = Mee
Digitally signed by:
Meena
DN: CN = Meena C

VEDAGIRI Date: andam Date: 2018.09.07


2018.09.07
= SG O = REL OU
Engineering = Engineering

13:12:29 +08'00' 13:12:50 +08'00' na Date: 2018.09.07 17:


01:53 +09'00' na Date: 2018.09.07
17:02:07 +09'00'

0c 7-Sep-18 Re-Issued for Design SV NTM NM NM

0b 4-Jul-17 Approved For Design SSO NTM NM NM

0a 26-May-17 Issued for Approval SSO NTM NM NM


Rev. No Date Description Prepared By Checked By Approved By
ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B

TABLE OF CONTENTS
S.No DESCRIPTION 0c Page No.

1 Heavy Naphtha Loading Rate Summary for Shipping Pump 24G-103A/B 3

2 Scenario 1 - Loading of Heavy Naphtha from Tank Farm 2 to Berth 9 (Suction Tank Level : 3 m) 4~5

3 System Curve Vs Pump Curve for Heavy Naphtha Shipping to Berth 9 6

4 Scenario 2 - Loading of Heavy Naphtha from Tank Farm 2 to Berth 9 (Suction Tank Level : 1.4 m) 7~8

Scenario 3 - Loading of Heavy Naphtha from Tank Farm 2 to EPPCO Valve Station Tie-in
5 (Suction Tank Level : 1.4m) 9 ~ 10
Scenario 3 -System Curve Vs Pump Curve for Light Naphtha Shipping to EPPCO Valve
6 Station Tie-In (Suction Tank Level : 1.4m) 11

7 Summary of Pump Head Calculation Methodology 12

8 Attachment-1 : Heavy Naphtha routing from TF-2 to Berth 9/EPPCO Valve Station - Key plan markup

9 Attachment-2 : Heavy Naphtha routing from TF-2 to Berth 9/EPPCO Valve Station - P&ID markup

10 Attachment-3 : Heavy Naphtha Shipping Pump 24G-103A/B Performance curves

11 Attachment-4 : Heavy Naphtha Shipping Pump 24G-103A/B GA Drawing

Doc. No: ESR00550-24-A-CAL-1004 Rev.0c Page 2 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA SHIPPING PUMPS 24G-103 A/B

HEAVY NAPHTHA TO BERTH 9-LOADING RATE SUMMARY FOR PUMP 24G-103A/B

Line Size
0c
Pump suction nozzle Calculated
Required Pump
From Elevation with Destination Surface Elevation Minimum Liquid Net Suction NPSH Pump Diff.
Flow Rate From Pump From Diff. Head with
Main MLA at respect to Tank Farm (Vessel Manifold) Level in Tank Pressure Head without
S.No Product From To Station-2 to Tankage B/L to 10% margin
Pipeway Berth 9 Elevation margin
tankage B/L Main Pipe Way
to Berth 9

m3/hr in in in in m m m Kg/cm2(g) mliq mliq mliq

1 Heavy Naphtha Tank Farm-2 Berth 9 2,000 24" 24" 30" 16" 1.40 18 3.0 -0.1 10 85.5 94

1000
2 Heavy Naphtha Tank Farm-2 Berth 9 (Reduced 24" 24" 30" 16" 1.40 18 1.4 -0.1 10 41.8 46
Speed)
Rated Pump Differential Head = 95 mliq @ 2000 m3/hr

Pump Minimum flow rate =850 m3/hr (At Rated Speed)

NPSH Required = 6.5m

HEAVY NAPHTHA TO EPPCO VALVE STATION TIE IN -LOADING RATE SUMMARY FOR PUMP 24G-103A/B

Line Size
Pressure Available
0c Pump suction nozzle EPPCO Valve Calculated
at EPPCO Valve Required Pump
From Main Pipeway Elevation with Station Minimum Liquid Net Suction NPSH Pump Diff.
Flow Rate From Pump From Station Tie-In at Diff. Head with
to EPPCO Valve respect to Tank Farm Tie in Point Level in Tank Pressure Head without
S.No Product From To Station-2 to Tankage B/L to Rated pump 10% margin
Station Tie-In (00550- Elevation Elevation margin
Tankage B/L Main Pipe Way differential head
011)

m3/hr in in in m m Kg/cm2(g) m Kg/cm2(g) mliq mliq mliq

EPPCO Valve
1 Heavy Naphtha Tank Farm-2 Station Tie In 1,250 24" 24" 16" 1.40 1 4 1.4 -0.1 10 103 114
(00550-011)

Pump Differential Head = 118 mliq @ 1250 m3/hr (At Rated Speed)
Pump Minimum flow rate =850 m3/hr (At Rated Speed)
NPSH Required = 6.5m

Properties of Heavy Naphtha :


Product Heavy Naphtha
Storage Temp (oC) 43
Specific Gravity @ Op. Temp. 0.723
Maximum Specific Gravity 0.745
Viscosity @ Op. Temp. 0.41 cP
Vap Press @ Op. Temp. (kg/cm2) 0.15

Doc,No: ESR00550-24-A-CAL-1004 Rev.0c Page 3 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Scenario 1-Loading of Heavy Naphtha to Berth 9 (Suction Tank Level : 3 m)
Item no. Description Sym Formula Unit PUMPS 24G-103A/B
1 INSTALLATION DATA
Pump Location Pump House-2
Product Heavy Naphtha
Service From Tank 24D-309 in Tank Farm 2
To Berth 9
Minimum Liquid Level in Tank Ht m 3.00
Tank Base Elevation Et m 0.80
Pump Suction Noz. Elevation w.r.to tank farm elevation
Ep m 1.40
(TOP)
Destination Surface Elevation Ed 100,000 DWT m 18

2 OPERATING CONDITIONS
Total Flow Rate m3/hr 2000
Rated Pump Capacity Q 3
m /hr 2000
Fluid specific gravity ρ 0.723
Pumping temperature t deg C 43
Fluid viscosity @ PT m cP 0.41

