Vous êtes sur la page 1sur 5

3/26/2017 www.sefindia.

org :: View topic ­ AISC ­2010 , MBMA­2012 provision/clause

www.sefindia.org
STRUCTURAL ENGINEERING FORUM OF INDIA [SEFI]

  Search

Like 73k Share     Follow @sefindia 3,806 followers

  Subscriptions  Digest Preferences    FAQ    Search    Memberlist    Usergroups   Register  Security Tips  Donate


  Profile    Log in to check your private messages    Log in to website Log in to forum 
Warning: Make sure you scan the downloaded attachment with updated antivirus tools  before opening them. They may contain viruses. 
Use online scanners here and here to upload downloaded attachment to check for safety.

 
AISC ‐2010 , MBMA‐2012 provision/clause
 
 

     www.sefindia.org Forum Index ­> SEFI General Discussion

View previous topic :: View next topic  

Author Message

vrpatil Posted: Thu Feb 25, 2016 8:58 am    Post subject: AISC ­2010 , MBMA­2012 provision/clause
General Sponsor
Dear All, 
 
 
As one of PEB manufacture considered DL+ 0.6WL instead ofDL+WL as there is provision/clause in
  latest code AISC­10 or MBMA­2012. But I amnot seen like that in old code.  As permy view DL+WL
  is one of governing load combination & how we cannot avoid. Pleaseprovide guidelines/views on this
Joined: 13 Dec 2011
Posts: 19 with respect to new revision etc. <o></o> 
   
Regards, 
vrpatil

Back to top    
N. Prabhakar Posted: Thu Feb 25, 2016 12:55 pm    Post subject:
General Sponsor
Dear Er. Patil, 
 
If the PEB structure is being put up in India, please follow Indian Codes IS 800 : 2007 and latest IS
http://www.sefindia.org/forum/viewtopic.php?t=17572 1/5
3/26/2017 www.sefindia.org :: View topic ­ AISC ­2010 , MBMA­2012 provision/clause

801 only, and not any other foreign codes as these are invalid legally.  Apart from this, how anyone
can consider a lower 0.6WL instead of WL?  This has no logic. 
 
With best wishes, 
 
N. Prabhakar 
Chartered Structural Engineer 
Vasai (E)

 
Joined: 25 Apr 2009
Posts: 359
 
Back to top    
vrpatil Posted: Thu Mar 03, 2016 7:54 am    Post subject: AISC ­210 , MBMA­2012 provision/clause
General Sponsor
Dear All,<o></o> 
Further more, I have studied old AISC codes along with new revisions. I found one change
from IBC 2009 / ASCE 7 05 is that wind speeds in IBC 2012 / ASCE 7 10 are now ultimate
values and associated with risk category and have increased about 30%.  That increase is may
  be counter balanced by new load combinations that reduce the wind load factor within the
  ASCE 7 USD/ASD combinations from 1.0 to 0.6 (as well in LRFD 1.6 to 1.0) depending on
Joined: 13 Dec 2011
Posts: 19 the combination.<o></o> 
   
But PEB manufacturer are considering basic wind speed as per IS code IS 875 part 3 – 1987
Basic wind speed such as 39 m/s only & reducing load factor from 1 to 0.6. Hence the
reducing wind pressure /load by 40% which is not proper.  <o></o> 
 
It is required to take care dealing with PEB supplier as far as AISC revised code concerned.
<o></o> 
 
Please provide views on this.<o></o> 
 
Prabhakar Sir thank you for replay & guidance.<o></o> 
 
Regards,<o></o> 
vrpatil
Back to top    
Kumar_Abhishek_Singh Posted: Thu Mar 03, 2016 9:50 am    Post subject:

http://www.sefindia.org/forum/viewtopic.php?t=17572 2/5
3/26/2017 www.sefindia.org :: View topic ­ AISC ­2010 , MBMA­2012 provision/clause
Bronze Sponsor Dear Prabhakar Sir, 
 
Your point is very true, but it will fall on deaf ears. I will tell you why. 
 
PEB manufacturers (I know many of them properly), are scared of the IS800 series codes because
they give very high quantity of steel. Compared to that AISC/ MBMA codes give about 25% reduction
in PEB steel quantity. This can be a major difference between them getting the project or not. 
 
Also, all (yes ALL) PEB industrial sheds designed in India are as per foreign codes,with the
connivance of all Contractors who execute it at site. I tried to raise a voice against this at office but
  then my voice nearly became the difference between me retaining my job or losing it. 
Joined: 18 Nov 2010  
Posts: 540
Location: New Delhi Best, 
Abhishek

Back to top    
N. Prabhakar Posted: Fri Mar 04, 2016 5:33 am    Post subject:
General Sponsor
Dear Er. Patil and Er. Abhishek Singh, 
 
Er. Patil has rightly pointed out the anomaly in mixing clauses of two different codes for the
calculation of design wind loads.  If they follow only one code throughout, the discrepancies in design
wouldn't be much.  This practice of mixing clauses of two different codes in the of design of
structural elements with thin flanges and webs for bending, axial force and shear has been very
much there, to suit one's convenience, by structural designers of PEB structures.   It has been
pointed out earlier also by several Sefians in this discussion forum. Unfortunately, many structural
engineers in India are RC Design based and not fully conversant with various aspects of steel
  design.  As such, many steel designs that are submitted for approval are gladly accepted without any
Joined: 25 Apr 2009
Posts: 359 comment.   
   
With best wishes, 
 
N. Prabhakar 
Chartered Structural Engineer 
Vasai (E)

Back to top    

Display posts from previous:  All Posts   Oldest First   Go

  All times are GMT
   www.sefindia.org Forum Index ­> SEFI General Discussion

http://www.sefindia.org/forum/viewtopic.php?t=17572 3/5
3/26/2017 www.sefindia.org :: View topic ­ AISC ­2010 , MBMA­2012 provision/clause

Page 1 of 1

  Jump to:  SEFI General Discussion   Go
Translation:  Translate topic    Go
You cannot post new topics in this forum
You cannot reply to topics in this forum
  You cannot edit your posts in this forum
  You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum
 
 
© 2003, 2008 SEFINDIA, Indian Domain Registration

Structural Engineering Forum of India
73,057 likes

Like Page Sign Up

3 friends like this

Structural Engineering Forum of India
March 24 at 1:33pm

Taizhou Bridge (work in progress pic)

http://www.sefindia.org/forum/viewtopic.php?t=17572 4/5
3/26/2017 www.sefindia.org :: View topic ­ AISC ­2010 , MBMA­2012 provision/clause

http://www.sefindia.org/forum/viewtopic.php?t=17572 5/5

Vous aimerez peut-être aussi