Brick Masonry Footings over
Learn Cement Concrete
Brick Foundation in Cement Mortar 1:8
Learn Concrete Mix of 1:8:16
For The Base System Components Initial Cost Structure
Assuming P
Safe permissible pressure on base) = 175 KN/sqm
DO’S DON’T’S
· Curing of masonry should be done on seven days · Fine sand should not be used in mortar
· Vertical masonry joints should be properly broken · Height of masonry construction should not be more
· Masonry should be stepped after one day’s construction than 1m per day
· Mortar should be used within 30 minutes of adding · Masonry should not be allowed to dry out quickly
water to the mix.
References : IS : 1080 – 1980 Simple Strip Foundation; IS : 1904 – 1973 Shallow Foundations; IS : 1077 : 1986 Bricks;
IS : 2212 : 1962 Brick Work; National Building Code of India : 1983 Part VI : Sector 2; IS 2250 : 1981
Mortars .