3 PUMP SUCTION PRESSURE


Pressure at liquid surface Hs1 (1.013)*10.2/ρ m liq 14.29
Minimum static head Hs2 = Ht + Et - Ep m liq 2.40
Suction line loss Hs3 See item 6 m liq 1.20
Strainer Pressure Drop Hs4 0.1 kg/cm2 m liq 1.38
Net suction pressure Hs = Hs1+ Hs2 - Hs3-Hs4 m liq 14.11
Net suction pressure Kg/cm2 (g) -0.01
2
Vapour pressure Hv 0.15 kg/cm (a) m liq 2.07
NPSH available Hn = Hs - Hv m liq 12.04
0c NPSH required Hr m liq 6.50

4 PUMP DISCHARGE PRESSURE


Vessel Pressure (Ship) Hd1 (1.013)*10.2/ρ m liq 14.29
Static head Hd2 = Ed - Ep m liq 16.60
Discharge line loss Hd3 See item 7 m liq 34.06
Flow meter Pressure Drop Hd4 0.5*10.2/ρ m liq 7.05
0c Restriction Orifice Pressure Drop Hd5 2 kg/cm2 m liq 27.65
Pressure @ pump discharge Hd = Sum (Hd1:Hd5) m liq 99.66

5 PUMP DIFFERENTIAL PRESSURE


Calculated Pump Differential Head DHc = Hd - Hs m liq 85.5
Required Pump Differential Head (with 10% Margin) 1.1*DHc m liq 94.1
Rated Pump Differential Head DHr m liq 95.0

6 PUMP SUCTION LINE LOSS Section #S1 #S2 #S3 #S4 #S5
3
Flow thru section Qs m /hr 2000 2000
Pipe ID Ds mm 743 743
Velocity Vs m/sec 1.28 1.28
Reynolds number Res 1678817 1678817
Absolute Roughness of pipe wall e mm 0.046 0.046
Friction factor fs 0.0123 0.0123
Pipe equivalent length Ls See item 8 m 679 186
Pressure loss thru section H#S m liq 0.94 0.26
2
Pressure Drop per 100 m pipe length (kg/cm )/100m 0.01 0.01
Suction line pressure loss Hs3 = Sum(#S1:#S5) m liq 1.20

7 PUMP DISCHARGE LINE LOSS Section #D1 #D2 #D3 #D4 #D5
Flow thru section Qd m3/hr 2000 2000 2000 2000 2000
Pipe ID Dd mm 591 591 591 743 381
Velocity Vd m/sec 2.03 2.03 2.03 1.28 4.87
Reynolds number Red 2110593 2110593 2110593 1678817 3273913
Absolute Roughness of pipe wall e mm 0.046 0.046 0.046 0.046 0.046
Friction factor fd 0.0124 0.0124 0.0124 0.0123 0.0130
Pipe equivalent length Ld See item 9 m 533 567 4401 1218 199
Pressure loss thru section H#D m liq 2.34 2.49 19.34 1.69 8.19
Pressure Drop per 100 m pipe length (kg/cm2)/100m 0.03 0.03 0.03 0.01 0.30
Discharge line pressure loss Hd3 = Sum(#D1:#D5) m liq 34.06
Remark
#S1 - 30" CS (Std) Tank 24D-307/308/309 Outlet line to Pump suction header.
#S2 - 30" CS (Std) Shipping pump 24G-103A/B Suction Line in Pump Station
#D1 - 24" CS (Sch 20) Shipping pump 24G-103A/B discharge Line in Pump Station
#D2 - 24" CS (Sch 20) from Pump Station to Tankage B/L
#D3 - 24" CS (Sch 20)from Tankage B/L to Main pipeway between Berth 5 & 7
#D4 - 30" CS (Std) from main pipeway between Berth 5 & 7 to Berth 9
#D5 -16" CS (Sch 40) Loading/Unloading Line & 16" Marine Loading Arm of Berth 9

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 4 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Scenario 1-Loading of Heavy Naphtha to Berth 9 (Suction Tank Level : 3 m)
Item no. Description Sym Formula Unit PUMPS 24G-103A/B
8 SUCTION PIPE EQUIVALENT LENGTH #S1 #S2 #S3 #S4 #S5
Straight length m 400 50
Fittings - Equiv. length Le/D
- Entrance loss 42.9 1 0
- Strainer 250 0 0
- Foot valve with strainer 420 0 0
- Step (Up) reducer 210 0 0
- Step (Down) reducer 10 0 1
- Gate valve 8 4 2
- Globe valve 340 0 0
- Ball valve 3 0 0
- Butterfly valve 45 0 0
- Check valve (swing) 100 0 0
- LR Elbow - 90 deg 20 10 4
- LR Elbow - 45 deg 16 0 0
- Equal Tee (str) 20 5 1
- Equal Tee (side) 60 0 0
- Exit loss 57.1 0 1

Sum of Le/D 375 183


Pipe ID mm 743.0 743.0
Equivalent length of fittings m 279 136
Total equivalent length m 679 186

9 DISCHARGE PIPE EQUIVALENT LENGTH #D1 #D2 #D3 #D4 #D5


Straight length m 50 300 3200 600 60
Fittings - Equiv. length Le/D
- Entrance loss 42.9 1 0 0 0 0
- Strainer 250 0 0 0 0 0
- Foot valve with strainer 420 0 0 0 0 0
- Step (Up) reducer 210 1 0 0 1 0
- Step (Down) reducer 10 0 0 12 3 0
- Gate valve 8 3 4 4 4 1
- Globe valve 340 0 0 0 0 0
- Ball valve 3 0 0 0 0 0
- Butterfly valve 45 0 0 0 0 0
- Check valve (swing) 100 4 0 0 0 0
- LR Elbow - 90 deg 20 5 16 70 24 15
- LR Elbow - 45 deg 16 0 0 0 0 0
- Equal Tee (str) 20 2 5 24 4 0
- Equal Tee (side) 60 0 0 0 0 0
- Exit loss 57.1 0 0 0 0 1

Sum of Le/D 817 452 2032 832 365


Pipe ID mm 591 591 591 743 381
Equivalent length of fittings m 483 267 1201 618 139
Total equivalent length m 533 567 4401 1218 199

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 5 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B

SYSTEM CURVE Vs PUMP CURVE FOR HEAVY NAPHTHA SHIPPING TO BERTH 9

24G-103 A/B - Flow Serve Pump Curve


SYSTEM CURVE - HEAVY NAPHTHA (HN)
0c Model No: 10HDX23A

Scenario 1.1 Scenario 1.2 2000 m3/hr @ 95 mliq

Minimum Product Level in Maximum Product Level in


Suction Tank Suction Tank Diff Head Diff Head Diff Head Diff Head
Flow Rate
@ 1443 rpm @ 1200 rpm @ 1000 rpm @ 800 rpm
(m3/hr)
Flow Rate Diff Head Flow Rate Diff Head (mliq) (mliq) (mliq) (mliq)
(m3/hr) (m liq) (m3/hr) (m liq)

2500 99 2500 78 0 128 89 62 40


2200 90 2200 69 400 127 87 60 38
2000 86 2000 65 600 125 86 59 37
1800 81 1800 60 800 124 84 57 35
1600 77 1600 56 1000 122 82 55 32
1400 74 1400 53 1200 119 79 51 27
1200 70 1200 49 1400 115 75 45
1000 68 1000 47 1600 110 68 37
800 66 800 45 1800 104 59
600 64 600 43 2000 95 48
400 62 400 41 2200 84
100 61 100 40 2400 70

Pump Curve (1443 rpm)

Flowrate (Q) vs Head (H) Pump Curve (1200 rpm)

Pump Curve (1000 rpm)

Pump Curve (800 rpm)

Scenario 1.1
140
"Scenario 1.2"
1443 rpm

120

100
Differential Head (m)

80

60

40

20

0
0 500 1000 1500 2000 2500 3000

Flow Rate Q (m3/hr)

Note: 0c
1. Scenario 1.1- Loading of Heavy Naphtha to Berth 9 at tank minimum liquid level.
2. Scenario 1.2- Loading of Heavy Naphtha to Berth 9 at tank maximum liquid level
3.As the Heavy Naphtha Shipping Pump 24G-103 A/B Differential head is over designed for pumping to EPPCO Valve station and for future Provision, the pump will
deliver very high flow rate due to less back pressure during loading to Berth 9. Hence during such conditions, Isolation valve (24-HV-052) located at the immediate
pump discharge shall be throttled manually to increase the system back pressure to limit the flow rate to the maximum flow rate of the pump and to avoid the
pump running beyond the curve, thus protecting the pump / motor from overloading.
4.Even if the shipping pump run at lowest speed, still the pump discharge valve need to be throttled to create back pressure to keep the pump running within the
recommended operating range of the pump curve, as the back pressure required is very less and the pump curve is beyond the system curve even at the lowest
speed.
5.Restriction Orifice is provided in the Heavy Naphtha Shipping Pump discharge line to limit the maximum flow rate to 2400 m3/hr to ensure that the actual surge
pressure is less than the maximum allowable surge pressure as per surge analysis.Refer to Doc No: ESR0055024RPT1106-Surge Analysis Report for Heavy Naphtha
Shipping Line.

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 6 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Scenario 2-Loading of Heavy Naphtha to Berth 9 (Suction Tank Level : 1.4 m)
Item no. Description Sym Formula Unit PUMPS 24G-103A/B
1 INSTALLATION DATA
Pump Location Pump House-2
Product Heavy Naphtha
Service From Tank 24D-309 in Tank Farm 2
To Berth 9
Minimum Liquid Level in Tank Ht m 1.40
Tank Base Elevation Et m 0.80
Pump Suction Noz. Elevation w.r.to tank farm elevation
Ep m 1.40
(TOP)
Destination Surface Elevation Ed 100,000 DWT m 18

2 OPERATING CONDITIONS
Total Flow Rate m3/hr 1000
Rated Pump Capacity Q 3
m /hr 2000
Fluid specific gravity ρ 0.723
Pumping temperature t deg C 43
Fluid viscosity @ PT m cP 0.41

3 PUMP SUCTION PRESSURE


Pressure at liquid surface Hs1 (1.013)*10.2/ρ m liq 14.29
Minimum static head Hs2 = Ht + Et - Ep m liq 0.80
Suction line loss Hs3 See item 6 m liq 0.32
Strainer Pressure Drop Hs4 0.1 kg/cm2 m liq 1.38
Net suction pressure Hs = Hs1+ Hs2 - Hs3-Hs4 m liq 13.39
Net suction pressure Kg/cm2 (g) -0.07
2
Vapour pressure Hv 0.15 kg/cm (a) m liq 2.07
NPSH available Hn = Hs - Hv m liq 11.31
0c NPSH required Hr m liq 6.50

4 PUMP DISCHARGE PRESSURE


Vessel Pressure (Ship) Hd1 (1.013)*10.2/ρ m liq 14.29
Static head Hd2 = Ed - Ep m liq 16.60
Discharge line loss Hd3 See item 7 m liq 8.94
Flow meter Pressure Drop Hd4 0.5*10.2/ρ m liq 7.05
0c Restriction Orifice Pressure Drop Hd5 0.6 kg/cm2 m liq 8.30
Pressure @ pump discharge Hd = Sum (Hd1:Hd5) m liq 55.18

5 PUMP DIFFERENTIAL PRESSURE


Calculated Pump Differential Head DHc = Hd - Hs m liq 41.8
Required Pump Differential Head (with 10% Margin) 1.1*DHc m liq 46.0
0c Pump Differential Head at 1000 RPM DHr m liq 55.0

6 PUMP SUCTION LINE LOSS Section #S1 #S2 #S3 #S4 #S5
3
Flow thru section Qs m /hr 1000 1000
Pipe ID Ds mm 743 743
Velocity Vs m/sec 0.64 0.64
Reynolds number Res 839408 839408
Absolute Roughness of pipe wall e mm 0.046 0.046
Friction factor fs 0.0131 0.0131
Pipe equivalent length Ls See item 8 m 679 186
Pressure loss thru section H#S m liq 0.25 0.07
2
Pressure Drop per 100 m pipe length (kg/cm )/100m 0.00 0.00
Suction line pressure loss Hs3 = Sum(#S1:#S5) m liq 0.32

7 PUMP DISCHARGE LINE LOSS Section #D1 #D2 #D3 #D4 #D5
Flow thru section Qd m3/hr 1000 1000 1000 1000 1000
Pipe ID Dd mm 591 591 591 743 381
Velocity Vd m/sec 1.01 1.01 1.01 0.64 2.44
Reynolds number Red 1055297 1055297 1055297 839408 1636956
Absolute Roughness of pipe wall e mm 0.046 0.046 0.046 0.046 0.046
Friction factor fd 0.0131 0.0131 0.0131 0.0131 0.0134
Pipe equivalent length Ld See item 9 m 533 567 4401 1218 199
Pressure loss thru section H#D m liq 0.62 0.66 5.10 0.45 2.11
Pressure Drop per 100 m pipe length (kg/cm2)/100m 0.01 0.01 0.01 0.00 0.08
Discharge line pressure loss Hd3 = Sum(#D1:#D5) m liq 8.94
Remark
#S1 - 30" CS (Std) Tank 24D-307/308/309 Outlet line to Pump suction header.
#S2 - 30" CS (Std) Shipping pump 24G-103A/B Suction Line in Pump Station
#D1 - 24" CS (Sch 20) Shipping pump 24G-103A/B discharge Line in Pump Station
#D2 - 24" CS (Sch 20) from Pump Station to Tankage B/L
#D3 - 24" CS (Sch 20)from Tankage B/L to Main pipeway between Berth 5 & 7
#D4 - 30" CS (Std) from main pipeway between Berth 5 & 7 to Berth 9
#D5 -16" CS (Sch 40) Loading/Unloading Line & 16" Marine Loading Arm of Berth 9

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 7 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Scenario 2-Loading of Heavy Naphtha to Berth 9 (Suction Tank Level : 1.4 m)
Item no. Description Sym Formula Unit PUMPS 24G-103A/B
8 SUCTION PIPE EQUIVALENT LENGTH #S1 #S2 #S3 #S4 #S5
Straight length m 400 50
Fittings - Equiv. length Le/D
- Entrance loss 42.9 1 0
- Strainer 250 0 0
- Foot valve with strainer 420 0 0
- Step (Up) reducer 210 0 0
- Step (Down) reducer 10 0 1
- Gate valve 8 4 2
- Globe valve 340 0 0
- Ball valve 3 0 0
- Butterfly valve 45 0 0
- Check valve (swing) 100 0 0
- LR Elbow - 90 deg 20 10 4
- LR Elbow - 45 deg 16 0 0
- Equal Tee (str) 20 5 1
- Equal Tee (side) 60 0 0
- Exit loss 57.1 0 1

Sum of Le/D 375 183


Pipe ID mm 743.0 743.0
Equivalent length of fittings m 279 136
Total equivalent length m 679 186

9 DISCHARGE PIPE EQUIVALENT LENGTH #D1 #D2 #D3 #D4 #D5


Straight length m 50 300 3200 600 60
Fittings - Equiv. length Le/D
- Entrance loss 42.9 1 0 0 0 0
- Strainer 250 0 0 0 0 0
- Foot valve with strainer 420 0 0 0 0 0
- Step (Up) reducer 210 1 0 0 1 0
- Step (Down) reducer 10 0 0 12 3 0
- Gate valve 8 3 4 4 4 1
- Globe valve 340 0 0 0 0 0
- Ball valve 3 0 0 0 0 0
- Butterfly valve 45 0 0 0 0 0
- Check valve (swing) 100 4 0 0 0 0
- LR Elbow - 90 deg 20 5 16 70 24 15
- LR Elbow - 45 deg 16 0 0 0 0 0
- Equal Tee (str) 20 2 5 24 4 0
- Equal Tee (side) 60 0 0 0 0 0
- Exit loss 57.1 0 0 0 0 1

Sum of Le/D 817 452 2032 832 365


Pipe ID mm 591 591 591 743 381
Equivalent length of fittings m 483 267 1201 618 139
Total equivalent length m 533 567 4401 1218 199

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 8 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Scenario 3-Loading of Heavy Naphtha to EPPCO Valve Station Tie-In (Suction Tank Level: 1.4 m)
Item no. Description Sym Formula Unit PUMPS 24G-103A/B
1 INSTALLATION DATA
Pump Location Pump House-2
Product Heavy Naphtha
Service From Tank 24D-309 in Tank Farm 2
To EPPCO Tie in 00550-011
Minimum Liquid Level in Tank Ht m 1.40
Tank Base Elevation Et m 0.80
Pump Suction Noz. Elevation w.r.to tank farm elevation
Ep m 1.40
(TOP)
Destination Surface Elevation Ed Highest point elevation m 1

2 OPERATING CONDITIONS
Total Flow Rate m3/hr 1250
Rated Pump Capacity Q 3
m /hr 2000
Fluid specific gravity ρ 0.723
Pumping temperature t deg C 43
Fluid viscosity @ PT m cP 0.41

3 PUMP SUCTION PRESSURE


Pressure at liquid surface Hs1 (1.013)*10.2/ρ m liq 14.29
Minimum static head Hs2 = Ht + Et - Ep m liq 0.80
Suction line loss Hs3 See item 6 m liq 0.49
Strainer Pressure Drop Hs4 0.1 kg/cm2 m liq 1.38
Net suction pressure Hs = Hs1+ Hs2 - Hs3-Hs4 m liq 13.22
Net suction pressure Kg/cm2 (g) -0.08
2
Vapour pressure Hv 0.15 kg/cm m liq 2.07
NPSH available Hn = Hs - Hv m liq 11.14
0c NPSH required Hr m liq 6.50

4 PUMP DISCHARGE PRESSURE


2
Pressure at Berth EPPCO Tie In (00550-011) Hd1 4 kg/cm (g) m liq 69.59
0c Static head Hd2 = Ed - Ep m liq -0.40
Discharge line loss Hd3 See item 7 m liq 32.16
Flow meter Pressure Drop Hd4 0.5*10.2/ρ m liq 7.05
Restriction Orifice Pressure Drop Hd5 0.6 kg/cm2 m liq 8.30
Pressure @ pump discharge Hd = Sum (Hd1:Hd5) m liq 116.70

5 PUMP DIFFERENTIAL PRESSURE


Calculated Pump Differential Head DHc = Hd - Hs m liq 103.5
Required Pump Differential Head (with 10% Margin) 1.1*DHc m liq 113.8
0c Rated Pump Differential Head DHr m liq ~ 118 @ 1250 m3/hr at Rated Speed

6 PUMP SUCTION LINE LOSS Section #S1 #S2 #S3 #S4 #S5
3
Flow thru section Qs m /hr 1250 1250
Pipe ID Ds mm 743 743
Velocity Vs m/sec 0.80 0.80
Reynolds number Res 1049260 1049260
Absolute Roughness of pipe wall e mm 0.046 0.046
Friction factor fs 0.0128 0.0128
Pipe equivalent length Ls See item 8 m 679 186
Pressure loss thru section H#S m liq 0.38 0.11
2
Pressure Drop per 100 m pipe length (kg/cm )/100m 0.00 0.00
Suction line pressure loss Hs3 = Sum(#S1:#S5) m liq 0.49

7 PUMP DISCHARGE LINE LOSS Section #D1 #D2 #D3 #D4 #D5
Flow thru section Qd m3/hr 1250 1250 1250 1250
Pipe ID Dd mm 591 591 591 390
Velocity Vd m/sec 1.27 1.27 1.27 2.91
Reynolds number Red 1319121 1319121 1319121 1998975
Absolute Roughness of pipe wall e mm 0.046 0.046 0.046 0.046
Friction factor fd 0.0129 0.0129 0.0129 0.0132
Pipe equivalent length Ld See item 9 m 533 567 4401 1539
Pressure loss thru section H#D m liq 0.95 1.01 7.81 22.39
Pressure Drop per 100 m pipe length (kg/cm2)/100m 0.01 0.01 0.01 0.11
Discharge line pressure loss Hd3 = Sum(#D1:#D5) m liq 32.16
Remark
#S1 - 30" CS (Std) Tank 24D-307/308/309 Outlet line to Pump suction header.
#S2 - 30" CS (Std) Shipping pump 24G-103A/B Suction Line in Pump Station
#D1 - 24" CS (Sch 20) Shipping pump 24G-103A/B discharge Line in Pump Station
#D2 - 24" CS (Sch 20) from Pump Station to Tankage B/L
#D3 - 24" CS (Sch 20) from Tankage B/L to Main pipeway between Berth 5 & 7
#D4 - 16" CS (Sch 20) from main pipeway between Berth 5 & 7 to EPPCO Valve Station Tie-In

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 9 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Scenario 3-Loading of Heavy Naphtha to EPPCO Valve Station Tie-In (Suction Tank Level: 1.4 m)
Item no. Description Sym Formula Unit PUMPS 24G-103A/B
8 SUCTION PIPE EQUIVALENT LENGTH #S1 #S2 #S3 #S4 #S5
Straight length m 400 50
Fittings - Equiv. length Le/D
- Entrance loss 42.9 1 0
- Strainer 250 0 0
- Foot valve with strainer 420 0 0
- Step (Up) reducer 210 0 0
- Step (Down) reducer 10 0 1
- Gate valve 8 4 2
- Globe valve 340 0 0
- Ball valve 3 0 0
- Butterfly valve 45 0 0
- Check valve (swing) 100 0 0
- LR Elbow - 90 deg 20 10 4
- LR Elbow - 45 deg 16 0 0
- Equal Tee (str) 20 5 1
- Equal Tee (side) 60 0 0
- Exit loss 57.1 0 1

Sum of Le/D 375 183


Pipe ID mm 743.0 743.0
Equivalent length of fittings m 279 136
Total equivalent length m 679 186

9 DISCHARGE PIPE EQUIVALENT LENGTH #D1 #D2 #D3 #D4 #D5


Straight length m 50 300 3200 1200
Fittings - Equiv. length Le/D
- Entrance loss 42.9 1 0 0 1
- Strainer 250 0 0 0 0
- Foot valve with strainer 420 0 0 0 0
- Step (Up) reducer 210 1 0 0 0
- Step (Down) reducer 10 0 0 12 0
- Gate valve 8 3 4 4 1
- Globe valve 340 0 0 0 0
- Ball valve 3 0 0 0 0
- Butterfly valve 45 0 0 0 0
- Check valve (swing) 100 4 0 0 0
- LR Elbow - 90 deg 20 5 16 70 32
- LR Elbow - 45 deg 16 0 0 0 0
- Equal Tee (str) 20 2 5 24 6
- Equal Tee (side) 60 0 0 0 0
- Exit loss 57.1 0 0 0 1

Sum of Le/D 817 452 2032 868


Pipe ID mm 591 591 591 390
Equivalent length of fittings m 483 267 1201 339
Total equivalent length m 533 567 4401 1539

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 10 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B

SCENARIO 3-SYSTEM CURVE Vs PUMP CURVE FOR HEAVY NAPHTHA SHIPPING TO EPPCO VALVE
STATION TIE-IN (Suction Tank Level: 1.4 m)

24G-103 A/B - Flow Serve Pump Curve


SYSTEM CURVE - HEAVY NAPHTHA (HN) 0c Model No: 10HDX23A

Scenario 3.1 Scenario 3.2 2000 m3/hr @ 95 mliq

Minimum Product Level in Maximum Product Level in


Suction Tank Suction Tank Diff Head Diff Head Diff Head Diff Head
Flow Rate
@ 1443 rpm @ 1200 rpm @ 1000 rpm @ 800 rpm
(m3/hr)
Flow Rate Diff Head Flow Rate Diff Head (mliq) (mliq) (mliq) (mliq)
(m3/hr) (m liq) (m3/hr) (m liq)

1800 137 1800 114 0 128 89 62 40


1300 106 1300 83 400 127 87 60 38
1200 101 1200 78 600 125 86 59 37
1100 96 1100 73 800 124 84 57 35
1000 92 1000 69 1000 122 82 55 32
900 88 900 65 1200 119 79 51 27
800 85 800 62 1400 115 75 45
700 82 700 59 1600 110 68 37
600 79 600 56 1800 104 59
400 75 400 52 2000 95 48
300 73 300 50 2200 84
200 72 200 49 2400 70

Pump Curve (1443 rpm)

Flowrate (Q) vs Head (H) Pump Curve (1200 rpm)

Pump Curve (1000 rpm)

Pump Curve (800 rpm)

Scenario 3.1
160 Scenario 3.2

140

120
Differential Head (m)

100
1200 rpm
80

60

40

20

0
0 500 1000 1500 2000 2500 3000

Flow Rate Q (m3/hr)

Note:
1. Scenario 3.1- Loading of Heavy Naphtha to EPPCO Valve Station Tie In (00550-011) at tank minimum liquid level.
2. Scenario 3.2- Loading of Heavy Naphtha to EPPCO Valve Station Tie In (00550-011) at tank maximum liquid level.
3. Restriction Orifice is provided in the Heavy Naphtha Shipping Pump discharge line to limit the maximum flow rate to 2400 m3/hr to ensure that the actual surge
0c pressure is less than the maximum allowable surge pressure as per surge analysis. Refer to Doc No: ESR0055024RPT1106-Surge Analysis Report for Heavy Naphtha
Shipping Line.

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 11 of 12


ENOC PROCESSING COMPANY L.L.C., DUBAI, UAE
PROJECT: REFINERY EXPANSION – TANKAGE FACILITIES
(ESR-00550)
PUMP HEAD CALCULATION FOR HEAVY NAPHTHA
SHIPPING PUMPS 24G-103 A/B
Summary of Pump Head Calculation Methodology
Item no. Description

1 INSTALLATION SCHEMATIC SKETCH

Tankage B/L Main Pipeway b/n Berth 5 &7


#D3
TANK
#D4
Ht #S1 #D2
#S2 #D1
Et Ship
Ep
Berth Area #D5
PUMP

2 FORMULA SUMMARY

2.1 Velocity ' V ' in (m/sec) V = Q*4


3600 * π * (D/1000)^2

Q - Flow thru section in (m3/hr)


D - Pipe ID in (mm)

2.2 Reynolds Number ' NRe ' NRe = (D/1000) * V * r * 1000


(m / 1000)

r - Fluid specific gravity


m - Fluid viscosity @ PT in (cP)

2.3 Darcy Friction Factor ' f '


For NRe <= 2100 f = 64 / NRe Laminar Flow

For NRe > 4000 f= 0.25 Turbulent Flow (Swamee-Jain Equation)


{ log [ (e/(3.7*D)) + (5.74/NRe0.9 )] }2

For 2100 < NRe <= 4000 (Transition flow), turbulent flow equation is used, which is the worst case.

2.4 Pressure drop thru section in (m.liq) H# = f * L * V^2


2* (D/1000) * 9.81

L - Pipe equivalent length in (m)


e - Absolute Roughness of pipe wall in (mm)

Doc No:ESR00550-24-A-CAL-1004 Rev.0c Page 12 of 12


0p 1 OF 1 01-A-10080 GENERAL NOTES
TAN
BERTH
NO. KER B
9 ERT
H
9

ATTACHMENT-1
N TAN
NO. KER B
HEAVY NAPHTHA ROUTING FROM TF-2 TO
7 ERT
H
BERTH 9 / EPPCO VALVE STATION
LEGEND
PIPE ROUTING MARKUP
0p

TAN
NO. KER B
5 ERT
LEGEND
H
30" CS (Std) Tank 24D-307/308/309 Outlet line to Pump suction header
30" CS (Std) Loading Pumps 24G-103 A/B Suction Line in Pump Station
24" CS (Sch 20) NLoading
EW Pumps 24G-103A/B discharge Line in Pump Station
24" CS (Sch 20) from
TE
COPump Station to Tankage B/L
24" CS (Sch 20) Tankage
RM NTA B/L to Main pipeway between Berth 5 & 7
IN INE
TAN 16" CS (Sch 20) from main R
AL pipeway between Berth 5 & 7 to EPPCO Valve Station
NO KER REFERENCE DRAWINGS
.3 BER
T H 30" CS (Std) from main pipeway between Berth 5 & 7 to Berth 9
16" Loading/Unloading Line to 16" Marine Loading Arm

G1

TAN
NO KER
.1 BER
TH
EPPCO
VALVE
STATION
EPCL
ENOC PROCESSING COMPANY L.L.C.
EIL TERMINAL-4 EPCL
EXPANSION AREA

EMARAT
ARCO

EIL TERMINAL-1
DATA
TELEPHONE
DEWA WATER
DEWA FOR 11 KV CABLE

DEWA FOR 11 KV CABLE


DEWA ELECTRICAL (FUTURE)

60
TUNNEL -F
TUNNEL -D
TUNNEL -E

EMIRATES NATIONAL OIL COMPANY LTD.


Group Engineering & Projects

x x x x x x x
x

x
x

x
x
x

x
x x
SUBSTATION x
x
x
x
x

x
x
x

x

HN- PUMP
x

x x
x


x x x
x
x
x
x
ING R
IST L x

G2 STATION x

x
x

x
EX P TT
J x
x
x










x
HE x
x

 x

x
x

x
TANKFARM-2 x
x
x

x
x

EIL TERMINAL-2 REFINERY EXPANSION - TANKAGE


x

x
x
x
x

24D-310 24D-311 24D-312


x

x
x
x
x
x

x
x

EPCL REFINERY EXPANSION


FACILITIES (ESR - 00550)
x

LAYDOWN AREA
x
x

PLOT NO B006F03 PLOT NO B006F02


x
x

24D-307 24D-308 24D-309


x
x
x

x
x
x
x

x
x
x
x

x


x






HEAVY
x


x
x

x
x
x
x

24D-303 24D-306
x
x
x

EDIBLE OIL COMPANY HEJP OTHER PROJECTS


NAPHTHA CONSTRUCTION &
x

EPCL REFINERY TANKAGE


LAYDOWN
CAR PARKING

CONSTRUCTION & LAYDOWN AREA


LAYDOWN
x

x
x

TANKFARM-1
CONSTRUCTION &
x

HEJP PUNCH D WORKS


x

x
x
x

TANK
x

24D-302 24D-305
x
x

x
x
x

ENOC PROCESSING COMPANY L.L.C.


x
x

24D-309
x
x

JP x
x

HE
x

TANKFARM-1 (PHASE-1)
x
x

CLASS-1 PRODUCTS
x

24D-301 Area = 23436.95 m2


24D-304
x

ING NAL DUBAI, UAE


I ST I
x
x
x
x

EX ERM
x x
T
x

x
x
x

x
x
x

0p

x
x
x
x

x
x
x

x x x x x x x x
x
x

x
x
x
x

x
x
x
x
x


x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

x
x

KEY PLAN
BERTH 6 BERTH 7
ENOC CONDENSATE PROCESSING PLANT
440

 01-A-10080 1 OF 1 0p
0g 0001 24-A-10107 GENERAL NOTES GENERAL NOTES
ATTACHMENT-2 0g

HEAVY NAPHTHA ROUTING


0g
FROM TF-2 TO 0g

BERTH 9 / EPPCO VALVE STATION HOLD

P&ID MARKUP
0g 0g

0g

0g
0g

0g 0g 0g 0g
0g

0g

0g 0g
0g 0g 0g

0g 0g
0g

0g 0g

0g
0g 0g 0g
0g 0g
0g

1
0g 0g
0g

0g 0g
0g 0g
0g

0g
0g
0g REFERENCE DRAWINGS
0g Digitally signed by: Digitally signed
Digitally signed by:
Mee Meena
DN: CN = Meena C
by: Meena

Ma
Mathi DN: CN =
= SG O = REL OU =
DN: CN = Mathi
email =
Kart
Digitally signed by:
Karthik

na
Engineering
Mee Meena C = SG

0g
DN: CN = Karthik Date: 2017.05.15
manivasagan. email = s.
15:45:08 +08'00'
O = REL OU =
mathivadhani@rota vkarthik@rotaryeng.
Engineering

na
ryeng.com.sg C = com.sg C = SG O =

thi SG O = REL OU =
ENG
Date: 2017.05.15
16:10:20 +08'00'
hik REL OU = ENG
Date: 2017.05.15
16:10:33 +08'00'
Date: 2017.05.
15 15:45:14 +
08'00'

0g

0g

ROTARY ENGINEERING FUJAIRAH FZE

2
0g

0g

ENOC PROCESSING COMPANY L.L.C.


DUBAI, UAE

PIPING & INSTRUMENT DIAGRAM


HEAVY NAPHTHA STORAGE TANK

0g 24-A-10107 0001 0g
0g 0001 24-A-10115 GENERAL NOTES
ATTACHMENT-2 0g

0g HEAVY NAPHTHA ROUTING FROM TF-2 TO0g 0g 0g 0g


0g
BERTH 9 / EPPCO
0g
VALVE STATION
P&ID MARKUP 0g

0g

0g

0g
0g 0g

0g 0g

HOLDS

0g
0g
0g 0g 0g
0g 0g 0g
0g 0g

0g 0g 0g
0g 0g
0g
0g 0g

0g 0g

REFERENCE DRAWINGS Digitally signed


Mee

2
Digitally signed by:

Mat
Digitally signed

Kar na
Mathi by: Karthik
DN: CN = Mathi email DN: CN = Karthik by: Meena

Mee
= manivasagan. email = s. DN: CN = Meena
vkarthik@rotarye Digitally signed by: Meena
mathivadhani@rotary C = SG O = DN: CN = Meena C = SG
eng.com.sg C = SG O ng.com.sg C =

hi REL OU = O = REL OU =

thik
SG O = REL OU
= REL OU = ENG Engineering
= ENG Engineering
Date: 2017.05.15 16:
16:24 +08'00' na
Date: 2017.05.15
16:16:37 +08'00'
Date: 2017.05.15
15:47:55 +08'00'
Date: 2017.05.15 15:48:
01 +08'00'

0g 0g

0g 0g

0g

ROTARY ENGINEERING FUJAIRAH FZE

0g
0g ENOC PROCESSING COMPANY L.L.C.

3 DUBAI, UAE

PIPING & INSTRUMENT DIAGRAM


HEAVY NAPHTHA SHIPPING PUMPS

0g 0g 24-A-10115 0001 0g
0g 0001 24-A-10123 GENERAL NOTES
ATTACHMENT-2
0g
HEAVY
0g NAPHTHA ROUTING FROM TF-2 TO
3 BERTH 9 / EPPCO VALVE STATION
P&ID MARKUP

4
0g

REFERENCE DRAWINGS Digitally signed


by: Meena
DN: CN =
Digitally signed Digitally signed
Mee
Digitally signed by: Meena C = SG

Mat Kar
Mathi by: Karthik by: Meena
DN: CN = Mathi email
= manivasagan.
DN: CN = Karthik
email = s.
vkarthik@rotarye
Mee DN: CN = Meena
C = SG O = REL
O = REL OU =
Engineering

na
mathivadhani@rotary OU = Engineering Date: 2017.05.
ng.com.sg C =

hi
eng.com.sg C = SG
O = REL OU = ENG
thik
Date: 2017.05.15 16:
19:29 +08'00'
SG O = REL OU
= ENG
Date: 2017.05.15
16:19:42 +08'00'
na Date: 2017.05.15
15:49:14 +08'00'
15 15:49:20 +
08'00'

0g 0g

ROTARY ENGINEERING FUJAIRAH FZE

ENOC PROCESSING COMPANY L.L.C.


DUBAI, UAE

PIPING & INSTRUMENT DIAGRAM


0g PIGGING STATION
LIGHT NAPHTHA & HEAVY NAPHTHA

0g 24-A-10123 0001 0g
0g 0001 27-A-10199 GENERAL NOTES
ATTACHMENT-2
HEAVY NAPHTHA ROUTING FROM TF-2 TO
BERTH 9 / EPPCO VALVE STATION
5
P&ID MARKUP

HOLDS

4 0g

0g

REFERENCE DRAWINGS

Digitally signed
by: Meena
Digitally signed
by: Meena Mee DN: CN = Meena
C = SG O = REL
Digitally signed by: Digitally signed by:
Mee DN: CN = Meena
C = SG O = REL
OU = Engineering

Mat Mathi
DN: CN = Mathi email
= manivasagan. Karth Karthik
DN: CN = Karthik email OU =
Engineering na Date: 2017.05.15
15:49:56 +08'00'
mathivadhani@rotary
eng.com.sg C = SG
= s.vkarthik@rotaryeng.
com.sg C = SG O = REL
na Date: 2017.05.15

hi ik 15:49:50 +08'00'
OU = ENG
O = REL OU = ENG Date: 2017.05.15 16:20:

0g
Date: 2017.05.15 16: 36 +08'00'
20:25 +08'00'

0g

0g

ROTARY ENGINEERING FUJAIRAH FZE


0g

0g
ENOC PROCESSING COMPANY L.L.C.
DUBAI, UAE
0g

PIPING & INSTRUMENT DIAGRAM


PROCESS BATTERY LIMIT

0g 27-A-10199 0001 0g
27-A-10103 GENERAL NOTES
ATTACHMENT-2
HEAVY NAPHTHA ROUTING FROM TF-2 TO
BERTH 9 / EPPCO VALVE STATION 7
P&ID MARKUP

6 1d
ISSUED FOR CONTRACT
5

REFERENCE DRAWINGS

ENOC PROCESSING COMPANY L.L.C.


DUBAI, UAE

PLANT 27
SOUTH BATTERY LIMIT / BERTH AREA
PIPING & INSTRUMENT DIAGRAM
INTERCONN. PIPING

27-A-10103 2 OF 2 1d
GENERAL NOTES
27-A-10103
ATTACHMENT-2
HEAVY NAPHTHA ROUTING FROM TF-2
TO BERTH 9 / EPPCO VALVE STATION
P&ID MARKUP

8
6
ISSUED FOR CONTRACT

CONSTRUCTION NOTES:-

REFERENCE DRAWINGS

ENOC PROCESSING COMPANY L.L.C.


DUBAI, UAE

PLANT 27
SOUTH BATTERY LIMIT / BERTH AREA
PIPING & INSTRUMENT DIAGRAM
INTERCONN. PIPING

27-A-10103 1 OF 2 11c
ATTACHMENT-2
HEAVY NAPHTHA ROUTING FROM TF-2
TO BERTH 9 / EPPCO VALVE STATION
P&ID MARKUP
9

7
Customer : ROTARY ENGINEERING FUJAIRAH... ATTACHMENT-3 Capacity : 2,000.0 m³/h
Item number : 24G 103A & 24G 103B Head : 95.00 m
Service : Heavy Naphtha Shipping Density / Specific gravity : - / 0.745
Flowserve reference : 921539516 Pump speed : 1,443 rpm
Pump size & type / Stages : 10HDX23A /1
Based on curve no. : 10HDX23-3B-2
Impeller diameter : 584 mm
Date : June 13, 2018
CURVES ARE APPROXIMATE, PUMP IS GUARANTEED FOR ONE SET OF CONDITIONS; CAPACITY, HEAD, AND POWER.

MCSF

1443

Copyright © 2016 Flowserve. All rights reserved. Affinity v2.9.3


ATTACHMENT-4

CODE 1

Naagab
alaji
Ganesh
Digitally signed by: Naagabalaji Ganesh
DN: CN = Naagabalaji Ganesh C = SG O = REL OU = ENGG
Date: 2018.06.23 17:33:02 +08'00'
3
DOCUMENT REVIEW SHEET
Project No.: P01N2993
Project Title: REFINERY EXPANSION – TANKAGE FACILITIES
Client: ENOC PROCESSING COMPANY L.L.C.
Document Review Sheet
Document number
S.No. Document Title Comments by ENOC Clarification/Justification by REL Reply by ENOC
(rev.00) Page Item No. Status
Comments Date Clarification/Justification by REL Date Comments

PUMP HEAD CALCULATION While selecting the pump REF to check the possibility Flow rate of 2000 m3/hr can be achieved only until tank
ESR00550-24-A-CAL-
1 FOR HEAVY NAPHTHA 1 1.0 of achieving rated flow (2000 m3/hr) up to the landing 10-Jul-17 min. liquid level of 3 m due to the hydraulics & net 7-Sep-18